12.04.2015 Views

Investor Day 2012 - Ausenco

Investor Day 2012 - Ausenco

Investor Day 2012 - Ausenco

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Our offering<br />

Minerals<br />

& Metals<br />

Process<br />

Infrastructure<br />

Environment<br />

& Sustainability<br />

Energy<br />

Program<br />

Management<br />

•Precious metals<br />

• Coal<br />

• Iron ore<br />

•Base metals<br />

• Industrial<br />

minerals<br />

• Mineral sands<br />

• Uranium<br />

• Phosphates<br />

• Fertilisers<br />

• Potash<br />

• Ports, marine<br />

• Civil & geotechnical<br />

and offshore<br />

engineering<br />

• Long Pre-feasibility, distance<br />

feasibility • Waste and treatment,<br />

conceptual design gas<br />

services<br />

• Conventional gas<br />

• Non-conventional<br />

slurry and liquid<br />

processing and • Gas conversion<br />

pipelines<br />

storage<br />

• Renewable energy<br />

• Paste and tailings • Mine waste<br />

• Bio fuels<br />

disposal systems management<br />

• Oil and gas<br />

• Materials handling • Environmental and pipelines<br />

•Rail<br />

Front end engineering sustainability<br />

and design service (FEED) • Power generation<br />

• Commercial and<br />

services<br />

and transmission<br />

industrial buildings • Permitting and • Coal gasification<br />

• Pulp and paper<br />

licensing<br />

• Off gas treatment<br />

• Supply chain<br />

• Water resource • Carbon storage<br />

simulations Engineering, and<br />

Procurement, management<br />

Construction Management • Oil sands<br />

(EPCM) and<br />

optimisation<br />

Engineering Procurement • Landfill Construction design and<br />

(EPC) • Oil contracts shale<br />

• Control systems<br />

gas recovery<br />

• Waste water<br />

• Laboratory & field<br />

treatment<br />

services<br />

• Infrastructure<br />

Onsite engineering and operations and maintenance support services<br />

• Program<br />

and project<br />

management<br />

• Procurement<br />

• Logistics<br />

• Construction<br />

management<br />

• Stakeholder<br />

relations<br />

management<br />

• Statutory approvals<br />

management<br />

Evaluate<br />

Innovate<br />

Create<br />

Optimise<br />

<strong>Investor</strong> <strong>Day</strong> | 1 May <strong>2012</strong> | 4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!