Aqua-Coast Engineering Ltd.<br />
PO Box 1367, Station ‘A’ Delta, B.C. V4M 3Y8<br />
Envelope Details<br />
<br />
Building Envelope Details<br />
Wood Frame<br />
Rainscreen<br />
March <strong>2011</strong> <strong>ver</strong>sion
Aqua-Coast Engineering Ltd.<br />
Generic Building Envelope <strong>detail</strong>s<br />
(rainscreen)<br />
March <strong>2011</strong><br />
Wall Base<br />
Flanged Window Head<br />
Flanged Window Sill<br />
Flanged Window Jamb<br />
Through Wall Flashing<br />
Installation<br />
Roof Edge Di<strong>ver</strong>ter Flashing<br />
3D Saddle Flashing<br />
Cladding Outside Corner<br />
Cladding Inside Corner<br />
Sliding Door Threshold<br />
Sliding Door Head<br />
Sliding Door Jamb<br />
Deck/Wall Interface<br />
Wood Swing Door Head<br />
Wood Swing Door Jamb<br />
Wood Swing Door Threshold<br />
Deck Rail Mount<br />
Deck Parapet Rail<br />
Window Installed<br />
Window installation Step 1<br />
Window installation Step 2<br />
Window installation Step 3<br />
Window installation Step 4<br />
Window installation Step 5<br />
Window installation Step 6<br />
Window installation Step 7<br />
Window installation Step 8<br />
Window installation Step 9<br />
Window installation Step 10<br />
Head and Sill Flashings<br />
Through wall flashing<br />
Plumbing Penetration<br />
Electrical Box (flanged)<br />
Electrical Box (non-flanged)<br />
Vent Installation (elevation)<br />
Vent Installation (section)<br />
BE-1<br />
BE-2<br />
BE-3<br />
BE-4<br />
BE-5<br />
BE-6<br />
BE-7<br />
BE-8<br />
BE-9<br />
BE-10<br />
BE-11<br />
BE-12<br />
BE-13<br />
BE-14<br />
BE-15<br />
BE-16<br />
BE-17<br />
BE-18<br />
BE-19<br />
BE-20<br />
BE-21<br />
BE-22<br />
BE-23<br />
BE-24<br />
BE-25<br />
BE-26<br />
BE-27<br />
BE-28<br />
BE-29<br />
BE-30<br />
BE-31<br />
BE-32<br />
BE-33<br />
BE-34<br />
BE-35<br />
BE-36
Roof Wall (section)<br />
Storefront Jamb (concrete)<br />
Storefront Head (concrete)<br />
Storefront Sill (concrete)<br />
Blindform Wall<br />
Foundation wall penetration<br />
Foundation wall penetration<br />
(section<br />
Slip Joint (exposed)<br />
Slip Joint (co<strong>ver</strong>ed)<br />
Bay/wall interface<br />
BE-37<br />
BE-38<br />
BE-39<br />
BE-40<br />
BE-41<br />
BE-42<br />
BE-43<br />
BE-44<br />
BE-45<br />
BE-46
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>
March <strong>2011</strong>