Investor Day 2012 - Ausenco
Investor Day 2012 - Ausenco
Investor Day 2012 - Ausenco
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Our offering<br />
Minerals<br />
& Metals<br />
Process<br />
Infrastructure<br />
Environment<br />
& Sustainability<br />
Energy<br />
Program<br />
Management<br />
•Precious metals<br />
• Coal<br />
• Iron ore<br />
•Base metals<br />
• Industrial<br />
minerals<br />
• Mineral sands<br />
• Uranium<br />
• Phosphates<br />
• Fertilisers<br />
• Potash<br />
• Ports, marine<br />
• Civil & geotechnical<br />
and offshore<br />
engineering<br />
• Long Pre-feasibility, distance<br />
feasibility • Waste and treatment,<br />
conceptual design gas<br />
services<br />
• Conventional gas<br />
• Non-conventional<br />
slurry and liquid<br />
processing and • Gas conversion<br />
pipelines<br />
storage<br />
• Renewable energy<br />
• Paste and tailings • Mine waste<br />
• Bio fuels<br />
disposal systems management<br />
• Oil and gas<br />
• Materials handling • Environmental and pipelines<br />
•Rail<br />
Front end engineering sustainability<br />
and design service (FEED) • Power generation<br />
• Commercial and<br />
services<br />
and transmission<br />
industrial buildings • Permitting and • Coal gasification<br />
• Pulp and paper<br />
licensing<br />
• Off gas treatment<br />
• Supply chain<br />
• Water resource • Carbon storage<br />
simulations Engineering, and<br />
Procurement, management<br />
Construction Management • Oil sands<br />
(EPCM) and<br />
optimisation<br />
Engineering Procurement • Landfill Construction design and<br />
(EPC) • Oil contracts shale<br />
• Control systems<br />
gas recovery<br />
• Waste water<br />
• Laboratory & field<br />
treatment<br />
services<br />
• Infrastructure<br />
Onsite engineering and operations and maintenance support services<br />
• Program<br />
and project<br />
management<br />
• Procurement<br />
• Logistics<br />
• Construction<br />
management<br />
• Stakeholder<br />
relations<br />
management<br />
• Statutory approvals<br />
management<br />
Evaluate<br />
Innovate<br />
Create<br />
Optimise<br />
<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 4