TBM Manufacturer Press Release - Draft.pdf - SCATnow
TBM Manufacturer Press Release - Draft.pdf - SCATnow
TBM Manufacturer Press Release - Draft.pdf - SCATnow
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
STP has issued a Letter of Intent to <strong>TBM</strong> <strong>Manufacturer</strong>, which allows <strong>TBM</strong> <strong>Manufacturer</strong> to<br />
advance the Preliminary Design of the <strong>TBM</strong> until NTP 2 is issued in August, 2011. Following<br />
issuance of NTP 2, STP will execute a <strong>TBM</strong> Supply Contract with <strong>TBM</strong> <strong>Manufacturer</strong>, which<br />
will allow <strong>TBM</strong> <strong>Manufacturer</strong> to commence final design, fabrication and manufacturing of the<br />
<strong>TBM</strong>.<br />
For more information on the Alaskan Way Viaduct and Seawall Replacement Program, visit<br />
www.alaskanwayviaduct.org.<br />
###<br />
WSDOT keeps people, businesses and the economy moving by operating and improving the<br />
state's transportation systems. To learn more about what we're doing, go to<br />
www.wsdot.wa.gov/news for pictures, videos, news and blogs. Real time traffic information is<br />
available at www.wsdot.wa.gov/traffic or by dialing 5-1-1.<br />
To unsubscribe to WSDOT media releases please reply and type REMOVE in the subject line.