Developing Project Excellence in a Complex World
Developing Project Excellence in a Complex World
Developing Project Excellence in a Complex World
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Project</strong> Management Challenge<br />
All 18 payloads had reserves<br />
• Cost ($ per fiscal year)<br />
• Mass (kg)<br />
• Power (watts)<br />
• Data rate to the spacecraft bus (kilobytes/second)<br />
Overruns would lead to de‐scop<strong>in</strong>g (i.e., <strong>in</strong>struments cut)<br />
Problem:<br />
How would you manage the reserves to <strong>in</strong>crease the<br />
likelihood that all <strong>in</strong>struments would fly on the spacecraft?<br />
http://appel.nasa.gov