Project phases – extending the project lifecycle offering<br />
Capital Expenditure<br />
Detailed Engineering<br />
Project Management<br />
Construction Management<br />
FEED Engineering<br />
Exploration<br />
Feasibility<br />
Study<br />
Illustrative <strong>Ausenco</strong> revenue share<br />
of total project Installed Capital<br />
Value (ICV)<br />
Time<br />
0.5 to 1% 1 to 1.5% 1.5 to 3.5% 6.5 to 12.5% 2 to 4%<br />
Evaluate<br />
$153.2m<br />
Innovate<br />
$112.2m<br />
Create<br />
$244.2m<br />
Optimise<br />
$38.3m<br />