12.04.2015 Views

Earned Schedule Analysis, A Better Set of Schedule Metrics

Earned Schedule Analysis, A Better Set of Schedule Metrics

Earned Schedule Analysis, A Better Set of Schedule Metrics

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

IPPM<br />

Research Topics<br />

• Determine if SPI(t) is a valid predictor <strong>of</strong> final<br />

duration (ongoing graduate thesis)<br />

• Validate use <strong>of</strong> SPI(t) in EAC formulas<br />

• Determine if earned schedule metrics are better at<br />

portraying schedule performance than traditional<br />

EVM metrics<br />

– Demonstrated on pilot projects<br />

– Need demonstration on broader scope <strong>of</strong> projects<br />

• Compare predicted IEAC(t) durations against<br />

predicted critical path<br />

34

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!