24.04.2015 Views

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

Final FONSI and EA for hot cargo pad on Kirtland AFB - Kirtland Air ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

FINDING OF NO SIGNIFICANT IMPACT<br />

FOR THE<br />

ENVIRONMENTAL ASSESSMENT<br />

ADDRESSING CONSTRUCTION, OPERATION, AND<br />

MAINTENANCE OF A HOT CARGO PAD AT<br />

KIRTLAND AIR FORCE BASE, NEW MEXICO<br />

JANUARY 2011


FINAL<br />

ENVIRONMENTAL ASSESSMENT<br />

ADDRESSING CONSTRUCTION, OPERATION, AND<br />

MAINTENANCE OF A HOT CARGO PAD<br />

AT<br />

KIRTLAND AIR FORCE BASE, NEW MEXICO<br />

JANUARY 2011


ACRONYMS AND ABBREVIATIONS<br />

µg/L microgram per liter<br />

µg/m 3 microgram per cubic meter<br />

377 ABW 377th <strong>Air</strong> Base Wing<br />

377 MSG 377th Missi<strong>on</strong> Support Group<br />

AAFES Army <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Exchange<br />

Service<br />

ACHP Advisory Council <strong>on</strong> Historic<br />

Preservati<strong>on</strong><br />

ACM Asbestos-c<strong>on</strong>taining material<br />

AEHD Albuquerque Envir<strong>on</strong>mental Health<br />

Department<br />

<strong>AFB</strong> <strong>Air</strong> Force Base<br />

AFH <strong>Air</strong> Force H<str<strong>on</strong>g>and</str<strong>on</strong>g>book<br />

AFI <strong>Air</strong> Force Instructi<strong>on</strong><br />

AFMC <strong>Air</strong> Force Materiel Comm<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

AFMAN <strong>Air</strong> Force Manual<br />

AFPAM <strong>Air</strong> Force Pamphlet<br />

AFPD <strong>Air</strong> Force Policy Directive<br />

AFOSH <strong>Air</strong> Force Occupati<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Envir<strong>on</strong>mental Safety, Fire<br />

Protecti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Health<br />

AICUZ <strong>Air</strong> Installati<strong>on</strong> Compatible Use<br />

Z<strong>on</strong>e<br />

AMRGI Albuquerque-Mid Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e<br />

Intrastate<br />

APE area of potential effect<br />

APZ Accident Potential Z<strong>on</strong>e<br />

AQCB <strong>Air</strong> Quality C<strong>on</strong>trol Board<br />

AQCR <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong><br />

AQD <strong>Air</strong> Quality Divisi<strong>on</strong><br />

ARMS Archaeological Records<br />

Management Secti<strong>on</strong><br />

ARPA Archaeological Resource Protecti<strong>on</strong><br />

Act<br />

ASR Alkali-silica reactivity<br />

AT/FP Anti-terrorism <str<strong>on</strong>g>for</str<strong>on</strong>g>ce protecti<strong>on</strong><br />

BASH Bird/Wildlife <strong>Air</strong>craft Strike Hazard<br />

BAT Best Available Technology<br />

bgs below ground surface<br />

BMP best management practice<br />

BTU British Thermal Unit<br />

CAA Clean <strong>Air</strong> Act<br />

C<str<strong>on</strong>g>EA</str<strong>on</strong>g>NC Civil Engineer Compliance Branch<br />

CEQ Council <strong>on</strong> Envir<strong>on</strong>mental Quality<br />

CERCLA<br />

CFR<br />

CH 4<br />

CO<br />

CO 2<br />

CO 2 e<br />

CWA<br />

CZMA<br />

dBA<br />

DCE<br />

DDESB<br />

DERP<br />

DFP<br />

DNL<br />

DOD<br />

DOE<br />

DOPAA<br />

<str<strong>on</strong>g>EA</str<strong>on</strong>g><br />

EISA<br />

EO<br />

EPCRA<br />

ERP<br />

ES<br />

ESA<br />

ESP<br />

FAA<br />

FEMA<br />

FICON<br />

FOD<br />

<str<strong>on</strong>g>FONSI</str<strong>on</strong>g><br />

FPPA<br />

GHG<br />

GWP<br />

HAP<br />

HMMS<br />

Comprehensive Envir<strong>on</strong>mental<br />

Resp<strong>on</strong>se, Compensati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Liability Act<br />

Code of Federal Regulati<strong>on</strong>s<br />

methane<br />

carb<strong>on</strong> m<strong>on</strong>oxide<br />

carb<strong>on</strong> dioxide<br />

CO 2 equivalent<br />

Clean Water Act<br />

Coastal Z<strong>on</strong>e Management Act<br />

A-weighted decibel<br />

1,1-dichloroethene<br />

Department of Defense Explosives<br />

Safety Board<br />

Defense Envir<strong>on</strong>mental Restorati<strong>on</strong><br />

Program<br />

Defensive Fighting Positi<strong>on</strong><br />

day-night average sound level<br />

Department of Defense<br />

U.S. Department of Energy<br />

Descripti<strong>on</strong> of Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Alternatives<br />

Envir<strong>on</strong>mental Assessment<br />

Energy Independence <str<strong>on</strong>g>and</str<strong>on</strong>g> Security<br />

Act<br />

Executive Order<br />

Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Community Right to Know Act<br />

Envir<strong>on</strong>mental Restorati<strong>on</strong> Program<br />

exposed site<br />

Endangered Species Act<br />

explosives site plan<br />

Federal Aviati<strong>on</strong> Administrati<strong>on</strong><br />

Federal Emergency Management<br />

Agency<br />

Federal Interagency Committee <strong>on</strong><br />

Noise<br />

Foreign object damage<br />

Finding of No Significant Impact<br />

Farml<str<strong>on</strong>g>and</str<strong>on</strong>g> Protecti<strong>on</strong> Policy Act<br />

greenhouse gas<br />

global warming potential<br />

hazardous air pollutant<br />

Hazardous Materials Management<br />

System<br />

c<strong>on</strong>tinued <strong>on</strong> inside of back cover


c<strong>on</strong>tinued from inside of fr<strong>on</strong>t cover<br />

HSWA Hazardous <str<strong>on</strong>g>and</str<strong>on</strong>g> Solid Waste<br />

Amendments<br />

HUD U.S. Department of Housing <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Urban Development<br />

IB Inhabited Building<br />

IICEP Interagency <str<strong>on</strong>g>and</str<strong>on</strong>g> Intergovernmental<br />

Coordinati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> Envir<strong>on</strong>mental<br />

Planning<br />

IL Intraline<br />

JD jurisdicti<strong>on</strong>al determinati<strong>on</strong><br />

LA Laboratory of Anthropology<br />

LBP lead-based paint<br />

LTM L<strong>on</strong>g Term M<strong>on</strong>itoring<br />

MBTA Migratory Bird Treaty Act<br />

MC Muniti<strong>on</strong>s C<strong>on</strong>stituent<br />

MCL Maximum C<strong>on</strong>taminant Level<br />

MCLG Maximum C<strong>on</strong>taminant Level Goal<br />

MEC Muniti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> Explosives of<br />

C<strong>on</strong>cern<br />

mg/m 3 milligrams per cubic meter<br />

MGD milli<strong>on</strong> gall<strong>on</strong>s per day<br />

MMRP Military Muniti<strong>on</strong>s Resp<strong>on</strong>se<br />

Program<br />

MOU Memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um of Underst<str<strong>on</strong>g>and</str<strong>on</strong>g>ing<br />

MS4 Municipal Separate Storm Sewer<br />

System<br />

MSA Metropolitan Statistical Area<br />

MVA milli<strong>on</strong>-volt amperes<br />

MW m<strong>on</strong>itoring well<br />

NAAQS Nati<strong>on</strong>al Ambient <strong>Air</strong> Quality<br />

St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards<br />

NEPA Nati<strong>on</strong>al Envir<strong>on</strong>mental Policy Act<br />

NHPA Nati<strong>on</strong>al Historic Preservati<strong>on</strong> Act<br />

NMAC New Mexico Administrative Code<br />

NMDGF New Mexico Department of Game<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Fish<br />

NMED New Mexico Envir<strong>on</strong>ment<br />

Department<br />

NO 2 nitrogen dioxide<br />

N 2 O nitrous oxide<br />

NO x nitrogen oxides<br />

NOA Notice of Availability<br />

NOI Notice of Intent<br />

NPDES Nati<strong>on</strong>al Pollutant Discharge<br />

Eliminati<strong>on</strong> System<br />

NRCS Natural Resources C<strong>on</strong>servati<strong>on</strong><br />

Service<br />

NRHP Nati<strong>on</strong>al Register of Historic Places<br />

O 3<br />

ODS<br />

OSH<br />

OSHA<br />

Pb<br />

PCB<br />

percent g<br />

PES<br />

PM 2.5<br />

PM 10<br />

PPA<br />

PPE<br />

ppm<br />

PSD<br />

PTR<br />

QD<br />

RCRA<br />

RFI<br />

SARA<br />

SDWA<br />

SHPO<br />

SIP<br />

SO 2<br />

SPCC<br />

SUA<br />

SWPPP<br />

TCE<br />

TMDL<br />

TNW<br />

tpy<br />

TSCA<br />

UFC<br />

USACE<br />

USAF<br />

USEPA<br />

USFWS<br />

U.S.C.<br />

VOC<br />

oz<strong>on</strong>e<br />

oz<strong>on</strong>e-depleting substance<br />

occupati<strong>on</strong>al safety <str<strong>on</strong>g>and</str<strong>on</strong>g> health<br />

Occupati<strong>on</strong>al Safety <str<strong>on</strong>g>and</str<strong>on</strong>g> Health<br />

Administrati<strong>on</strong><br />

lead<br />

polychlorinated biphenyl<br />

percentage of the <str<strong>on</strong>g>for</str<strong>on</strong>g>ce of gravity<br />

Potential Explosive Site<br />

particulate matter equal to or less<br />

than 2.5 micr<strong>on</strong>s in diameter<br />

particulate matter equal to or less<br />

than 10 micr<strong>on</strong>s in diameter<br />

Polluti<strong>on</strong> Preventi<strong>on</strong> Act<br />

pers<strong>on</strong>al protective equipment<br />

parts per milli<strong>on</strong><br />

Preventi<strong>on</strong> of Significant<br />

Deteriorati<strong>on</strong><br />

public traffic route<br />

quantity-distance<br />

Resource C<strong>on</strong>servati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Recovery Act<br />

Resource C<strong>on</strong>servati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Recovery Act Facility Investigati<strong>on</strong><br />

Superfund Amendments <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Reauthorizati<strong>on</strong> Act<br />

Safe Drinking Water Act<br />

State Historic Preservati<strong>on</strong> Officer<br />

State Implementati<strong>on</strong> Plan<br />

sulfur dioxide<br />

Spill Preventi<strong>on</strong>, C<strong>on</strong>trol, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Countermeasures<br />

Special Use <strong>Air</strong>space<br />

Storm Water Polluti<strong>on</strong> Preventi<strong>on</strong><br />

Plan<br />

trichloroethylene<br />

Total Maximum Daily Load<br />

Traditi<strong>on</strong>al Navigable Water<br />

t<strong>on</strong>s per year<br />

Toxic Substance C<strong>on</strong>trol Act<br />

Unified Facilities Criteria<br />

U.S. Army Corps of Engineers<br />

U.S. <strong>Air</strong> Force<br />

U.S. Envir<strong>on</strong>mental Protecti<strong>on</strong><br />

Agency<br />

U.S. Fish <str<strong>on</strong>g>and</str<strong>on</strong>g> Wildlife Service<br />

United States Code<br />

volatile organic compound


FINAL<br />

ENVIRONMENTAL ASSESSMENT<br />

ADDRESSING CONSTRUCTION, OPERATION, AND<br />

MAINTENANCE OF A HOT CARGO PAD<br />

AT<br />

KIRTLAND AIR FORCE BASE, NEW MEXICO<br />

377th <strong>Air</strong> Base Wing<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, New Mexico<br />

JANUARY 2011


COVER SHEET<br />

FINAL ENVIRONMENTAL ASSESSMENT<br />

ADDRESSING CONSTRUCTION, OPERATION, AND MAINTENANCE OF A HOT CARGO PAD<br />

AT KIRTLAND AIR FORCE BASE, NEW MEXICO<br />

Proposed Acti<strong>on</strong>: The 377th <strong>Air</strong> Base Wing (377 ABW) proposes to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a<br />

<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base (<strong>AFB</strong>).<br />

Report Designati<strong>on</strong>: <str<strong>on</strong>g>Final</str<strong>on</strong>g> Envir<strong>on</strong>mental Assessment (<str<strong>on</strong>g>EA</str<strong>on</strong>g>)<br />

Resp<strong>on</strong>sible Agency: U.S. <strong>Air</strong> Force (USAF), 377 ABW, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Affected Locati<strong>on</strong>: Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, New Mexico<br />

Abstract: Under the Proposed Acti<strong>on</strong>, the 377 ABW proposes to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> to ensure reliable support <str<strong>on</strong>g>and</str<strong>on</strong>g> backup <str<strong>on</strong>g>for</str<strong>on</strong>g> the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5).<br />

Other comp<strong>on</strong>ents of the Proposed Acti<strong>on</strong> include c<strong>on</strong>structi<strong>on</strong> of a new taxiway to the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>; replacement of the deteriorating taxiway to Pad 5; additi<strong>on</strong> of new <str<strong>on</strong>g>and</str<strong>on</strong>g> relocati<strong>on</strong> of existing<br />

anti-ram barriers, defensive fighting positi<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel shelters surrounding the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5; additi<strong>on</strong> of new lighting at the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5; <str<strong>on</strong>g>and</str<strong>on</strong>g> removal of existing<br />

lighting at Pad 5. The analysis in this <str<strong>on</strong>g>EA</str<strong>on</strong>g> c<strong>on</strong>siders the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the No Acti<strong>on</strong> Alternative.<br />

Four alternatives to the Proposed Acti<strong>on</strong> were c<strong>on</strong>sidered, but eliminated from detailed analysis due to<br />

infeasibility.<br />

For additi<strong>on</strong>al in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> <strong>on</strong> this <str<strong>on</strong>g>EA</str<strong>on</strong>g> c<strong>on</strong>tact Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> NEPA Program Manager by mail at<br />

377 MSG/C<str<strong>on</strong>g>EA</str<strong>on</strong>g>NQ, 2050 Wyoming Boulevard SE, Suite 125, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, NM 87117-5270,<br />

or by email at nepa@kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g>.af.mil.


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

EXECUTIVE SUMMARY<br />

Introducti<strong>on</strong><br />

This Envir<strong>on</strong>mental Assessment (<str<strong>on</strong>g>EA</str<strong>on</strong>g>) has been prepared <str<strong>on</strong>g>for</str<strong>on</strong>g> the 377th <strong>Air</strong> Base Wing (377 ABW) at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base (<strong>AFB</strong>), New Mexico, to identify <str<strong>on</strong>g>and</str<strong>on</strong>g> assess the potential envir<strong>on</strong>mental impacts<br />

associated with c<strong>on</strong>structing, operating, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintaining a new <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

Purpose <str<strong>on</strong>g>and</str<strong>on</strong>g> Need<br />

The purpose of the Proposed Acti<strong>on</strong> is to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a new <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, as well as<br />

related comp<strong>on</strong>ents such as a taxiway, security measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> lighting, at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> to ensure reliable<br />

support <str<strong>on</strong>g>and</str<strong>on</strong>g> backup <str<strong>on</strong>g>for</str<strong>on</strong>g> the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5).<br />

Pad 5 is the <strong>on</strong>ly <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> with a sufficient surrounding clear z<strong>on</strong>e to accommodate <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> (i.e., weap<strong>on</strong>s, ammuniti<strong>on</strong>, explosives, <str<strong>on</strong>g>and</str<strong>on</strong>g> other hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g>). However, Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its<br />

taxiway are in poor c<strong>on</strong>diti<strong>on</strong> due to cracking, spalling, <str<strong>on</strong>g>and</str<strong>on</strong>g> failing of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>’s Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement c<strong>on</strong>crete<br />

caused by alkali-silica reactivity (ASR), <str<strong>on</strong>g>and</str<strong>on</strong>g> disintegrati<strong>on</strong> of the taxiway’s asphalt due to age. The<br />

deficient c<strong>on</strong>diti<strong>on</strong> of Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its taxiway have the potential to jeopardize aircraft safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> delay or<br />

abort critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s due to <str<strong>on</strong>g>for</str<strong>on</strong>g>eign object damage (FOD) <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft tire-cut potential. In<br />

additi<strong>on</strong>, the existing lighting at Pad 5 is not sufficient <str<strong>on</strong>g>and</str<strong>on</strong>g> further jeopardizes aircraft safety. During the<br />

past 5 years, approximately $1 milli<strong>on</strong> has been spent <strong>on</strong> repairs to the <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> taxiway, but a stable state<br />

of repair is difficult due to its c<strong>on</strong>tinual use <str<strong>on</strong>g>and</str<strong>on</strong>g> repairs are <strong>on</strong>going. Hot <str<strong>on</strong>g>cargo</str<strong>on</strong>g> is c<strong>on</strong>tinuously flown in<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> out of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, a <str<strong>on</strong>g>pad</str<strong>on</strong>g> capable of h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> must be missi<strong>on</strong>-ready at all<br />

times. The need <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong> is to increase the reliability, safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> capacity of the<br />

available <str<strong>on</strong>g>pad</str<strong>on</strong>g>s able to accommodate <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> to ensure that this critical missi<strong>on</strong> can be fulfilled.<br />

Descripti<strong>on</strong> of Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Alternatives<br />

Proposed Acti<strong>on</strong>. The 377 ABW proposes to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong> in the northwestern porti<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, adjacent to the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5). The<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be a 4.2-acre semi-circular <str<strong>on</strong>g>pad</str<strong>on</strong>g> c<strong>on</strong>sisting of 18-inch-thick Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement<br />

c<strong>on</strong>crete with additives to reduce the effects of ASR. A new 6-inch-thick asphalt taxiway would be<br />

c<strong>on</strong>structed from the existing taxiway to the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> the existing deteriorating taxiway <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Pad 5 would be demolished <str<strong>on</strong>g>and</str<strong>on</strong>g> replaced. Other comp<strong>on</strong>ents of the Proposed Acti<strong>on</strong> would include<br />

c<strong>on</strong>structi<strong>on</strong> of anti-terrorism <str<strong>on</strong>g>for</str<strong>on</strong>g>ce protecti<strong>on</strong> measures (i.e., anti-ram barriers <str<strong>on</strong>g>and</str<strong>on</strong>g> defensive fighting<br />

positi<strong>on</strong>s [DFPs]), new lighting, <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel shelters. Existing anti-ram barriers (i.e., cabling) around<br />

Pad 5 would be relocated <str<strong>on</strong>g>and</str<strong>on</strong>g> new cabling would be added to enclose the existing <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> their taxiways. DFPs would be c<strong>on</strong>structed around the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> to provide additi<strong>on</strong>al<br />

security. One pers<strong>on</strong>nel shelter would be c<strong>on</strong>structed at the southern end of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> to provide<br />

protecti<strong>on</strong> from the elements <str<strong>on</strong>g>for</str<strong>on</strong>g> pers<strong>on</strong>nel. The light poles at Pad 5 would be demolished <str<strong>on</strong>g>and</str<strong>on</strong>g> new mast<br />

light poles would be c<strong>on</strong>structed at both Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> the proposed new <str<strong>on</strong>g>pad</str<strong>on</strong>g>.<br />

The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be used <str<strong>on</strong>g>for</str<strong>on</strong>g> loading <str<strong>on</strong>g>and</str<strong>on</strong>g> unloading weap<strong>on</strong>s, ammuniti<strong>on</strong>, explosives,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> other hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g> of Hazard Classificati<strong>on</strong> 1.1 from various aircraft, including C-130, C-17, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

possibly F-16. The proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be used in c<strong>on</strong>juncti<strong>on</strong> with Pad 5 to ensure the critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

missi<strong>on</strong>s c<strong>on</strong>tinue unimpeded; each <str<strong>on</strong>g>pad</str<strong>on</strong>g> would act as c<strong>on</strong>tingency if the other <str<strong>on</strong>g>pad</str<strong>on</strong>g> is unavailable. The<br />

type <str<strong>on</strong>g>and</str<strong>on</strong>g> quantity of current <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> operati<strong>on</strong>s at the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not change <str<strong>on</strong>g>and</str<strong>on</strong>g> there would be no<br />

increase in the quantity of aircraft utilizing the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s. Activities that would occur at the<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

ES-1


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> include pre- <str<strong>on</strong>g>and</str<strong>on</strong>g> post-flight procedures, <str<strong>on</strong>g>cargo</str<strong>on</strong>g> loading <str<strong>on</strong>g>and</str<strong>on</strong>g> unloading, <str<strong>on</strong>g>and</str<strong>on</strong>g>, if<br />

necessary, emergency aircraft repairs. Regular maintenance at the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would c<strong>on</strong>sist<br />

of FOD sweeps <str<strong>on</strong>g>and</str<strong>on</strong>g> mechanical sweeping, as well as joint resealing <str<strong>on</strong>g>and</str<strong>on</strong>g> replacement, spall repair, <str<strong>on</strong>g>and</str<strong>on</strong>g> restriping.<br />

L<strong>on</strong>g-term maintenance might include repairs such as select slab replacement.<br />

No Acti<strong>on</strong> Alternative. Under the No Acti<strong>on</strong> Alternative, a new <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> associated<br />

infrastructure would not be c<strong>on</strong>structed, upgrades would not be made to existing infrastructure, <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong>ly<br />

Pad 5 would be available <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s. Selecti<strong>on</strong> of this alternative would result in c<strong>on</strong>tinued<br />

deteriorati<strong>on</strong> of Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its taxiway, which would cause FOD <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft tire-cut potential to reach<br />

unacceptable levels, <str<strong>on</strong>g>and</str<strong>on</strong>g> impair nighttime operati<strong>on</strong>s due to poor lighting c<strong>on</strong>diti<strong>on</strong>s. <strong>Air</strong>craft <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

pers<strong>on</strong>nel safety would be jeopardized <str<strong>on</strong>g>and</str<strong>on</strong>g> critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s would be delayed or aborted, which<br />

would adversely affect U.S. <strong>Air</strong> Force (USAF) missi<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> globally.<br />

Alternatives C<strong>on</strong>sidered But Eliminated from Detailed Analysis. Four alternative site locati<strong>on</strong>s to the<br />

Proposed Acti<strong>on</strong>, all in the general vicinity of Pad 5, were c<strong>on</strong>sidered. Alternative Site 1 would require<br />

the removal of the Explosive Holding Area due to overlap with its quantity-distance (QD) arc, <str<strong>on</strong>g>and</str<strong>on</strong>g> would<br />

be within the Clear Z<strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g> Accident Potential Z<strong>on</strong>e (APZ) I <str<strong>on</strong>g>for</str<strong>on</strong>g> Runway 26. Alternative Site 2 would<br />

be primarily within Envir<strong>on</strong>mental Restorati<strong>on</strong> Program Site (ERP) site, WP-26, <str<strong>on</strong>g>and</str<strong>on</strong>g> its QD arc would<br />

overlap with Pennsylvania Avenue, a high-density public traffic route. Alternative Sites 3 <str<strong>on</strong>g>and</str<strong>on</strong>g> 4 would<br />

abut an approximately 90-foot cliff, <str<strong>on</strong>g>and</str<strong>on</strong>g> Alternative Site 4 would also be primarily within the ERP site.<br />

There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, these alternatives were not c<strong>on</strong>sidered feasible <str<strong>on</strong>g>and</str<strong>on</strong>g> were eliminated from detailed analysis.<br />

Summary of Envir<strong>on</strong>mental Impacts<br />

Table ES-1 provides an overview of potential impacts anticipated under the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

No Acti<strong>on</strong> Alternative broken down by resource area. Secti<strong>on</strong> 4 of this <str<strong>on</strong>g>EA</str<strong>on</strong>g> addresses these impacts in<br />

more detail.<br />

Table ES-1. Summary of Envir<strong>on</strong>mental Impacts<br />

Resource Area<br />

L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use<br />

Noise<br />

Visual Resources<br />

Proposed Acti<strong>on</strong><br />

No adverse impacts <strong>on</strong> installati<strong>on</strong> or municipal l<str<strong>on</strong>g>and</str<strong>on</strong>g> use plans <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

policies, or l<str<strong>on</strong>g>and</str<strong>on</strong>g> use viability <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>tinued l<str<strong>on</strong>g>and</str<strong>on</strong>g> occupati<strong>on</strong> are<br />

anticipated. Less than significant adverse impacts <strong>on</strong> the l<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

use compatibility from noise producti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> safety issues<br />

related to proximity to an airport <str<strong>on</strong>g>and</str<strong>on</strong>g> QD arcs are anticipated.<br />

Less-than-significant adverse impacts <strong>on</strong> noise due to<br />

temporary increased noise producti<strong>on</strong> from demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong> activities are anticipated.<br />

Less-than-significant adverse impacts <strong>on</strong> visual resources due<br />

to short-term visibility of wastes <str<strong>on</strong>g>and</str<strong>on</strong>g> supplies during<br />

demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities, <str<strong>on</strong>g>and</str<strong>on</strong>g> negligible alterati<strong>on</strong><br />

of the visual c<strong>on</strong>diti<strong>on</strong>s during operati<strong>on</strong> are anticipated.<br />

No Acti<strong>on</strong><br />

Alternative<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

ES-2


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Resource Area<br />

<strong>Air</strong> Quality<br />

Geology <str<strong>on</strong>g>and</str<strong>on</strong>g> Soils<br />

Water Resources<br />

Biological<br />

Resources<br />

Cultural<br />

Resources<br />

Infrastructure<br />

Proposed Acti<strong>on</strong><br />

Less-than-significant adverse impacts are anticipated during<br />

demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities due to short-term<br />

combusti<strong>on</strong> emissi<strong>on</strong>s from equipment <str<strong>on</strong>g>and</str<strong>on</strong>g> dust emissi<strong>on</strong>s from<br />

ground disturbance, <str<strong>on</strong>g>and</str<strong>on</strong>g> negligible c<strong>on</strong>tributi<strong>on</strong> towards the<br />

New Mexico statewide greenhouse gas inventory. Dust c<strong>on</strong>trol<br />

could reduce overall emissi<strong>on</strong>s.<br />

No significant adverse impacts <strong>on</strong> geological resources or soils<br />

are anticipated. Use of best management practices (BMPs)<br />

could minimize impacts <strong>on</strong> soils due to soil erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

sedimentati<strong>on</strong>.<br />

Less-than-significant adverse impacts <strong>on</strong> groundwater<br />

availability, surface water resources, water quality, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

floodplains due to ground disturbance <str<strong>on</strong>g>and</str<strong>on</strong>g> potential use of<br />

groundwater <str<strong>on</strong>g>for</str<strong>on</strong>g> dust suppressi<strong>on</strong> are anticipated. Use of BMPs<br />

identified in the Nati<strong>on</strong>al Pollutant Discharge Eliminati<strong>on</strong><br />

System permit <str<strong>on</strong>g>and</str<strong>on</strong>g> Storm Water Polluti<strong>on</strong> Preventi<strong>on</strong> Plan<br />

would help minimize impacts due to potential spills <str<strong>on</strong>g>and</str<strong>on</strong>g> soil<br />

erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong> from runoff.<br />

Less-than-significant adverse impacts <strong>on</strong> burrowing owls<br />

(Athene cunicularia) due to potential disturbance of nests<br />

during demoliti<strong>on</strong> or c<strong>on</strong>structi<strong>on</strong> are anticipated. Surveys<br />

prior to demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> flagging of nests or<br />

relocati<strong>on</strong> of owls would minimize the impact. Increased noise<br />

during c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> increased lighting during operati<strong>on</strong> are<br />

anticipated to result in less-than-significant impacts <strong>on</strong> wildlife<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> migrating birds, respectively. No significant adverse<br />

impacts <strong>on</strong> vegetati<strong>on</strong> are anticipated due to the previously<br />

disturbed nature of the site. No wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are within the site.<br />

No cultural resources are present within the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> site; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no adverse impacts are anticipated.<br />

Less-than-significant adverse impacts <strong>on</strong> electrical <str<strong>on</strong>g>and</str<strong>on</strong>g> water<br />

supply systems are anticipated due to short-term increase in<br />

dem<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> possible service interrupti<strong>on</strong> during c<strong>on</strong>structi<strong>on</strong>,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> negligible increases in dem<str<strong>on</strong>g>and</str<strong>on</strong>g> during operati<strong>on</strong>. Short<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

l<strong>on</strong>g-term, less-than-significant adverse impacts <strong>on</strong> storm<br />

water systems are anticipated due to increased soil erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

sedimentati<strong>on</strong> during c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the increase of<br />

impervious surfaces. Temporary, less-than-significant adverse<br />

impacts <strong>on</strong> solid waste management system are anticipated due<br />

to increased dem<str<strong>on</strong>g>and</str<strong>on</strong>g> during demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong>. No<br />

impacts <strong>on</strong> natural gas systems, liquid fuels, central heating <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

cooling systems, sanitary sewer <str<strong>on</strong>g>and</str<strong>on</strong>g> wastewater systems, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

communicati<strong>on</strong>s systems are anticipated.<br />

No Acti<strong>on</strong><br />

Alternative<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

ES-3


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Resource Area<br />

Hazardous<br />

Materials <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Waste<br />

Safety<br />

<strong>Air</strong>craft Safety<br />

Socioec<strong>on</strong>omics<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Envir<strong>on</strong>mental<br />

Justice<br />

Proposed Acti<strong>on</strong><br />

Less-than-significant adverse impacts <strong>on</strong> hazardous materials<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> petroleum products management, hazardous <str<strong>on</strong>g>and</str<strong>on</strong>g> petroleum<br />

wastes, <str<strong>on</strong>g>and</str<strong>on</strong>g> polluti<strong>on</strong> preventi<strong>on</strong> are anticipated. No new<br />

chemicals or toxic substances would be used or stored, but<br />

petroleum products would be used during c<strong>on</strong>structi<strong>on</strong>. The<br />

quantity of hazardous wastes generated would be negligible,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> properly disposed of. Use of BMPs <str<strong>on</strong>g>and</str<strong>on</strong>g> compliance with<br />

the Installati<strong>on</strong> Hazardous Waste Management Plan, Hazardous<br />

Materials Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Resp<strong>on</strong>se Plan, <str<strong>on</strong>g>and</str<strong>on</strong>g> Spill<br />

Preventi<strong>on</strong>, C<strong>on</strong>trol <str<strong>on</strong>g>and</str<strong>on</strong>g> Countermeasure Plan could minimize<br />

impacts. Less-than-significant adverse impacts related to ERP<br />

site WP-26 are anticipated. No adverse impacts related to<br />

asbestos-c<strong>on</strong>taining material, lead-based paint, or<br />

polychlorinated biphenyls are anticipated.<br />

Less-than-significant adverse impacts <strong>on</strong> c<strong>on</strong>tractor safety are<br />

anticipated. Compliance with health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety programs<br />

would minimize impacts. No adverse impacts <strong>on</strong> military<br />

pers<strong>on</strong>nel or the public are anticipated. Less-than-significant<br />

adverse impacts <strong>on</strong> explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> muniti<strong>on</strong>s safety are<br />

anticipated from locati<strong>on</strong> within <str<strong>on</strong>g>and</str<strong>on</strong>g> establishment of QD arcs.<br />

Operati<strong>on</strong> of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> is anticipated to have a<br />

beneficial impact <strong>on</strong> aircraft safety, but this impact would not<br />

be significant. Hot <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s would be safer due to<br />

improved lighting <str<strong>on</strong>g>and</str<strong>on</strong>g> less potential <str<strong>on</strong>g>for</str<strong>on</strong>g> FOD <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft tirecut.<br />

The ability to schedule <str<strong>on</strong>g>and</str<strong>on</strong>g> complete <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s<br />

would also likely improve. Operati<strong>on</strong> of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

would have an inherent low risk level, but this would not be a<br />

significant adverse impact. The probability of an aircraft<br />

mishap during operati<strong>on</strong> is unlikely, <str<strong>on</strong>g>and</str<strong>on</strong>g> adherence to USAF<br />

policy <strong>on</strong> explosives safety, as well as design <str<strong>on</strong>g>and</str<strong>on</strong>g> safety<br />

st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards would also be expected to lessen the probability of an<br />

aircraft mishap.<br />

Less-than-significant adverse impacts <strong>on</strong> populati<strong>on</strong>, housing,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>mental justice are anticipated. Short-term,<br />

beneficial impacts <strong>on</strong> local business, employment, <str<strong>on</strong>g>and</str<strong>on</strong>g> the local<br />

ec<strong>on</strong>omy are anticipated.<br />

No Acti<strong>on</strong><br />

Alternative<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated.<br />

No new impacts<br />

are anticipated,<br />

although aircraft<br />

safety would<br />

c<strong>on</strong>tinue to be<br />

impacted due to<br />

the <strong>on</strong>going<br />

deteriorati<strong>on</strong> of<br />

Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

existing poor<br />

lighting<br />

c<strong>on</strong>diti<strong>on</strong>s.<br />

No new impacts<br />

are anticipated.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

ES-4


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

FINAL ENVIRONMENTAL ASSESSMENT<br />

ADDRESSING CONSTRUCTION, OPERATION, AND MAINTENANCE OF A HOT CARGO PAD<br />

AT KIRTLAND AIR FORCE BASE, NEW MEXICO<br />

TABLE OF CONTENTS<br />

ACRONYMS AND ABBREVIATIONS ................................ INSIDE FRONT AND BACK COVERS<br />

COVER SHEET<br />

EXECUTIVE SUMMARY .................................................................................................................. ES-1<br />

1. PURPOSE AND NEED FOR ACTION ....................................................................................... 1-1<br />

1.1 INTRODUCTION ....................................................................................................................... 1-1<br />

1.2 PURPOSE AND NEED FOR THE PROPOSED ACTION ................................................................. 1-3<br />

1.3 SCOPE OF THE <str<strong>on</strong>g>EA</str<strong>on</strong>g> ................................................................................................................... 1-3<br />

1.3.1 Envir<strong>on</strong>mental Laws, Regulati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> Executive Orders ........................................ 1-3<br />

1.4 INTERAGENCY COORDINATION AND PUBLIC INVOLVEMENT ................................................. 1-4<br />

2. DESCRIPTION OF PROPOSED ACTION AND ALTERNATIVES ...................................... 2-1<br />

2.1 PROPOSED ACTION ................................................................................................................. 2-1<br />

2.1.1 Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong> .................................................................................... 2-3<br />

2.1.2 Operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance ....................................................................................... 2-4<br />

2.2 NO ACTION ALTERNATIVE ..................................................................................................... 2-4<br />

2.3 ALTERNATIVES CONSIDERED BUT ELIMINATED FROM DETAILED ANALYSIS ....................... 2-5<br />

3. AFFECTED ENVIRONMENT .................................................................................................... 3-1<br />

3.1 LAND USE ............................................................................................................................... 3-1<br />

3.1.1 Definiti<strong>on</strong> of the Resource ........................................................................................ 3-1<br />

3.1.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................... 3-1<br />

3.2 NOISE ...................................................................................................................................... 3-5<br />

3.2.1 Definiti<strong>on</strong> of the Resource ........................................................................................ 3-5<br />

3.2.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................... 3-8<br />

3.3 VISUAL RESOURCES ............................................................................................................... 3-8<br />

3.3.1 Definiti<strong>on</strong> of the Resource ........................................................................................ 3-8<br />

3.3.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................... 3-8<br />

3.4 AIR QUALITY ........................................................................................................................ 3-10<br />

3.4.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-10<br />

3.4.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-12<br />

3.5 GEOLOGY AND SOILS ........................................................................................................... 3-14<br />

3.5.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-14<br />

3.5.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-14<br />

3.6 WATER RESOURCES ............................................................................................................. 3-17<br />

3.6.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-17<br />

3.6.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-19<br />

3.7 BIOLOGICAL RESOURCES ..................................................................................................... 3-21<br />

3.7.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-21<br />

3.7.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-22<br />

3.8 CULTURAL RESOURCES ........................................................................................................ 3-27<br />

3.8.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-27<br />

3.8.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-28<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

i


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

TABLE OF CONTENTS (CONTINUED)<br />

3.9 INFRASTRUCTURE ................................................................................................................. 3-30<br />

3.9.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-30<br />

3.9.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-30<br />

3.10 HAZARDOUS MATERIALS AND WASTE................................................................................. 3-32<br />

3.10.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-32<br />

3.10.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-33<br />

3.11 SAFETY ................................................................................................................................. 3-35<br />

3.11.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-35<br />

3.11.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-36<br />

3.12 AIRCRAFT SAFETY ................................................................................................................ 3-37<br />

3.12.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-37<br />

3.12.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-40<br />

3.13 SOCIOECONOMICS AND ENVIRONMENTAL JUSTICE ............................................................. 3-40<br />

3.13.1 Definiti<strong>on</strong> of the Resource ...................................................................................... 3-40<br />

3.13.2 Existing C<strong>on</strong>diti<strong>on</strong>s ................................................................................................. 3-40<br />

4. ENVIRONMENTAL CONSEQUENCES ................................................................................... 4-1<br />

4.1 LAND USE ............................................................................................................................... 4-1<br />

4.1.1 Evaluati<strong>on</strong> Criteria .................................................................................................... 4-1<br />

4.1.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................... 4-1<br />

4.2 NOISE ...................................................................................................................................... 4-3<br />

4.2.1 Evaluati<strong>on</strong> Criteria .................................................................................................... 4-3<br />

4.2.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................... 4-3<br />

4.3 VISUAL RESOURCES ............................................................................................................... 4-4<br />

4.3.1 Evaluati<strong>on</strong> Criteria .................................................................................................... 4-4<br />

4.3.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................... 4-4<br />

4.4 AIR QUALITY .......................................................................................................................... 4-5<br />

4.4.1 Evaluati<strong>on</strong> Criteria .................................................................................................... 4-5<br />

4.4.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................... 4-6<br />

4.5 GEOLOGY AND SOILS ............................................................................................................. 4-8<br />

4.5.1 Evaluati<strong>on</strong> Criteria .................................................................................................... 4-8<br />

4.5.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................... 4-9<br />

4.6 WATER RESOURCES ............................................................................................................... 4-9<br />

4.6.1 Evaluati<strong>on</strong> Criteria .................................................................................................... 4-9<br />

4.6.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................. 4-10<br />

4.7 BIOLOGICAL RESOURCES ..................................................................................................... 4-11<br />

4.7.1 Evaluati<strong>on</strong> Criteria .................................................................................................. 4-11<br />

4.7.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................. 4-12<br />

4.8 CULTURAL RESOURCES ........................................................................................................ 4-13<br />

4.8.1 Evaluati<strong>on</strong> Criteria .................................................................................................. 4-13<br />

4.8.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................. 4-14<br />

4.9 INFRASTRUCTURE ................................................................................................................. 4-14<br />

4.9.1 Evaluati<strong>on</strong> Criteria .................................................................................................. 4-14<br />

4.9.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................. 4-15<br />

4.10 HAZARDOUS MATERIALS AND WASTE................................................................................. 4-17<br />

4.10.1 Evaluati<strong>on</strong> Criteria .................................................................................................. 4-17<br />

4.10.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................. 4-17<br />

4.11 SAFETY ................................................................................................................................. 4-19<br />

4.11.1 Evaluati<strong>on</strong> Criteria .................................................................................................. 4-19<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

ii


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

TABLE OF CONTENTS (CONTINUED)<br />

4.11.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................. 4-19<br />

4.12 AIRCRAFT SAFETY ................................................................................................................ 4-21<br />

4.12.1 Evaluati<strong>on</strong> Criteria .................................................................................................. 4-21<br />

4.12.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................. 4-22<br />

4.13 SOCIOECONOMICS AND ENVIRONMENTAL JUSTICE ............................................................. 4-23<br />

4.13.1 Evaluati<strong>on</strong> Criteria .................................................................................................. 4-23<br />

4.13.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences ................................................................................. 4-24<br />

4.14 CUMULATIVE IMPACTS ......................................................................................................... 4-25<br />

4.14.1 Impact Analysis ....................................................................................................... 4-25<br />

4.14.2 Cumulative Impact Analysis by Resource Area ...................................................... 4-28<br />

4.14.3 Unavoidable Adverse Impacts ................................................................................. 4-30<br />

4.14.4 Compatibility of the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Alternatives with the Objectives of<br />

Federal, Regi<strong>on</strong>al, <str<strong>on</strong>g>and</str<strong>on</strong>g> Local L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Plans, Policies, <str<strong>on</strong>g>and</str<strong>on</strong>g> C<strong>on</strong>trols .................... 4-31<br />

4.14.5 Relati<strong>on</strong>ship Between Short-term Uses <str<strong>on</strong>g>and</str<strong>on</strong>g> L<strong>on</strong>g-term Productivity ..................... 4-31<br />

4.14.6 Irreversible <str<strong>on</strong>g>and</str<strong>on</strong>g> Irretrievable Commitment of Resources ....................................... 4-31<br />

5. LIST OF PREPARERS ................................................................................................................. 5-1<br />

6. REFERENCES ............................................................................................................................... 6-1<br />

APPENDICES<br />

A. Applicable Laws, Regulati<strong>on</strong>s, Policies, <str<strong>on</strong>g>and</str<strong>on</strong>g> Planning Criteria<br />

B. Interagency <str<strong>on</strong>g>and</str<strong>on</strong>g> Intergovernmental Coordinati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> Envir<strong>on</strong>mental Planning (IICEP)<br />

Materials<br />

C. <strong>Air</strong> Quality Supporting Documentati<strong>on</strong><br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

iii


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

FIGURES<br />

1-1. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> Locati<strong>on</strong> Map........................................................................................................... 1-2<br />

2-1. Proposed Hot Cargo Pad Locati<strong>on</strong> Map ......................................................................................... 2-2<br />

2-2. Alternatives Locati<strong>on</strong> Map ............................................................................................................. 2-6<br />

3-1. L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Map <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> .................................................................................................... 3-4<br />

3-2. Noise C<strong>on</strong>tours at Proposed Acti<strong>on</strong> Site ........................................................................................ 3-7<br />

3-3. Current Visual C<strong>on</strong>diti<strong>on</strong>s at the Northern Porti<strong>on</strong> of the Proposed Acti<strong>on</strong> Site. .......................... 3-9<br />

3-4. Current Visual C<strong>on</strong>diti<strong>on</strong>s at the Central Porti<strong>on</strong> of the Proposed Acti<strong>on</strong> Site. ............................. 3-9<br />

3-5. Current Visual C<strong>on</strong>diti<strong>on</strong>s at the Southern Porti<strong>on</strong> of the Proposed Acti<strong>on</strong> Site. ........................ 3-10<br />

3-6. Mapped Soil Units at the Proposed Acti<strong>on</strong> Site ........................................................................... 3-16<br />

3-7. Surface Water, Floodplains, <str<strong>on</strong>g>and</str<strong>on</strong>g> Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>....................................................... 3-20<br />

3-8. Potential Prairie Dog Col<strong>on</strong>ies <str<strong>on</strong>g>and</str<strong>on</strong>g> Burrowing Owl Nest Locati<strong>on</strong>s near the Proposed<br />

Acti<strong>on</strong> Site .................................................................................................................................... 3-26<br />

3-9. Hot Cargo Pad Design Criteria ..................................................................................................... 3-39<br />

4-1. Sample Risk Assessment Matrix .................................................................................................. 4-22<br />

TABLES<br />

ES-1. Summary of Envir<strong>on</strong>mental Impacts ........................................................................................... ES-2<br />

1-1. List of Coordinati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Permits Associated with the Proposed Acti<strong>on</strong> ....................................... 1-4<br />

3-1. Typical Outdoor Noise Levels ........................................................................................................ 3-6<br />

3-2. Predicted Noise Levels <str<strong>on</strong>g>for</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Demoliti<strong>on</strong> Equipment ........................................... 3-8<br />

3-3. Nati<strong>on</strong>al Ambient <strong>Air</strong> Quality St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards ..................................................................................... 3-11<br />

3-4. Local <str<strong>on</strong>g>and</str<strong>on</strong>g> Regi<strong>on</strong>al <strong>Air</strong> Emissi<strong>on</strong>s Inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> 2002 ................................................................ 3-13<br />

3-5. Calendar Year 2008 <strong>Air</strong> Emissi<strong>on</strong>s Inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> ................................................. 3-13<br />

3-6. Soil Properties of the Mapped Soil Type Found at the Proposed Acti<strong>on</strong> Site .............................. 3-15<br />

3-7. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> Vegetati<strong>on</strong> Communities ....................................................................................... 3-23<br />

3-8. Archaeological Sites Identified Near the Proposed Acti<strong>on</strong> Site ................................................... 3-29<br />

3-9. 2000 Populati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> 2008 Populati<strong>on</strong> Estimates ......................................................................... 3-41<br />

3-10. Minority <str<strong>on</strong>g>and</str<strong>on</strong>g> Low-Income Characteristics (2000) ....................................................................... 3-42<br />

4-1. Predicted Noise Levels from Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong> Activities .......................................... 4-3<br />

4-2. C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity de minimis Emissi<strong>on</strong>s Thresholds............................................................................... 4-5<br />

4-3. Estimated <strong>Air</strong> Emissi<strong>on</strong>s Resulting from the Proposed Acti<strong>on</strong> ...................................................... 4-7<br />

4-4. Severity of a Mishap ..................................................................................................................... 4-21<br />

4-5. Present <str<strong>on</strong>g>and</str<strong>on</strong>g> Reas<strong>on</strong>ably Foreseeable Acti<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> .................................................... 4-26<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

iv


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

1.1 Introducti<strong>on</strong><br />

1. Purpose <str<strong>on</strong>g>and</str<strong>on</strong>g> Need <str<strong>on</strong>g>for</str<strong>on</strong>g> Acti<strong>on</strong><br />

This secti<strong>on</strong> describes the purpose <str<strong>on</strong>g>and</str<strong>on</strong>g> need <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base (<strong>AFB</strong>),<br />

provides summaries of the envir<strong>on</strong>mental review process <str<strong>on</strong>g>and</str<strong>on</strong>g> the applicable regulatory requirements, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

presents an overview of the organizati<strong>on</strong> of the document.<br />

Federal agencies are required to c<strong>on</strong>sider the envir<strong>on</strong>mental c<strong>on</strong>sequences of proposed acti<strong>on</strong>s in the<br />

decisi<strong>on</strong>making process under the requirements of the Nati<strong>on</strong>al Envir<strong>on</strong>mental Policy Act (NEPA) of<br />

1969 (42 United States Code [U.S.C.] Secti<strong>on</strong>s 4321 to 4370d) <str<strong>on</strong>g>and</str<strong>on</strong>g> the Council <strong>on</strong> Envir<strong>on</strong>mental<br />

Quality’s (CEQ) implementing regulati<strong>on</strong>s (40 Code of Federal Regulati<strong>on</strong>s [CFR] Parts 1500–1508).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is also required to c<strong>on</strong>sider U.S. <strong>Air</strong> Force (USAF) NEPA-implementing regulati<strong>on</strong><br />

(32 CFR 989), <str<strong>on</strong>g>and</str<strong>on</strong>g> Department of Defense (DOD) Instructi<strong>on</strong> 4715.9, Envir<strong>on</strong>mental Planning Analysis.<br />

This Envir<strong>on</strong>mental Assessment (<str<strong>on</strong>g>EA</str<strong>on</strong>g>) addressing the C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot<br />

Cargo Pad at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> was prepared in accordance with NEPA. This <str<strong>on</strong>g>EA</str<strong>on</strong>g> evaluates the potential<br />

envir<strong>on</strong>mental impacts associated with c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> other related comp<strong>on</strong>ents including c<strong>on</strong>structi<strong>on</strong> of a new taxiway to the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>; replacement of a existing deteriorating taxiway to Pad 5; relocati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> additi<strong>on</strong> of anti-ram<br />

barriers, defensive fighting positi<strong>on</strong>s (DFPs), <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel shelters surrounding the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5; additi<strong>on</strong> of new lighting at the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5; <str<strong>on</strong>g>and</str<strong>on</strong>g> removal of existing<br />

lighting at Pad 5.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is just southeast of Albuquerque, New Mexico (see Figure 1-1), at the foot of the Manzano<br />

Mountains. These mountains define the eastern boundary of an area called East Mesa. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

encompasses approximately 52,000 acres of the East Mesa <str<strong>on</strong>g>and</str<strong>on</strong>g> has an average elevati<strong>on</strong> of 5,400 feet<br />

above mean sea level. L<str<strong>on</strong>g>and</str<strong>on</strong>g> use <str<strong>on</strong>g>for</str<strong>on</strong>g> areas adjacent to the installati<strong>on</strong> includes the Cibola Nati<strong>on</strong>al Forest<br />

to the northeast <str<strong>on</strong>g>and</str<strong>on</strong>g> east, the Isleta Indian Reservati<strong>on</strong> (Isleta Pueblo) <str<strong>on</strong>g>and</str<strong>on</strong>g> Cibola Nati<strong>on</strong>al Forest<br />

(including Manzano Wilderness Area) to the south, <str<strong>on</strong>g>and</str<strong>on</strong>g> residential <str<strong>on</strong>g>and</str<strong>on</strong>g> business areas of the City of<br />

Albuquerque to the west <str<strong>on</strong>g>and</str<strong>on</strong>g> north.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> was established in the late 1930s as a training base <str<strong>on</strong>g>for</str<strong>on</strong>g> the Army <strong>Air</strong> Corps. In 1941,<br />

c<strong>on</strong>structi<strong>on</strong> of permanent barracks, warehouses, <str<strong>on</strong>g>and</str<strong>on</strong>g> a chapel was completed, <str<strong>on</strong>g>and</str<strong>on</strong>g> a single B-18 bomber,<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s first military aircraft, arrived. Troops so<strong>on</strong> followed, <str<strong>on</strong>g>and</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> grew rapidly<br />

with U.S. involvement in World War II. The installati<strong>on</strong> served as a training site <str<strong>on</strong>g>for</str<strong>on</strong>g> air crews <str<strong>on</strong>g>for</str<strong>on</strong>g> many<br />

of the country’s bomber aircraft, including the B-17, B-18, B-24, <str<strong>on</strong>g>and</str<strong>on</strong>g> the B-29. After World War II,<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> shifted from a training facility to a test <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluati<strong>on</strong> facility <str<strong>on</strong>g>for</str<strong>on</strong>g> weap<strong>on</strong>s delivery,<br />

working closely with both Los Alamos Nati<strong>on</strong>al Laboratory <str<strong>on</strong>g>and</str<strong>on</strong>g> S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Nati<strong>on</strong>al Laboratory. In 1971,<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> its adjoining neighbor to the east, S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Army Base, were combined. The two<br />

divisi<strong>on</strong>s of the installati<strong>on</strong> are still referred to as Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> West <str<strong>on</strong>g>and</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> East, respectively. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong> is now operated by the 377th <strong>Air</strong> Base Wing (377 ABW).<br />

The 377 ABW is a unit of the <strong>Air</strong> Force Materiel Comm<str<strong>on</strong>g>and</str<strong>on</strong>g> (AFMC), <str<strong>on</strong>g>and</str<strong>on</strong>g> its prime missi<strong>on</strong>, as the host<br />

unit at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, is to support more than 100 Missi<strong>on</strong> Partners with support pers<strong>on</strong>nel, resources,<br />

equipment, <str<strong>on</strong>g>and</str<strong>on</strong>g> facilities. The installati<strong>on</strong> functi<strong>on</strong>s as a test <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluati<strong>on</strong> center <str<strong>on</strong>g>for</str<strong>on</strong>g> the Space <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Missile Systems Center <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Operati<strong>on</strong>al Test <str<strong>on</strong>g>and</str<strong>on</strong>g> Evaluati<strong>on</strong> Center; <str<strong>on</strong>g>and</str<strong>on</strong>g> it is the headquarters<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> operati<strong>on</strong>al organizati<strong>on</strong>s, such as the <strong>Air</strong> Force Security Police Agency, <strong>Air</strong> Force Inspecti<strong>on</strong><br />

Agency, S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Nati<strong>on</strong>al Laboratories, <str<strong>on</strong>g>and</str<strong>on</strong>g> Albuquerque Service Center <str<strong>on</strong>g>for</str<strong>on</strong>g> the U.S. Department of<br />

Energy (DOE). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> also functi<strong>on</strong>s as a training base <str<strong>on</strong>g>for</str<strong>on</strong>g> the 58th Special Operati<strong>on</strong>s Wing of<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

1-1


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

96<br />

126<br />

Los<br />

Alamos<br />

Rio Arriba<br />

68<br />

76<br />

Taos<br />

Mora<br />

518<br />

McKinley<br />

197<br />

550<br />

S<str<strong>on</strong>g>and</str<strong>on</strong>g>oval<br />

4<br />

B<str<strong>on</strong>g>and</str<strong>on</strong>g>elier<br />

Nati<strong>on</strong>al<br />

M<strong>on</strong>ument<br />

84<br />

Santa Fe<br />

Santa<br />

Fe Santa Fe<br />

Nati<strong>on</strong>al<br />

Forest<br />

Pecos Nati<strong>on</strong>al<br />

Historic<br />

Park San<br />

Miguel<br />

25<br />

14<br />

Cibola<br />

Rio<br />

Rancho<br />

Albuquerque<br />

Indian<br />

Petroglyph State Park<br />

Cibola<br />

Nati<strong>on</strong>al<br />

Forest<br />

41<br />

285<br />

Bernalillo<br />

40<br />

Valencia<br />

New Mexico<br />

Torrance<br />

3<br />

25<br />

60<br />

55<br />

42<br />

Colorado<br />

Colorado<br />

Springs<br />

Pueblo<br />

Socorro<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Installati<strong>on</strong> Boundary<br />

Ariz<strong>on</strong>a<br />

Albuquerque<br />

54<br />

Amarillo<br />

52<br />

0 5 10 20<br />

Miles<br />

Kilometers<br />

0 10 107 20 40<br />

Projecti<strong>on</strong>: Transverse Mercator<br />

State Plane New Mexico Central FIPS 3002 feet<br />

North American Datum of 1983<br />

Sources: ESRI StreetMap USA 2007; Hillshade: U.S. Geological Survey EROS Data Center, 2006<br />

380<br />

Tucs<strong>on</strong><br />

Lincoln Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

New Mexico<br />

Las Cruces<br />

El Paso<br />

Mexico Texas<br />

Lubbock<br />

Figure 1-1. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> Locati<strong>on</strong> Map<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

1-2


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

<strong>Air</strong> Educati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Training Comm<str<strong>on</strong>g>and</str<strong>on</strong>g>’s 19th <strong>Air</strong> Force. The 150th Fighter Group of the New Mexico<br />

<strong>Air</strong> Nati<strong>on</strong>al Guard is also stati<strong>on</strong>ed at the installati<strong>on</strong>. The 377 ABW provides fire protecti<strong>on</strong> (including<br />

crash <str<strong>on</strong>g>and</str<strong>on</strong>g> rescue) <str<strong>on</strong>g>for</str<strong>on</strong>g> Albuquerque Internati<strong>on</strong>al Sunport.<br />

This <str<strong>on</strong>g>EA</str<strong>on</strong>g> is organized into six secti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> appendices. Secti<strong>on</strong> 1 states the purpose, need, scope, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

public involvement ef<str<strong>on</strong>g>for</str<strong>on</strong>g>ts <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong>. Secti<strong>on</strong> 2 c<strong>on</strong>tains a detailed descripti<strong>on</strong> of the<br />

Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the alternatives c<strong>on</strong>sidered. Secti<strong>on</strong> 3 describes the existing c<strong>on</strong>diti<strong>on</strong>s of the<br />

potentially affected envir<strong>on</strong>ment. Secti<strong>on</strong> 4 identifies the envir<strong>on</strong>mental c<strong>on</strong>sequences of implementing<br />

all reas<strong>on</strong>able alternatives, including direct, indirect, <str<strong>on</strong>g>and</str<strong>on</strong>g> cumulative impacts. Secti<strong>on</strong> 5 provides the list<br />

of preparers <str<strong>on</strong>g>for</str<strong>on</strong>g> this <str<strong>on</strong>g>EA</str<strong>on</strong>g>. Secti<strong>on</strong> 6 lists the references used to support the analyses. Publicati<strong>on</strong> of this<br />

<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> will also include a signed Finding of No Significant Impact (<str<strong>on</strong>g>FONSI</str<strong>on</strong>g>) <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong>.<br />

1.2 Purpose <str<strong>on</strong>g>and</str<strong>on</strong>g> Need <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong><br />

The purpose of the Proposed Acti<strong>on</strong> is to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a new <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, as well as<br />

related comp<strong>on</strong>ents such as a taxiway, security measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> lighting, at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> to ensure reliable<br />

support <str<strong>on</strong>g>and</str<strong>on</strong>g> backup <str<strong>on</strong>g>for</str<strong>on</strong>g> the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5).<br />

Pad 5 is the <strong>on</strong>ly <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> with a sufficient surrounding clear z<strong>on</strong>e to accommodate <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> (i.e., weap<strong>on</strong>s, ammuniti<strong>on</strong>, explosives, <str<strong>on</strong>g>and</str<strong>on</strong>g> other hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g>). However, Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its<br />

taxiway are in poor c<strong>on</strong>diti<strong>on</strong> due to cracking, spalling, <str<strong>on</strong>g>and</str<strong>on</strong>g> failing of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>’s Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement c<strong>on</strong>crete<br />

caused by alkali-silica reactivity (ASR), <str<strong>on</strong>g>and</str<strong>on</strong>g> disintegrati<strong>on</strong> of the taxiway’s asphalt due to age. The<br />

deficient c<strong>on</strong>diti<strong>on</strong> of Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its taxiway have the potential to jeopardize aircraft safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> delay or<br />

abort critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s due to <str<strong>on</strong>g>for</str<strong>on</strong>g>eign object damage (FOD) <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft tire-cut potential. In<br />

additi<strong>on</strong>, the existing lighting at Pad 5 is not sufficient <str<strong>on</strong>g>and</str<strong>on</strong>g> further jeopardizes aircraft safety. During the<br />

past 5 years, approximately $1 milli<strong>on</strong> has been spent <strong>on</strong> repairs to the <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> taxiway, but a stable state<br />

of repair is difficult due to its c<strong>on</strong>tinual use <str<strong>on</strong>g>and</str<strong>on</strong>g> repairs are <strong>on</strong>going. Hot <str<strong>on</strong>g>cargo</str<strong>on</strong>g> is c<strong>on</strong>tinuously flown in<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> out of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, a <str<strong>on</strong>g>pad</str<strong>on</strong>g> capable of h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> must be missi<strong>on</strong>-ready at all<br />

times. The need <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong> is to increase the reliability, safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> capacity of the<br />

available <str<strong>on</strong>g>pad</str<strong>on</strong>g>s able to accommodate <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> to ensure that this critical missi<strong>on</strong> can be fulfilled.<br />

1.3 Scope of the <str<strong>on</strong>g>EA</str<strong>on</strong>g><br />

Scope c<strong>on</strong>sists of the range of acti<strong>on</strong>s, alternatives, <str<strong>on</strong>g>and</str<strong>on</strong>g> impacts to be c<strong>on</strong>sidered. The scope of the<br />

Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the range of alternatives c<strong>on</strong>sidered are presented in detail in Secti<strong>on</strong> 2. In<br />

accordance with CEQ regulati<strong>on</strong>s implementing NEPA (40 CFR 1502.14), the No Acti<strong>on</strong> Alternative is<br />

analyzed to provide the baseline against which the envir<strong>on</strong>mental impacts of implementing the range of<br />

alternatives addressed can be compared. This <str<strong>on</strong>g>EA</str<strong>on</strong>g> identifies appropriate mitigati<strong>on</strong> measures <str<strong>on</strong>g>and</str<strong>on</strong>g> best<br />

management practices (BMPs) that are not already included in the Proposed Acti<strong>on</strong> or alternatives to<br />

avoid, minimize, reduce, or compensate <str<strong>on</strong>g>for</str<strong>on</strong>g> adverse envir<strong>on</strong>mental impacts. This <str<strong>on</strong>g>EA</str<strong>on</strong>g> examines the<br />

envir<strong>on</strong>mental impacts of the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> reas<strong>on</strong>able alternatives <strong>on</strong> the following resource<br />

areas: l<str<strong>on</strong>g>and</str<strong>on</strong>g> use, noise, visual resources, air quality, geology <str<strong>on</strong>g>and</str<strong>on</strong>g> soils, water resources, biological<br />

resources, cultural resources, infrastructure, hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> waste, safety, aircraft safety, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

socioec<strong>on</strong>omics <str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>mental justice. The resource areas that do not apply are eliminated from<br />

further analysis in Secti<strong>on</strong> 3.<br />

1.3.1 Envir<strong>on</strong>mental Laws, Regulati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> Executive Orders<br />

To comply with NEPA (Public Law 91-190, 42 U.S.C. 4321 et seq.), the planning <str<strong>on</strong>g>and</str<strong>on</strong>g> decisi<strong>on</strong>making<br />

process involves a study of other relevant envir<strong>on</strong>mental laws, regulati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> Executive Orders (EOs).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

1-3


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

The NEPA process does not replace procedural or substantive requirements of other envir<strong>on</strong>mental laws;<br />

it addresses them collectively in an analysis, which enables decisi<strong>on</strong>makers to have a comprehensive view<br />

of major envir<strong>on</strong>mental issues <str<strong>on</strong>g>and</str<strong>on</strong>g> requirements associated with the Proposed Acti<strong>on</strong>. According to CEQ<br />

regulati<strong>on</strong>s, the requirements of NEPA must be integrated “with other planning <str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>mental review<br />

procedures required by law or by agency practice so that all such procedures run c<strong>on</strong>currently rather than<br />

c<strong>on</strong>secutively” (40 CFR 11 1500.2).<br />

As required under the CEQ implementing guidance <str<strong>on</strong>g>for</str<strong>on</strong>g> NEPA in 40 CFR 1500.2(c), the <str<strong>on</strong>g>EA</str<strong>on</strong>g> c<strong>on</strong>tains a list<br />

of Federal permits, licenses, <str<strong>on</strong>g>and</str<strong>on</strong>g> coordinati<strong>on</strong> that might be required in implementing the Proposed<br />

Acti<strong>on</strong> or alternatives (see Table 1-1).<br />

Table 1-1. List of Coordinati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Permits Associated with the Proposed Acti<strong>on</strong><br />

Agency<br />

DOD Explosives Safety Board (DDESB)<br />

U.S. Fish <str<strong>on</strong>g>and</str<strong>on</strong>g> Wildlife Service (USFWS)<br />

U.S. Army Corps of Engineers (USACE)<br />

U.S. Envir<strong>on</strong>mental Protecti<strong>on</strong> Agency<br />

(USEPA)<br />

Albuquerque Envir<strong>on</strong>mental Health<br />

Department (AEHD)<br />

New Mexico Historic Preservati<strong>on</strong> Divisi<strong>on</strong><br />

Permit/Approval/C<strong>on</strong>diti<strong>on</strong><br />

DDESB-Approved Explosives Safety Plan<br />

Endangered Species Act (ESA) Secti<strong>on</strong> 7 Coordinati<strong>on</strong><br />

Migratory Bird Treaty Act (MBTA) Coordinati<strong>on</strong><br />

Clean Water Act (CWA) Secti<strong>on</strong> 404 Permit<br />

Nati<strong>on</strong>al Pollutant Discharge Eliminati<strong>on</strong> System<br />

(NPDES) permit<br />

Applicable air quality permits<br />

Title V Permit<br />

Nati<strong>on</strong>al Historic Preservati<strong>on</strong> Act (NHPA) Secti<strong>on</strong> 106<br />

C<strong>on</strong>sultati<strong>on</strong><br />

Appendix A c<strong>on</strong>tains summaries of the envir<strong>on</strong>mental laws, regulati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> EOs that might apply to this<br />

project. Where relevant, these laws will be described in more detail in the appropriate resource areas<br />

presented in Secti<strong>on</strong> 3 of the <str<strong>on</strong>g>EA</str<strong>on</strong>g>. The scope of the analysis of potential envir<strong>on</strong>mental c<strong>on</strong>sequences in<br />

Secti<strong>on</strong> 4 c<strong>on</strong>siders direct, indirect, <str<strong>on</strong>g>and</str<strong>on</strong>g> cumulative impacts.<br />

1.4 Interagency Coordinati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Public Involvement<br />

NEPA requirements help ensure that envir<strong>on</strong>mental in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> is made available to the public during the<br />

decisi<strong>on</strong>making process <str<strong>on</strong>g>and</str<strong>on</strong>g> prior to acti<strong>on</strong>s being taken. The premise of NEPA is that the quality of<br />

Federal decisi<strong>on</strong>s would be enhanced if prop<strong>on</strong>ents provide in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> to the public <str<strong>on</strong>g>and</str<strong>on</strong>g> involve the<br />

public in the planning process. The Intergovernmental Coordinati<strong>on</strong> Act <str<strong>on</strong>g>and</str<strong>on</strong>g> EO 12372,<br />

Intergovernmental Review of Federal Programs, require Federal agencies to cooperate with <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>sider<br />

state <str<strong>on</strong>g>and</str<strong>on</strong>g> local views in implementing a Federal proposal. <strong>Air</strong> Force Instructi<strong>on</strong> (AFI) 32-7060,<br />

Interagency <str<strong>on</strong>g>and</str<strong>on</strong>g> Intergovernmental Coordinati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> Envir<strong>on</strong>mental Planning (IICEP), requires the<br />

USAF to implement an agency coordinati<strong>on</strong> process, which is used <str<strong>on</strong>g>for</str<strong>on</strong>g> the purpose of facilitating <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

receiving agency input <strong>on</strong> the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> implements scoping requirements.<br />

Through the IICEP process, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> made the Draft <str<strong>on</strong>g>EA</str<strong>on</strong>g> available to relevant Federal, state, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

local agencies <str<strong>on</strong>g>and</str<strong>on</strong>g> Tribes to share the analyses associated with the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> alternatives, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

provide them sufficient time to make known their envir<strong>on</strong>mental c<strong>on</strong>cerns specific to the acti<strong>on</strong>. The<br />

IICEP process also provided Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> with the opportunity to coordinate with <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>sider state,<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

1-4


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

local, <str<strong>on</strong>g>and</str<strong>on</strong>g> tribal views in implementing the Federal proposal. IICEP materials related to this <str<strong>on</strong>g>EA</str<strong>on</strong>g> are<br />

included in Appendix B. The agencies <str<strong>on</strong>g>and</str<strong>on</strong>g> Tribes c<strong>on</strong>tacted during the IICEP process are listed in<br />

Appendix B.<br />

A Notice of Availability (NOA) <str<strong>on</strong>g>for</str<strong>on</strong>g> the Draft <str<strong>on</strong>g>EA</str<strong>on</strong>g> was published in The Albuquerque Journal <strong>on</strong><br />

September 5, 2010. The publicati<strong>on</strong> of the NOA initiated the 30-day review period. At the closing of the<br />

public review period, no comments from the general public had been received. Two comments from<br />

government agencies (Albuquerque Envir<strong>on</strong>mental Health Department [AEHD] <strong>Air</strong> Quality Divisi<strong>on</strong><br />

[AQD] <str<strong>on</strong>g>and</str<strong>on</strong>g> New Mexico Department of Game <str<strong>on</strong>g>and</str<strong>on</strong>g> Fish [NMDGF]) were received. These comments<br />

were incorporated into the analysis of potential envir<strong>on</strong>mental impacts per<str<strong>on</strong>g>for</str<strong>on</strong>g>med as part of this <str<strong>on</strong>g>EA</str<strong>on</strong>g>,<br />

where applicable. Appendix B c<strong>on</strong>tains additi<strong>on</strong>al details about the public review period.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

1-5


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

THIS PAGE INTENTIONALLY LEFT BLANK<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

1-6


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

2. Descripti<strong>on</strong> of Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Alternatives<br />

2.1 Proposed Acti<strong>on</strong><br />

This secti<strong>on</strong> describes the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> alternatives c<strong>on</strong>sidered. As discussed in Secti<strong>on</strong> 1.1, the<br />

NEPA process evaluates potential envir<strong>on</strong>mental c<strong>on</strong>sequences associated with a proposed acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>siders alternative courses of acti<strong>on</strong>. Reas<strong>on</strong>able alternatives must satisfy the purpose of <str<strong>on</strong>g>and</str<strong>on</strong>g> need <str<strong>on</strong>g>for</str<strong>on</strong>g> a<br />

proposed acti<strong>on</strong>, as defined in Secti<strong>on</strong> 1.2. In additi<strong>on</strong>, CEQ regulati<strong>on</strong>s also specify the inclusi<strong>on</strong> of a<br />

No Acti<strong>on</strong> Alternative against which potential impacts would be compared. While the No Acti<strong>on</strong><br />

Alternative would not satisfy the purpose of or need <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong>, it is analyzed in detail in<br />

accordance with CEQ regulati<strong>on</strong>s.<br />

The 377 ABW proposes to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> immediately adjacent to the<br />

east of the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5) in the northwestern porti<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> southeast of the<br />

eastern end of Runway 26 of Albuquerque Internati<strong>on</strong>al Sunport (see Figure 2-1). The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be a 4.2-acre semi-circular <str<strong>on</strong>g>pad</str<strong>on</strong>g> c<strong>on</strong>sisting of 18-inch-thick Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement c<strong>on</strong>crete<br />

with additives to reduce the effects of ASR 1 <strong>on</strong> top of base material. A c<strong>on</strong>crete area approximately<br />

200 feet wide would separate the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5. A new 6-inch-thick asphalt taxiway<br />

would be c<strong>on</strong>structed from the existing taxiway (leading to Pad 5) to the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> the existing<br />

deteriorating taxiway <str<strong>on</strong>g>for</str<strong>on</strong>g> Pad 5 would be demolished <str<strong>on</strong>g>and</str<strong>on</strong>g> replaced. C<strong>on</strong>structi<strong>on</strong> would likely begin in<br />

mid-2012 <str<strong>on</strong>g>and</str<strong>on</strong>g> last 12 to 14 m<strong>on</strong>ths.<br />

Other comp<strong>on</strong>ents of the Proposed Acti<strong>on</strong> would include c<strong>on</strong>structi<strong>on</strong> of anti-terrorism <str<strong>on</strong>g>for</str<strong>on</strong>g>ce protecti<strong>on</strong><br />

(AT/FP) measures (i.e., anti-ram barriers <str<strong>on</strong>g>and</str<strong>on</strong>g> DFPs), new lighting, <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel shelters. Existing antiram<br />

barriers (i.e., cabling) around Pad 5 would be relocated <str<strong>on</strong>g>and</str<strong>on</strong>g> new cabling would be added to enclose<br />

the existing <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> their taxiways. DFPs would be c<strong>on</strong>structed around the<br />

proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> to provide additi<strong>on</strong>al security. One pers<strong>on</strong>nel shelter would be c<strong>on</strong>structed at the southern<br />

end of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> to provide protecti<strong>on</strong> from the elements <str<strong>on</strong>g>for</str<strong>on</strong>g> pers<strong>on</strong>nel. The current lighting at<br />

Pad 5 is not adequate; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the light poles at Pad 5 would be demolished <str<strong>on</strong>g>and</str<strong>on</strong>g> new mast light poles<br />

would be c<strong>on</strong>structed at both Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The Proposed Acti<strong>on</strong> would comply with<br />

sustainable design principles m<str<strong>on</strong>g>and</str<strong>on</strong>g>ated by EO 13423 <str<strong>on</strong>g>and</str<strong>on</strong>g> minimum DOD AT/FP st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards.<br />

C<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would require overlap into an area designated as an<br />

Envir<strong>on</strong>mental Restorati<strong>on</strong> Program (ERP) site (WP-26) east of Pad 5. WP-26 c<strong>on</strong>sists of two ab<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>on</strong>ed<br />

sewage lago<strong>on</strong>s that are surrounded by berms <str<strong>on</strong>g>and</str<strong>on</strong>g> a locked fence. WP-26 also includes the golf course<br />

main p<strong>on</strong>d; however, because the p<strong>on</strong>d is approximately 2 miles southeast of the Proposed Acti<strong>on</strong> it will<br />

not be c<strong>on</strong>sidered in this <str<strong>on</strong>g>EA</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> future reference to WP-26 or ERP site refers to the sewage lago<strong>on</strong>s <strong>on</strong>ly.<br />

Each lago<strong>on</strong> covers approximately 7 acres with a total area of 14 acres. WP-26 is c<strong>on</strong>taminated due to its<br />

historical use as settling p<strong>on</strong>ds <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s residential <str<strong>on</strong>g>and</str<strong>on</strong>g> light industrial raw sewage. These<br />

historical lago<strong>on</strong>s were in service <str<strong>on</strong>g>for</str<strong>on</strong>g> a 7-m<strong>on</strong>th period (April through October) each year from 1962 to<br />

1987. WP-26 has metals c<strong>on</strong>taminati<strong>on</strong> in the surface sediment (i.e., sewage sludge), <str<strong>on</strong>g>and</str<strong>on</strong>g> organics<br />

c<strong>on</strong>taminati<strong>on</strong>, including trichloroethylene (TCE), in groundwater (perched aquifer) <str<strong>on</strong>g>and</str<strong>on</strong>g> soil gas. The site<br />

is currently being remediated to excavate surface c<strong>on</strong>taminati<strong>on</strong> c<strong>on</strong>sisting of the top 5 inches of sewage<br />

sludge; these activities are expected to be completed in Spring 2010. Under the Proposed Acti<strong>on</strong>, the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would overlap into the extreme northwestern corner of this site (see Figure 2-1).<br />

1 ASR is a chemical reacti<strong>on</strong> that occurs between alkaline comp<strong>on</strong>ents in Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement <str<strong>on</strong>g>and</str<strong>on</strong>g> silica in aggregates<br />

that causes the absorpti<strong>on</strong> of water, <str<strong>on</strong>g>and</str<strong>on</strong>g> subsequent swelling <str<strong>on</strong>g>and</str<strong>on</strong>g> cracking of affected c<strong>on</strong>crete.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-1


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph Ave<br />

Texas St<br />

Hardin Blvd<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph<br />

West Ordinance Rd<br />

Southgate Ave<br />

TOW ROAD<br />

TARGET RD<br />

Proposed Acti<strong>on</strong><br />

Pad 5<br />

Glow Rd<br />

Pennsylvania St<br />

WP-26<br />

TARGET ROAD A<br />

TARGET ROAD B<br />

Envir<strong>on</strong>mental Restorati<strong>on</strong> Program Site<br />

Existing Hot Cargo Pad<br />

Muniti<strong>on</strong> Haul Rd<br />

Proposed Hot Cargo Pad (Proposed Acti<strong>on</strong>)<br />

Proposed Hot Cargo Pad Taxiway (Proposed Acti<strong>on</strong>)<br />

Existing Hot Cargo Pad QD Arc<br />

Proposed Hot Cargo Pad QD Arc<br />

0 125 250 500<br />

Feet<br />

Meters<br />

0 35 70 140<br />

Projecti<strong>on</strong>: Transverse Mercator<br />

State Plane New Mexico Central FIPS 3002 feet<br />

North American Datum of 1983<br />

1 inch = 1,000 feet<br />

Map Extent<br />

Figure 2-1. Proposed Hot Cargo Pad Locati<strong>on</strong> Map<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-2


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

2.1.1 Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong><br />

Prior to c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, existing aboveground infrastructure, including light<br />

poles, pers<strong>on</strong>nel shelter, storage shed, fencing, utility infrastructure, protective bollards, <str<strong>on</strong>g>and</str<strong>on</strong>g> lago<strong>on</strong><br />

infrastructure (berms <str<strong>on</strong>g>and</str<strong>on</strong>g> fencing), within the footprint of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be removed. Some<br />

infrastructure, including a pers<strong>on</strong>nel shelter <str<strong>on</strong>g>and</str<strong>on</strong>g> DFPs, would be relocated to the perimeter of the<br />

proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>. No lago<strong>on</strong> infrastructure would be rebuilt after c<strong>on</strong>structi<strong>on</strong> is complete. M<strong>on</strong>itoring wells<br />

associated with WP-26 that are within the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> footprint would be modified to make the well<br />

head <str<strong>on</strong>g>and</str<strong>on</strong>g> cover flush with the ground surface. A small asphalt parking <str<strong>on</strong>g>and</str<strong>on</strong>g> storage area <str<strong>on</strong>g>for</str<strong>on</strong>g> mobile<br />

lighting equipment northeast of Pad 5 would be demolished, <str<strong>on</strong>g>and</str<strong>on</strong>g> the equipment would be relocated. The<br />

perimeter road <strong>on</strong> the eastern side of Pad 5 would be demolished. The locati<strong>on</strong> of all underground<br />

utilities would be verified to the extent possible be<str<strong>on</strong>g>for</str<strong>on</strong>g>e commencement of ground disturbing activities.<br />

C<strong>on</strong>structi<strong>on</strong> activities would involve grading of the ground surface, <str<strong>on</strong>g>and</str<strong>on</strong>g> applicati<strong>on</strong> of base material <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

18-inch-thick Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement c<strong>on</strong>crete <str<strong>on</strong>g>pad</str<strong>on</strong>g>. A paved shoulder would be c<strong>on</strong>structed around the<br />

perimeter of the <str<strong>on</strong>g>pad</str<strong>on</strong>g> to protect adjacent areas from jet blast, help mitigate FOD risk, permit equipment<br />

storage, <str<strong>on</strong>g>and</str<strong>on</strong>g> to facilitate drainage. The surface adjacent to the paved shoulder would be graded to<br />

facilitate drainage <str<strong>on</strong>g>and</str<strong>on</strong>g> to prevent storm water from p<strong>on</strong>ding <strong>on</strong> the outside edge of the shoulder. Existing<br />

light poles surrounding Pad 5 would be removed, <str<strong>on</strong>g>and</str<strong>on</strong>g> new mast light poles would be installed around the<br />

perimeter of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5. Additi<strong>on</strong>al DFPs <str<strong>on</strong>g>and</str<strong>on</strong>g> at least <strong>on</strong>e pers<strong>on</strong>nel shelter would be<br />

c<strong>on</strong>structed <strong>on</strong> the perimeter of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>. Some existing anti-ram cabling would be relocated,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> new cabling would be added in order to surround the perimeter of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad<br />

5. Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> replacement of the existing asphalt taxiway (leading to Pad 5) would occur after<br />

c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. Asphalt from the taxiway, small parking <str<strong>on</strong>g>and</str<strong>on</strong>g> storage area,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> perimeter road would be crushed <str<strong>on</strong>g>and</str<strong>on</strong>g> screened if rebar is not present.<br />

Dumpsters would be provided <str<strong>on</strong>g>for</str<strong>on</strong>g> municipal solid waste generated by c<strong>on</strong>structi<strong>on</strong> activity at the project<br />

site. The asphalt waste from demoliti<strong>on</strong> of the taxiway would be transported to the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> recycling or disposal. If necessary, hazardous c<strong>on</strong>structi<strong>on</strong> debris would be transported to the Rio<br />

Rancho L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill, since the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill accepts <strong>on</strong>ly n<strong>on</strong>hazardous demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong><br />

waste. To the extent possible, materials would be diverted from l<str<strong>on</strong>g>and</str<strong>on</strong>g>fills <str<strong>on</strong>g>and</str<strong>on</strong>g> either recycled or reused.<br />

Cardboard wastes would be separated <str<strong>on</strong>g>for</str<strong>on</strong>g> pickup <str<strong>on</strong>g>and</str<strong>on</strong>g> would be recycled as a functi<strong>on</strong> of the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Qualified Recycling Program. Miscellaneous salvageable metals would be transported to the Defense<br />

Reutilizati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Marketing Office <str<strong>on</strong>g>for</str<strong>on</strong>g> recycling or reuse. In additi<strong>on</strong>, clean fill material, ground up<br />

asphalt, <str<strong>on</strong>g>and</str<strong>on</strong>g> broken up cement would be diverted from l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill disposal <str<strong>on</strong>g>and</str<strong>on</strong>g> reused whenever possible.<br />

Equipment such as bulldozers, backhoes, fr<strong>on</strong>t-end loaders, dump trucks, tractor-trailers, c<strong>on</strong>crete mixers,<br />

asphalt vehicles, <str<strong>on</strong>g>and</str<strong>on</strong>g> generators would be required to support the proposed demoliti<strong>on</strong>, site preparati<strong>on</strong>,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities. Sufficient amounts of fuels, hydraulic fluids, oils, <str<strong>on</strong>g>and</str<strong>on</strong>g> lubricants would be<br />

stored <strong>on</strong> site during the project to support c<strong>on</strong>tractor vehicles <str<strong>on</strong>g>and</str<strong>on</strong>g> machinery. No other hazardous<br />

materials would be stored <strong>on</strong> site. All material needs, such as c<strong>on</strong>crete <str<strong>on</strong>g>and</str<strong>on</strong>g> asphalt, would be supplied by<br />

offsite vendors. C<strong>on</strong>structi<strong>on</strong> activities would require small amounts of electricity; however, no natural<br />

gas or steam would be required <str<strong>on</strong>g>for</str<strong>on</strong>g> demoliti<strong>on</strong> or c<strong>on</strong>structi<strong>on</strong>. If a dust nuisance or hazard has the<br />

potential to occur during demoliti<strong>on</strong> or c<strong>on</strong>structi<strong>on</strong>, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would supply water to be used <str<strong>on</strong>g>for</str<strong>on</strong>g> dust<br />

c<strong>on</strong>trol. Water would be applied by water trucks <str<strong>on</strong>g>and</str<strong>on</strong>g> sprayers. Due to the area of l<str<strong>on</strong>g>and</str<strong>on</strong>g> disturbance that<br />

would occur during demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities, the Proposed Acti<strong>on</strong> would require Nati<strong>on</strong>al<br />

Pollutant Discharge Eliminati<strong>on</strong> System (NPDES) permit coverage <str<strong>on</strong>g>and</str<strong>on</strong>g> preparati<strong>on</strong> of a Storm Water<br />

Polluti<strong>on</strong> Preventi<strong>on</strong> Plan (SWPPP), <str<strong>on</strong>g>and</str<strong>on</strong>g> a fugitive dust-c<strong>on</strong>trol c<strong>on</strong>structi<strong>on</strong> permit from the AEHD-<br />

AQD.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-3


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

2.1.2 Operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance<br />

The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be used <str<strong>on</strong>g>for</str<strong>on</strong>g> loading <str<strong>on</strong>g>and</str<strong>on</strong>g> unloading weap<strong>on</strong>s, ammuniti<strong>on</strong>, explosives,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> other hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g> of Hazard Classificati<strong>on</strong> 1.1 from various aircraft, including C-130, C-17, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

possibly F-16. F-16s currently utilize the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5) as part of the 150th Fighter Wing<br />

of the New Mexico <strong>Air</strong> Nati<strong>on</strong>al Guard; however, the F-16s are scheduled to be reassigned in 2010. It is<br />

not known at this time what aircraft, if any, the 150th Fighter Wing might acquire in the future. Some<br />

general (n<strong>on</strong>hazardous) <str<strong>on</strong>g>cargo</str<strong>on</strong>g> might also be included within the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> shipments. Both the proposed<br />

<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5 would be used <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s, but the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would likely not be used<br />

simultaneously. The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be used in c<strong>on</strong>juncti<strong>on</strong> with Pad 5 to ensure the<br />

critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s c<strong>on</strong>tinue unimpeded; each <str<strong>on</strong>g>pad</str<strong>on</strong>g> would act as c<strong>on</strong>tingency if the other <str<strong>on</strong>g>pad</str<strong>on</strong>g> is<br />

unavailable. The type <str<strong>on</strong>g>and</str<strong>on</strong>g> quantity of current <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> operati<strong>on</strong>s at the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not change <str<strong>on</strong>g>and</str<strong>on</strong>g> there<br />

would be no increase in the quantity of aircraft utilizing the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s. Activities that would occur at<br />

the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> include pre- <str<strong>on</strong>g>and</str<strong>on</strong>g> post-flight procedures, <str<strong>on</strong>g>cargo</str<strong>on</strong>g> loading <str<strong>on</strong>g>and</str<strong>on</strong>g> unloading, <str<strong>on</strong>g>and</str<strong>on</strong>g>, if<br />

necessary, emergency aircraft repairs.<br />

Hot <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s are required at facilities where the existing apr<strong>on</strong>s cannot be used <str<strong>on</strong>g>for</str<strong>on</strong>g> h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling hazardous<br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> safety reas<strong>on</strong>s due to insufficient quantity-distance (QD) clear z<strong>on</strong>es, which are protecti<strong>on</strong><br />

requirements from potential explosive sites (PESs) to various types of exposed sites (ESs). Under the<br />

Proposed Acti<strong>on</strong>, the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be the PES <str<strong>on</strong>g>and</str<strong>on</strong>g> inhabited buildings <str<strong>on</strong>g>and</str<strong>on</strong>g> public traffic<br />

routes (PTRs) (i.e., public highways or railroad lines) would be ESs. <strong>Air</strong> Force Manual (AFMAN)<br />

91-201, Explosives Safety St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards, describes the inhabited building (IB) distance, the minimum<br />

distance required to protect n<strong>on</strong>explosives-related facilities <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel. IB distance applies to several<br />

different types of ESs, including buildings <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong>s involving people not related to<br />

muniti<strong>on</strong>s/explosives work, joint DOD/n<strong>on</strong>-DOD use runways, <str<strong>on</strong>g>and</str<strong>on</strong>g> high-density PTRs. The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be in the northwestern porti<strong>on</strong> of the installati<strong>on</strong>, but south of the main cant<strong>on</strong>ment areas<br />

at a locati<strong>on</strong> in which the immediately surrounding area is generally undeveloped. However, there are<br />

several potential ESs in the general vicinity of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, including the east end of<br />

Runway 26 approximately 0.65 miles northwest, the Zia Park housing area approximately 0.6 miles north,<br />

the <strong>Air</strong>borne Laser Hanger approximately 0.3 miles west, <str<strong>on</strong>g>and</str<strong>on</strong>g> Pennsylvania Avenue approximately<br />

0.25 miles east. The Proposed Acti<strong>on</strong> would require an IB separati<strong>on</strong> distance of 1,250 feet<br />

(approximately 0.24 miles); there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, n<strong>on</strong>e of the ESs listed above would be within the IB distance. In<br />

additi<strong>on</strong>, a no-fly z<strong>on</strong>e would be en<str<strong>on</strong>g>for</str<strong>on</strong>g>ced over the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>.<br />

Routine maintenance, c<strong>on</strong>ducted weekly <str<strong>on</strong>g>and</str<strong>on</strong>g> prior to missi<strong>on</strong>s, at the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would<br />

c<strong>on</strong>sist of FOD sweeps <str<strong>on</strong>g>and</str<strong>on</strong>g> mechanical sweeping. Additi<strong>on</strong>al regular maintenance activities would<br />

include joint resealing <str<strong>on</strong>g>and</str<strong>on</strong>g> replacement, spall repair, <str<strong>on</strong>g>and</str<strong>on</strong>g> restriping. L<strong>on</strong>g-term maintenance, possibly<br />

10 to 20 years after c<strong>on</strong>structi<strong>on</strong>, might include repairs such as select slab replacement.<br />

2.2 No Acti<strong>on</strong> Alternative<br />

CEQ regulati<strong>on</strong>s specify the inclusi<strong>on</strong> of the No Acti<strong>on</strong> Alternative in the alternatives analysis (40 CFR<br />

1502.14). The No Acti<strong>on</strong> Alternative is analyzed to provide a baseline of the existing c<strong>on</strong>diti<strong>on</strong>s against<br />

which the potential envir<strong>on</strong>mental <str<strong>on</strong>g>and</str<strong>on</strong>g> socioec<strong>on</strong>omic impacts of the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> alternative<br />

acti<strong>on</strong>s can be compared. Under the No Acti<strong>on</strong> Alternative, the 377 ABW would not c<strong>on</strong>struct a <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, taxiway, anti-ram cabling, DFPs, lighting, <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel shelters. Selecti<strong>on</strong> of this alternative<br />

would result in c<strong>on</strong>tinued deteriorati<strong>on</strong> of the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5) <str<strong>on</strong>g>and</str<strong>on</strong>g> its taxiway due to ASR<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> age, respectively. The c<strong>on</strong>diti<strong>on</strong> of Pad 5 was rated SERIOUS (just above FAILED) <str<strong>on</strong>g>and</str<strong>on</strong>g> assigned a<br />

C-17 FOD rating of POOR (lowest possible rating) in a 2004 <strong>Air</strong> Force Civil Engineering Support<br />

Agency airfield c<strong>on</strong>diti<strong>on</strong> survey. Without implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>, the pavement<br />

c<strong>on</strong>diti<strong>on</strong>s at Pad 5 would c<strong>on</strong>tinue to deteriorate causing FOD <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft tire-cut potential to be at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-4


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

unacceptable levels, <str<strong>on</strong>g>and</str<strong>on</strong>g> nighttime operati<strong>on</strong>s would be impaired due to poor lighting c<strong>on</strong>diti<strong>on</strong>s. <strong>Air</strong>craft<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel safety would be jeopardized <str<strong>on</strong>g>and</str<strong>on</strong>g> critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s would be delayed or aborted,<br />

which would adversely affect USAF missi<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> globally.<br />

2.3 Alternatives C<strong>on</strong>sidered but Eliminated from Detailed Analysis<br />

Due to logistics <str<strong>on</strong>g>and</str<strong>on</strong>g> safety <str<strong>on</strong>g>and</str<strong>on</strong>g> security issues associated with operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g>, several criteria were evaluated when developing potential alternative locati<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. These criteria include the following:<br />

<br />

<br />

<br />

Locati<strong>on</strong> adjacent to existing runway, taxiway, <str<strong>on</strong>g>and</str<strong>on</strong>g> roads<br />

Sufficient QD separati<strong>on</strong> distance of 1,250 feet<br />

Minimal impact <strong>on</strong> QD separati<strong>on</strong> distances <str<strong>on</strong>g>and</str<strong>on</strong>g> other critical facilities.<br />

In additi<strong>on</strong> to the Proposed Acti<strong>on</strong>, the 377 ABW c<strong>on</strong>sidered four alternative locati<strong>on</strong>s <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

near existing Pad 5 due to the proximity to existing Runway 8-26, <str<strong>on</strong>g>and</str<strong>on</strong>g> the associated taxiways <str<strong>on</strong>g>and</str<strong>on</strong>g> road<br />

network (see Figure 2-2). L<str<strong>on</strong>g>and</str<strong>on</strong>g> uses are restricted within QD separati<strong>on</strong> distances. In order to minimize<br />

the size of restricted l<str<strong>on</strong>g>and</str<strong>on</strong>g> use areas, the QD separati<strong>on</strong> distances <str<strong>on</strong>g>for</str<strong>on</strong>g> Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

would be combined as much as possible, <str<strong>on</strong>g>and</str<strong>on</strong>g> the alternative locati<strong>on</strong>s would all surround Pad 5 to take<br />

advantage of its existing QD separati<strong>on</strong> distance.<br />

Alternative Site 1. Alternative Site 1 is north-northeast of Pad 5, <str<strong>on</strong>g>and</str<strong>on</strong>g> adjacent to the east of the existing<br />

taxiway. The Explosive Holding Area (also called Safe Haven or Safe Refuge) is immediately adjacent to<br />

the northeast of this alternative. The Explosive Holding Area is a porti<strong>on</strong> of an infrequently traveled<br />

paved road that is used to park vehicles transporting <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> while they are cleared to enter or exit the<br />

installati<strong>on</strong>. The Explosive Holding Area is at its current locati<strong>on</strong> because it is close to Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

Truman Gate, <str<strong>on</strong>g>and</str<strong>on</strong>g> away from inhabited crowded areas of the installati<strong>on</strong>. This alternative would require<br />

the disc<strong>on</strong>tinuati<strong>on</strong> of use of the Explosive Holding Area due to the required intraline (IL) separati<strong>on</strong><br />

distance. IL distance provides the minimum amount of protecti<strong>on</strong> to activities associated with explosives.<br />

Alternative Site 1 is also within the Clear Z<strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g> Accident Potential Z<strong>on</strong>e (APZ) I <str<strong>on</strong>g>for</str<strong>on</strong>g> Runway 26 of<br />

Albuquerque Internati<strong>on</strong>al Sunport. Explosive facilities are prohibited from Clear Z<strong>on</strong>es <str<strong>on</strong>g>and</str<strong>on</strong>g> APZs I <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

II. Alternative Site 1 is not feasible because it would require the removal of the Explosive Holding Area,<br />

an integral security comp<strong>on</strong>ent that can not be sited elsewhere <strong>on</strong> the installati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> explosive facilities<br />

are prohibited from the proposed locati<strong>on</strong> of Alternative Site 1. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, this alternative has been<br />

eliminated from further detailed analysis.<br />

Alternative Site 2. Alternative Site 2 is east of Pad 5, adjacent to the east of the locati<strong>on</strong> of the Proposed<br />

Acti<strong>on</strong>. Pennsylvania Avenue, which is categorized as a high-density PTR, is approximately 850 feet<br />

west of this alternative. A high-density PTR would require IBD protecti<strong>on</strong> of 1,250 feet of separati<strong>on</strong><br />

from the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. In additi<strong>on</strong>, a majority of this alternative would be within an ERP site (WP-26),<br />

which could present additi<strong>on</strong>al c<strong>on</strong>structi<strong>on</strong> costs due to infrastructure removal <str<strong>on</strong>g>and</str<strong>on</strong>g> remediati<strong>on</strong> activities.<br />

Alternative Site 2 is not feasible because it would not comply with the required separati<strong>on</strong> distance <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

high-density PTRs; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, it has been eliminated from further detailed analysis.<br />

Alternative Site 3. Alternative Site 3 is southeast of Pad 5, <str<strong>on</strong>g>and</str<strong>on</strong>g> would abut an approximately 90-foot cliff<br />

(into Tijeras Arroyo) to the south. This alternative’s locati<strong>on</strong> next to a cliff presents dangerous c<strong>on</strong>diti<strong>on</strong>s<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, including movement of pers<strong>on</strong>nel; maneuvering of aircraft<br />

within the <str<strong>on</strong>g>pad</str<strong>on</strong>g>; <str<strong>on</strong>g>and</str<strong>on</strong>g> placement of access roads, lighting, drainage, AT/FP measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> associated<br />

equipment <strong>on</strong> the perimeter of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The presence of the cliff presents additi<strong>on</strong>al security issues <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

pers<strong>on</strong>nel guarding the aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> due to potentially obstructed sightlines to locati<strong>on</strong>s below the<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-5


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

M Ave<br />

Perimeter Cir<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph Ave<br />

Texas St<br />

Hardin Blvd<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph<br />

Alternative Site 1<br />

Southgate Ave<br />

Proposed Acti<strong>on</strong><br />

TOW ROAD<br />

West Ordinance<br />

TARGET RD<br />

Rd<br />

Pad 5<br />

Glow Rd<br />

Alternative Site 2<br />

Pennsylvania St<br />

Alternative Site 3<br />

Alternative Site 4<br />

Existing Hot Cargo Pad<br />

TARGET ROAD B<br />

Proposed Hot Cargo Pad (Proposed Acti<strong>on</strong>)<br />

Alternatives C<strong>on</strong>sidered <str<strong>on</strong>g>and</str<strong>on</strong>g> Eliminated<br />

Muniti<strong>on</strong> Haul Rd<br />

Existing Hot Cargo Pad QD Arc<br />

Proposed Hot Cargo Pad QD Arc<br />

QD Arcs <str<strong>on</strong>g>for</str<strong>on</strong>g> Alternatives C<strong>on</strong>sidered <str<strong>on</strong>g>and</str<strong>on</strong>g> Eliminated<br />

0 125 250 500<br />

Feet<br />

Meters<br />

0 35 70 140<br />

Projecti<strong>on</strong>: Transverse Mercator<br />

State Plane New Mexico Central FIPS 3002 feet<br />

North American Datum of 1983<br />

1 inch = 1,012 feet<br />

Map Extent<br />

Figure 2-2. Alternatives Locati<strong>on</strong> Map<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-6


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

cliff. Alternative Site 3 has been eliminated from further detailed analysis due to safety <str<strong>on</strong>g>and</str<strong>on</strong>g> security<br />

issues that would make this alternative infeasible.<br />

Alternative Site 4. Alternative Site 4 is southeast of Pad 5, <str<strong>on</strong>g>and</str<strong>on</strong>g> would abut an approximately 90-foot cliff<br />

(into Tijeras Arroyo) to the south. This alternative’s locati<strong>on</strong> next to a cliff presents dangerous c<strong>on</strong>diti<strong>on</strong>s<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, including movement of pers<strong>on</strong>nel; maneuvering of aircraft<br />

within the <str<strong>on</strong>g>pad</str<strong>on</strong>g>; <str<strong>on</strong>g>and</str<strong>on</strong>g> placement of access roads, lighting, drainage, AT/FP measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> associated<br />

equipment <strong>on</strong> the perimeter of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The presence of the cliff presents additi<strong>on</strong>al security issues <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

pers<strong>on</strong>nel guarding the aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> due to potentially obstructed sightlines to locati<strong>on</strong>s below the<br />

cliff. In additi<strong>on</strong>, this alternative would be entirely within an ERP site (WP-26), which could present<br />

additi<strong>on</strong>al c<strong>on</strong>structi<strong>on</strong> costs due to infrastructure removal <str<strong>on</strong>g>and</str<strong>on</strong>g> remediati<strong>on</strong> activities. Alternative Site 4<br />

has been eliminated from further detailed analysis due to safety <str<strong>on</strong>g>and</str<strong>on</strong>g> security issues that would make this<br />

alternative infeasible.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-7


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

THIS PAGE INTENTIONALLY LEFT BLANK<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

2-8


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

3. Affected Envir<strong>on</strong>ment<br />

All potentially relevant resource areas were initially c<strong>on</strong>sidered <str<strong>on</strong>g>for</str<strong>on</strong>g> analysis in this <str<strong>on</strong>g>EA</str<strong>on</strong>g>. In compliance<br />

with NEPA <str<strong>on</strong>g>and</str<strong>on</strong>g> CEQ guidelines, the discussi<strong>on</strong>s of the affected envir<strong>on</strong>ment in Secti<strong>on</strong> 3 <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

envir<strong>on</strong>mental c<strong>on</strong>sequences in Secti<strong>on</strong> 4 focus <strong>on</strong>ly <strong>on</strong> those resource areas c<strong>on</strong>sidered potentially<br />

subject to impacts <str<strong>on</strong>g>and</str<strong>on</strong>g> with potentially significant envir<strong>on</strong>mental issues. This secti<strong>on</strong> includes l<str<strong>on</strong>g>and</str<strong>on</strong>g> use,<br />

noise, visual resources, air quality, geology <str<strong>on</strong>g>and</str<strong>on</strong>g> soils, water resources, biological resources, cultural<br />

resources, infrastructure, hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> waste, safety, aircraft safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> socioec<strong>on</strong>omics <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

envir<strong>on</strong>mental justice. <strong>Air</strong>space management is not addressed in this <str<strong>on</strong>g>EA</str<strong>on</strong>g> because the Proposed Acti<strong>on</strong><br />

does not involve any resources that would impact airspace.<br />

3.1 L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use<br />

3.1.1 Definiti<strong>on</strong> of the Resource<br />

The term “l<str<strong>on</strong>g>and</str<strong>on</strong>g> use” refers to real property classificati<strong>on</strong>s that indicate either natural c<strong>on</strong>diti<strong>on</strong>s or the<br />

types of human activity occurring <strong>on</strong> a parcel. In many cases, l<str<strong>on</strong>g>and</str<strong>on</strong>g> use descripti<strong>on</strong>s are codified in local<br />

z<strong>on</strong>ing laws. However, there is no nati<strong>on</strong>ally recognized c<strong>on</strong>venti<strong>on</strong> or uni<str<strong>on</strong>g>for</str<strong>on</strong>g>m terminology <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

describing l<str<strong>on</strong>g>and</str<strong>on</strong>g> use categories. As a result, the meanings of various l<str<strong>on</strong>g>and</str<strong>on</strong>g> use descripti<strong>on</strong>s, “labels,” <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

definiti<strong>on</strong>s vary am<strong>on</strong>g jurisdicti<strong>on</strong>s. Natural c<strong>on</strong>diti<strong>on</strong>s of property can be described or categorized as<br />

unimproved, undeveloped, c<strong>on</strong>servati<strong>on</strong> or preservati<strong>on</strong> area, <str<strong>on</strong>g>and</str<strong>on</strong>g> natural or scenic area. There is a wide<br />

variety of l<str<strong>on</strong>g>and</str<strong>on</strong>g> use categories resulting from human activity. Descriptive terms often used include<br />

residential, commercial, industrial, agricultural, instituti<strong>on</strong>al, <str<strong>on</strong>g>and</str<strong>on</strong>g> recreati<strong>on</strong>al. USAF installati<strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use<br />

planning comm<strong>on</strong>ly utilizes 12 general l<str<strong>on</strong>g>and</str<strong>on</strong>g> use classificati<strong>on</strong>s: <strong>Air</strong>field, <strong>Air</strong>craft Operati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Maintenance, Industrial, Administrative, Community (Commercial), Community (Service), Medical,<br />

Housing (Accompanied), Housing (Unaccompanied), Outdoor Recreati<strong>on</strong>, Open Space, <str<strong>on</strong>g>and</str<strong>on</strong>g> Water<br />

(USAF 1998a).<br />

Two main objectives of l<str<strong>on</strong>g>and</str<strong>on</strong>g> use planning are to ensure orderly growth <str<strong>on</strong>g>and</str<strong>on</strong>g> compatible uses am<strong>on</strong>g<br />

adjacent property parcels or areas. According to <strong>Air</strong> Force Pamphlet (AFPAM) 32-1010, L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use<br />

Planning, l<str<strong>on</strong>g>and</str<strong>on</strong>g> use planning is the arrangement of compatible activities in the most functi<strong>on</strong>ally effective<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> efficient manner (USAF 1998a). Compatibility am<strong>on</strong>g l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses fosters the societal interest of<br />

obtaining the highest <str<strong>on</strong>g>and</str<strong>on</strong>g> best uses of real property. Tools supporting l<str<strong>on</strong>g>and</str<strong>on</strong>g> use planning within the<br />

civilian sector include written master plans/management plans, policies, <str<strong>on</strong>g>and</str<strong>on</strong>g> z<strong>on</strong>ing regulati<strong>on</strong>s. The<br />

USAF comprehensive planning process also utilizes functi<strong>on</strong>al analysis, which determines the degree of<br />

c<strong>on</strong>nectivity am<strong>on</strong>g installati<strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses as well as between installati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> off-installati<strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses, to<br />

determine future installati<strong>on</strong> development <str<strong>on</strong>g>and</str<strong>on</strong>g> facilities planning.<br />

In appropriate cases, the locati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> extent of a proposed acti<strong>on</strong> needs to be evaluated <str<strong>on</strong>g>for</str<strong>on</strong>g> its potential<br />

effects <strong>on</strong> a project site <str<strong>on</strong>g>and</str<strong>on</strong>g> adjacent l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses. The <str<strong>on</strong>g>for</str<strong>on</strong>g>emost factor affecting a proposed acti<strong>on</strong> in terms<br />

of l<str<strong>on</strong>g>and</str<strong>on</strong>g> use is its compliance with any applicable l<str<strong>on</strong>g>and</str<strong>on</strong>g> use or z<strong>on</strong>ing regulati<strong>on</strong>s. Other relevant factors<br />

include matters such as existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> use at the project site, the types of l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses <strong>on</strong> adjacent properties<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> their proximity to a proposed acti<strong>on</strong>, the durati<strong>on</strong> of a proposed activity, <str<strong>on</strong>g>and</str<strong>on</strong>g> its “permanence.”<br />

3.1.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Surrounding L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is in the southwestern porti<strong>on</strong> of Bernalillo County, New Mexico<br />

(see Figure 1-1). It is bounded <strong>on</strong> the west <str<strong>on</strong>g>and</str<strong>on</strong>g> north by the City of Albuquerque, <strong>on</strong> the northeast <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

east by the Cibola Nati<strong>on</strong>al Forest, <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong> the south by Isleta Indian Reservati<strong>on</strong> (Isleta Pueblo). The<br />

Albuquerque Internati<strong>on</strong>al Sunport, the City of Albuquerque’s airport, abuts Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s northwestern<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-1


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

border <str<strong>on</strong>g>and</str<strong>on</strong>g> allows uses of its runways by the installati<strong>on</strong>. The regi<strong>on</strong> surrounding Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> includes<br />

both urban <str<strong>on</strong>g>and</str<strong>on</strong>g> rural areas, including generalized l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses of residential (single <str<strong>on</strong>g>and</str<strong>on</strong>g> multi-family),<br />

parks/recreati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> pockets of industrial/manufacturing, public/instituti<strong>on</strong>al (hospital <str<strong>on</strong>g>and</str<strong>on</strong>g> medical<br />

center), <str<strong>on</strong>g>and</str<strong>on</strong>g> commercial (retail <str<strong>on</strong>g>and</str<strong>on</strong>g> service) to the north; open space (vacant/other <str<strong>on</strong>g>and</str<strong>on</strong>g> low-impact<br />

recreati<strong>on</strong>) to the northeast <str<strong>on</strong>g>and</str<strong>on</strong>g> east; open space <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g>est or vacant l<str<strong>on</strong>g>and</str<strong>on</strong>g> to the south; <str<strong>on</strong>g>and</str<strong>on</strong>g> a mixture of<br />

open space (vacant/other <str<strong>on</strong>g>and</str<strong>on</strong>g> parks/recreati<strong>on</strong>), transportati<strong>on</strong>/utilities, <str<strong>on</strong>g>and</str<strong>on</strong>g> public/instituti<strong>on</strong>al (Zia Rifle<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Pistol Club) to the west (K<strong>AFB</strong> 2002, City of Albuquerque 2008).<br />

Several proposed developments within the City of Albuquerque pose c<strong>on</strong>straints to future development at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, including residential projects <str<strong>on</strong>g>and</str<strong>on</strong>g> improvement/extensi<strong>on</strong> of area roadway corridors. An<br />

approximately 13,000-acre, mixed-use, master-planned community, Mesa del Sol, is proposed at an area<br />

adjacent to the southwestern boundary of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. In order to prevent l<str<strong>on</strong>g>and</str<strong>on</strong>g> use incompatibility<br />

issues <str<strong>on</strong>g>and</str<strong>on</strong>g> avoid future c<strong>on</strong>flicts from this development <strong>on</strong> the installati<strong>on</strong>’s operati<strong>on</strong>al effectiveness, it<br />

will be separated from Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> by La Semilla, a 2,700-acre, 1-mile-wide nature refuge <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

envir<strong>on</strong>mental educati<strong>on</strong> campus that will be c<strong>on</strong>trolled by the DOE <str<strong>on</strong>g>and</str<strong>on</strong>g> have minimal structures <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

limited l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses (Forest City 2005). A sec<strong>on</strong>d planned mixed-use community, Valle del Sol, is proposed<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> an area within Tijeras Arroyo, southwest of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, in unincorporated Bernalillo County<br />

(K<strong>AFB</strong> 2002). While providing a limitati<strong>on</strong> to installati<strong>on</strong> expansi<strong>on</strong>, the extensi<strong>on</strong> of Eubank Boulevard<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> improvement to the Gibs<strong>on</strong> Boulevard corridor will also improve vehicle access <str<strong>on</strong>g>and</str<strong>on</strong>g> movement <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> employees (K<strong>AFB</strong> 2002).<br />

On-Installati<strong>on</strong> L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> c<strong>on</strong>sists of approximately 52,000 acres, making it the third<br />

largest installati<strong>on</strong> in the AFMC, <str<strong>on</strong>g>and</str<strong>on</strong>g> the sixth largest installati<strong>on</strong> in the USAF (K<strong>AFB</strong> 2002). The<br />

377 ABW is the host organizati<strong>on</strong> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> provides installati<strong>on</strong> operati<strong>on</strong>s support to more<br />

than 100 Missi<strong>on</strong> Partners in more than 2,000 buildings (K<strong>AFB</strong> 2002, K<strong>AFB</strong> 2007, Krieg 2010). The<br />

l<str<strong>on</strong>g>and</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is primarily owned by the USAF, but several other ownerships <str<strong>on</strong>g>and</str<strong>on</strong>g> leases also<br />

apply. The DOE occupies the largest amount of l<str<strong>on</strong>g>and</str<strong>on</strong>g> area of any Missi<strong>on</strong> Partners at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The<br />

DOE owns <str<strong>on</strong>g>and</str<strong>on</strong>g> operates facilities <strong>on</strong> approximately 7,500 acres, primarily in the eastern porti<strong>on</strong> of the<br />

cant<strong>on</strong>ment area, <str<strong>on</strong>g>and</str<strong>on</strong>g> the southwestern <str<strong>on</strong>g>and</str<strong>on</strong>g> northeastern porti<strong>on</strong> of the installati<strong>on</strong>.<br />

The most heavily developed area of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is the cant<strong>on</strong>ment area in the northwestern porti<strong>on</strong> of<br />

the installati<strong>on</strong>. The cant<strong>on</strong>ment area is comm<strong>on</strong>ly referred to in terms of its east or west sides; the west<br />

side is the site of the original Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> while the east side included S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia <str<strong>on</strong>g>and</str<strong>on</strong>g> Manzano Bases.<br />

Recent installati<strong>on</strong> planning <str<strong>on</strong>g>and</str<strong>on</strong>g> infrastructure ef<str<strong>on</strong>g>for</str<strong>on</strong>g>ts have focused <strong>on</strong> unifying the <str<strong>on</strong>g>for</str<strong>on</strong>g>merly segregated<br />

western <str<strong>on</strong>g>and</str<strong>on</strong>g> eastern porti<strong>on</strong>s of the cant<strong>on</strong>ment area into a more unified installati<strong>on</strong> (K<strong>AFB</strong> 2002).<br />

<strong>Air</strong>field operati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft support facilities are c<strong>on</strong>centrated in the airfield complex area, which is in<br />

the western porti<strong>on</strong> of the cant<strong>on</strong>ment area adjacent to <str<strong>on</strong>g>and</str<strong>on</strong>g> surrounding the Albuquerque Internati<strong>on</strong>al<br />

Sunport <str<strong>on</strong>g>and</str<strong>on</strong>g> its runways. Several Missi<strong>on</strong> Partners, including the <strong>Air</strong> Force Research Laboratory, the<br />

New Mexico <strong>Air</strong> Nati<strong>on</strong>al Guard, the Space <str<strong>on</strong>g>and</str<strong>on</strong>g> Missiles Systems Center/Test <str<strong>on</strong>g>and</str<strong>on</strong>g> Evaluati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

58th Special Operati<strong>on</strong>s Wing, are also in this area. In additi<strong>on</strong>, there are two housing areas in the<br />

western cant<strong>on</strong>ment area al<strong>on</strong>g the northern border of the installati<strong>on</strong>. The remaining intensive<br />

development at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, including administrative, housing, medical, recreati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> commercial<br />

services uses, is in the eastern porti<strong>on</strong> of the cant<strong>on</strong>ment area. A majority of the 377 ABW’s buildings<br />

are in this area, as well as the facilities of other major Missi<strong>on</strong> Partners, including S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Nati<strong>on</strong>al<br />

Laboratories, the DOE Albuquerque Office, the <strong>Air</strong> Force Operati<strong>on</strong>al Test <str<strong>on</strong>g>and</str<strong>on</strong>g> Evaluati<strong>on</strong> Center, the<br />

Defense Threat Reducti<strong>on</strong> Agency, <str<strong>on</strong>g>and</str<strong>on</strong>g> the <strong>Air</strong> Force Safety Center. Most military family housing <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

their associated community uses are at the northeastern border of the cant<strong>on</strong>ment area, adjacent to<br />

existing off-installati<strong>on</strong> neighborhoods.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-2


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

The southern <str<strong>on</strong>g>and</str<strong>on</strong>g> western porti<strong>on</strong>s of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, which represent approximately 80 percent of the<br />

installati<strong>on</strong>’s total l<str<strong>on</strong>g>and</str<strong>on</strong>g> area, are largely dedicated to military training <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong>al facilities. Some<br />

facilities in these areas of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> include the Star Fire Optical Range, High Energy Research Test<br />

Facility, <str<strong>on</strong>g>and</str<strong>on</strong>g> the Lovelace Respiratory Research Institute. S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Nati<strong>on</strong>al Laboratories also operates <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

maintains several facilities <strong>on</strong> the installati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> research, testing <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluati<strong>on</strong> of various weap<strong>on</strong>s,<br />

communicati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> energy systems. While most recreati<strong>on</strong>al facilities are in the cant<strong>on</strong>ment area, the<br />

golf course is in the southwestern porti<strong>on</strong> of the installati<strong>on</strong>. No outdoor recreati<strong>on</strong> is permitted in the<br />

eastern porti<strong>on</strong> of the installati<strong>on</strong> (K<strong>AFB</strong> 2007).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has 10 l<str<strong>on</strong>g>and</str<strong>on</strong>g> use designati<strong>on</strong>s: <strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance, <strong>Air</strong>field, Administrati<strong>on</strong><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Research, Community (includes commercial <str<strong>on</strong>g>and</str<strong>on</strong>g> service functi<strong>on</strong>s), Military Family Housing,<br />

Industrial, Medical, Outdoor Recreati<strong>on</strong>, Open Space, <str<strong>on</strong>g>and</str<strong>on</strong>g> Associate-Owned (see Figure 3-1) (K<strong>AFB</strong><br />

2002). The installati<strong>on</strong> is a closed base; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, hunting, trapping, fishing, <str<strong>on</strong>g>and</str<strong>on</strong>g> commercial <str<strong>on</strong>g>for</str<strong>on</strong>g>estry<br />

operati<strong>on</strong>s are prohibited (K<strong>AFB</strong> 2007). In Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> Future L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Plan, presented in the 2002<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, New Mexico General Plan, l<str<strong>on</strong>g>and</str<strong>on</strong>g> use z<strong>on</strong>es have been established to guide the<br />

type <str<strong>on</strong>g>and</str<strong>on</strong>g> locati<strong>on</strong> of development at the installati<strong>on</strong>. Future l<str<strong>on</strong>g>and</str<strong>on</strong>g> use plans include the following general<br />

l<str<strong>on</strong>g>and</str<strong>on</strong>g> use recommendati<strong>on</strong>s:<br />

Exp<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>centrate <strong>Air</strong>field uses al<strong>on</strong>g the flightline. Industrial <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong>craft<br />

Operati<strong>on</strong>s/Maintenance l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses would also be appropriate al<strong>on</strong>g or near the flightline.<br />

<br />

<br />

<br />

<br />

C<strong>on</strong>centrate Administrati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses in the western porti<strong>on</strong> of the cant<strong>on</strong>ment area<br />

(surrounding the <strong>Air</strong> Force Research Laboratory campus) <str<strong>on</strong>g>and</str<strong>on</strong>g> in the eastern porti<strong>on</strong> of the<br />

cant<strong>on</strong>ment area (north of S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Nati<strong>on</strong>al Laboratories <str<strong>on</strong>g>and</str<strong>on</strong>g> DOE).<br />

C<strong>on</strong>centrate Community l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses in the northeastern porti<strong>on</strong> of the cant<strong>on</strong>ment area, adjacent to<br />

Administrati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Research l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses, with the intenti<strong>on</strong> of creating a mixed use “town site” that<br />

would become the functi<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g> symbolic center of the installati<strong>on</strong>.<br />

Privatize existing housing inventory <str<strong>on</strong>g>and</str<strong>on</strong>g> associated improvements with the intenti<strong>on</strong> of removing<br />

west side housing areas <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>solidating military family housing in the eastern porti<strong>on</strong> of the<br />

cant<strong>on</strong>ment area. C<strong>on</strong>solidati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> migrati<strong>on</strong> of the housing areas could be accompanied by the<br />

c<strong>on</strong>solidati<strong>on</strong> of Community uses.<br />

Implement several transportati<strong>on</strong>-related projects, including establishment of a new arterial<br />

between the western <str<strong>on</strong>g>and</str<strong>on</strong>g> eastern porti<strong>on</strong>s of the cant<strong>on</strong>ment area, extensi<strong>on</strong> of Eubank Boulevard<br />

<strong>on</strong>to the installati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> of a new entry gate <strong>on</strong> Eubank Boulevard, to improve<br />

circulati<strong>on</strong> (K<strong>AFB</strong> 2002).<br />

The locati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> is in the northwestern porti<strong>on</strong> of the installati<strong>on</strong> in the eastern<br />

porti<strong>on</strong> of the cant<strong>on</strong>ment area, <str<strong>on</strong>g>and</str<strong>on</strong>g> approximately 0.5 miles southeast of the eastern end of Runway 26 of<br />

the Albuquerque Internati<strong>on</strong>al Sunport (see Figure 2-1). The proposed site c<strong>on</strong>sists of undeveloped l<str<strong>on</strong>g>and</str<strong>on</strong>g>,<br />

c<strong>on</strong>crete <str<strong>on</strong>g>and</str<strong>on</strong>g> asphalt surfaces (shoulders, roadways, <str<strong>on</strong>g>and</str<strong>on</strong>g> small parking lot) associated with the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> a porti<strong>on</strong> of ERP site WP-26, two ab<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>on</strong>ed sewage lago<strong>on</strong>s. The locati<strong>on</strong> of the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> is immediately surrounded by the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5) to the west, ERP<br />

site WP-26 to the east, <str<strong>on</strong>g>and</str<strong>on</strong>g> undeveloped l<str<strong>on</strong>g>and</str<strong>on</strong>g> to the north <str<strong>on</strong>g>and</str<strong>on</strong>g> south. The <strong>Air</strong>borne Laser Hanger is<br />

approximately 0.3 miles west of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The current l<str<strong>on</strong>g>and</str<strong>on</strong>g> use designati<strong>on</strong> of the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> is <strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> Open Space, while the future l<str<strong>on</strong>g>and</str<strong>on</strong>g> use<br />

designati<strong>on</strong> is <strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-3


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph Ave<br />

Hardin Blvd<br />

Texas St<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph<br />

Southgate Ave<br />

TOW ROAD<br />

West Ordinance<br />

TARGET RD<br />

Proposed Acti<strong>on</strong><br />

Rd<br />

Pad 5<br />

Glow Rd<br />

Pennsylvania St<br />

TARGET ROAD A<br />

2002 L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use<br />

Administrati<strong>on</strong>/Research<br />

<strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance<br />

<strong>Air</strong>field<br />

Industrial<br />

TARGET ROAD B<br />

Open Space<br />

Existing Hot Cargo Pad<br />

Muniti<strong>on</strong> Haul Rd<br />

Proposed Hot Cargo Pad (Proposed Acti<strong>on</strong>)<br />

Proposed Hot Cargo Pad Taxiway (Proposed Acti<strong>on</strong>)<br />

Existing Hot Cargo Pad QD Arc<br />

Proposed Hot Cargo Pad QD Arc<br />

0 125 250 500<br />

Feet<br />

Meters<br />

0 35 70 140<br />

Projecti<strong>on</strong>: Transverse Mercator<br />

State Plane New Mexico Central FIPS 3002 feet<br />

North American Datum of 1983<br />

1 inch = 1,000 feet<br />

Map Extent<br />

Figure 3-1. L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Map <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-4


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be within the day-night average sound level (DNL) 65 to 69 A-<br />

weighted decibel (dBA) noise z<strong>on</strong>e, <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed taxiway would be within the DNL 70 to 74 dBA noise<br />

z<strong>on</strong>e from aircraft operati<strong>on</strong>s at the Albuquerque Internati<strong>on</strong>al Sunport (see Figure 3-2).<br />

The Proposed Acti<strong>on</strong> would also be within the 1,250-foot-radius QD arc of the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

(Pad 5). As discussed in Secti<strong>on</strong> 2.1.2, QD arcs are an area surrounding a potential explosi<strong>on</strong> site that is<br />

defined by explosive limits of the potential explosi<strong>on</strong> site.<br />

The northern porti<strong>on</strong> of the proposed taxiway would be within the Runway 26 Clear Z<strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g> APZ I at<br />

the Albuquerque Internati<strong>on</strong>al Sunport (K<strong>AFB</strong> 2002). Existing USAF facilities <str<strong>on</strong>g>and</str<strong>on</strong>g> l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses may<br />

c<strong>on</strong>tinue in the Clear Z<strong>on</strong>e; however, replacement facilities should be sited outside the Clear Z<strong>on</strong>e.<br />

Generally, people intensive uses <str<strong>on</strong>g>and</str<strong>on</strong>g> uses not required <str<strong>on</strong>g>for</str<strong>on</strong>g> flight operati<strong>on</strong>s should not be sited within the<br />

Clear Z<strong>on</strong>e. Acceptable l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses within the Clear Z<strong>on</strong>e are: agriculture; livestock grazing (excluding<br />

feed <str<strong>on</strong>g>and</str<strong>on</strong>g> dairy lots); permanent open space; existing or new water areas provided they do not create bird<br />

strike hazards; rights-of-way <str<strong>on</strong>g>for</str<strong>on</strong>g> single track railroads <str<strong>on</strong>g>and</str<strong>on</strong>g> fenced, two-lane highways without sidewalks<br />

or bicycle trails provided they do not violate obstacle clearance criteria; rights-of-way <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

communicati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> utilities provided all facilities are at grade level or underground; <str<strong>on</strong>g>and</str<strong>on</strong>g> essential<br />

navigati<strong>on</strong> aids <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong>al facilities, provided there are no feasible alternatives. In additi<strong>on</strong>, acti<strong>on</strong>s<br />

or uses that create a substance (e.g., dust) that would impair visibility, produce light that would distract<br />

pilots, produce electrical interference, or attract birds are prohibited in the Clear Z<strong>on</strong>e. L<str<strong>on</strong>g>and</str<strong>on</strong>g> use<br />

guidelines within the APZ I are less restrictive; however, uses that c<strong>on</strong>centrate people in small areas are<br />

not acceptable. Some general l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses permitted in the APZ I are industrial/manufacturing,<br />

transportati<strong>on</strong>, communicati<strong>on</strong>/utilities, wholesale trade, open space, recreati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> agriculture (USAF<br />

1999).<br />

3.2 Noise<br />

3.2.1 Definiti<strong>on</strong> of the Resource<br />

Sound is defined as a particular auditory effect produced by a given source, <str<strong>on</strong>g>for</str<strong>on</strong>g> example the sound of rain<br />

<strong>on</strong> a rooftop. Sound is measured with instruments that record instantaneous sound levels in decibels. The<br />

dBA is used to characterize sound levels that can be sensed by the human ear. “A-weighted” denotes the<br />

adjustment of the frequency range to what the average human ear can sense when experiencing an audible<br />

event.<br />

Noise <str<strong>on</strong>g>and</str<strong>on</strong>g> sound share the same physical aspects, but noise is c<strong>on</strong>sidered a disturbance while sound is<br />

defined as an auditory effect. Noise is defined as any sound that is undesirable because it interferes with<br />

communicati<strong>on</strong>, is intense enough to damage hearing, or is otherwise annoying. Noise can be intermittent<br />

or c<strong>on</strong>tinuous, steady or impulsive, <str<strong>on</strong>g>and</str<strong>on</strong>g> can involve any number of sources <str<strong>on</strong>g>and</str<strong>on</strong>g> frequencies. It can be<br />

readily identifiable or generally n<strong>on</strong>descript. Human resp<strong>on</strong>se to increased sound levels varies according<br />

to the source type, characteristics of the sound source, distance between source <str<strong>on</strong>g>and</str<strong>on</strong>g> receptor, receptor<br />

sensitivity, <str<strong>on</strong>g>and</str<strong>on</strong>g> time of day. How an individual resp<strong>on</strong>ds to the sound source will determine if the sound<br />

is viewed as music to <strong>on</strong>e’s ears or as annoying noise. Affected receptors are specific (e.g., schools,<br />

churches, or hospitals) or broad (e.g., nature preserves or designated districts) areas in which occasi<strong>on</strong>al<br />

or persistent sensitivity to noise above ambient levels exists.<br />

Noise Metrics <str<strong>on</strong>g>and</str<strong>on</strong>g> Regulati<strong>on</strong>s. Sound levels, resulting from multiple single events, are used to<br />

characterize community noise effects from aircraft or vehicle activity <str<strong>on</strong>g>and</str<strong>on</strong>g> are measured in DNL. The<br />

DNL noise metric incorporates a “penalty” <str<strong>on</strong>g>for</str<strong>on</strong>g> evening <str<strong>on</strong>g>and</str<strong>on</strong>g> nighttime noise events to account <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

increased annoyance. DNL is the energy-averaged sound level measured over a 24-hour period, with a<br />

10-dBA penalty assigned to noise events occurring between 10:00 p.m. <str<strong>on</strong>g>and</str<strong>on</strong>g> 7:00 a.m. DNL values are<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-5


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

obtained by averaging single event values <str<strong>on</strong>g>for</str<strong>on</strong>g> a given 24-hour period. DNL is the preferred sound level<br />

metric used to characterize noise impacts of the Federal Aviati<strong>on</strong> Administrati<strong>on</strong> (FAA), U.S. Department<br />

of Housing <str<strong>on</strong>g>and</str<strong>on</strong>g> Urban Development (HUD), U.S. Envir<strong>on</strong>mental Protecti<strong>on</strong> Agency (USEPA), <str<strong>on</strong>g>and</str<strong>on</strong>g> DOD<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> modeling airport envir<strong>on</strong>ments.<br />

DNL is the metric recognized by the U.S. government <str<strong>on</strong>g>for</str<strong>on</strong>g> measuring noise <str<strong>on</strong>g>and</str<strong>on</strong>g> its impacts <strong>on</strong> humans.<br />

According to the USAF, the FAA, <str<strong>on</strong>g>and</str<strong>on</strong>g> the HUD criteria, residential units <str<strong>on</strong>g>and</str<strong>on</strong>g> other noise-sensitive l<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

uses are “clearly unacceptable” in areas where the noise exposure exceeds a DNL of 75 dBA, “normally<br />

unacceptable” in regi<strong>on</strong>s exposed to noise between 65 dBA <str<strong>on</strong>g>and</str<strong>on</strong>g> 75 dBA, <str<strong>on</strong>g>and</str<strong>on</strong>g> “normally acceptable” in<br />

areas exposed to noise of 65 dBA or lower. The Federal Interagency Committee <strong>on</strong> Noise developed l<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

use compatibility guidelines <str<strong>on</strong>g>for</str<strong>on</strong>g> noise in terms of DNL sound levels (FICON 1992). For outdoor<br />

activities, the USEPA recommends a DNL sound level of 55 dBA as the sound level below which there is<br />

no reas<strong>on</strong> to suspect that the general populati<strong>on</strong> would be at risk from any of the effects of noise (USEPA<br />

1974).<br />

Noise levels vary depending <strong>on</strong> the populati<strong>on</strong> density <str<strong>on</strong>g>and</str<strong>on</strong>g> proximity to l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses such as parks, schools,<br />

or industrial facilities. As shown <strong>on</strong> Table 3-1, noise levels in a suburban residential area are a DNL of<br />

about 55 dBA, which increases to 60 dBA <str<strong>on</strong>g>for</str<strong>on</strong>g> an urban residential area, <str<strong>on</strong>g>and</str<strong>on</strong>g> to 80 dBA in the downtown<br />

secti<strong>on</strong> of a city (FHWA 1980).<br />

DNL (dBA)<br />

Table 3-1. Typical Outdoor Noise Levels<br />

Locati<strong>on</strong><br />

50 Residential area in a small town or quiet suburban area<br />

55 Suburban residential area<br />

60 Urban residential area<br />

65 Noisy urban residential area<br />

70 Very noisy urban residential area<br />

80 City noise (downtown of major metropolitan area)<br />

88 3rd floor apartment in a major city next to a freeway<br />

Source: FHWA 1980<br />

Most people are exposed to DNL sound levels of 50 to 55 dBA or higher <strong>on</strong> a daily basis. Studies<br />

specifically c<strong>on</strong>ducted to determine noise effects <strong>on</strong> various human activities show that approximately<br />

90 percent of the populati<strong>on</strong> is not significantly bothered by outdoor sound levels below a DNL of<br />

65 dBA (FICON 1992). Studies of community annoyance in resp<strong>on</strong>se to numerous types of<br />

envir<strong>on</strong>mental noise show that DNL correlates well with effect assessments <str<strong>on</strong>g>and</str<strong>on</strong>g> that there is a c<strong>on</strong>sistent<br />

relati<strong>on</strong>ship between DNL <str<strong>on</strong>g>and</str<strong>on</strong>g> the level of annoyance.<br />

Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong> Sound Levels. Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> work can cause an increase in<br />

sound that is well above the ambient level. A variety of sounds are emitted from graders, loaders, trucks,<br />

pavers, <str<strong>on</strong>g>and</str<strong>on</strong>g> other work activities <str<strong>on</strong>g>and</str<strong>on</strong>g> processes. Table 3-2 lists noise levels associated with comm<strong>on</strong><br />

types of c<strong>on</strong>structi<strong>on</strong> equipment. Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> equipment usually exceeds the ambient<br />

sound levels by 20 to 25 dBA in an urban envir<strong>on</strong>ment <str<strong>on</strong>g>and</str<strong>on</strong>g> up to 30 to 35 dBA in a quiet suburban area.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-6


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

M Ave<br />

70<br />

Perimeter Cir<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph Ave<br />

Texas St<br />

Hardin Blvd<br />

75<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph<br />

Southgate Ave<br />

TOW ROAD<br />

West Ordinance Rd<br />

TARGET RD<br />

Pad 5<br />

70<br />

Proposed Acti<strong>on</strong><br />

Glow Rd<br />

Pennsylvania St<br />

65<br />

TARGET ROAD A<br />

1996 DNL Noise C<strong>on</strong>tours (dBA)<br />

TARGET ROAD B<br />

Existing Hot Cargo Pad<br />

Proposed Hot Cargo Pad (Proposed Acti<strong>on</strong>)<br />

Proposed Hot Cargo Pad Taxiway (Proposed Acti<strong>on</strong>)<br />

Muniti<strong>on</strong> Haul Rd<br />

Existing Hot Cargo Pad QD Arc<br />

Proposed Hot Cargo Pad QD Arc<br />

0 125 250 500<br />

Feet<br />

Meters<br />

0 35 70 140<br />

Projecti<strong>on</strong>: Transverse Mercator<br />

State Plane New Mexico Central FIPS 3002 feet<br />

North American Datum of 1983<br />

1 inch = 1,000 feet<br />

Map Extent<br />

Figure 3-2. Noise C<strong>on</strong>tours at Proposed Acti<strong>on</strong> Site<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-7


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

3.2.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Ambient Noise Envir<strong>on</strong>ment. The ambient noise envir<strong>on</strong>ment at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is affected mainly by<br />

USAF <str<strong>on</strong>g>and</str<strong>on</strong>g> civilian aircraft operati<strong>on</strong>s. The commercial <str<strong>on</strong>g>and</str<strong>on</strong>g> military aircraft operati<strong>on</strong>s at Albuquerque<br />

Internati<strong>on</strong>al Sunport are the primary source of noise in the northern <str<strong>on</strong>g>and</str<strong>on</strong>g> northwestern areas of the<br />

installati<strong>on</strong>.<br />

Table 3-2. Predicted Noise Levels <str<strong>on</strong>g>for</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Demoliti<strong>on</strong> Equipment<br />

C<strong>on</strong>structi<strong>on</strong> Category <str<strong>on</strong>g>and</str<strong>on</strong>g> Equipment<br />

Bulldozer<br />

Dump Truck<br />

Backhoe<br />

Fr<strong>on</strong>t-End Loaders<br />

Pavers<br />

Source: USEPA 1971<br />

Predicted Noise Level at 50 Feet<br />

80 dBA<br />

83–94 dBA<br />

72–93 dBA<br />

72–82 dBA<br />

87–88 dBA<br />

Noise from aircraft operati<strong>on</strong>s is present throughout the northwestern porti<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> as a result<br />

of operati<strong>on</strong>s at the Albuquerque Internati<strong>on</strong>al Sunport. The DNL 65 to 80+ dBA noise c<strong>on</strong>tours from<br />

aircraft operati<strong>on</strong>s at Albuquerque Internati<strong>on</strong>al Sunport were plotted <strong>on</strong> an aerial map (see Figure 3-2).<br />

The plotted c<strong>on</strong>tours from aircraft operati<strong>on</strong>s extend al<strong>on</strong>g the runways to the east, west, <str<strong>on</strong>g>and</str<strong>on</strong>g> southwest.<br />

The DNL 65 to 69 dBA noise z<strong>on</strong>e encompasses the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> the DNL 70 to 74 dBA<br />

noise z<strong>on</strong>e encompasses the associated new taxiway.<br />

3.3 Visual Resources<br />

3.3.1 Definiti<strong>on</strong> of the Resource<br />

Visual resources include the natural <str<strong>on</strong>g>and</str<strong>on</strong>g> man-made physical features that give a particular l<str<strong>on</strong>g>and</str<strong>on</strong>g>scape its<br />

character. The features that <str<strong>on</strong>g>for</str<strong>on</strong>g>m the overall visual impressi<strong>on</strong> a viewer receives include l<str<strong>on</strong>g>and</str<strong>on</strong>g><str<strong>on</strong>g>for</str<strong>on</strong>g>ms,<br />

vegetati<strong>on</strong>, water, color, adjacent scenery, scarcity, <str<strong>on</strong>g>and</str<strong>on</strong>g> man-made modificati<strong>on</strong>s.<br />

3.3.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Military <str<strong>on</strong>g>and</str<strong>on</strong>g> civilian airfields compose much of the visual envir<strong>on</strong>ment of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The prominent<br />

visual features of the installati<strong>on</strong> include hangars, maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> support facilities, <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft.<br />

Off-installati<strong>on</strong>, the visual envir<strong>on</strong>ment varies from urban to rangel<str<strong>on</strong>g>and</str<strong>on</strong>g> to <str<strong>on</strong>g>for</str<strong>on</strong>g>est. To the north <str<strong>on</strong>g>and</str<strong>on</strong>g> west of<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> are urban areas of the City of Albuquerque; to the northeast <str<strong>on</strong>g>and</str<strong>on</strong>g> east open spaces, <str<strong>on</strong>g>for</str<strong>on</strong>g>ests,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> rangel<str<strong>on</strong>g>and</str<strong>on</strong>g> are the prominent visual features; south of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is Isleta Pueblo, which generally<br />

c<strong>on</strong>sists of open space, <str<strong>on</strong>g>for</str<strong>on</strong>g>ests, or vacant l<str<strong>on</strong>g>and</str<strong>on</strong>g> (K<strong>AFB</strong> 2003).<br />

The Proposed Acti<strong>on</strong> site is approximately 0.65 miles southeast of the eastern end of the Albuquerque<br />

Internati<strong>on</strong>al Sunport’s Runway 26, immediately east of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5).<br />

The Proposed Acti<strong>on</strong> area c<strong>on</strong>tains a small asphalt-paved vehicle parking area with a service road, a small<br />

storage shed, a pers<strong>on</strong>nel shelter, protective bollards <str<strong>on</strong>g>and</str<strong>on</strong>g> fences, <str<strong>on</strong>g>and</str<strong>on</strong>g> natural vegetati<strong>on</strong>. No permanent,<br />

prominent visual features are currently at or in the vicinity of the Proposed Acti<strong>on</strong>; however, military<br />

aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> l<str<strong>on</strong>g>and</str<strong>on</strong>g>-based vehicles are often seen at Pad 5 during <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> transport missi<strong>on</strong>s. In general,<br />

the aesthetic appearance of the Proposed Acti<strong>on</strong> area <str<strong>on</strong>g>and</str<strong>on</strong>g> vicinity is similar to that of a typical military<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-8


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

airfield. Figures 3-3, 3-4, <str<strong>on</strong>g>and</str<strong>on</strong>g> 3-5 are p<str<strong>on</strong>g>hot</str<strong>on</strong>g>ographs documenting the current visual c<strong>on</strong>diti<strong>on</strong>s at <str<strong>on</strong>g>and</str<strong>on</strong>g> in<br />

the vicinity of the Proposed Acti<strong>on</strong>.<br />

Figure 3-3. Current Visual C<strong>on</strong>diti<strong>on</strong>s at the Northern Porti<strong>on</strong> of the Proposed Acti<strong>on</strong> Site.<br />

View is facing north at existing small parking area.<br />

Figure 3-4. Current Visual C<strong>on</strong>diti<strong>on</strong>s at the Central Porti<strong>on</strong> of the Proposed Acti<strong>on</strong> Site.<br />

View is facing east at ERP site WP-26 (fenced area in background) <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel shelter.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-9


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Figure 3-5. Current Visual C<strong>on</strong>diti<strong>on</strong>s at the Southern Porti<strong>on</strong> of the Proposed Acti<strong>on</strong> Site.<br />

View is facing southeast at ERP site WP-26 (fenced area in background).<br />

3.4 <strong>Air</strong> Quality<br />

3.4.1 Definiti<strong>on</strong> of the Resource<br />

In accordance with Federal Clean <strong>Air</strong> Act (CAA) requirements, the air quality in a given regi<strong>on</strong> or area is<br />

measured by the c<strong>on</strong>centrati<strong>on</strong> of various pollutants in the atmosphere. The measurements of these<br />

“criteria pollutants” in ambient air are expressed in units of parts per milli<strong>on</strong> (ppm), milligrams per cubic<br />

meter (mg/m 3 ), or micrograms per cubic meter (µg/m 3 ). The air quality in a regi<strong>on</strong> is a result not <strong>on</strong>ly of<br />

the types <str<strong>on</strong>g>and</str<strong>on</strong>g> quantities of atmospheric pollutants <str<strong>on</strong>g>and</str<strong>on</strong>g> pollutant sources in an area, but also surface<br />

topography, the size of the topological “air basin,” <str<strong>on</strong>g>and</str<strong>on</strong>g> the prevailing meteorological c<strong>on</strong>diti<strong>on</strong>s.<br />

The CAA directed the USEPA to develop, implement, <str<strong>on</strong>g>and</str<strong>on</strong>g> en<str<strong>on</strong>g>for</str<strong>on</strong>g>ce str<strong>on</strong>g envir<strong>on</strong>mental regulati<strong>on</strong>s that<br />

would ensure clean <str<strong>on</strong>g>and</str<strong>on</strong>g> healthy ambient air quality. To protect public health <str<strong>on</strong>g>and</str<strong>on</strong>g> welfare, the USEPA<br />

developed numerical c<strong>on</strong>centrati<strong>on</strong>-based st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards, or Nati<strong>on</strong>al Ambient <strong>Air</strong> Quality St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards<br />

(NAAQS), <str<strong>on</strong>g>for</str<strong>on</strong>g> pollutants that have been determined to impact human health <str<strong>on</strong>g>and</str<strong>on</strong>g> the envir<strong>on</strong>ment. The<br />

USEPA established both primary <str<strong>on</strong>g>and</str<strong>on</strong>g> sec<strong>on</strong>dary NAAQS under the provisi<strong>on</strong>s of the CAA. NAAQS are<br />

currently established <str<strong>on</strong>g>for</str<strong>on</strong>g> six criteria air pollutants: oz<strong>on</strong>e (O 3 ), carb<strong>on</strong> m<strong>on</strong>oxide (CO), nitrogen dioxide<br />

(NO 2 ), sulfur dioxide (SO 2 ), respirable particulate matter (including particulate matter equal to or less<br />

than 10 micr<strong>on</strong>s in diameter [PM 10 ] <str<strong>on</strong>g>and</str<strong>on</strong>g> particulate matter equal to or less than 2.5 micr<strong>on</strong>s in diameter<br />

[PM 2.5 ]), <str<strong>on</strong>g>and</str<strong>on</strong>g> lead (Pb). The primary NAAQS represent maximum levels of background air polluti<strong>on</strong> that<br />

are c<strong>on</strong>sidered safe, with an adequate margin of safety to protect public health. Sec<strong>on</strong>dary NAAQS<br />

represent the maximum pollutant c<strong>on</strong>centrati<strong>on</strong> necessary to protect vegetati<strong>on</strong>, crops, <str<strong>on</strong>g>and</str<strong>on</strong>g> other public<br />

resources al<strong>on</strong>g with maintaining visibility st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards. Table 3-3 presents the primary <str<strong>on</strong>g>and</str<strong>on</strong>g> sec<strong>on</strong>dary<br />

USEPA NAAQS.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-10


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Pollutant<br />

O 3<br />

PM 10<br />

PM 2.5<br />

CO<br />

NO 2<br />

SO 2<br />

Table 3-3. Nati<strong>on</strong>al Ambient <strong>Air</strong> Quality St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards<br />

Averaging<br />

Time<br />

Primary<br />

1 Hour a 0.12 ppm<br />

8 Hours b 0.08 ppm<br />

(157 µg/m 3 )<br />

8 Hours 0.075 ppm g<br />

Nati<strong>on</strong>al St<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

Sec<strong>on</strong>dary<br />

Same as Primary<br />

St<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

24 Hours c 150 µg/m 3 Same as Primary<br />

Annual Arithmetic Mean d ----<br />

St<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

24 Hours e 35 µg/m 3 Same as Primary<br />

Annual Arithmetic Mean f 15 µg/m 3<br />

St<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

8 Hours c 9.0 ppm<br />

(10 mg/m 3 )<br />

1 Hour c 35 ppm<br />

(40 mg/m 3 )<br />

0.053 ppm<br />

Annual Arithmetic Mean<br />

(100 µg/m 3 )<br />

Annual Arithmetic Mean<br />

24 Hours c 0.14 ppm<br />

(365 µg/m 3 )<br />

N<strong>on</strong>e<br />

Same as Primary<br />

St<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

0.03 ppm<br />

(80 µg/m 3 ) 0.5 ppm<br />

1,300 µg/m 3 , 3-Hour<br />

averaging time<br />

Pb Quarterly Average 1.5 µg/m 3 Same as Primary<br />

St<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

Source: USEPA 2009a<br />

Notes: Parenthetical values are approximate equivalent c<strong>on</strong>centrati<strong>on</strong>s.<br />

a. (a) The st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard is attained when the expected number of days per calendar year with maximum hourly average<br />

c<strong>on</strong>centrati<strong>on</strong>s above 0.12 ppm is ≤ 1. (b) As of June 15, 2005, the USEPA revoked the 1-hour oz<strong>on</strong>e st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard in all areas<br />

except the 14 8-hour oz<strong>on</strong>e n<strong>on</strong>attainment Early Acti<strong>on</strong> Compact Areas.<br />

b. (a) To attain this st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard, the 3-year average of the fourth-highest daily maximum 8-hour average oz<strong>on</strong>e c<strong>on</strong>centrati<strong>on</strong>s<br />

measured at each m<strong>on</strong>itor within an area over each year must not exceed 0.08 ppm. (b) The 1997 st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard—<str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

implementati<strong>on</strong> rules <str<strong>on</strong>g>for</str<strong>on</strong>g> that st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard—will remain in place <str<strong>on</strong>g>for</str<strong>on</strong>g> implementati<strong>on</strong> purposes as the USEPA undertakes<br />

rulemaking to address the transiti<strong>on</strong> from the 1997 oz<strong>on</strong>e st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard to the 2008 oz<strong>on</strong>e st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard.<br />

c. Not to be exceeded more than <strong>on</strong>ce per year.<br />

d. To attain this st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard, the expected annual arithmetic mean PM10 c<strong>on</strong>centrati<strong>on</strong> at each m<strong>on</strong>itor within an area must not<br />

exceed 50 μg/m3.<br />

e. To attain this st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard, the 3-year average of the 98th percentile of 24-hour c<strong>on</strong>centrati<strong>on</strong>s at each populati<strong>on</strong>-oriented<br />

m<strong>on</strong>itor within an area must not exceed 35 µg/m3.<br />

f. To attain this st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard, the 3-year average of the annual arithmetic mean PM2.5 c<strong>on</strong>centrati<strong>on</strong>s from single or multiple<br />

community-oriented m<strong>on</strong>itors must not exceed 15.0 µg/m3.<br />

g. To attain this st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard, the 3-year average of the fourth-highest daily maximum 8-hour average oz<strong>on</strong>e c<strong>on</strong>centrati<strong>on</strong>s<br />

measured at each m<strong>on</strong>itor within an area over each year must not exceed 0.075 ppm (effective May 27, 2008).<br />

Although O 3 is c<strong>on</strong>sidered a criteria air pollutant <str<strong>on</strong>g>and</str<strong>on</strong>g> is measurable in the atmosphere, it is not often<br />

c<strong>on</strong>sidered a regulated air pollutant when calculating emissi<strong>on</strong>s because O 3 is typically not emitted<br />

directly from most emissi<strong>on</strong>s sources. Oz<strong>on</strong>e is <str<strong>on</strong>g>for</str<strong>on</strong>g>med in the atmosphere by p<str<strong>on</strong>g>hot</str<strong>on</strong>g>ochemical reacti<strong>on</strong>s<br />

involving sunlight <str<strong>on</strong>g>and</str<strong>on</strong>g> previously emitted pollutants or “O 3 precursors.” These O 3 precursors c<strong>on</strong>sist<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-11


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

primarily of nitrogen oxides (NO x ) <str<strong>on</strong>g>and</str<strong>on</strong>g> volatile organic compounds (VOCs) that are directly emitted from<br />

a wide range of emissi<strong>on</strong>s sources. For this reas<strong>on</strong>, regulatory agencies attempt to limit atmospheric O 3<br />

c<strong>on</strong>centrati<strong>on</strong>s by c<strong>on</strong>trolling VOC pollutants (also identified as reactive organic gases) <str<strong>on</strong>g>and</str<strong>on</strong>g> NO 2 .<br />

As authorized by the CAA, the USEPA has delegated resp<strong>on</strong>sibility <str<strong>on</strong>g>for</str<strong>on</strong>g> ensuring compliance with<br />

NAAQS to the states <str<strong>on</strong>g>and</str<strong>on</strong>g> local agencies. As such, each state must develop air pollutant c<strong>on</strong>trol programs<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> promulgate regulati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> rules that focus <strong>on</strong> meeting NAAQS <str<strong>on</strong>g>and</str<strong>on</strong>g> maintaining healthy ambient air<br />

quality levels. These programs are detailed in State Implementati<strong>on</strong> Plans (SIPs) that must be developed<br />

by each state or local regulatory agency <str<strong>on</strong>g>and</str<strong>on</strong>g> approved by the USEPA. A SIP is a compilati<strong>on</strong> of<br />

regulati<strong>on</strong>s, strategies, schedules, <str<strong>on</strong>g>and</str<strong>on</strong>g> en<str<strong>on</strong>g>for</str<strong>on</strong>g>cement acti<strong>on</strong>s designed to move the state into compliance<br />

with all NAAQS. Any changes to the compliance schedule or plan (e.g., new regulati<strong>on</strong>s, emissi<strong>on</strong>s<br />

budgets, c<strong>on</strong>trols) must be incorporated into the SIP <str<strong>on</strong>g>and</str<strong>on</strong>g> approved by the USEPA.<br />

In 1997, the USEPA initiated work <strong>on</strong> new General C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity rules <str<strong>on</strong>g>and</str<strong>on</strong>g> guidance to reflect the new<br />

8-hour O 3 , PM 2.5 , <str<strong>on</strong>g>and</str<strong>on</strong>g> regi<strong>on</strong>al haze st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards that were promulgated in that year. The 1-hour O 3 st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

will no l<strong>on</strong>ger apply to an area 1 year after the effective date of the designati<strong>on</strong> of that area <str<strong>on</strong>g>for</str<strong>on</strong>g> the 8-hour<br />

O 3 NAAQS. The effective designati<strong>on</strong> date <str<strong>on</strong>g>for</str<strong>on</strong>g> most areas was June 15, 2004. The USEPA designated<br />

PM 2.5 n<strong>on</strong>attainment areas in December 2004, <str<strong>on</strong>g>and</str<strong>on</strong>g> finalized the PM 2.5 implementati<strong>on</strong> rule in January<br />

2005.<br />

On September 22, 2009, the USEPA issued a final rule <str<strong>on</strong>g>for</str<strong>on</strong>g> m<str<strong>on</strong>g>and</str<strong>on</strong>g>atory greenhouse gas (GHG) reporting<br />

from large GHG emissi<strong>on</strong>s sources in the United States. The purpose of the rule is to collect<br />

comprehensive <str<strong>on</strong>g>and</str<strong>on</strong>g> accurate data <strong>on</strong> carb<strong>on</strong> dioxide (CO 2 ) <str<strong>on</strong>g>and</str<strong>on</strong>g> other GHG emissi<strong>on</strong>s that can be used to<br />

in<str<strong>on</strong>g>for</str<strong>on</strong>g>m future policy decisi<strong>on</strong>s. In general, the threshold <str<strong>on</strong>g>for</str<strong>on</strong>g> reporting is 25,000 metric t<strong>on</strong>s or more of<br />

CO 2 equivalent per year. The first emissi<strong>on</strong>s report is due in 2011 <str<strong>on</strong>g>for</str<strong>on</strong>g> 2010 emissi<strong>on</strong>s. Although GHGs<br />

are not currently regulated under the CAA, the USEPA has clearly indicated that GHG emissi<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

climate change are issues that need to be c<strong>on</strong>sidered in future planning. GHGs are produced by the<br />

burning of fossil fuels <str<strong>on</strong>g>and</str<strong>on</strong>g> through industrial <str<strong>on</strong>g>and</str<strong>on</strong>g> biological processes.<br />

Title V of the CAA Amendments of 1990 requires states <str<strong>on</strong>g>and</str<strong>on</strong>g> local agencies to permit major stati<strong>on</strong>ary<br />

sources. A major stati<strong>on</strong>ary source is a facility (i.e., plant, installati<strong>on</strong>, or activity) that has the potential to<br />

emit more than 100 t<strong>on</strong>s per year (tpy) of any <strong>on</strong>e criteria air pollutant, 10 tpy of a hazardous air pollutant,<br />

or 25 tpy of any combinati<strong>on</strong> of hazardous air pollutants.<br />

Federal Preventi<strong>on</strong> of Significant Deteriorati<strong>on</strong> (PSD) regulati<strong>on</strong>s also define air pollutant emissi<strong>on</strong>s from<br />

proposed major stati<strong>on</strong>ary sources or modificati<strong>on</strong>s to be “significant” if (1) a proposed project is within<br />

10 kilometers of any Class I area, <str<strong>on</strong>g>and</str<strong>on</strong>g> (2) regulated pollutant emissi<strong>on</strong>s would cause an increase in the<br />

24-hour average c<strong>on</strong>centrati<strong>on</strong> of any regulated pollutant in the Class I area of 1 μg/m 3 or more<br />

[40 CFR 52.21(b)(23)(iii)]. PSD regulati<strong>on</strong>s also define ambient air increments, limiting the allowable<br />

increases to any area’s baseline air c<strong>on</strong>taminant c<strong>on</strong>centrati<strong>on</strong>s, based <strong>on</strong> the area’s designati<strong>on</strong> as Class I,<br />

II, or III [40 CFR 52.21(c)]. Because Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is not within 10 kilometers of a Class I area, PSD<br />

regulati<strong>on</strong>s do not apply <str<strong>on</strong>g>and</str<strong>on</strong>g> are not discussed further in this <str<strong>on</strong>g>EA</str<strong>on</strong>g>.<br />

3.4.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is in Bernalillo County which is within the Albuquerque-Mid Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Intrastate<br />

(AMRGI) <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong> (AQCR) 152 (40 CFR 81.83). The AMRGI AQCR c<strong>on</strong>sists of<br />

porti<strong>on</strong>s of S<str<strong>on</strong>g>and</str<strong>on</strong>g>oval <str<strong>on</strong>g>and</str<strong>on</strong>g> Valencia counties, <str<strong>on</strong>g>and</str<strong>on</strong>g> Bernalillo County in its entirety. The City of<br />

Albuquerque <str<strong>on</strong>g>and</str<strong>on</strong>g> Bernalillo County have been designated as being in maintenance status <str<strong>on</strong>g>for</str<strong>on</strong>g> CO effective<br />

July 15, 1996 (USEPA 1996). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the surrounding area are in attainment <str<strong>on</strong>g>for</str<strong>on</strong>g> all other<br />

criteria pollutants.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-12


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

The most recent emissi<strong>on</strong>s inventories <str<strong>on</strong>g>for</str<strong>on</strong>g> Bernalillo County <str<strong>on</strong>g>and</str<strong>on</strong>g> the AMRGI AQCR are shown in<br />

Table 3-4. Bernalillo County is c<strong>on</strong>sidered the local area of influence, <str<strong>on</strong>g>and</str<strong>on</strong>g> the AMRGI AQCR is<br />

c<strong>on</strong>sidered the regi<strong>on</strong>al area of influence <str<strong>on</strong>g>for</str<strong>on</strong>g> the air quality analysis.<br />

Locati<strong>on</strong><br />

Table 3-4. Local <str<strong>on</strong>g>and</str<strong>on</strong>g> Regi<strong>on</strong>al <strong>Air</strong> Emissi<strong>on</strong>s Inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> 2002<br />

NO x<br />

(tpy)<br />

VOC<br />

(tpy)<br />

CO<br />

(tpy)<br />

SO 2<br />

(tpy)<br />

PM 10<br />

(tpy)<br />

PM 2.5<br />

(tpy)<br />

Bernalillo County, New<br />

Mexico<br />

24,930 24,310 185,250 1,568 61,892 8,183<br />

AMRGI AQCR 36,778 31,651 245,346 2,619 137,376 16,676<br />

Source: USEPA 2009b<br />

The DOE, Energy In<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> Administrati<strong>on</strong> states that in 2005, gross CO 2 emissi<strong>on</strong>s in New Mexico<br />

were 59.5 milli<strong>on</strong> metric t<strong>on</strong>s (DOE 2009).<br />

The Albuquerque-Bernalillo County <strong>Air</strong> Quality C<strong>on</strong>trol Board (AQCB) is the air polluti<strong>on</strong> c<strong>on</strong>trol<br />

authority <str<strong>on</strong>g>for</str<strong>on</strong>g> Bernalillo County while the AEHD-AQD h<str<strong>on</strong>g>and</str<strong>on</strong>g>les air quality management functi<strong>on</strong>s. There<br />

are various sources <strong>on</strong> the installati<strong>on</strong> that emit criteria <str<strong>on</strong>g>and</str<strong>on</strong>g> hazardous air pollutants (HAPs), including<br />

emergency generators, boilers, <str<strong>on</strong>g>hot</str<strong>on</strong>g> water heaters, fuel storage tanks, gasoline service stati<strong>on</strong>s, surface<br />

coating, aircraft engine testing, <str<strong>on</strong>g>and</str<strong>on</strong>g> miscellaneous chemical usage. As required by the<br />

Albuquerque-Bernalillo County AQCB regulati<strong>on</strong>s, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> estimates annual emissi<strong>on</strong>s from<br />

stati<strong>on</strong>ary sources <str<strong>on</strong>g>and</str<strong>on</strong>g> provides this in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> to the AEHD-AQD. Table 3-5 summarizes the calendar<br />

year 2008 air emissi<strong>on</strong>s inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

Table 3-5. Calendar Year 2008 <strong>Air</strong> Emissi<strong>on</strong>s Inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

NO x<br />

(tpy)<br />

VOC<br />

(tpy)<br />

CO<br />

(tpy)<br />

SO 2<br />

(tpy)<br />

PM 10<br />

(tpy)<br />

2008 Actual Emissi<strong>on</strong>s 12.8 60.0 13.0 1.1 8.1<br />

Source: K<strong>AFB</strong> 2009a<br />

The AEHD-AQD has fugitive dust-c<strong>on</strong>trol requirements in 20.11.20 New Mexico Administrative Code<br />

(NMAC), Fugitive Dust C<strong>on</strong>trol. A fugitive dust-c<strong>on</strong>trol c<strong>on</strong>structi<strong>on</strong> permit is required <str<strong>on</strong>g>for</str<strong>on</strong>g> projects<br />

disturbing 0.75 acres or more, as well as the demoliti<strong>on</strong> of buildings c<strong>on</strong>taining more than 75,000 cubic<br />

feet of space. An applicati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> a fugitive dust-c<strong>on</strong>trol c<strong>on</strong>structi<strong>on</strong> permit from the AEHD-AQD must<br />

be submitted a minimum of 30 days prior to the start of c<strong>on</strong>structi<strong>on</strong>. As stated in 20.11.20.12 NMAC<br />

General Provisi<strong>on</strong>s, each pers<strong>on</strong> shall use reas<strong>on</strong>ably available c<strong>on</strong>trol measures or any other effective<br />

c<strong>on</strong>trol measure during active operati<strong>on</strong>s or <strong>on</strong> inactive disturbed surface areas, as necessary to prevent<br />

the release of fugitive dust, whether or not the pers<strong>on</strong> is required by 20.11.20 NMAC to obtain a fugitive<br />

dust-c<strong>on</strong>trol permit. This regulati<strong>on</strong> also c<strong>on</strong>tains a provisi<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> buildings c<strong>on</strong>taining asbestosc<strong>on</strong>taining<br />

materials (ACMs) as stated in 20.11.20.22 NMAC Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Renovati<strong>on</strong> Activities;<br />

Fugitive Dust C<strong>on</strong>trol C<strong>on</strong>structi<strong>on</strong> Permit <str<strong>on</strong>g>and</str<strong>on</strong>g> Asbestos Notificati<strong>on</strong> Requirements: “All demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

renovati<strong>on</strong> activities shall employ reas<strong>on</strong>ably available c<strong>on</strong>trol measures at all times, <str<strong>on</strong>g>and</str<strong>on</strong>g>, when removing<br />

asbestos-c<strong>on</strong>taining material (ACM), shall also comply with the federal st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards incorporated in<br />

20.11.64 NMAC, Emissi<strong>on</strong> St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> Hazardous <strong>Air</strong> Pollutants <str<strong>on</strong>g>for</str<strong>on</strong>g> Stati<strong>on</strong>ary Sources. A pers<strong>on</strong><br />

who demolishes or renovates any commercial building, residential building c<strong>on</strong>taining five or more<br />

dwellings, or a residential structure that will be demolished in order to build a n<strong>on</strong>residential structure or<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-13


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

building shall file an asbestos notificati<strong>on</strong> with the department no fewer than 10 calendar days be<str<strong>on</strong>g>for</str<strong>on</strong>g>e the<br />

start of such activity. Written asbestos notificati<strong>on</strong> certifying to the presence of ACM is required even if<br />

regulated ACM is not or may not be present in such buildings or structures.”<br />

3.5 Geology <str<strong>on</strong>g>and</str<strong>on</strong>g> Soils<br />

3.5.1 Definiti<strong>on</strong> of the Resource<br />

Geological resources c<strong>on</strong>sist of the Earth’s surface <str<strong>on</strong>g>and</str<strong>on</strong>g> subsurface materials. Within a given<br />

physiographic province, these resources typically are described in terms of topography <str<strong>on</strong>g>and</str<strong>on</strong>g> physiography,<br />

geology, soils, <str<strong>on</strong>g>and</str<strong>on</strong>g>, where applicable, geologic hazards <str<strong>on</strong>g>and</str<strong>on</strong>g> pale<strong>on</strong>tology. Topography <str<strong>on</strong>g>and</str<strong>on</strong>g> physiography<br />

pertain to the general shape <str<strong>on</strong>g>and</str<strong>on</strong>g> arrangement of a l<str<strong>on</strong>g>and</str<strong>on</strong>g> surface, including its height <str<strong>on</strong>g>and</str<strong>on</strong>g> the positi<strong>on</strong> of its<br />

natural <str<strong>on</strong>g>and</str<strong>on</strong>g> human-made features. Geology is the study of the Earth’s compositi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> provides<br />

in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> <strong>on</strong> the structure <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>figurati<strong>on</strong> of surface <str<strong>on</strong>g>and</str<strong>on</strong>g> subsurface features. Such in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong><br />

derives from field analysis based <strong>on</strong> observati<strong>on</strong>s of the surface <str<strong>on</strong>g>and</str<strong>on</strong>g> borings to identify subsurface<br />

compositi<strong>on</strong>.<br />

Soils are the unc<strong>on</strong>solidated materials overlying bedrock or other parent material. Soils typically are<br />

described in terms of their complex type, slope, <str<strong>on</strong>g>and</str<strong>on</strong>g> physical characteristics. Differences am<strong>on</strong>g soil<br />

types in terms of their structure, elasticity, strength, shrink-swell potential, <str<strong>on</strong>g>and</str<strong>on</strong>g> erosi<strong>on</strong> potential affect<br />

their abilities to support certain applicati<strong>on</strong>s or uses. In appropriate cases, soil properties must be<br />

examined <str<strong>on</strong>g>for</str<strong>on</strong>g> their compatibility with particular c<strong>on</strong>structi<strong>on</strong> activities or types of l<str<strong>on</strong>g>and</str<strong>on</strong>g> use.<br />

Prime farml<str<strong>on</strong>g>and</str<strong>on</strong>g> is protected under the Farml<str<strong>on</strong>g>and</str<strong>on</strong>g> Protecti<strong>on</strong> Policy Act (FPPA) of 1981. Prime farml<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

is defined as l<str<strong>on</strong>g>and</str<strong>on</strong>g> that has the best combinati<strong>on</strong> of physical <str<strong>on</strong>g>and</str<strong>on</strong>g> chemical characteristics <str<strong>on</strong>g>for</str<strong>on</strong>g> producing<br />

food, feed, <str<strong>on</strong>g>for</str<strong>on</strong>g>age, fiber, <str<strong>on</strong>g>and</str<strong>on</strong>g> oilseed crops, <str<strong>on</strong>g>and</str<strong>on</strong>g> is also available <str<strong>on</strong>g>for</str<strong>on</strong>g> these uses. The soil qualities,<br />

growing seas<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> moisture supply are needed <str<strong>on</strong>g>for</str<strong>on</strong>g> a well-managed soil to produce a sustained high<br />

yield of crops in an ec<strong>on</strong>omic manner. The l<str<strong>on</strong>g>and</str<strong>on</strong>g> could be cropl<str<strong>on</strong>g>and</str<strong>on</strong>g>, pasture, rangel<str<strong>on</strong>g>and</str<strong>on</strong>g>, or other l<str<strong>on</strong>g>and</str<strong>on</strong>g>, but<br />

not urban developed l<str<strong>on</strong>g>and</str<strong>on</strong>g> or water. The intent of the FPPA is to minimize the extent that Federal<br />

programs c<strong>on</strong>tribute to the unnecessary c<strong>on</strong>versi<strong>on</strong> of farml<str<strong>on</strong>g>and</str<strong>on</strong>g> to n<strong>on</strong>agricultural uses. The Act also<br />

ensures that Federal programs are administered in a manner that, to the extent practicable, will be<br />

compatible with private, state, <str<strong>on</strong>g>and</str<strong>on</strong>g> local government programs <str<strong>on</strong>g>and</str<strong>on</strong>g> policies to protect farml<str<strong>on</strong>g>and</str<strong>on</strong>g>.<br />

The implementing procedures of the FPPA <str<strong>on</strong>g>and</str<strong>on</strong>g> Natural Resources C<strong>on</strong>servati<strong>on</strong> Service (NRCS) require<br />

Federal agencies to evaluate the adverse effects (direct <str<strong>on</strong>g>and</str<strong>on</strong>g> indirect) of their activities <strong>on</strong> prime <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

unique farml<str<strong>on</strong>g>and</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> farml<str<strong>on</strong>g>and</str<strong>on</strong>g> of statewide <str<strong>on</strong>g>and</str<strong>on</strong>g> local importance, <str<strong>on</strong>g>and</str<strong>on</strong>g> to c<strong>on</strong>sider alternative acti<strong>on</strong>s that<br />

could avoid adverse effects. Determinati<strong>on</strong> of whether an area is c<strong>on</strong>sidered prime or unique farml<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> potential impacts associated with a proposed acti<strong>on</strong> is based <strong>on</strong> preparati<strong>on</strong> of the farml<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>versi<strong>on</strong> impact rating <str<strong>on</strong>g>for</str<strong>on</strong>g>m AD-1006 <str<strong>on</strong>g>for</str<strong>on</strong>g> areas where prime farml<str<strong>on</strong>g>and</str<strong>on</strong>g> soils occur <str<strong>on</strong>g>and</str<strong>on</strong>g> by applying<br />

criteria established at Secti<strong>on</strong> 658.5 of the FPPA (7 CFR 658). The NRCS is resp<strong>on</strong>sible <str<strong>on</strong>g>for</str<strong>on</strong>g> overseeing<br />

compliance with the FPPA <str<strong>on</strong>g>and</str<strong>on</strong>g> has developed the rules <str<strong>on</strong>g>and</str<strong>on</strong>g> regulati<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> implementati<strong>on</strong> of the Act<br />

(see 7 CFR Part 658, 5 July 1984).<br />

3.5.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Regi<strong>on</strong>al Geology. The City of Albuquerque <str<strong>on</strong>g>and</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> are near the juncti<strong>on</strong> of five<br />

physiographic provinces: the Colorado Plateau, the Basin <str<strong>on</strong>g>and</str<strong>on</strong>g> Range, the Southern Rocky Mountains, the<br />

Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e rift, <str<strong>on</strong>g>and</str<strong>on</strong>g> the Great Plains (Grant 1981). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is in the eastern margin of the<br />

Albuquerque Basin, a major feature of the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e rift. The Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e rift is approximately<br />

620 miles l<strong>on</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> is bordered <strong>on</strong> the west by the Colorado Plateau <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong> the east by the Great Plains.<br />

The Albuquerque Basin is north-trending <str<strong>on</strong>g>and</str<strong>on</strong>g> is approximately 90 miles l<strong>on</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> 31 miles wide. It<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-14


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

extends from near the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e to the foothills of the S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia <str<strong>on</strong>g>and</str<strong>on</strong>g> Manzanita mountains (K<strong>AFB</strong> 2007).<br />

The Albuquerque Basin is defined to the south by the Socorro Channel, to the north by the Nacimiento<br />

Uplift, to the west by the Puerco Plateau <str<strong>on</strong>g>and</str<strong>on</strong>g> Lucero Uplift, <str<strong>on</strong>g>and</str<strong>on</strong>g> to the east by the S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia <str<strong>on</strong>g>and</str<strong>on</strong>g> Manzanita<br />

mountains. The widest point of the Albuquerque Basin is near Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> it tapers off gradually<br />

towards its north <str<strong>on</strong>g>and</str<strong>on</strong>g> south ends. The basin was deepened <str<strong>on</strong>g>and</str<strong>on</strong>g> local mountain ranges were tilted by largescale<br />

faulting that occurred approximately 11.2 to 5.3 milli<strong>on</strong> years ago. Geologic <str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong>s found<br />

within Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> range in age from Precambrian granites to present-day windblown s<str<strong>on</strong>g>and</str<strong>on</strong>g>s.<br />

Topography. Most of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is situated <strong>on</strong> a relatively flat mesa. This mesa is cut by the eastwest<br />

trending Tijeras Arroyo, which drains into the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e. Elevati<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> range from<br />

5,200 feet in the west to almost 8,000 feet in the Manzanita Mountains. In additi<strong>on</strong>, several cany<strong>on</strong>s (e.g.,<br />

Lurance, Sol se Mete, B<strong>on</strong>ito, Otero, <str<strong>on</strong>g>and</str<strong>on</strong>g> Madera) are located <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

Soils. Most of the Albuquerque Basin c<strong>on</strong>sists of poorly c<strong>on</strong>solidated sediments that eroded from the<br />

surrounding mountains. These sediments, known as the Santa Fe Group, are overlain in places by the<br />

5.3-to-1.6-milli<strong>on</strong>-year-old Ortiz gravel deposits. Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e soil types <str<strong>on</strong>g>and</str<strong>on</strong>g> volcanic deposits are also<br />

interspersed. The dominant soils of the Albuquerque Basin are well-drained <str<strong>on</strong>g>and</str<strong>on</strong>g> loamy, with minor<br />

amounts of gravelly <str<strong>on</strong>g>and</str<strong>on</strong>g> st<strong>on</strong>y soils also found al<strong>on</strong>g the mountains <str<strong>on</strong>g>and</str<strong>on</strong>g> arroyos. Twenty-five soil types<br />

have been identified <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Of these 25 soil types, 3 are found at the site proposed <str<strong>on</strong>g>for</str<strong>on</strong>g> the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (see Figure 3-6). Table 3-6 provides general characteristics <str<strong>on</strong>g>and</str<strong>on</strong>g> limitati<strong>on</strong>s<br />

associated with the soils mapped within the Proposed Acti<strong>on</strong> site.<br />

Table 3-6. Soil Properties of the Mapped Soil Type Found at the Proposed Acti<strong>on</strong> Site<br />

Map Unit<br />

Name<br />

Slope<br />

(percent)<br />

Farml<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Classificati<strong>on</strong><br />

Drainage<br />

Road<br />

Limitati<strong>on</strong>s<br />

Building<br />

Limitati<strong>on</strong>s<br />

Excavati<strong>on</strong><br />

Limitati<strong>on</strong>s<br />

Welldrained<br />

Embudo<br />

gravelly fine<br />

s<str<strong>on</strong>g>and</str<strong>on</strong>g>y loam<br />

Wink fine<br />

s<str<strong>on</strong>g>and</str<strong>on</strong>g>y loam<br />

Bluepoint-<br />

Kokan<br />

associati<strong>on</strong><br />

Source: NRCS 2009<br />

0 to 5<br />

Not prime<br />

farml<str<strong>on</strong>g>and</str<strong>on</strong>g> soil<br />

Somewhat<br />

limited<br />

Very limited<br />

Very limited<br />

0 to 5<br />

--<br />

Not prime<br />

farml<str<strong>on</strong>g>and</str<strong>on</strong>g> soil<br />

Not prime<br />

farml<str<strong>on</strong>g>and</str<strong>on</strong>g> soil<br />

Welldrained<br />

Not rated<br />

Not limited<br />

Somewhat<br />

limited<br />

Not limited<br />

Very limited<br />

Somewhat<br />

limited<br />

Very limited<br />

Prime Farml<str<strong>on</strong>g>and</str<strong>on</strong>g>. Of the 25 soil types mapped at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, n<strong>on</strong>e are c<strong>on</strong>sidered prime farml<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

soils or farml<str<strong>on</strong>g>and</str<strong>on</strong>g> soils of statewide importance (NRCS 2009). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is not currently used <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

agricultural purposes, nor is any agricultural use planned <str<strong>on</strong>g>for</str<strong>on</strong>g> the future.<br />

Geologic Hazards. Geologic hazards are defined as a natural geologic event that can endanger human<br />

lives <str<strong>on</strong>g>and</str<strong>on</strong>g> threaten property. This includes earthquakes, l<str<strong>on</strong>g>and</str<strong>on</strong>g>slides, sinkholes, tsunamis, <str<strong>on</strong>g>and</str<strong>on</strong>g> volcanoes. In<br />

the City of Albuquerque, the primary geologic hazard that could potentially endanger lives or threaten<br />

property is earthquakes. The Albuquerque area is characterized by a series of faults <strong>on</strong> the eastern side of<br />

the S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia <str<strong>on</strong>g>and</str<strong>on</strong>g> Manzano mountains. Movement <strong>on</strong> these faults has not occurred within the past 10,000<br />

years; however, the Albuquerque area in general has a history of relatively frequent, but low magnitude<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> intensity, earthquakes (K<strong>AFB</strong> 1997a). The U.S. Geological Survey has produced seismic hazards<br />

maps based <strong>on</strong> current in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> about the rate at which earthquakes occur in different areas <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong><br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-15


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph Ave<br />

Texas St<br />

WaB<br />

Hardin Blvd<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph<br />

West Ordinance Rd<br />

EmB<br />

Southgate Ave<br />

TOW ROAD<br />

TARGET RD<br />

Proposed Acti<strong>on</strong><br />

Pad 5<br />

Glow Rd<br />

Pennsylvania St<br />

TARGET ROAD A<br />

Soils<br />

BKD<br />

BKD, Bluepoint‐Kokan associati<strong>on</strong>, hilly<br />

EmB, Embudo gravelly fine s<str<strong>on</strong>g>and</str<strong>on</strong>g>y loam, 0 to 5 percent slopes<br />

TARGET ROAD B<br />

GA, Gila fine s<str<strong>on</strong>g>and</str<strong>on</strong>g>y loam<br />

WaB, Wink fine s<str<strong>on</strong>g>and</str<strong>on</strong>g>y loam, 0 to 5 percent slopes<br />

Existing Hot Cargo Pad<br />

Muniti<strong>on</strong> Haul Rd<br />

Proposed Hot Cargo Pad (Proposed Acti<strong>on</strong>)<br />

Proposed Hot Cargo Pad Taxiway (Proposed Acti<strong>on</strong>)<br />

Existing Hot Cargo Pad QD Arc<br />

Proposed Hot Cargo Pad QD Arc<br />

0 125 250 500<br />

Feet<br />

Meters<br />

0 35 70 140<br />

Projecti<strong>on</strong>: Transverse Mercator<br />

State Plane New Mexico Central FIPS 3002 feet<br />

North American Datum of 1983<br />

1 inch = 1,000 feet<br />

BKD<br />

GA<br />

Map Extent<br />

Figure 3-6. Mapped Soil Units at the Proposed Acti<strong>on</strong> Site<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-16


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

how far str<strong>on</strong>g shaking extends from the quake source. The hazard maps show the levels of horiz<strong>on</strong>tal<br />

shaking that have a 2 in 100 chance of being exceeded in a 50-year period. Shaking is expressed as a<br />

percentage of the <str<strong>on</strong>g>for</str<strong>on</strong>g>ce of gravity (percent g) <str<strong>on</strong>g>and</str<strong>on</strong>g> is proporti<strong>on</strong>al to the hazard faced by a particular type<br />

of building. In general, little or no damage is expected at values less than 10 percent g, moderate damage<br />

could occur at 10 to 20 percent g, <str<strong>on</strong>g>and</str<strong>on</strong>g> major damage could occur at values greater than 20 percent g. The<br />

regi<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has a seismic hazard rating of approximately 16 to 20 percent g (USGS 2009).<br />

3.6 Water Resources<br />

3.6.1 Definiti<strong>on</strong> of the Resource<br />

Water resources include groundwater, surface water, <str<strong>on</strong>g>and</str<strong>on</strong>g> floodplains. Evaluati<strong>on</strong> of water resources<br />

examines the quantity <str<strong>on</strong>g>and</str<strong>on</strong>g> quality of the resource <str<strong>on</strong>g>and</str<strong>on</strong>g> its dem<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> various purposes. Groundwater<br />

c<strong>on</strong>sists of subsurface hydrologic resources. It is an essential resource that functi<strong>on</strong>s to recharge surface<br />

water <str<strong>on</strong>g>and</str<strong>on</strong>g> is often used <str<strong>on</strong>g>for</str<strong>on</strong>g> potable water c<strong>on</strong>sumpti<strong>on</strong>, agricultural irrigati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> industrial applicati<strong>on</strong>s.<br />

Groundwater typically can be described in terms of its depth from the surface, aquifer or well capacity,<br />

water quality, surrounding geologic compositi<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> recharge rate.<br />

Surface water resources generally c<strong>on</strong>sist of wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, lakes, rivers, <str<strong>on</strong>g>and</str<strong>on</strong>g> streams. Surface water is<br />

important <str<strong>on</strong>g>for</str<strong>on</strong>g> its c<strong>on</strong>tributi<strong>on</strong>s to the ec<strong>on</strong>omic, ecological, recreati<strong>on</strong>al, <str<strong>on</strong>g>and</str<strong>on</strong>g> human health of a<br />

community or locale. The Clean Water Act (CWA) (33 U.S.C. 1251 et seq., as amended) establishes<br />

Federal limits, through the Nati<strong>on</strong>al Pollutant Discharge Eliminati<strong>on</strong> System (NPDES), <strong>on</strong> the amounts of<br />

specific pollutants that are discharged to surface waters in order to restore <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain the chemical,<br />

physical, <str<strong>on</strong>g>and</str<strong>on</strong>g> biological integrity of the water. The NPDES program regulates the discharge of point (end<br />

of pipe) <str<strong>on</strong>g>and</str<strong>on</strong>g> n<strong>on</strong>point (storm water) sources of water polluti<strong>on</strong>. Secti<strong>on</strong> 404 of the CWA regulates the<br />

discharge of dredge or fill material into waters of the United States, which includes wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s. Waters of<br />

the United States are defined within the CWA, as amended, <str<strong>on</strong>g>and</str<strong>on</strong>g> jurisdicti<strong>on</strong> is addressed by the USEPA<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> the U.S. Army Corps of Engineers (USACE). See Secti<strong>on</strong> 3.7.1 <str<strong>on</strong>g>for</str<strong>on</strong>g> further details regarding<br />

jurisdicti<strong>on</strong> by these agencies <str<strong>on</strong>g>and</str<strong>on</strong>g> wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, a subset of waters of the United States.<br />

Storm water is an important comp<strong>on</strong>ent of surface water systems because of its potential to introduce<br />

sediments <str<strong>on</strong>g>and</str<strong>on</strong>g> other c<strong>on</strong>taminants that could degrade surface waters. Proper management of storm water<br />

flows, which can be intensified by high proporti<strong>on</strong>s of impervious surfaces associated with buildings,<br />

roads, <str<strong>on</strong>g>and</str<strong>on</strong>g> parking lots, is important to the management of surface water quality <str<strong>on</strong>g>and</str<strong>on</strong>g> natural flow<br />

characteristics. Prol<strong>on</strong>ged increases in storm water volume <str<strong>on</strong>g>and</str<strong>on</strong>g> velocity associated with development <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

increased impervious surfaces has potential to impact adjacent streams as a result of stream bank erosi<strong>on</strong><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> channel widening or down cutting associated with the adjustment of the stream to the change in flow<br />

characteristics. Storm water management systems are typically designed to c<strong>on</strong>tain runoff <strong>on</strong>site during<br />

c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> to maintain predevelopment storm water flow characteristics following development,<br />

through either the applicati<strong>on</strong> of infiltrati<strong>on</strong> or retenti<strong>on</strong> practices. Failure to size storm water systems<br />

appropriately to hold or delay c<strong>on</strong>veyance of the largest predicted precipitati<strong>on</strong> event often leads to<br />

downstream flooding <str<strong>on</strong>g>and</str<strong>on</strong>g> the envir<strong>on</strong>mental <str<strong>on</strong>g>and</str<strong>on</strong>g> ec<strong>on</strong>omic damages associated with flooding.<br />

In 2010, the USEPA issued a <str<strong>on</strong>g>Final</str<strong>on</strong>g> Rule <str<strong>on</strong>g>for</str<strong>on</strong>g> the CWA c<strong>on</strong>cerning technology-based Effluent Limitati<strong>on</strong>s<br />

Guidelines <str<strong>on</strong>g>and</str<strong>on</strong>g> New Source Per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Development Point Source<br />

Category. All NPDES storm water permits issued by the USEPA or states must incorporate requirements<br />

established in the <str<strong>on</strong>g>Final</str<strong>on</strong>g> Rule. As of February 1, 2010, all new c<strong>on</strong>structi<strong>on</strong> (or demoliti<strong>on</strong>) sites that<br />

disturb <strong>on</strong>e or more acres of l<str<strong>on</strong>g>and</str<strong>on</strong>g> are required to meet the n<strong>on</strong>-numeric effluent limitati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> effective<br />

erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong> c<strong>on</strong>trols must be designed, installed, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintained. These include:<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-17


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

C<strong>on</strong>trol storm water volume <str<strong>on</strong>g>and</str<strong>on</strong>g> velocity to minimize erosi<strong>on</strong><br />

C<strong>on</strong>trol storm water discharges including both peak flow rates <str<strong>on</strong>g>and</str<strong>on</strong>g> total storm water volume<br />

Minimize the amount of soil exposed during c<strong>on</strong>structi<strong>on</strong> activities<br />

Minimize the disturbance of steep slopes<br />

Minimize sediment discharges from the site using c<strong>on</strong>trols that address factors such as the<br />

amount, frequency, intensity <str<strong>on</strong>g>and</str<strong>on</strong>g> durati<strong>on</strong> of precipitati<strong>on</strong>; the nature of resulting storm water<br />

runoff; <str<strong>on</strong>g>and</str<strong>on</strong>g> soil characteristics, including the range of soil particle sizes expected to be present <strong>on</strong><br />

the site<br />

Provide <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain natural buffers around surface waters, direct storm water to vegetated areas<br />

to increase sediment removal <str<strong>on</strong>g>and</str<strong>on</strong>g> maximize storm water infiltrati<strong>on</strong> where feasible<br />

Minimize erosi<strong>on</strong> at outlets <str<strong>on</strong>g>and</str<strong>on</strong>g> downstream channel <str<strong>on</strong>g>and</str<strong>on</strong>g> stream bank erosi<strong>on</strong><br />

Minimize soil compacti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> preserve topsoil where feasible.<br />

In additi<strong>on</strong>, c<strong>on</strong>structi<strong>on</strong> site owners <str<strong>on</strong>g>and</str<strong>on</strong>g> operators that disturb <strong>on</strong>e or more acres of l<str<strong>on</strong>g>and</str<strong>on</strong>g> are required to<br />

use BMPs to ensure that soil disturbed during c<strong>on</strong>structi<strong>on</strong> activities does not pollute nearby water bodies.<br />

Effective August 1, 2011, c<strong>on</strong>structi<strong>on</strong> activities disturbing a total of 20 or more acres at <strong>on</strong>e time,<br />

including n<strong>on</strong>-c<strong>on</strong>tiguous l<str<strong>on</strong>g>and</str<strong>on</strong>g> disturbances that take place at the same time <str<strong>on</strong>g>and</str<strong>on</strong>g> are part of a larger<br />

comm<strong>on</strong> plan of development, must comply with the numeric effluent limitati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> turbidity in additi<strong>on</strong><br />

to the n<strong>on</strong>-numeric effluent limitati<strong>on</strong>s. The maximum daily turbidity limitati<strong>on</strong> will be<br />

280 nephelometric turbidity units.<br />

Secti<strong>on</strong> 438 of the Energy Independence <str<strong>on</strong>g>and</str<strong>on</strong>g> Security Act (EISA) (42 U.S.C. 17094) establishes into law<br />

new storm water design requirements <str<strong>on</strong>g>for</str<strong>on</strong>g> Federal c<strong>on</strong>structi<strong>on</strong> projects that disturb a footprint of greater<br />

than 5,000 square feet of l<str<strong>on</strong>g>and</str<strong>on</strong>g>. EISA Secti<strong>on</strong> 438 requirements are independent of storm water<br />

requirements under the CWA. The project footprint c<strong>on</strong>sists of all horiz<strong>on</strong>tal hard surfaces <str<strong>on</strong>g>and</str<strong>on</strong>g> disturbed<br />

areas associated with project development. Under these requirements, predevelopment site hydrology<br />

must be maintained or restored to the maximum extent technically feasible with respect to temperature,<br />

rate, volume, <str<strong>on</strong>g>and</str<strong>on</strong>g> durati<strong>on</strong> of flow. Predevelopment hydrology shall be modeled or calculated using<br />

recognized tools <str<strong>on</strong>g>and</str<strong>on</strong>g> must include site-specific factors such as soil type, ground cover, <str<strong>on</strong>g>and</str<strong>on</strong>g> ground slope.<br />

Site design shall incorporate storm water retenti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> reuse technologies such as bioretenti<strong>on</strong> areas,<br />

permeable pavements, cisterns/recycling, <str<strong>on</strong>g>and</str<strong>on</strong>g> green roofs to the maximum extent technically feasible.<br />

Post-c<strong>on</strong>structi<strong>on</strong> analyses shall be c<strong>on</strong>ducted to evaluate the effectiveness of the as-built storm water<br />

reducti<strong>on</strong> features. As stated in a DOD memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um dated January 19, 2010, these regulati<strong>on</strong>s will be<br />

incorporated into applicable DOD Unified Facilities Criteria (UFC) within 6 m<strong>on</strong>ths (DOD 2010).<br />

Additi<strong>on</strong>al guidance is provided in the USEPA’s Technical Guidance <strong>on</strong> Implementing the Stormwater<br />

Runoff Requirements <str<strong>on</strong>g>for</str<strong>on</strong>g> Federal Projects under Secti<strong>on</strong> 438 of the Energy Independence <str<strong>on</strong>g>and</str<strong>on</strong>g> Security<br />

Act.<br />

Floodplains are areas of low-level ground present al<strong>on</strong>g rivers, stream channels, or coastal waters that are<br />

subject to periodic or infrequent inundati<strong>on</strong> due to rain or melting snow. Floodplain ecosystem functi<strong>on</strong>s<br />

include natural moderati<strong>on</strong> of floods, flood storage <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>veyance, groundwater recharge, nutrient<br />

cycling, water quality maintenance, <str<strong>on</strong>g>and</str<strong>on</strong>g> habitat <str<strong>on</strong>g>for</str<strong>on</strong>g> a diversity of plants <str<strong>on</strong>g>and</str<strong>on</strong>g> animals. Flood potential is<br />

evaluated by the Federal Emergency Management Agency (FEMA), which defines the 100-year<br />

floodplain as an area within which there is a 1 percent chance of inundati<strong>on</strong> by a flood event in a given<br />

year. Risk of flooding is influenced by local topography, the frequency of precipitati<strong>on</strong> events, the size of<br />

the watershed above the floodplain, <str<strong>on</strong>g>and</str<strong>on</strong>g> upstream development. Federal, state, <str<strong>on</strong>g>and</str<strong>on</strong>g> local regulati<strong>on</strong>s often<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-18


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

limit floodplain development to passive uses, such as recreati<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g> preservati<strong>on</strong> activities, to reduce<br />

the risks to human health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety. EO 11988, Floodplain Management, directs Federal agencies to<br />

avoid siting within floodplains unless the agency determines that there is no practicable alternative.<br />

3.6.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Groundwater. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is within the limits of the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Underground Water Basin, which is<br />

defined as a natural resource area <str<strong>on</strong>g>and</str<strong>on</strong>g> is designated as a “declared underground water basin” by New<br />

Mexico. The Basin is regulated by the state as a sole source of potable water, although the Albuquerque<br />

area will be supplemented in the future with surface water diverted from the San Juan <str<strong>on</strong>g>and</str<strong>on</strong>g> Chama rivers<br />

to the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e (K<strong>AFB</strong> 2007). Two aquifers, a regi<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g> a perched aquifer, underlie Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

The regi<strong>on</strong>al aquifer is present under all of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> ranges in depth from near surface to depths<br />

of 200 feet below grade surface east of the major fault z<strong>on</strong>es in the eastern porti<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

to depths of 350 to 500 feet below grade surface west of the fault z<strong>on</strong>e. The regi<strong>on</strong>al aquifer is used <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

the installati<strong>on</strong>’s water supply. The perched aquifer is limited in area, straddling Tijeras Arroyo northeast<br />

of the c<strong>on</strong>fluence of Tijeras Arroyo <str<strong>on</strong>g>and</str<strong>on</strong>g> Arroyo del Coyote, <str<strong>on</strong>g>and</str<strong>on</strong>g> occurs at depths of 200 to 400 feet below<br />

grade surface. The perched aquifer is a result of infiltrati<strong>on</strong> of water from both man-made <str<strong>on</strong>g>and</str<strong>on</strong>g> natural<br />

origins, with a flow directi<strong>on</strong> to the southeast, <str<strong>on</strong>g>and</str<strong>on</strong>g> is not used <str<strong>on</strong>g>for</str<strong>on</strong>g> any purpose. The presence of faults has<br />

a direct bearing <strong>on</strong> the movement <str<strong>on</strong>g>and</str<strong>on</strong>g> occurrence of groundwater in the vicinity of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The<br />

groundwater flow directi<strong>on</strong> is down basin (south), with local variati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> even reversals due to<br />

groundwater pumping, specific geologic structures, or shallow influences near the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e (K<strong>AFB</strong><br />

2002).<br />

Surface Water. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is within the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e watershed. The Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e is the major surface<br />

hydrologic feature in central New Mexico, flowing north to south through Albuquerque approximately<br />

5 miles west of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> (K<strong>AFB</strong> 2007). Water resources <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> reflect its dry climate.<br />

The average annual precipitati<strong>on</strong> in Albuquerque is 9 inches, with half of the average annual precipitati<strong>on</strong><br />

occurring from July to October during heavy thunderstorms (K<strong>AFB</strong> 2007). Surface water generally<br />

occurs in the <str<strong>on</strong>g>for</str<strong>on</strong>g>m of storm water sheet flow that drains into small gullies during heavy precipitati<strong>on</strong><br />

(K<strong>AFB</strong> 2007). Surface water generally flows across Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> in a western directi<strong>on</strong> toward the Rio<br />

Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e.<br />

The two main surface water drainage channels <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> are Tijeras Arroyo <str<strong>on</strong>g>and</str<strong>on</strong>g> the smaller<br />

Arroyo del Coyote, which joins Tijeras Arroyo approximately 1 mile west of the Tijeras Arroyo Golf<br />

Course (see Figure 3-7). Tijeras Arroyo <str<strong>on</strong>g>and</str<strong>on</strong>g> Arroyo del Coyote are tributaries to the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e, <str<strong>on</strong>g>and</str<strong>on</strong>g> no<br />

jurisdicti<strong>on</strong>al determinati<strong>on</strong>s (JDs) have been made <strong>on</strong> these water features. If JDs were made, these<br />

arroyos could be regulated under Secti<strong>on</strong> 404 of the CWA (see Secti<strong>on</strong>s 3.7.1 <str<strong>on</strong>g>and</str<strong>on</strong>g> 3.7.2.5 <str<strong>on</strong>g>for</str<strong>on</strong>g> more<br />

in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> <strong>on</strong> jurisdicti<strong>on</strong>al wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s). Both arroyos flow intermittently during heavy thunderstorms <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

spring snowmelt, but most of the water percolates into alluvial deposits or is lost to the atmosphere via<br />

evapotranspirati<strong>on</strong> (K<strong>AFB</strong> 2002). Tijeras Arroyo, which is dry <str<strong>on</strong>g>for</str<strong>on</strong>g> most of the year, is the primary<br />

surface channel that drains surface water from Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> to the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e. Precipitati<strong>on</strong> reaches<br />

Tijeras Arroyo through a series of storm drains, flood canals, <str<strong>on</strong>g>and</str<strong>on</strong>g> small, mostly unnamed arroyos. Nearly<br />

95 percent of the precipitati<strong>on</strong> that flows through Tijeras Arroyo evaporates be<str<strong>on</strong>g>for</str<strong>on</strong>g>e it reaches the Rio<br />

Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e, <str<strong>on</strong>g>and</str<strong>on</strong>g> the remaining 5 percent is equally divided between groundwater recharge <str<strong>on</strong>g>and</str<strong>on</strong>g> runoff (K<strong>AFB</strong><br />

2002). The closest main drainage channel that sheet runoff from the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> could drain<br />

to is the Tijeras Arroyo, which is approximately 0.75 miles south of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. A<br />

clearly defined tributary to the Tijeras Arroyo is approximately 0.35 miles south of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. There are no natural lakes or rivers <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Six man-made p<strong>on</strong>ds are located <strong>on</strong><br />

Tijeras Golf Course. At least 12 naturally occurring springs have been found <strong>on</strong> the installati<strong>on</strong> (K<strong>AFB</strong><br />

2007).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-19


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Club Rd<br />

Gibs<strong>on</strong> Blvd<br />

G Ave<br />

F Ave<br />

Aberdeen Ave<br />

St<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph Ave<br />

Carlisle Blvd<br />

o<br />

y<br />

Manz<strong>on</strong>o Spring #2<br />

r o<br />

r<br />

s A<br />

a<br />

j e r<br />

T i<br />

New Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

A r<br />

Coyote Spring 1 ‐ 12<br />

o y<br />

r<br />

o d<br />

e l<br />

C o<br />

t e<br />

y o<br />

G Spring<br />

Homestead Spring<br />

Four Hills Spring 1<br />

20th<br />

Hardin Blvd<br />

Texas St<br />

Wyoming Blvd<br />

Pennsylvania St<br />

Existing Hot Cargo Pad<br />

Proposed Hot Cargo Pad<br />

(Proposed Acti<strong>on</strong>)<br />

Proposed Hot Cargo Pad Taxiway<br />

(Proposed Acti<strong>on</strong>)<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Installati<strong>on</strong> Boundary<br />

Pad 5<br />

Proposed<br />

Acti<strong>on</strong><br />

Cattail<br />

Spring<br />

Coyote Arroyo<br />

East Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Existing Structures<br />

Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g> Points<br />

Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s (2006)<br />

100‐Year Floodplain<br />

Intermittent Streams<br />

Roads<br />

0 0.4 0.8 1.6<br />

0 0.5 1 2<br />

Miles<br />

Kilometers<br />

Projecti<strong>on</strong>: Transverse Mercator<br />

State Plane New Mexico Central FIPS 3002 feet<br />

North American Datum of 1983<br />

Sources: USACE 2006, Hot Cargo Pads <str<strong>on</strong>g>and</str<strong>on</strong>g> Hydrography data: Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> 10/2009<br />

Figure 3-7. Surface Water, Floodplains, <str<strong>on</strong>g>and</str<strong>on</strong>g> Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-20


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Storm water runoff <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> predominantly flows through the drainage patterns created by<br />

natural terrain <str<strong>on</strong>g>and</str<strong>on</strong>g> paved surfaces. In some areas, runoff is directed through ditches <str<strong>on</strong>g>and</str<strong>on</strong>g> piping, with<br />

direct discharges into a receiving stream or surface water body. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has a Storm Water<br />

Municipal Separate Storm Sewer System (MS4), which collects <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>veys storm water from storm<br />

drains, pipes, <str<strong>on</strong>g>and</str<strong>on</strong>g> ditches, <str<strong>on</strong>g>and</str<strong>on</strong>g> discharges storm water into Tijeras Arroyo <str<strong>on</strong>g>and</str<strong>on</strong>g> the City of Albuquerque’s<br />

MS4. Storm water in the developed area of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> drains into small culverts. There are also four<br />

storm water detenti<strong>on</strong> p<strong>on</strong>ds within the cant<strong>on</strong>ment area. Storm water in the industrial/laboratory areas of<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> discharges via surface runoff or three large culverts that drain toward Tijeras Arroyo.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has an NPDES General Storm Water Permit <str<strong>on</strong>g>for</str<strong>on</strong>g> industrial activities <str<strong>on</strong>g>and</str<strong>on</strong>g> an active program<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> projects that require an NPDES permit. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> must also comply with MS4<br />

permit requirements <str<strong>on</strong>g>and</str<strong>on</strong>g> has developed a Storm Water Management Plan as required by the MS4 permit<br />

(K<strong>AFB</strong> 2002).<br />

Floodplains. A 100-year floodplain encompasses Tijeras Arroyo <str<strong>on</strong>g>and</str<strong>on</strong>g> Arroyo del Coyote (see<br />

Figure 3-7). These are the <strong>on</strong>ly two arroyos with a floodplain <strong>on</strong> the installati<strong>on</strong>. Vegetati<strong>on</strong> can<br />

encroach <strong>on</strong> the Tijeras Arroyo channel <str<strong>on</strong>g>and</str<strong>on</strong>g> obstruct the flow of water, which can cause flooding,<br />

especially during high-intensity thunderstorms between May <str<strong>on</strong>g>and</str<strong>on</strong>g> October. Tijeras Arroyo <str<strong>on</strong>g>and</str<strong>on</strong>g> Arroyo del<br />

Coyote floods occur infrequently <str<strong>on</strong>g>and</str<strong>on</strong>g> are characterized by high peak flows, small volumes, <str<strong>on</strong>g>and</str<strong>on</strong>g> short<br />

durati<strong>on</strong>s (K<strong>AFB</strong> 2007).<br />

3.7 Biological Resources<br />

3.7.1 Definiti<strong>on</strong> of the Resource<br />

Biological resources include native or naturalized plants <str<strong>on</strong>g>and</str<strong>on</strong>g> animals <str<strong>on</strong>g>and</str<strong>on</strong>g> the habitats in which they occur,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> native or introduced species found in l<str<strong>on</strong>g>and</str<strong>on</strong>g>scaped or disturbed areas. Protected species are defined as<br />

those listed as threatened, endangered, or proposed or c<str<strong>on</strong>g>and</str<strong>on</strong>g>idate <str<strong>on</strong>g>for</str<strong>on</strong>g> listing by the U.S. Fish <str<strong>on</strong>g>and</str<strong>on</strong>g> Wildlife<br />

Service (USFWS); New Mexico Energy, Minerals, <str<strong>on</strong>g>and</str<strong>on</strong>g> Natural Resources Department; or NMDGF.<br />

Federal species of c<strong>on</strong>cern are not protected by law; however, these species could become listed, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

there<str<strong>on</strong>g>for</str<strong>on</strong>g>e are given c<strong>on</strong>siderati<strong>on</strong> when addressing biological resource impacts of an acti<strong>on</strong>.<br />

Sensitive habitats include those areas designated by the USFWS as critical habitat protected by the<br />

Endangered Species Act (ESA) <str<strong>on</strong>g>and</str<strong>on</strong>g> sensitive ecological areas as designated by state or Federal rulings.<br />

Sensitive habitats also include wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, plant communities that are unusual or of limited distributi<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

important seas<strong>on</strong>al use areas <str<strong>on</strong>g>for</str<strong>on</strong>g> wildlife (e.g., migrati<strong>on</strong> routes, breeding areas, crucial summer/winter<br />

habitats).<br />

Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are an important natural system <str<strong>on</strong>g>and</str<strong>on</strong>g> habitat because of the diverse biologic <str<strong>on</strong>g>and</str<strong>on</strong>g> hydrologic<br />

functi<strong>on</strong>s they per<str<strong>on</strong>g>for</str<strong>on</strong>g>m. These functi<strong>on</strong>s include water quality improvement, groundwater recharge <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

discharge, polluti<strong>on</strong> mitigati<strong>on</strong>, nutrient cycling, wildlife habitat provisi<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> erosi<strong>on</strong> protecti<strong>on</strong>.<br />

Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s have been defined as areas that are “inundated or saturated by surface or groundwater at a<br />

frequency <str<strong>on</strong>g>and</str<strong>on</strong>g> durati<strong>on</strong> sufficient to support, <str<strong>on</strong>g>and</str<strong>on</strong>g> under normal circumstances do support, a prevalence of<br />

vegetati<strong>on</strong> typically adapted <str<strong>on</strong>g>for</str<strong>on</strong>g> life in saturated soil c<strong>on</strong>diti<strong>on</strong>s” (USACE 1987). Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are protected<br />

as a subset of the “waters of the United States” under Secti<strong>on</strong> 404 of the CWA. The term “waters of the<br />

United States” has a broad meaning under the CWA <str<strong>on</strong>g>and</str<strong>on</strong>g> incorporates deepwater aquatic habitats <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

special aquatic habitats, including wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s. For regulatory purposes, wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are defined by three<br />

factors: vegetati<strong>on</strong>, hydrologic regime, <str<strong>on</strong>g>and</str<strong>on</strong>g> soil characteristics. In additi<strong>on</strong>, many states have local<br />

regulati<strong>on</strong>s governing wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s <str<strong>on</strong>g>and</str<strong>on</strong>g> their buffer areas.<br />

In 2006, the U.S. Supreme Court addressed the jurisdicti<strong>on</strong>al scope of Secti<strong>on</strong> 404 of the CWA,<br />

specifically the term “the waters of the United States,” in Rapanos v. United States <str<strong>on</strong>g>and</str<strong>on</strong>g> in Carabell v.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-21


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

United States. As a c<strong>on</strong>sequence of the associated U.S. Supreme Court decisi<strong>on</strong>, the USEPA <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

USACE, in coordinati<strong>on</strong> with the Office of Management <str<strong>on</strong>g>and</str<strong>on</strong>g> Budget <str<strong>on</strong>g>and</str<strong>on</strong>g> the CEQ, developed the Clean<br />

Water Act Jurisdicti<strong>on</strong> Following the U.S. Supreme Court’s Decisi<strong>on</strong> in Rapanos v. United States <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Carabell v. United States memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um (USEPA <str<strong>on</strong>g>and</str<strong>on</strong>g> USACE 2007a). The guidance requires a greater<br />

level of documentati<strong>on</strong> to support an agency JD <str<strong>on</strong>g>for</str<strong>on</strong>g> a particular water body. As a result of the decisi<strong>on</strong>,<br />

the agencies now assert jurisdicti<strong>on</strong> over the following categories of water bodies: Traditi<strong>on</strong>al Navigable<br />

Waters (TNWs); all wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s adjacent to TNWs; n<strong>on</strong>navigable tributaries of TNWs that are relatively<br />

permanent (i.e., tributaries that typically flow year-round or have c<strong>on</strong>tinuous flow at least seas<strong>on</strong>ally); <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s that directly abut such tributaries. In additi<strong>on</strong>, the agencies assert jurisdicti<strong>on</strong> over every water<br />

body that is not a Relatively Permanent Water if that water body is determined (<strong>on</strong> the basis of a factspecific<br />

analysis) to have a significant nexus with a TNW. The classes of water bodies that are subject to<br />

CWA jurisdicti<strong>on</strong>, <strong>on</strong>ly if such a significant nexus is dem<strong>on</strong>strated are: n<strong>on</strong>navigable tributaries that do<br />

not typically flow year-round or have c<strong>on</strong>tinuous flow at least seas<strong>on</strong>ally; wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s adjacent to such<br />

tributaries; <str<strong>on</strong>g>and</str<strong>on</strong>g> wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s adjacent to but that do not directly abut a relatively permanent, n<strong>on</strong>navigable<br />

tributary. A significant nexus exists if the tributary, in combinati<strong>on</strong> with all of its adjacent wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, has<br />

more than a speculative or an insubstantial effect <strong>on</strong> the chemical, physical, or biological, integrity of a<br />

TNW. Principal c<strong>on</strong>siderati<strong>on</strong>s when evaluating significant nexus include the volume, durati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

frequency of the flow of water in the tributary <str<strong>on</strong>g>and</str<strong>on</strong>g> the proximity of the tributary to a TNW, plus the<br />

hydrologic, ecologic, <str<strong>on</strong>g>and</str<strong>on</strong>g> other functi<strong>on</strong>s per<str<strong>on</strong>g>for</str<strong>on</strong>g>med by the tributary <str<strong>on</strong>g>and</str<strong>on</strong>g> all of its adjacent wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s.<br />

An additi<strong>on</strong>al memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um regarding USEPA <str<strong>on</strong>g>and</str<strong>on</strong>g> USACE coordinati<strong>on</strong> <strong>on</strong> JDs under CWA Secti<strong>on</strong> 404<br />

in light of the Solid Waste Agency of Northern Cook County <str<strong>on</strong>g>and</str<strong>on</strong>g> Rapanos Supreme Court Decisi<strong>on</strong>s was<br />

developed <str<strong>on</strong>g>and</str<strong>on</strong>g> signed in resp<strong>on</strong>se to the Rapanos decisi<strong>on</strong> (USEPA <str<strong>on</strong>g>and</str<strong>on</strong>g> USACE 2007b). Headquarters<br />

originally required the districts to request c<strong>on</strong>currence <str<strong>on</strong>g>for</str<strong>on</strong>g> <strong>on</strong>ly those JDs where the district was<br />

c<strong>on</strong>sidering asserting jurisdicti<strong>on</strong> over a n<strong>on</strong>navigable, intra-state, isolated water or wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>. The<br />

agencies now require that all determinati<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> n<strong>on</strong>navigable, isolated waters be elevated <str<strong>on</strong>g>for</str<strong>on</strong>g> USACE<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> USEPA Headquarters review prior to the district making a final decisi<strong>on</strong> <strong>on</strong> the JD.<br />

3.7.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> lies at the intersecti<strong>on</strong> of four major North American physiographic <str<strong>on</strong>g>and</str<strong>on</strong>g> biotic provinces:<br />

the Great Plains, Great Basin, Rocky Mountains, <str<strong>on</strong>g>and</str<strong>on</strong>g> Chihuahuan Desert. Vegetati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> wildlife found<br />

within Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> are influenced by each of these provinces, the Great Basin being the most dominant.<br />

Elevati<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> range from approximately 5,000 feet in the west to almost 8,000 feet in the<br />

Manzanita Mountains, providing a variety of ecosystems. Several cany<strong>on</strong>s (Lurance, Sol se Mete,<br />

B<strong>on</strong>ito, Otero, <str<strong>on</strong>g>and</str<strong>on</strong>g> Madera) are in the eastern porti<strong>on</strong> of the installati<strong>on</strong>; a few smaller cany<strong>on</strong>s occur <strong>on</strong><br />

Manzano Base porti<strong>on</strong> of the installati<strong>on</strong>. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is near three regi<strong>on</strong>al natural areas: S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia<br />

Mountain Wilderness Area, S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Foothills Open Space, <str<strong>on</strong>g>and</str<strong>on</strong>g> the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Valley State Park. The<br />

S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Mountain Wilderness Area, encompassing 37,877 acres, is approximately 5 miles north of the<br />

eastern porti<strong>on</strong> of the installati<strong>on</strong>. This area is home to many species plants <str<strong>on</strong>g>and</str<strong>on</strong>g> animals <str<strong>on</strong>g>and</str<strong>on</strong>g> is also<br />

located <strong>on</strong> an important raptor migrati<strong>on</strong> route (K<strong>AFB</strong> 2007).<br />

3.7.2.1 Applicable Laws, Regulati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Policies<br />

Appendix A c<strong>on</strong>tains summaries of the Federal envir<strong>on</strong>mental laws, regulati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> EOs that might<br />

apply to the Proposed Acti<strong>on</strong>. The State of New Mexico also has regulati<strong>on</strong>s applicable to biological<br />

resources. The New Mexico Wildlife C<strong>on</strong>servati<strong>on</strong> Act of 1974 declared that native wildlife found to be<br />

threatened or endangered should be managed to maintain <str<strong>on</strong>g>and</str<strong>on</strong>g>, to the extent possible, enhance their<br />

numbers. Resp<strong>on</strong>sibility <str<strong>on</strong>g>for</str<strong>on</strong>g> implementing this Act was given to the NMDGF.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-22


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

3.7.2.2 Vegetati<strong>on</strong><br />

Four main plant communities are found <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>: grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> (includes sagebrush steppe <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s), piny<strong>on</strong>-juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, p<strong>on</strong>derosa pine woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> riparian/wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>/arroyo<br />

(see Table 3-7). Grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> piny<strong>on</strong>-juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are the dominant vegetative communities at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The riparian/wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>/arroyo community is c<strong>on</strong>fined to drainages <str<strong>on</strong>g>and</str<strong>on</strong>g> isolated areas<br />

inundated by surface water during at least some part of the year. The p<strong>on</strong>derosa pine woodl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

community is found al<strong>on</strong>g the eastern boundary of the installati<strong>on</strong> (K<strong>AFB</strong> 2007).<br />

Table 3-7. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> Vegetati<strong>on</strong> Communities<br />

Vegetati<strong>on</strong> Community Type<br />

Elevati<strong>on</strong> (feet)<br />

Grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> (including sagebrush steppe <str<strong>on</strong>g>and</str<strong>on</strong>g> juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s) 5,200–5,700<br />

Piny<strong>on</strong>-Juniper Woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s 6,300–7,500<br />

P<strong>on</strong>derosa Pine Woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s 7,600–7,988<br />

Riparian/Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>/Arroyo<br />

variable<br />

Source: K<strong>AFB</strong> 2007<br />

Grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> Community. This community is found between elevati<strong>on</strong>s of 5,200 <str<strong>on</strong>g>and</str<strong>on</strong>g> 5,700 feet at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong>. The grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> community at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> was further delineated into two more community types,<br />

including sagebrush steppe in the western porti<strong>on</strong> of the installati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s in the eastern<br />

porti<strong>on</strong>. In the sagebrush steppe the understory is less dense, with cryptogamic crust covering areas of<br />

exposed ground. Juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are similar to the grassl<str<strong>on</strong>g>and</str<strong>on</strong>g>s to the east except <str<strong>on</strong>g>for</str<strong>on</strong>g> the greater<br />

abundance of <strong>on</strong>e seeded juniper. The presence of this shrubby tree creates a savanna-like habitat in an<br />

otherwise treeless area. Juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are found at a slightly higher elevati<strong>on</strong> then the surrounding<br />

grassl<str<strong>on</strong>g>and</str<strong>on</strong>g>. This habitat type provides a transiti<strong>on</strong> into piny<strong>on</strong>-juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s (K<strong>AFB</strong> 2007).<br />

Piny<strong>on</strong>-Juniper Woodl<str<strong>on</strong>g>and</str<strong>on</strong>g> Community. The piny<strong>on</strong>-juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g> community ranges in elevati<strong>on</strong><br />

from 6,300 to 7,500 feet. This plant community is composed primarily of Colorado piny<strong>on</strong> pine <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong>e<br />

seeded juniper, with an understory of shrubs <str<strong>on</strong>g>and</str<strong>on</strong>g> grasses (K<strong>AFB</strong> 2007).<br />

P<strong>on</strong>derosa Pine Woodl<str<strong>on</strong>g>and</str<strong>on</strong>g> Community. The p<strong>on</strong>derosa pine woodl<str<strong>on</strong>g>and</str<strong>on</strong>g> community is found in the<br />

highest elevati<strong>on</strong>s of the eastern porti<strong>on</strong> of the installati<strong>on</strong>. It is typically found between 7,600 to<br />

7,988 feet (K<strong>AFB</strong> 2007).<br />

Riparian/Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>/Arroyo Community. The riparian/wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>/arroyo community c<strong>on</strong>sists of species that<br />

have a greater moisture requirement than species comm<strong>on</strong> to the other communities <strong>on</strong> the installati<strong>on</strong>.<br />

These plant communities are found al<strong>on</strong>g Tijeras Arroyo, Arroyo del Coyote, <str<strong>on</strong>g>and</str<strong>on</strong>g> at the various springs<br />

located throughout Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Most of the small, scattered wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> are in good<br />

c<strong>on</strong>diti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> occur in c<strong>on</strong>juncti<strong>on</strong> with other plant communities (K<strong>AFB</strong> 2007).<br />

Turf <str<strong>on</strong>g>and</str<strong>on</strong>g> L<str<strong>on</strong>g>and</str<strong>on</strong>g>scaped Areas. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> promotes water c<strong>on</strong>servati<strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>scaping by using xeriscape<br />

methods combined with native plant materials (K<strong>AFB</strong> 2007).<br />

The Proposed Acti<strong>on</strong> site is previously disturbed area that c<strong>on</strong>sists of asphalt, compacted gravel ground<br />

surface, two small structures, <str<strong>on</strong>g>and</str<strong>on</strong>g> undeveloped l<str<strong>on</strong>g>and</str<strong>on</strong>g> with bare ground or minimal vegetati<strong>on</strong> c<strong>on</strong>sisting of<br />

annual weeds <str<strong>on</strong>g>and</str<strong>on</strong>g> native grasses (see Figures 3-3, 3-4, <str<strong>on</strong>g>and</str<strong>on</strong>g> 3-5). Vegetati<strong>on</strong> typical of the surrounding<br />

grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> community includes broom snakeweed (Gutierrezia sarothrae), Great Plains yucca (Yucca<br />

glauca), Indian ricegrass (Oryzopsis hymenoides), purple three-awn (Artemisia pupurea), black grama<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-23


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

(Bouteloua eriopoda), blue grama (Bouteloua gracilis), galleta (Hilaria jamesii), foxtail barley (Hordeum<br />

jubatum), four-wing saltbush (Atriplex canescens), s<str<strong>on</strong>g>and</str<strong>on</strong>g> sagebrush (Artemisia filifolia), needle-<str<strong>on</strong>g>and</str<strong>on</strong>g>-thread<br />

grass (Stipa comata), globemallows (Sphaeralcea spp.), Siberian elm (Ulmus pumila), Morm<strong>on</strong> tea<br />

(Ephedra viridis), New Mexican bitterweed (Senecio neomexicanus), ring muhly (Muhlenbergia torreyi),<br />

plains prickly-pear (Opuntia polyacantha), <str<strong>on</strong>g>and</str<strong>on</strong>g> bottlebrush squirrel tail (Elymus l<strong>on</strong>gifolius) (K<strong>AFB</strong><br />

2003).<br />

3.7.2.3 Wildlife Species <str<strong>on</strong>g>and</str<strong>on</strong>g> Habitat<br />

Wildlife management falls under the jurisdicti<strong>on</strong> of the NMDGF <str<strong>on</strong>g>and</str<strong>on</strong>g> the USFWS <str<strong>on</strong>g>for</str<strong>on</strong>g> migratory birds <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

federally threatened <str<strong>on</strong>g>and</str<strong>on</strong>g> endangered species. Threatened <str<strong>on</strong>g>and</str<strong>on</strong>g> endangered species are addressed in this<br />

<str<strong>on</strong>g>EA</str<strong>on</strong>g> under Secti<strong>on</strong> 3.7.2.4. Other laws protecting wildlife include, but are not limited to, the Bald Eagle<br />

Protecti<strong>on</strong> Act of 1940 (protects bald <str<strong>on</strong>g>and</str<strong>on</strong>g> golden eagles), the Migratory Bird Treaty Act (MBTA) of 1918<br />

(protects neotropical migrants), <str<strong>on</strong>g>and</str<strong>on</strong>g> the ESA. Refer to Appendix A <str<strong>on</strong>g>for</str<strong>on</strong>g> additi<strong>on</strong>al laws <str<strong>on</strong>g>and</str<strong>on</strong>g> regulati<strong>on</strong>s<br />

(K<strong>AFB</strong> 2007).<br />

Wildlife species found at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> are representative of the species diversity comm<strong>on</strong> to the regi<strong>on</strong>al<br />

ecosystem (grassl<str<strong>on</strong>g>and</str<strong>on</strong>g>, juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>, piny<strong>on</strong>-juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> p<strong>on</strong>derosa pine woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s) <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

species comm<strong>on</strong> to semideveloped grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> areas. Species can be transient <str<strong>on</strong>g>and</str<strong>on</strong>g> travel or inhabit several<br />

communities, or exist in transiti<strong>on</strong>al areas between vegetati<strong>on</strong> communities.<br />

The locati<strong>on</strong> of the Proposed Acti<strong>on</strong> lies within the grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> associati<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Comm<strong>on</strong><br />

birds associated with the grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> associati<strong>on</strong> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> include horned lark (Eremophila<br />

alpestris), scaled quail (Callipepia squamata), mourning dove (Zenaida macroura), greater roadrunner<br />

(Geococcyx cali<str<strong>on</strong>g>for</str<strong>on</strong>g>nianus), American crow (Cowus brachyrhynchos), northern mockingbird (Mimus<br />

polyglottos), curved-billed thrasher (Toxostoma curvirostre), lark sparrow (Chordestes grammacus),<br />

black-throated sparrow (Amphispiza bilineata), western meadowlark (Sturnella neglecta), brown-headed<br />

cowbird (Molothrus ater), <str<strong>on</strong>g>and</str<strong>on</strong>g> house finch (Carpodacus mexicanus). The birds of prey, or raptors, most<br />

comm<strong>on</strong>ly found in the grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> associati<strong>on</strong> include northern harrier (Circus cyaneus), red-tailed hawk<br />

(Buteo jamaicensis), American kestrel (Falco sparverius), prairie falc<strong>on</strong> (F. mexicanus), l<strong>on</strong>g-eared owl<br />

(Asio otus), <str<strong>on</strong>g>and</str<strong>on</strong>g> great horned owl (Bubo virginianus). A comm<strong>on</strong> scavenger in this habitat type is the<br />

turkey vulture (Cathartes aura) (K<strong>AFB</strong> 2003).<br />

The grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> associati<strong>on</strong> has a mammal community dominated by rodents, rabbits, <str<strong>on</strong>g>and</str<strong>on</strong>g> hares. These<br />

include the desert cott<strong>on</strong>tail (Sylvilagus audub<strong>on</strong>ii), Gunnis<strong>on</strong>’s prairie dog (Cynomys gunnis<strong>on</strong>i), whitefooted<br />

deer mouse (Peromyscus maniculatus), silky pocket mouse (Perognathus flavus), Merriam’s<br />

kangaroo rat (Dipodomys merriami), <str<strong>on</strong>g>and</str<strong>on</strong>g> the northern grasshopper mouse (Onychomys leucogaster).<br />

Mammalian predators found in the grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> associati<strong>on</strong> include the coyote (Canis latrans), badger<br />

(Taxidea taxus), kit fox (Vulpes macrotis), striped skunk (Mephitis mephitis) <str<strong>on</strong>g>and</str<strong>on</strong>g> bobcat (Lynx rufus)<br />

(K<strong>AFB</strong> 2003). During the site visit <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong> in September 2009, prairie dogs were<br />

observed north <str<strong>on</strong>g>and</str<strong>on</strong>g> northeast of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site in the general vicinity of the new taxiway.<br />

Amphibians <str<strong>on</strong>g>and</str<strong>on</strong>g> reptiles found <strong>on</strong> the grassl<str<strong>on</strong>g>and</str<strong>on</strong>g>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> include the following: Woodhouse’s<br />

toad (Bufo woodhousii), New Mexico s<str<strong>on</strong>g>pad</str<strong>on</strong>g>efoot (Spea multiplicata), coachwhip snake (Masticophis<br />

flagellum), whiptail lizards (Cnemidophorus spp.), lesser earless lizard (Holbrookia maculata), <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

western rattlesnake (Crotalus viridis). Many of these species have extensive periods of dormancy during<br />

dry c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> rapid breeding cycles when temporary p<strong>on</strong>ds occur after rains (K<strong>AFB</strong> 2003).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-24


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

3.7.2.4 Threatened <str<strong>on</strong>g>and</str<strong>on</strong>g> Endangered Species<br />

The agencies that have primary resp<strong>on</strong>sibility <str<strong>on</strong>g>for</str<strong>on</strong>g> the c<strong>on</strong>servati<strong>on</strong> of plant <str<strong>on</strong>g>and</str<strong>on</strong>g> animal species in New<br />

Mexico are the USFWS; the NMDGF; <str<strong>on</strong>g>and</str<strong>on</strong>g> the New Mexico Energy, Minerals, <str<strong>on</strong>g>and</str<strong>on</strong>g> Natural Resources<br />

Department. These agencies maintain lists of plant <str<strong>on</strong>g>and</str<strong>on</strong>g> animal species that have been classified, or are<br />

potential c<str<strong>on</strong>g>and</str<strong>on</strong>g>idates <str<strong>on</strong>g>for</str<strong>on</strong>g> classificati<strong>on</strong>, as threatened or endangered in Bernalillo County. Of those species<br />

known to occur in the county, two Federal species of c<strong>on</strong>cern (western burrowing owl [Athene<br />

cunicularia hypugaea] <str<strong>on</strong>g>and</str<strong>on</strong>g> mountain plover [Charadrius m<strong>on</strong>tanus]), <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong>e state threatened species<br />

(gray vireo [Vireo vicinior]) have the potential to occur in the project area.<br />

Gray vireo. The gray vireo (Vireo vicinior), a state threatened species, as listed by the NMDGF, is the<br />

<strong>on</strong>ly federally or state-listed species known to occur <strong>on</strong> the installati<strong>on</strong>. The USFWS c<strong>on</strong>siders the gray<br />

vireo a sensitive species. In 2003, an installati<strong>on</strong>wide gray vireo survey was c<strong>on</strong>ducted in which<br />

53 territories were mapped (K<strong>AFB</strong> 2004a). Territories were found throughout the juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

community in an elevati<strong>on</strong>al belt of 5,850 to 6,600 feet. Gray vireos occupied areas with an open canopy<br />

(i.e., less than 25 percent) with <strong>on</strong>e seeded juniper as the dominate tree/shrub species (K<strong>AFB</strong> 2007).<br />

Western burrowing owl. The western burrowing owl (Athene cunicularia hypugaea), a Federal species<br />

of c<strong>on</strong>cern, is a comm<strong>on</strong> resident at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. It is very closely associated with the prairie dog<br />

col<strong>on</strong>ies <strong>on</strong> the installati<strong>on</strong>, as they use ab<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>on</strong>ed prairie dog burrows <str<strong>on</strong>g>for</str<strong>on</strong>g> nesting <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

during summer m<strong>on</strong>ths. Owls generally occur <strong>on</strong> the installati<strong>on</strong> between March <str<strong>on</strong>g>and</str<strong>on</strong>g> October be<str<strong>on</strong>g>for</str<strong>on</strong>g>e<br />

migrating south, although a few birds might occur <strong>on</strong> the installati<strong>on</strong> during mild winters. Burrowing owl<br />

inventories have been c<strong>on</strong>ducted every year since 1994, <str<strong>on</strong>g>and</str<strong>on</strong>g> in 2005 a migrati<strong>on</strong> study was initiated to<br />

identify where nesting owls at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> go to winter. Since burrowing owls use old prairie dog<br />

burrows <str<strong>on</strong>g>for</str<strong>on</strong>g> nesting, a Prairie Dog Management Plan was developed <str<strong>on</strong>g>for</str<strong>on</strong>g> the installati<strong>on</strong>, which takes into<br />

account burrowing owl habitat requirements (K<strong>AFB</strong> 2007). Figure 3-8 shows potential prairie dog<br />

habitat <str<strong>on</strong>g>and</str<strong>on</strong>g> burrowing owl locati<strong>on</strong>s (observed 15 July 2009) at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Although not depicted <strong>on</strong><br />

Figure 3-8, prairie dogs have been observed within the QD arcs <str<strong>on</strong>g>for</str<strong>on</strong>g> the exiting <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g>s.<br />

Mountain plover. Mountain plovers (Charadrius m<strong>on</strong>tanus), a Federal species of c<strong>on</strong>cern, are not known<br />

to occur <strong>on</strong> the installati<strong>on</strong>. However, in 2003, an adult with two chicks was observed just south of the<br />

installati<strong>on</strong> <strong>on</strong> the Isleta Pueblo Indian Reservati<strong>on</strong> (K<strong>AFB</strong> 2004a). Appropriate nesting habitat <str<strong>on</strong>g>for</str<strong>on</strong>g> this<br />

species is limited <strong>on</strong> the installati<strong>on</strong>; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, it is unlikely that the mountain plover uses Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

during the nesting seas<strong>on</strong>. However, the southern grassl<str<strong>on</strong>g>and</str<strong>on</strong>g>s of the installati<strong>on</strong> could potentially be used<br />

as brood-rearing habitat or during migrati<strong>on</strong> (K<strong>AFB</strong> 2007).<br />

Santa Fe milkvetch. Santa Fe milkvetch (Astragalus feensis), a rare plant in New Mexico, is known or<br />

expected to occur <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> (K<strong>AFB</strong> 2008d). Santa Fe milkvetch is found <strong>on</strong> gravelly hillsides in<br />

piny<strong>on</strong>-juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g> or plains-mesa grassl<str<strong>on</strong>g>and</str<strong>on</strong>g> (5,100 to 6,000 feet elevati<strong>on</strong>) (NMRPTC 1999).<br />

Critical Habitat<br />

Critical habitats are those areas of l<str<strong>on</strong>g>and</str<strong>on</strong>g>, air, or water that are essential <str<strong>on</strong>g>for</str<strong>on</strong>g> maintaining or restoring<br />

threatened or endangered plant or animal populati<strong>on</strong>s. Neither the NMDGF nor the USFWS has<br />

designated or identified any critical habitat <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Surveys <str<strong>on</strong>g>and</str<strong>on</strong>g> literature indicate that<br />

important habitats <strong>on</strong> the installati<strong>on</strong> include the wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, which are rare in the regi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> provide water<br />

in an otherwise arid envir<strong>on</strong>ment. Other important habitats <strong>on</strong> the installati<strong>on</strong> include prairie dog towns,<br />

which provide nesting habitat <str<strong>on</strong>g>for</str<strong>on</strong>g> the burrowing owl, <str<strong>on</strong>g>and</str<strong>on</strong>g> areas between 5,900 <str<strong>on</strong>g>and</str<strong>on</strong>g> 6,600 feet elevati<strong>on</strong><br />

c<strong>on</strong>taining open juniper woodl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, which are used as nesting habitat by the gray vireo (K<strong>AFB</strong> 2007).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-25


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph Ave<br />

Texas St<br />

Hardin Blvd<br />

R<str<strong>on</strong>g>and</str<strong>on</strong>g>olph<br />

West Ordinance Rd<br />

Southgate Ave<br />

TOW ROAD<br />

TARGET RD<br />

Proposed Acti<strong>on</strong><br />

Pad 5<br />

Glow Rd<br />

Pennsylvania St<br />

TARGET ROAD A<br />

Habitat<br />

TARGET ROAD B<br />

Burrowing Owl Locati<strong>on</strong>s<br />

Prairie Dog<br />

Existing Hot Cargo Pad<br />

Muniti<strong>on</strong> Haul Rd<br />

Proposed Hot Cargo Pad (Proposed Acti<strong>on</strong>)<br />

Proposed Hot Cargo Pad Taxiway (Proposed Acti<strong>on</strong>)<br />

Existing Hot Cargo Pad QD Arc<br />

Proposed Hot Cargo Pad QD Arc<br />

0 125 250 500<br />

Feet<br />

Meters<br />

0 35 70 140<br />

Projecti<strong>on</strong>: Transverse Mercator<br />

State Plane New Mexico Central FIPS 3002 feet<br />

North American Datum of 1983<br />

1 inch = 1,000 feet<br />

Map Extent<br />

Figure 3-8. Potential Prairie Dog Col<strong>on</strong>ies <str<strong>on</strong>g>and</str<strong>on</strong>g> Burrowing Owl Nest Locati<strong>on</strong>s<br />

near the Proposed Acti<strong>on</strong> Site<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-26


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

3.7.2.5 Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s provide an important functi<strong>on</strong> in recharging aquifers <str<strong>on</strong>g>and</str<strong>on</strong>g> buffering streams by filtering<br />

sediment <str<strong>on</strong>g>and</str<strong>on</strong>g> nutrients. Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s have been defined by agencies resp<strong>on</strong>sible <str<strong>on</strong>g>for</str<strong>on</strong>g> their management. The<br />

term “wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>” used herein, is defined using USACE c<strong>on</strong>venti<strong>on</strong>s. The USACE has jurisdicti<strong>on</strong> to<br />

protect wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s under Secti<strong>on</strong> 404 of the CWA using the following definiti<strong>on</strong>:<br />

. . . areas that are inundated or saturated by surface or ground water at a frequency <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

durati<strong>on</strong> sufficient to support, <str<strong>on</strong>g>and</str<strong>on</strong>g> that under normal circumstances do support, a<br />

prevalence of vegetati<strong>on</strong> typically adapted <str<strong>on</strong>g>for</str<strong>on</strong>g> life in saturated soil c<strong>on</strong>diti<strong>on</strong>s (33 CFR<br />

328.3[b]). Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s generally include swamps, marshes, bogs, <str<strong>on</strong>g>and</str<strong>on</strong>g> similar areas.<br />

Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s have three diagnostic characteristics that include: (1) over 50 percent of the<br />

dominant species present must be classified as obligate, facultative wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>, or<br />

facultative, (2) the soils must be classified as hydric, <str<strong>on</strong>g>and</str<strong>on</strong>g> (3) the area is either<br />

permanently or seas<strong>on</strong>ally inundated, or saturated to the surface at some time during the<br />

growing seas<strong>on</strong> of the prevalent vegetati<strong>on</strong> (USACE 1987).<br />

Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are c<strong>on</strong>sidered waters of the United States if they are determined to be jurisdicti<strong>on</strong>al by the<br />

USACE <str<strong>on</strong>g>and</str<strong>on</strong>g> USEPA. See Secti<strong>on</strong> 3.7.1 <str<strong>on</strong>g>for</str<strong>on</strong>g> further details regarding jurisdicti<strong>on</strong> by these agencies.<br />

There are several wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>; however there are no wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s at or near the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site (see Figure 3-7).<br />

3.8 Cultural Resources<br />

3.8.1 Definiti<strong>on</strong> of the Resource<br />

Cultural resources include prehistoric <str<strong>on</strong>g>and</str<strong>on</strong>g> historic archaeological sites, structures, districts, or areas<br />

c<strong>on</strong>taining physical evidence of human activity. These resources are protected <str<strong>on</strong>g>and</str<strong>on</strong>g> identified under<br />

several Federal laws <str<strong>on</strong>g>and</str<strong>on</strong>g> EOs. The Federal Laws include the Nati<strong>on</strong>al Historic Preservati<strong>on</strong> Act (NHPA)<br />

(1966), the Archaeological <str<strong>on</strong>g>and</str<strong>on</strong>g> Historic Preservati<strong>on</strong> Act (1974), the American Indian Religious Freedom<br />

Act (1978), the Archaeological Resources Protecti<strong>on</strong> Act (1979), <str<strong>on</strong>g>and</str<strong>on</strong>g> the Native American Graves<br />

Protecti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Repatriati<strong>on</strong> Act (1990).<br />

The NHPA requires that Federal agencies assume the resp<strong>on</strong>sibility <str<strong>on</strong>g>for</str<strong>on</strong>g> the preservati<strong>on</strong> of historic <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

prehistoric resources located <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>s owned or c<strong>on</strong>trolled by that agency. Secti<strong>on</strong> 110 (a)(2) of the<br />

NHPA requires that “...each Federal agency shall establish a program to locate, inventory, <str<strong>on</strong>g>and</str<strong>on</strong>g> nominate<br />

to the Secretary all properties under the agency’s ownership or c<strong>on</strong>trol...that appear to qualify <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

inclusi<strong>on</strong> <strong>on</strong> the Nati<strong>on</strong>al Register….” Secti<strong>on</strong> 110 (a)(2) further requires that “Each agency shall<br />

exercise cauti<strong>on</strong> to assure that any property that might qualify <str<strong>on</strong>g>for</str<strong>on</strong>g> inclusi<strong>on</strong> is not inadvertently<br />

transferred, sold, demolished, substantially altered, or allowed to deteriorate significantly.” These<br />

requirements are also included in DOD Directive 4710.1.<br />

Under NHPA guidelines, cultural resources, including building, structures, objects, sites, <str<strong>on</strong>g>and</str<strong>on</strong>g> districts, are<br />

to be evaluated <str<strong>on</strong>g>for</str<strong>on</strong>g> Nati<strong>on</strong>al Register of Historic Places (NRHP) eligibility using the NRHP Criteria <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Evaluati<strong>on</strong>, as listed in 36 CFR 60.4. To be listed in, or c<strong>on</strong>sidered eligible <str<strong>on</strong>g>for</str<strong>on</strong>g> the NRHP, a cultural<br />

resource must be 50 years or older <str<strong>on</strong>g>and</str<strong>on</strong>g> possess at least <strong>on</strong>e of the four following criteria:<br />

<br />

The resource is associated with events that have made a significant c<strong>on</strong>tributi<strong>on</strong> to the broad<br />

pattern of history (criteri<strong>on</strong> A).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-27


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

<br />

<br />

<br />

The resource is associated with the lives of people significant in the past (criteri<strong>on</strong> B).<br />

The resource embodies distinctive characteristics of a type, period, or method of c<strong>on</strong>structi<strong>on</strong>;<br />

represents the work of a master; possesses high artistic value; or represents a significant <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

distinguishable entity whose comp<strong>on</strong>ents may lack individual distincti<strong>on</strong> (criteri<strong>on</strong> C).<br />

The resource has yielded, or might be likely to yield, in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> important in prehistory or<br />

history (criteri<strong>on</strong> D).<br />

In additi<strong>on</strong> to meeting at least <strong>on</strong>e of the above criteria, a cultural resource must also possess integrity of<br />

locati<strong>on</strong>, design, setting, materials, workmanship, feeling, <str<strong>on</strong>g>and</str<strong>on</strong>g> associati<strong>on</strong>. Integrity is defined as the<br />

authenticity of a property’s historic identity, as evidenced by the survival of physical characteristics it<br />

possessed in the past <str<strong>on</strong>g>and</str<strong>on</strong>g> its capacity to c<strong>on</strong>vey in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> about a culture or group of people, a historic<br />

pattern, or a specific type of architectural or engineering design or technology. Locati<strong>on</strong> refers to the<br />

place where an event occurred or a property was originally built. Design c<strong>on</strong>siders elements such as plan,<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g>m, <str<strong>on</strong>g>and</str<strong>on</strong>g> style of a property. Setting is the physical envir<strong>on</strong>ment of the property. Materials refer to the<br />

physical elements used to c<strong>on</strong>struct the property. Workmanship refers to the craftsmanship of the creators<br />

of a property. Feeling is the ability of the property to c<strong>on</strong>vey its historic time <str<strong>on</strong>g>and</str<strong>on</strong>g> place. Associati<strong>on</strong><br />

refers to the link between the property <str<strong>on</strong>g>and</str<strong>on</strong>g> a historically significant event or pers<strong>on</strong>.<br />

Cultural resources meeting these st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards (i.e., age, eligibility, <str<strong>on</strong>g>and</str<strong>on</strong>g> integrity) are termed “historic<br />

properties” under the NHPA. Sites or structures that are not c<strong>on</strong>sidered individually significant can be<br />

c<strong>on</strong>sidered eligible <str<strong>on</strong>g>for</str<strong>on</strong>g> listing in the NRHP as part of a historic district. According to the NRHP, a<br />

historic district possesses a significant c<strong>on</strong>centrati<strong>on</strong>, linkage, or c<strong>on</strong>tinuity of sites, buildings, structures,<br />

or objects that are historically or aesthetically united by plan or physical development.<br />

Typically, cultural resources are grouped into three separate categories: archaeological, architectural, or<br />

sites that have a traditi<strong>on</strong>al religious or cultural significance to Native American tribes. Archaeological<br />

resources are defined as areas that have altered the l<str<strong>on</strong>g>and</str<strong>on</strong>g>scape. Architectural resources are built structures<br />

of significance. In general, these architectural resources are typically more than 50 years old but newer<br />

structures can be evaluated under the entire above criteri<strong>on</strong>. Resources of traditi<strong>on</strong>al, religious, or cultural<br />

significance to Native American tribes can include architectural or archaeological resources, sacred sites,<br />

neighborhoods, geographic l<str<strong>on</strong>g>and</str<strong>on</strong>g>marks, flora or faunal habitats, mineral localities, or sites c<strong>on</strong>sidered<br />

essential <str<strong>on</strong>g>for</str<strong>on</strong>g> the preservati<strong>on</strong> of traditi<strong>on</strong>al culture.<br />

The <str<strong>on</strong>g>EA</str<strong>on</strong>g> process requires the assessment of potential impacts <strong>on</strong> cultural resources. In additi<strong>on</strong>, under<br />

Secti<strong>on</strong> 106 of the NHPA, Federal agencies must take into account the effect of their undertakings <strong>on</strong><br />

historic properties <str<strong>on</strong>g>and</str<strong>on</strong>g> allow the Advisory Council <strong>on</strong> Historic Preservati<strong>on</strong> (ACHP) an opportunity to<br />

comment. Under this process, the Federal agency evaluates the NRHP eligibility of resources within the<br />

proposed undertaking’s area of potential effect (APE) <str<strong>on</strong>g>and</str<strong>on</strong>g> assesses the possible effects of the proposed<br />

undertaking <strong>on</strong> historic resources in c<strong>on</strong>sultati<strong>on</strong> with the State Historic Preservati<strong>on</strong> Officer (SHPO) <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

other parties. The APE is defined as the geographic area(s) “within which an undertaking may directly or<br />

indirectly cause alterati<strong>on</strong>s in the character or use of historic properties, if any such properties exist.”<br />

Under Secti<strong>on</strong> 110 of the NHPA, Federal agencies are required to establish programs to inventory <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

nominate cultural resources under their purview to the NRHP.<br />

3.8.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Current underst<str<strong>on</strong>g>and</str<strong>on</strong>g>ing of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> history <str<strong>on</strong>g>and</str<strong>on</strong>g> prehistory reflects archival data, data collected during<br />

surveys, limited test <str<strong>on</strong>g>and</str<strong>on</strong>g> block excavati<strong>on</strong>s, as well as in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> derived from comparis<strong>on</strong>s with<br />

archaeological sequences developed <str<strong>on</strong>g>for</str<strong>on</strong>g> the middle Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e. The prehistoric chr<strong>on</strong>ological sequence<br />

used at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is based primarily <strong>on</strong> projectile point <str<strong>on</strong>g>for</str<strong>on</strong>g>ms <str<strong>on</strong>g>and</str<strong>on</strong>g> supported in part by radiocarb<strong>on</strong><br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-28


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

age estimates available <str<strong>on</strong>g>for</str<strong>on</strong>g> the Holocene epoch <str<strong>on</strong>g>and</str<strong>on</strong>g> the discovery of early projectile point types in a<br />

stratified c<strong>on</strong>text. In general, the prehistory <str<strong>on</strong>g>and</str<strong>on</strong>g> history of Central New Mexico, including Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>,<br />

is divided into four basic periods: Paleoindian, Archaic, Pueblo, <str<strong>on</strong>g>and</str<strong>on</strong>g> Historic. Numerous Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

reports review the general cultural chr<strong>on</strong>ology <str<strong>on</strong>g>and</str<strong>on</strong>g> the history of prehistoric settlement, <str<strong>on</strong>g>and</str<strong>on</strong>g> subsistence<br />

patterns of the Middle Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e.<br />

The town of Albuquerque was founded in 1706 <str<strong>on</strong>g>and</str<strong>on</strong>g> has experienced a l<strong>on</strong>g <str<strong>on</strong>g>and</str<strong>on</strong>g> rich history. The decades<br />

following the U.S. Civil War witnessed a period of western settlement, encouraged in part by the<br />

Homestead Act of 1862. The Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e saw an increase in settlement, with farming <str<strong>on</strong>g>and</str<strong>on</strong>g> ranching<br />

becoming the major ec<strong>on</strong>omic activities. Substantial ec<strong>on</strong>omic development followed the arrival of the<br />

Atchis<strong>on</strong>, Topeka, <str<strong>on</strong>g>and</str<strong>on</strong>g> Santa Fe Railroads in 1879 <str<strong>on</strong>g>and</str<strong>on</strong>g> so<strong>on</strong> Albuquerque became the largest city in New<br />

Mexico.<br />

As Spanish, <str<strong>on</strong>g>and</str<strong>on</strong>g> later Mexican, populati<strong>on</strong>s exp<str<strong>on</strong>g>and</str<strong>on</strong>g>ed, the Albuquerque area’s populati<strong>on</strong> c<strong>on</strong>tinued to<br />

shift outward <str<strong>on</strong>g>and</str<strong>on</strong>g> the foothills provided areas to graze cattle <str<strong>on</strong>g>and</str<strong>on</strong>g> sheep. In the late 1800s, mineable<br />

sources of coal, copper, lead, <str<strong>on</strong>g>and</str<strong>on</strong>g> zinc were discovered near the city. Fluorspars were mined in the<br />

Manzanita regi<strong>on</strong> as fluorite in the 1930s <str<strong>on</strong>g>and</str<strong>on</strong>g> 1940s (Voynick 1997). The upl<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g>est attracted col<strong>on</strong>ial<br />

woodcutters. Roads were later built to gain access to timber al<strong>on</strong>g the upper cany<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> ridge tops<br />

during the late 1800s <str<strong>on</strong>g>and</str<strong>on</strong>g> early 1900s.<br />

Archaeological Resources. According to an <strong>on</strong>line records search c<strong>on</strong>ducted through the Archaeological<br />

Records Management Secti<strong>on</strong> (ARMS) of the New Mexico Department of Cultural Affairs <str<strong>on</strong>g>and</str<strong>on</strong>g> the New<br />

Mexico State Historic Preservati<strong>on</strong> Office (http://stubbs.arms.state.nm.us/arms/), there have been more<br />

than 150 cultural resources projects undertaken at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. These projects have resulted in the<br />

identificati<strong>on</strong> of 661 archaeological sites <str<strong>on</strong>g>and</str<strong>on</strong>g> the NRHP evaluati<strong>on</strong>s of more than 2,000 facilities. Of the<br />

661 archaeological sites recorded within the boundaries of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, most are located in the eastern<br />

porti<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Laboratory of Anthropology (LA) numbers have been assigned <str<strong>on</strong>g>for</str<strong>on</strong>g> each of<br />

these archaeological resources. NRHP eligibility evaluati<strong>on</strong>s are generally complete <str<strong>on</strong>g>for</str<strong>on</strong>g> the sites located<br />

<strong>on</strong> the lower piedm<strong>on</strong>ts <str<strong>on</strong>g>and</str<strong>on</strong>g> drainages of the western porti<strong>on</strong>s of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the eastern Manzanita<br />

Mountains.<br />

There have been three archaeological sites identified within <strong>on</strong>e mile of the Proposed Acti<strong>on</strong>: LA 99781<br />

(historic milled lumber structure with an associated historic trash comp<strong>on</strong>ent), LA 131751 (historic scatter<br />

of domestic <str<strong>on</strong>g>and</str<strong>on</strong>g> military medical artifacts), <str<strong>on</strong>g>and</str<strong>on</strong>g> LA 131741 (historic artifact scatter representing a historic<br />

trash dump) (see Table 3-8). All of the sites were determined ineligible to the NRHP <str<strong>on</strong>g>and</str<strong>on</strong>g> were c<strong>on</strong>curred<br />

by the SHPO.<br />

Table 3-8. Archaeological Sites Identified Near the Proposed Acti<strong>on</strong> Site<br />

LA Number Descripti<strong>on</strong> Eligibility<br />

99781 Historic structure with associated historic trash Not eligible<br />

131751 Historic scatter of domestic <str<strong>on</strong>g>and</str<strong>on</strong>g> military medical artifacts Not eligible<br />

131741 Historic artifact scatter (domestic trash dump) Not eligible<br />

N<strong>on</strong>e of the sites occur within the APE <str<strong>on</strong>g>and</str<strong>on</strong>g> no known sites would be disturbed by the Proposed Acti<strong>on</strong>.<br />

Architectural Resources. The inventory <str<strong>on</strong>g>and</str<strong>on</strong>g> assessment of architectural resources at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has<br />

been <strong>on</strong>going since 1984. To date, 2,183 structures have been evaluated <str<strong>on</strong>g>for</str<strong>on</strong>g> NRHP eligibility. Of these,<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-29


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

244 buildings <str<strong>on</strong>g>and</str<strong>on</strong>g> structures have been determined eligible through c<strong>on</strong>sultati<strong>on</strong> with the New Mexico<br />

SHPO.<br />

No NRHP-eligible architectural resources occur within the APE <str<strong>on</strong>g>and</str<strong>on</strong>g> no NRHP-eligible architectural<br />

resources would be disturbed by the Proposed Acti<strong>on</strong>.<br />

Traditi<strong>on</strong>al Cultural Properties. No traditi<strong>on</strong>al cultural properties or sacred sites have been identified at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

3.9 Infrastructure<br />

3.9.1 Definiti<strong>on</strong> of the Resource<br />

Infrastructure c<strong>on</strong>sists of the systems <str<strong>on</strong>g>and</str<strong>on</strong>g> physical structures that enable a populati<strong>on</strong> in a specified area<br />

to functi<strong>on</strong>. Infrastructure is wholly human-made, with a high correlati<strong>on</strong> between the type <str<strong>on</strong>g>and</str<strong>on</strong>g> extent of<br />

infrastructure <str<strong>on</strong>g>and</str<strong>on</strong>g> the degree to which an area is characterized as “urban” or developed. The availability<br />

of infrastructure <str<strong>on</strong>g>and</str<strong>on</strong>g> its capacity to support growth are generally regarded as essential to the ec<strong>on</strong>omic<br />

growth of an area. The infrastructure in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> provided below was primarily obtained from the 2002<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, New Mexico General Plan (K<strong>AFB</strong> 2002) <str<strong>on</strong>g>and</str<strong>on</strong>g> provides a brief overview of each<br />

infrastructure comp<strong>on</strong>ent <str<strong>on</strong>g>and</str<strong>on</strong>g> comments <strong>on</strong> its existing general c<strong>on</strong>diti<strong>on</strong>. The infrastructure comp<strong>on</strong>ents<br />

to be discussed in this secti<strong>on</strong> include utilities <str<strong>on</strong>g>and</str<strong>on</strong>g> solid waste management.<br />

Utilities include electrical, natural gas, liquid fuel, central heating <str<strong>on</strong>g>and</str<strong>on</strong>g> cooling, water supply, sanitary<br />

sewage/wastewater, storm water h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling, <str<strong>on</strong>g>and</str<strong>on</strong>g> communicati<strong>on</strong>s systems. Solid waste management<br />

primarily relates to the availability of l<str<strong>on</strong>g>and</str<strong>on</strong>g>fills to support a populati<strong>on</strong>’s residential, commercial, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

industrial needs.<br />

3.9.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Electrical Systems. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> purchases electrical power from Western Area Power Administrati<strong>on</strong>.<br />

All electricity to the installati<strong>on</strong> comes through the S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Switching Stati<strong>on</strong> <strong>on</strong> an approximately<br />

80 milli<strong>on</strong>-volt amperes (MVA) capacity electrical circuit. The estimated normal electrical load <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is approximately 35 MVA, <str<strong>on</strong>g>and</str<strong>on</strong>g> the estimated historical maximum electrical load is<br />

approximately 76 MVA. A 12.47-kilovolt underground electrical main currently supplies electricity to<br />

the area of the Proposed Acti<strong>on</strong> (K<strong>AFB</strong> 2008b).<br />

Natural Gas Systems. Coral Energy supplies Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> with natural gas. Natural gas enters the<br />

installati<strong>on</strong> through a 60 pound-per-square inch pipeline just east of Pennsylvania Avenue. There are<br />

approximately 70 miles of natural gas mains at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> that provide natural gas service to multiple<br />

buildings <strong>on</strong> the installati<strong>on</strong>. The primary buildings that receive natural gas service are in the cant<strong>on</strong>ment<br />

area, family housing areas, <str<strong>on</strong>g>and</str<strong>on</strong>g> the S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Steam Plant. Natural gas dem<str<strong>on</strong>g>and</str<strong>on</strong>g> depends <strong>on</strong> weather<br />

c<strong>on</strong>diti<strong>on</strong>s; however, the approximate c<strong>on</strong>sumpti<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> 2006 was 1,100,000 milli<strong>on</strong> British Thermal Units<br />

(BTUs). No natural gas mains currently extend to the area of the Proposed Acti<strong>on</strong> (K<strong>AFB</strong> 2008b).<br />

Liquid Fuel. Liquid fuels are supplied to Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> by c<strong>on</strong>tractors. The primary liquid fuels supplied<br />

include JP-8 (jet fuel), diesel, <str<strong>on</strong>g>and</str<strong>on</strong>g> gasoline. All of these fuels are purchased in bulk, delivered to the<br />

installati<strong>on</strong> by tanker truck, <str<strong>on</strong>g>and</str<strong>on</strong>g> stored in various sized storage tanks scattered across the installati<strong>on</strong>. The<br />

primary use <str<strong>on</strong>g>for</str<strong>on</strong>g> liquid fuels at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is to power military aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> l<str<strong>on</strong>g>and</str<strong>on</strong>g>-based vehicles (K<strong>AFB</strong><br />

2002).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-30


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Central Heating <str<strong>on</strong>g>and</str<strong>on</strong>g> Cooling Systems. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has approximately 20 miles of steam mains that<br />

provide heating service to select buildings <strong>on</strong> the installati<strong>on</strong>. The steam system is powered by three<br />

central heating plants; however, <strong>on</strong>ly <strong>on</strong>e, the S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Steam Plant, is currently in service. Natural gas is<br />

the fuel source <str<strong>on</strong>g>for</str<strong>on</strong>g> the S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Steam Plant. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is in the process of gradually disc<strong>on</strong>necting<br />

buildings from the central heating system <str<strong>on</strong>g>and</str<strong>on</strong>g> aims to eventually shut down the entire central heating<br />

system. No central heating mains currently extend to the area of the Proposed Acti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

does not have a centralized cooling system (K<strong>AFB</strong> 2002).<br />

Water Supply Systems. Water is supplied to Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> by seven groundwater wells that have a<br />

collective water-pumping maximum of 9.3 milli<strong>on</strong> gall<strong>on</strong>s per day (MGD). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> also purchases<br />

water from the City of Albuquerque to meet dem<str<strong>on</strong>g>and</str<strong>on</strong>g> during peak periods; however, the amount of water<br />

purchased from the city has been negligible since 1998. The maximum water supply capacity from the<br />

City of Albuquerque is 8.6 MGD, which results in a maximum total water supply to Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> of<br />

17.9 MGD (K<strong>AFB</strong> 2008b). Water is stored in approximately 24 water storage tanks at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>,<br />

which have a collective storage capacity of approximately 5.5 milli<strong>on</strong> gall<strong>on</strong>s. Water is transported<br />

throughout Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> by two separate but interc<strong>on</strong>nected water distributi<strong>on</strong> systems, <str<strong>on</strong>g>and</str<strong>on</strong>g> is currently<br />

supplied to the area of the Proposed Acti<strong>on</strong>. There are approximately 160 miles of potable water supply<br />

piping <str<strong>on</strong>g>and</str<strong>on</strong>g> approximately 50 miles of n<strong>on</strong>potable water supply piping. N<strong>on</strong>potable water is primarily<br />

used <str<strong>on</strong>g>for</str<strong>on</strong>g> golf course irrigati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> fire protecti<strong>on</strong> systems. In general, the water supply piping is properly<br />

sized <str<strong>on</strong>g>and</str<strong>on</strong>g> is in good c<strong>on</strong>diti<strong>on</strong> despite being more than 50 years of age <strong>on</strong> average (K<strong>AFB</strong> 2002).<br />

Current water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is approximately 6 to 10 MGD during the summer <str<strong>on</strong>g>and</str<strong>on</strong>g> 2 to<br />

4 MGD during the winter. As such, the groundwater wells generally have sufficient pumping capacity to<br />

meet current water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> (K<strong>AFB</strong> 2002).<br />

Sanitary Sewer/Wastewater Systems. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> does not have its own sewage treatment facility.<br />

Instead, the sanitary sewer system of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, which c<strong>on</strong>sists of approximately 92 miles of<br />

collecti<strong>on</strong> mains, transports wastewater to the City of Albuquerque treatment facility. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is<br />

permitted a maximum of 1.149 milli<strong>on</strong> gall<strong>on</strong>s of sewer discharge per day (901,000 gall<strong>on</strong>s per day<br />

average) (Segura 2010). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> utilizes approximately 40 oil/water separators to collect greases<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> oils be<str<strong>on</strong>g>for</str<strong>on</strong>g>e they enter the wastewater collecti<strong>on</strong> system. Some facilities in remote porti<strong>on</strong>s of the<br />

installati<strong>on</strong> are not serviced by the sanitary sewer system; these facilities instead utilize isolated, <strong>on</strong>site<br />

septic systems to dispose of wastewater. Wastewater service is currently not available at the area of the<br />

Proposed Acti<strong>on</strong> (K<strong>AFB</strong> 2002).<br />

Storm Water Systems. Man-made storm water drainage systems, which include gutters, culverts, ditches,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> underground piping, direct storm water to receiving channels <str<strong>on</strong>g>and</str<strong>on</strong>g> basins in developed porti<strong>on</strong>s of<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. In less-developed porti<strong>on</strong>s of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, man-made storm water drainage systems<br />

have not been installed, <str<strong>on</strong>g>and</str<strong>on</strong>g> storm water drains by sheet flow to various natural drainageways. Most<br />

storm water at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> that does not get absorbed into the ground drains into the Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e, which<br />

eventually discharges in the Gulf of Mexico (K<strong>AFB</strong> 2002).<br />

Communicati<strong>on</strong>s Systems. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> utilizes copper <str<strong>on</strong>g>and</str<strong>on</strong>g> fiber optic cable <str<strong>on</strong>g>for</str<strong>on</strong>g> teleph<strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g> data<br />

transmissi<strong>on</strong> services. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> operates its own teleph<strong>on</strong>e switching system, which is adequately<br />

sized to support the current needs of the installati<strong>on</strong>. The data transmissi<strong>on</strong> system has been designed to<br />

accommodate future growth of the installati<strong>on</strong> (K<strong>AFB</strong> 2002).<br />

Solid Waste Management. Solid waste generated at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is collected by c<strong>on</strong>tractors <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

disposed of at the Rio Rancho L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill, which is off-installati<strong>on</strong> in the City of Rio Rancho <str<strong>on</strong>g>and</str<strong>on</strong>g> operated<br />

by Waste Management. In 2008, the Rio Rancho L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill received a 10-year permit renewal <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

approval <str<strong>on</strong>g>for</str<strong>on</strong>g> a permit modificati<strong>on</strong> that allows <str<strong>on</strong>g>for</str<strong>on</strong>g> an increase of approximately 1,179,600 cubic yards of<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-31


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

capacity over the amount approved in its 1998 New Mexico Envir<strong>on</strong>ment Department permit (Permit<br />

Number 231402), but anticipates closure in 2019 (Waste Management 2010, NMED undated). From<br />

2007 to 2009, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> sent an average of 2,500 t<strong>on</strong>s of solid waste per year to the City of Rio<br />

Rancho l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill (Kitt 2010). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> operates a c<strong>on</strong>structi<strong>on</strong>-<str<strong>on</strong>g>and</str<strong>on</strong>g>-demoliti<strong>on</strong>-<strong>on</strong>ly l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill <strong>on</strong> the<br />

installati<strong>on</strong>. This l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill accepts <strong>on</strong>ly c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> waste from permitted c<strong>on</strong>tractors<br />

working <strong>on</strong> the installati<strong>on</strong>. The maximum capacity of the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill is 10,164,000 cubic<br />

yards (4,065,676 t<strong>on</strong>s) <str<strong>on</strong>g>and</str<strong>on</strong>g> the remaining capacity is 5,017,316 cubic yards (2,006,964 t<strong>on</strong>s). From 2007<br />

to 2009, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> disposed of an average of 23,000 t<strong>on</strong>s per year of c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong><br />

waste at the <strong>on</strong>-installati<strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill (Kitt 2010). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> manages a recycling program to reduce the<br />

amount of solid waste sent to l<str<strong>on</strong>g>and</str<strong>on</strong>g>fills. The Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> Qualified Recycling Program is operated by<br />

c<strong>on</strong>tractors <str<strong>on</strong>g>and</str<strong>on</strong>g> collects office paper, cardboard, <str<strong>on</strong>g>and</str<strong>on</strong>g> aluminum from pick-up points scattered across the<br />

installati<strong>on</strong> (K<strong>AFB</strong> 2002). Additi<strong>on</strong>al recycling ef<str<strong>on</strong>g>for</str<strong>on</strong>g>ts are oftentimes included in specific c<strong>on</strong>structi<strong>on</strong><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> projects.<br />

3.10 Hazardous Materials <str<strong>on</strong>g>and</str<strong>on</strong>g> Waste<br />

3.10.1 Definiti<strong>on</strong> of the Resource<br />

Hazardous materials are defined by 49 CFR 171.8 as “hazardous substances, hazardous wastes, marine<br />

pollutants, elevated temperature materials, materials designated as hazardous in the Hazardous Materials<br />

Table (49 CFR 172.101), <str<strong>on</strong>g>and</str<strong>on</strong>g> materials that meet the defining criteria <str<strong>on</strong>g>for</str<strong>on</strong>g> hazard classes <str<strong>on</strong>g>and</str<strong>on</strong>g> divisi<strong>on</strong>s” in<br />

49 CFR 173. Transportati<strong>on</strong> of hazardous materials is regulated by the U.S. Department of<br />

Transportati<strong>on</strong> regulati<strong>on</strong>s within 49 CFR 105–180.<br />

Hazardous wastes are defined by the Resource C<strong>on</strong>servati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Recovery Act (RCRA) at 42 U.S.C.<br />

6903(5), as amended by the Hazardous <str<strong>on</strong>g>and</str<strong>on</strong>g> Solid Waste Amendments, as: “a solid waste, or combinati<strong>on</strong><br />

of solid wastes, which because of its quantity, c<strong>on</strong>centrati<strong>on</strong>, or physical, chemical, or infectious<br />

characteristics may (A) cause, or significantly c<strong>on</strong>tribute to an increase in mortality or an increase in<br />

serious irreversible, or incapacitating reversible, illness; or (B) pose a substantial present or potential<br />

hazard to human health or the envir<strong>on</strong>ment when improperly treated, stored, transported, or disposed of,<br />

or otherwise managed.” Certain types of hazardous wastes are subject to special management provisi<strong>on</strong>s<br />

intended to ease the management burden <str<strong>on</strong>g>and</str<strong>on</strong>g> facilitate the recycling of such materials. These are called<br />

universal wastes <str<strong>on</strong>g>and</str<strong>on</strong>g> their associated regulatory requirements are specified in 40 CFR 273. Four types of<br />

waste are currently covered under the universal waste regulati<strong>on</strong>s: hazardous waste batteries, hazardous<br />

waste pesticides that are either recalled or collected in waste pesticide collecti<strong>on</strong> programs, hazardous<br />

waste thermostats, <str<strong>on</strong>g>and</str<strong>on</strong>g> hazardous waste lamps.<br />

Special hazards are those substances that might pose a risk to human health <str<strong>on</strong>g>and</str<strong>on</strong>g> are addressed separately<br />

from other hazardous substances. Special hazards include ACM, polychlorinated biphenyls (PCBs), <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

lead-based paint (LBP). The USEPA is given authority to regulate these special hazard substances by the<br />

Toxic Substances C<strong>on</strong>trol Act (TSCA) Title 15 U.S.C. Chapter 53. TSCA Subchapter I identifies PCBs,<br />

Subchapter II ACMs <str<strong>on</strong>g>and</str<strong>on</strong>g> Subchapter IV LBP. The USEPA has established regulati<strong>on</strong>s regarding asbestos<br />

abatement <str<strong>on</strong>g>and</str<strong>on</strong>g> worker safety under 40 CFR 763 with additi<strong>on</strong>al regulati<strong>on</strong> c<strong>on</strong>cerning emissi<strong>on</strong>s (40 CFR<br />

61). Whether from lead abatement or other activities, depending <strong>on</strong> the quantity or c<strong>on</strong>centrati<strong>on</strong> the<br />

disposal of the LBP waste is potentially regulated by the RCRA at 40 CFR 260. The disposal of PCBs is<br />

addressed in 40 CFR 750 <str<strong>on</strong>g>and</str<strong>on</strong>g> 761. The presence of special hazards or c<strong>on</strong>trols over them might affect, or<br />

be affected by, a proposed acti<strong>on</strong>. In<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> <strong>on</strong> special hazards describing their locati<strong>on</strong>s, quantities,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>diti<strong>on</strong> assists in determining the significance of a proposed acti<strong>on</strong>.<br />

The DOD has developed the ERP, which facilitates envir<strong>on</strong>mentally resp<strong>on</strong>sible l<str<strong>on</strong>g>and</str<strong>on</strong>g> management<br />

through investigati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> cleanup of c<strong>on</strong>taminated sites <strong>on</strong> military installati<strong>on</strong>s. Through the ERP, the<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-32


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

DOD evaluates <str<strong>on</strong>g>and</str<strong>on</strong>g> cleans up sites where hazardous wastes have been spilled or released to the<br />

envir<strong>on</strong>ment. Descripti<strong>on</strong> of ERP activities provides a useful gauge of the c<strong>on</strong>diti<strong>on</strong> of soils, water<br />

resources, <str<strong>on</strong>g>and</str<strong>on</strong>g> other resources that might be affected by c<strong>on</strong>taminants. It also aids in identificati<strong>on</strong> of<br />

properties <str<strong>on</strong>g>and</str<strong>on</strong>g> their usefulness <str<strong>on</strong>g>for</str<strong>on</strong>g> given purposes (e.g., activities dependent <strong>on</strong> groundwater usage might<br />

be restricted until remediati<strong>on</strong> of a groundwater c<strong>on</strong>taminant plume has been completed).<br />

The in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> provided in this secti<strong>on</strong> focuses <strong>on</strong> the presence <str<strong>on</strong>g>and</str<strong>on</strong>g> management of hazardous materials<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> wastes associated with the demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities, <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of<br />

the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The analysis includes the generati<strong>on</strong>, storage, transportati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> disposal of<br />

hazardous wastes generated through implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>.<br />

For the USAF, <strong>Air</strong> Force Policy Directive (AFPD) 32-70, Envir<strong>on</strong>mental Quality, <str<strong>on</strong>g>and</str<strong>on</strong>g> the AFI 32-7000<br />

series incorporate the requirements of all Federal regulati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> other AFIs <str<strong>on</strong>g>and</str<strong>on</strong>g> DOD Directives <str<strong>on</strong>g>for</str<strong>on</strong>g> the<br />

management of hazardous materials, hazardous wastes, <str<strong>on</strong>g>and</str<strong>on</strong>g> special hazards.<br />

3.10.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Hazardous Materials <str<strong>on</strong>g>and</str<strong>on</strong>g> Petroleum Products. AFI 32-7086, Hazardous Materials Management,<br />

establishes procedures <str<strong>on</strong>g>and</str<strong>on</strong>g> st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards that govern management of hazardous materials throughout the<br />

USAF. It applies to all USAF pers<strong>on</strong>nel who authorize, procure, issue, use, or dispose of hazardous<br />

materials, <str<strong>on</strong>g>and</str<strong>on</strong>g> to those who manage, m<strong>on</strong>itor, or track any of those activities. As part of the Hazardous<br />

Waste Management Plan, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has deemed the 377th Missi<strong>on</strong> Support Group (377 MSG)/Civil<br />

Engineer Compliance Branch (C<str<strong>on</strong>g>EA</str<strong>on</strong>g>NC) as the resp<strong>on</strong>sible entity to oversee the storage <str<strong>on</strong>g>and</str<strong>on</strong>g> usage of<br />

hazardous materials <strong>on</strong> installati<strong>on</strong>. Part of the 377 MSG/C<str<strong>on</strong>g>EA</str<strong>on</strong>g>NC resp<strong>on</strong>sibilities is to c<strong>on</strong>trol the<br />

procurement <str<strong>on</strong>g>and</str<strong>on</strong>g> use of hazardous material to support USAF missi<strong>on</strong>s, ensure the safety <str<strong>on</strong>g>and</str<strong>on</strong>g> health of<br />

pers<strong>on</strong>nel <str<strong>on</strong>g>and</str<strong>on</strong>g> surrounding communities, <str<strong>on</strong>g>and</str<strong>on</strong>g> minimize USAF dependence <strong>on</strong> hazardous materials. The<br />

377 MSG/C<str<strong>on</strong>g>EA</str<strong>on</strong>g>NC is charged with managing materials to reduce the amount of hazardous waste<br />

generated <strong>on</strong> the installati<strong>on</strong> (K<strong>AFB</strong> 2004b).<br />

There are no known hazardous materials or petroleum products at the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site.<br />

Hazardous <str<strong>on</strong>g>and</str<strong>on</strong>g> Petroleum Wastes. The 377 ABW maintains a Hazardous Waste Management Plan<br />

(K<strong>AFB</strong> 2004b) as directed by AFI 32-7042, Waste Management. This plan prescribes the roles <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

resp<strong>on</strong>sibilities of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> pers<strong>on</strong>nel with respect to the waste stream inventory, waste analysis<br />

plan, hazardous waste management procedures, training, emergency resp<strong>on</strong>se, <str<strong>on</strong>g>and</str<strong>on</strong>g> polluti<strong>on</strong> preventi<strong>on</strong>.<br />

The plan establishes the procedures to comply with applicable Federal, state, <str<strong>on</strong>g>and</str<strong>on</strong>g> local st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> solid<br />

waste <str<strong>on</strong>g>and</str<strong>on</strong>g> hazardous waste management. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is a large-quantity hazardous waste generator<br />

(H<str<strong>on</strong>g>and</str<strong>on</strong>g>ler Identificati<strong>on</strong> NM9570024423). Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has several 90-day hazardous waste<br />

accumulati<strong>on</strong> areas.<br />

The existing Pad 5 area has historically been used <str<strong>on</strong>g>for</str<strong>on</strong>g> aircraft <str<strong>on</strong>g>cargo</str<strong>on</strong>g> loading. No known hazardous or<br />

petroleum wastes were generated, stored, or disposed of at the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> project area.<br />

Envir<strong>on</strong>mental Restorati<strong>on</strong> Program. The Defense Envir<strong>on</strong>mental Restorati<strong>on</strong> Program (DERP) was<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g>mally established by C<strong>on</strong>gress in 1986 to provide <str<strong>on</strong>g>for</str<strong>on</strong>g> the cleanup of DOD sites. The ERP <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

Military Muniti<strong>on</strong>s Resp<strong>on</strong>se Program (MMRP) are comp<strong>on</strong>ents of the DERP. The ERP requires each<br />

DOD installati<strong>on</strong> to identify, investigate, <str<strong>on</strong>g>and</str<strong>on</strong>g> clean up hazardous waste disposal or release sites. The<br />

MMRP addresses n<strong>on</strong>operati<strong>on</strong>al range l<str<strong>on</strong>g>and</str<strong>on</strong>g>s that are suspected or known to c<strong>on</strong>tain unexploded<br />

ordnance, discarded military muniti<strong>on</strong>s, or Muniti<strong>on</strong>s C<strong>on</strong>stituent (MC) c<strong>on</strong>taminati<strong>on</strong>.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-33


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

C<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would overlap into <strong>on</strong>e ERP site, WP-26, east of Pad 5. WP-<br />

26 c<strong>on</strong>sists of two ab<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>on</strong>ed sewage lago<strong>on</strong>s that are surrounded by berms <str<strong>on</strong>g>and</str<strong>on</strong>g> a locked fence. The<br />

lago<strong>on</strong>s were c<strong>on</strong>structed from local material in 1962 <str<strong>on</strong>g>and</str<strong>on</strong>g> were unlined. Elevated levels of silver,<br />

benzo(a)pyrene, <str<strong>on</strong>g>and</str<strong>on</strong>g> TCE c<strong>on</strong>taminati<strong>on</strong> have been identified at WP-26 due to its historical use as settling<br />

p<strong>on</strong>ds <str<strong>on</strong>g>for</str<strong>on</strong>g> residential <str<strong>on</strong>g>and</str<strong>on</strong>g> light industrial raw sewage waste generated at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. These historical<br />

lago<strong>on</strong>s were in service from 1962 to 1987 (K<strong>AFB</strong> 2008a, K<strong>AFB</strong> 2008e).<br />

Initial sampling occurred in 2002 <str<strong>on</strong>g>and</str<strong>on</strong>g> 2003, <str<strong>on</strong>g>and</str<strong>on</strong>g> identified TCE <str<strong>on</strong>g>and</str<strong>on</strong>g> 1,1-dichloroethene (DCE) at levels<br />

above the minimum detecti<strong>on</strong> c<strong>on</strong>centrati<strong>on</strong> in soil vapor samples from 50 to 200 feet below ground<br />

surface (bgs). Additi<strong>on</strong>ally, TCE was detected in perched groundwater samples above the USEPA<br />

Maximum C<strong>on</strong>taminant Level (MCL) of 5 micrograms per liter (µg/L). Subsequent sampling associati<strong>on</strong><br />

associated with a RCRA Facility Investigati<strong>on</strong> (RFI) from 2004 through 2006 revealed soil vapor<br />

sampling of TCE, DCE, <str<strong>on</strong>g>and</str<strong>on</strong>g> acet<strong>on</strong>e at c<strong>on</strong>centrati<strong>on</strong>s significantly above the minimum detecti<strong>on</strong><br />

c<strong>on</strong>centrati<strong>on</strong>. Perched groundwater (from approximately 200 feet bgs) samples were collected under the<br />

RFI c<strong>on</strong>firming that TCE was the <strong>on</strong>ly c<strong>on</strong>stituent of c<strong>on</strong>cern detected above its USEPA MCL (K<strong>AFB</strong><br />

2008e).<br />

Soil sampling occurred separately from 2006 to 2007. The sampling event delineated the thickness of<br />

sewage sludge <str<strong>on</strong>g>and</str<strong>on</strong>g> effect the sludge had <strong>on</strong> subsurface soils to a depth of 5 feet. This investigati<strong>on</strong> found<br />

several metals at elevated c<strong>on</strong>centrati<strong>on</strong>s in the sewage sludge. Laboratory testing c<strong>on</strong>firmed that<br />

chromium identified in the samples was not hexavalent chromium (the most toxic <str<strong>on</strong>g>for</str<strong>on</strong>g>m). The sampling<br />

data were utilized to compile an Ecological <str<strong>on</strong>g>and</str<strong>on</strong>g> Human Health Risk Assessment. The c<strong>on</strong>clusi<strong>on</strong>s of the<br />

assessment stated that silver in the sewage sludge was the <strong>on</strong>ly metal likely to create an ecological hazard.<br />

C<strong>on</strong>currently, benzo(a)pyrene in the sludge-soil mixed layer was identified as the sole human health<br />

potential carcinogen risk (K<strong>AFB</strong> 2008a).<br />

To address the potential risks identified in the Ecological <str<strong>on</strong>g>and</str<strong>on</strong>g> Human Health Risk Assessment Report, a<br />

remedial acti<strong>on</strong> c<strong>on</strong>sisting of removal of the top 5 inches of sewage sludge will be c<strong>on</strong>ducted in Spring<br />

2010 (Holmes 2009).<br />

Four MMRP sites (SR763, SR764, <str<strong>on</strong>g>and</str<strong>on</strong>g> SR767 Rifle Ranges <str<strong>on</strong>g>and</str<strong>on</strong>g> the SR766 Sub-Machine Gun Range)<br />

have been identified as overlapping with the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5) <str<strong>on</strong>g>and</str<strong>on</strong>g> the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> site. The historical <str<strong>on</strong>g>and</str<strong>on</strong>g> revised historical range boundaries <str<strong>on</strong>g>for</str<strong>on</strong>g> SR763, SR764, <str<strong>on</strong>g>and</str<strong>on</strong>g> SR766, <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

revised historical range boundary <str<strong>on</strong>g>for</str<strong>on</strong>g> SR767 overlap with the Proposed Acti<strong>on</strong> area. Phase I surveys were<br />

c<strong>on</strong>ducted <str<strong>on</strong>g>for</str<strong>on</strong>g> these ranges, <str<strong>on</strong>g>and</str<strong>on</strong>g> expended small arms cartridges <str<strong>on</strong>g>and</str<strong>on</strong>g> links were discovered at SR764<br />

during the survey. No other MCs were identified at these ranges. Although, it was determined that<br />

SR766 <str<strong>on</strong>g>and</str<strong>on</strong>g> SR767 were not surveyed because discrepancies in the locati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> boundaries of SR766 <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

SR767 were identified after completi<strong>on</strong> of the surveys. All four MMRP sites are listed as category G <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

human health, chemical warfare, <str<strong>on</strong>g>and</str<strong>on</strong>g> explosive hazard. This hazard classificati<strong>on</strong> category corresp<strong>on</strong>ds<br />

with a minimal potential <str<strong>on</strong>g>for</str<strong>on</strong>g> exposure. It is not anticipated that these areas c<strong>on</strong>tain Muniti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Explosives of C<strong>on</strong>cern (MEC); however, due to their historical use as firing ranges, there is a potential <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

MC c<strong>on</strong>taminati<strong>on</strong> (USACE 2007).<br />

Asbestos-C<strong>on</strong>taining Material. Asbestos is regulated by the USEPA under the CAA, TSCA, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Comprehensive Envir<strong>on</strong>mental Resp<strong>on</strong>se, Compensati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Liability Act (CERCLA). The USEPA has<br />

established that any material c<strong>on</strong>taining more than 1 percent asbestos is c<strong>on</strong>sidered an ACM. Friable<br />

ACM is any material c<strong>on</strong>taining more than 1 percent asbestos, <str<strong>on</strong>g>and</str<strong>on</strong>g> that, when dry, can be crumbled,<br />

pulverized, or reduced to powder by h<str<strong>on</strong>g>and</str<strong>on</strong>g> pressure. N<strong>on</strong>friable ACM is any ACM that does not meet the<br />

criteria <str<strong>on</strong>g>for</str<strong>on</strong>g> friable ACM. There are no records of ACMs at the Proposed Acti<strong>on</strong> site.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-34


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Lead-Based Paint. The Residential Lead-Based Paint Hazard Reducti<strong>on</strong> Act of 1992, Subtitle B,<br />

Secti<strong>on</strong> 408 (comm<strong>on</strong>ly called Title X) regulates the use <str<strong>on</strong>g>and</str<strong>on</strong>g> disposal of LBP <strong>on</strong> Federal facilities.<br />

Federal agencies are required to comply with applicable Federal, state, <str<strong>on</strong>g>and</str<strong>on</strong>g> local laws relating to LBP<br />

activities <str<strong>on</strong>g>and</str<strong>on</strong>g> hazards. The existing shelter <str<strong>on</strong>g>and</str<strong>on</strong>g> storage facility at Pad 5 were c<strong>on</strong>structed after 1978 <str<strong>on</strong>g>and</str<strong>on</strong>g>,<br />

there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, likely does not c<strong>on</strong>tain LBP.<br />

Polychlorinated Biphenyls. PCBs are a group of chemical mixtures used as insulators in electrical<br />

equipment such as trans<str<strong>on</strong>g>for</str<strong>on</strong>g>mers <str<strong>on</strong>g>and</str<strong>on</strong>g> fluorescent light ballasts. Federal regulati<strong>on</strong>s govern items<br />

c<strong>on</strong>taining 50 to 499 ppm PCBs. Chemicals classified as PCBs were widely manufactured <str<strong>on</strong>g>and</str<strong>on</strong>g> used in<br />

the United States throughout the 1950s <str<strong>on</strong>g>and</str<strong>on</strong>g> 1960s, but were banned in 1979. PCB-c<strong>on</strong>taining oil is<br />

typically found in older electrical trans<str<strong>on</strong>g>for</str<strong>on</strong>g>mers <str<strong>on</strong>g>and</str<strong>on</strong>g> light fixtures (ballasts). Trans<str<strong>on</strong>g>for</str<strong>on</strong>g>mers c<strong>on</strong>taining<br />

greater than 500 ppm PCBs, between 50 <str<strong>on</strong>g>and</str<strong>on</strong>g> 500 ppm PCBs, <str<strong>on</strong>g>and</str<strong>on</strong>g> less than 50 ppm PCB are c<strong>on</strong>sidered<br />

PCB, PCB-c<strong>on</strong>taminated, <str<strong>on</strong>g>and</str<strong>on</strong>g> n<strong>on</strong>-PCB, respectively. There are no records indicating the presence of<br />

PCBs at the Proposed Acti<strong>on</strong> site.<br />

Polluti<strong>on</strong> Preventi<strong>on</strong>. AFI 32-7080, Polluti<strong>on</strong> Preventi<strong>on</strong> Program, implements the regulatory m<str<strong>on</strong>g>and</str<strong>on</strong>g>ates<br />

in the Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Community Right-to-Know Act; Polluti<strong>on</strong> Preventi<strong>on</strong> Act of 1990;<br />

EO 12873, Federal Acquisiti<strong>on</strong>, Recycling, <str<strong>on</strong>g>and</str<strong>on</strong>g> Waste Preventi<strong>on</strong>; <str<strong>on</strong>g>and</str<strong>on</strong>g> EO 12902, Energy Efficiency <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Water C<strong>on</strong>servati<strong>on</strong> at Federal Facilities. AFI 32-7080 prescribes the establishment of Polluti<strong>on</strong><br />

Preventi<strong>on</strong> Management Plans, which have management <str<strong>on</strong>g>and</str<strong>on</strong>g> minimizati<strong>on</strong> strategies <str<strong>on</strong>g>for</str<strong>on</strong>g> oz<strong>on</strong>e-depleting<br />

substances, USEPA 17 industrial toxics, hazardous wastes, municipal solid wastes, affirmative<br />

procurement of envir<strong>on</strong>mentally friendly products, energy c<strong>on</strong>servati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> air <str<strong>on</strong>g>and</str<strong>on</strong>g> water pollutant<br />

reducti<strong>on</strong>. The 377 ABW fulfills this requirement with the following plans.<br />

Polluti<strong>on</strong> Preventi<strong>on</strong> Management Acti<strong>on</strong> Plan (K<strong>AFB</strong> 1999)<br />

<str<strong>on</strong>g>Final</str<strong>on</strong>g> Management Acti<strong>on</strong> Plan (K<strong>AFB</strong> 1997b)<br />

Hazardous Waste Management Plan (K<strong>AFB</strong> 2004b)<br />

Spill Preventi<strong>on</strong>, C<strong>on</strong>trol, <str<strong>on</strong>g>and</str<strong>on</strong>g> Countermeasures (SPCC) Plan (K<strong>AFB</strong> 2001)<br />

Hazardous Material Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Resp<strong>on</strong>se Plan (K<strong>AFB</strong> 2008c).<br />

3.11 Safety<br />

3.11.1 Definiti<strong>on</strong> of the Resource<br />

A safe envir<strong>on</strong>ment is <strong>on</strong>e in which there is no, or an optimally reduced, potential <str<strong>on</strong>g>for</str<strong>on</strong>g> death, serious<br />

bodily injury or illness, or property damage. Human health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety addresses workers’ health <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

safety during c<strong>on</strong>structi<strong>on</strong> activities as well as public health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety during <str<strong>on</strong>g>and</str<strong>on</strong>g> following c<strong>on</strong>structi<strong>on</strong><br />

activities.<br />

C<strong>on</strong>structi<strong>on</strong> site safety requires adherence to regulatory requirements imposed <str<strong>on</strong>g>for</str<strong>on</strong>g> the benefit of<br />

employees. It includes implementati<strong>on</strong> of engineering <str<strong>on</strong>g>and</str<strong>on</strong>g> administrative practices that aim to reduce<br />

risks of illness, injury, death, <str<strong>on</strong>g>and</str<strong>on</strong>g> property damage. The health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety of <strong>on</strong>site military <str<strong>on</strong>g>and</str<strong>on</strong>g> civilian<br />

workers are safeguarded by numerous DOD <str<strong>on</strong>g>and</str<strong>on</strong>g> military-branch specific regulati<strong>on</strong>s designed to comply<br />

with st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards issued by the Federal Occupati<strong>on</strong>al Safety <str<strong>on</strong>g>and</str<strong>on</strong>g> Health Administrati<strong>on</strong> (OSHA), USEPA,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> state occupati<strong>on</strong>al safety <str<strong>on</strong>g>and</str<strong>on</strong>g> health agencies. These st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards specify health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety<br />

requirements, the amount <str<strong>on</strong>g>and</str<strong>on</strong>g> type of training required <str<strong>on</strong>g>for</str<strong>on</strong>g> workers, the use of pers<strong>on</strong>al protective<br />

equipment (PPE), administrative c<strong>on</strong>trols, engineering c<strong>on</strong>trols, <str<strong>on</strong>g>and</str<strong>on</strong>g> permissible exposure limits <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

workplace stressors.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-35


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety hazards can often be identified <str<strong>on</strong>g>and</str<strong>on</strong>g> reduced or eliminated. Necessary elements <str<strong>on</strong>g>for</str<strong>on</strong>g> an<br />

accident-pr<strong>on</strong>e situati<strong>on</strong> or envir<strong>on</strong>ment include the presence of the hazard itself together with the<br />

exposed (<str<strong>on</strong>g>and</str<strong>on</strong>g> possibly susceptible) populati<strong>on</strong>. The degree of exposure depends primarily <strong>on</strong> the<br />

proximity of the hazard to the populati<strong>on</strong>. Hazards include transportati<strong>on</strong>, maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> repair<br />

activities, <str<strong>on</strong>g>and</str<strong>on</strong>g> the creati<strong>on</strong> of noisy envir<strong>on</strong>ments or a potential fire hazard. The proper operati<strong>on</strong>,<br />

maintenance, <str<strong>on</strong>g>and</str<strong>on</strong>g> repair of vehicles <str<strong>on</strong>g>and</str<strong>on</strong>g> equipment carry important safety implicati<strong>on</strong>s. Any facility or<br />

human-use area with potential explosive or other rapid oxidati<strong>on</strong> process creates unsafe envir<strong>on</strong>ments due<br />

to noise or fire hazards <str<strong>on</strong>g>for</str<strong>on</strong>g> nearby populati<strong>on</strong>s. Noisy envir<strong>on</strong>ments can also mask verbal or mechanical<br />

warning signals such as sirens, bells, or horns.<br />

3.11.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

C<strong>on</strong>tractor Safety. All c<strong>on</strong>tractors per<str<strong>on</strong>g>for</str<strong>on</strong>g>ming demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities are resp<strong>on</strong>sible <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

following Federal <str<strong>on</strong>g>and</str<strong>on</strong>g> State of New Mexico OSHA regulati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> are required to c<strong>on</strong>duct demoliti<strong>on</strong><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities in a manner that does not increase risk to workers or the public.<br />

New Mexico is <strong>on</strong>e of several states that administer their own occupati<strong>on</strong>al safety <str<strong>on</strong>g>and</str<strong>on</strong>g> health (OSH)<br />

program according to the provisi<strong>on</strong>s of the Federal Occupati<strong>on</strong>al Safety <str<strong>on</strong>g>and</str<strong>on</strong>g> Health Act of 1970, which<br />

permits a state to administer its own OSH program if it meets all of the Federal requirements regarding<br />

the program’s structure <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong>s. The New Mexico Occupati<strong>on</strong>al Health <str<strong>on</strong>g>and</str<strong>on</strong>g> Safety Bureau<br />

program has the resp<strong>on</strong>sibility of en<str<strong>on</strong>g>for</str<strong>on</strong>g>cing Occupati<strong>on</strong>al Health <str<strong>on</strong>g>and</str<strong>on</strong>g> Safety Regulati<strong>on</strong>s within New<br />

Mexico. Its jurisdicti<strong>on</strong> includes all private <str<strong>on</strong>g>and</str<strong>on</strong>g> public entities such as city, county, <str<strong>on</strong>g>and</str<strong>on</strong>g> state government<br />

employees. Federal employees are excluded as they are covered by Federal OSHA regulati<strong>on</strong>s.<br />

OSH programs address the health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety of people at work. OSH regulati<strong>on</strong>s cover potential<br />

exposure to a wide range of chemical, physical, biological, <str<strong>on</strong>g>and</str<strong>on</strong>g> erg<strong>on</strong>omic stressors. The regulati<strong>on</strong>s are<br />

designed to c<strong>on</strong>trol these hazards by eliminating exposure to the hazards via administrative or engineering<br />

c<strong>on</strong>trols, substituti<strong>on</strong>, or use of PPE. Occupati<strong>on</strong>al health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety is the resp<strong>on</strong>sibility of each<br />

employer, as applicable. Employer resp<strong>on</strong>sibilities are to review potentially hazardous workplace<br />

c<strong>on</strong>diti<strong>on</strong>s; m<strong>on</strong>itor exposure to workplace chemical (e.g., asbestos, lead, hazardous substances), physical<br />

(e.g., noise propagati<strong>on</strong>, falls), biological (e.g., infectious waste, wildlife, pois<strong>on</strong>ous plants) agents, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

erg<strong>on</strong>omic stressors; recommend <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluate c<strong>on</strong>trols (e.g., preventi<strong>on</strong>, administrative, engineering,<br />

PPE) to ensure exposure to pers<strong>on</strong>nel is eliminated or adequately c<strong>on</strong>trolled; <str<strong>on</strong>g>and</str<strong>on</strong>g> ensure a medical<br />

surveillance program is in place to per<str<strong>on</strong>g>for</str<strong>on</strong>g>m occupati<strong>on</strong>al health physicals <str<strong>on</strong>g>for</str<strong>on</strong>g> those workers subject to the<br />

use of respiratory protecti<strong>on</strong>, engaged in hazardous waste work, asbestos, lead, or other work requiring<br />

medical m<strong>on</strong>itoring.<br />

One ERP site, WP-26, is partially within the area of the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g>, as such, represents a<br />

potential exposure to c<strong>on</strong>tractor pers<strong>on</strong>nel. WP-26 c<strong>on</strong>sists of two ab<str<strong>on</strong>g>and</str<strong>on</strong>g><strong>on</strong>ed sewage lago<strong>on</strong>s that were<br />

used as settling p<strong>on</strong>ds <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s residential <str<strong>on</strong>g>and</str<strong>on</strong>g> light industrial sewage system from 1962 to<br />

1987. Soil <str<strong>on</strong>g>and</str<strong>on</strong>g> groundwater sampling has identified both surface <str<strong>on</strong>g>and</str<strong>on</strong>g> subsurface media c<strong>on</strong>taminati<strong>on</strong> at<br />

WP-26. Specific c<strong>on</strong>taminates identified include TCE in subsurface soil vapor <str<strong>on</strong>g>and</str<strong>on</strong>g> perched groundwater,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> various heavy metals <str<strong>on</strong>g>and</str<strong>on</strong>g> benzo(a)pyrene in surface sludge. Additi<strong>on</strong>ally, WP-26 might c<strong>on</strong>tain<br />

pathogens from sewage, such as tetanus <str<strong>on</strong>g>and</str<strong>on</strong>g> Hepatitis A. Exposure to any of these c<strong>on</strong>taminates or<br />

pathogens are potential health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety c<strong>on</strong>cerns to c<strong>on</strong>tractors working <strong>on</strong> site. Further details<br />

regarding c<strong>on</strong>taminati<strong>on</strong> at WP-26 are presented in Secti<strong>on</strong> 3.10.2.<br />

Military Pers<strong>on</strong>nel Safety. Each branch of the military has its own policies <str<strong>on</strong>g>and</str<strong>on</strong>g> regulati<strong>on</strong>s that act to<br />

protect its workers, despite their work locati<strong>on</strong>. <strong>Air</strong> Force regulati<strong>on</strong> AFI 91-301, <strong>Air</strong> Force<br />

Occupati<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g> Envir<strong>on</strong>mental Safety, Fire Protecti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Health (AFOSH) Program, which<br />

implements AFPD 91-3, Occupati<strong>on</strong>al Safety <str<strong>on</strong>g>and</str<strong>on</strong>g> Health, governs the recogniti<strong>on</strong>, evaluati<strong>on</strong>, c<strong>on</strong>trol,<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-36


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> protecti<strong>on</strong> of <strong>Air</strong> Force pers<strong>on</strong>nel from occupati<strong>on</strong>al health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety hazards. The purpose of the<br />

AFOSH Program is to minimize the loss of USAF resources <str<strong>on</strong>g>and</str<strong>on</strong>g> to protect USAF pers<strong>on</strong>nel from<br />

occupati<strong>on</strong>al deaths, injuries, or illnesses by managing risks.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5) currently presents safety c<strong>on</strong>cerns to military pers<strong>on</strong>nel.<br />

Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its associated taxiways are in poor c<strong>on</strong>diti<strong>on</strong> due to cracking <str<strong>on</strong>g>and</str<strong>on</strong>g> spalling of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>’s c<strong>on</strong>crete<br />

surface <str<strong>on</strong>g>and</str<strong>on</strong>g> disintegrati<strong>on</strong> of the taxiways’ asphalt due to age. The c<strong>on</strong>diti<strong>on</strong> of Pad 5 was rated<br />

SERIOUS (just above FAILED) <str<strong>on</strong>g>and</str<strong>on</strong>g> assigned a C-17 FOD rating of POOR (lowest possible rating) in a<br />

2004 <strong>Air</strong> Force Civil Engineering Support. The current c<strong>on</strong>diti<strong>on</strong> of Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its taxiways have the<br />

potential to jeopardize military pers<strong>on</strong>nel safety by damaging aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> delaying or aborting critical <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s. Additi<strong>on</strong>ally, the existing lighting at Pad 5 is not sufficient, which further jeopardizes<br />

military pers<strong>on</strong>nel safety. Currently, Pad 5 must remain in a state of c<strong>on</strong>tinuous operati<strong>on</strong> because<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> does not have any other <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s with the m<str<strong>on</strong>g>and</str<strong>on</strong>g>ated safety clearance z<strong>on</strong>es required <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g>. As such, Pad 5 currently cannot be shut down <str<strong>on</strong>g>for</str<strong>on</strong>g> extended periods to receive needed<br />

maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> safety improvements.<br />

Public Safety. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has its own emergency services department. The emergency services<br />

department provides Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> with not <strong>on</strong>ly fire suppressi<strong>on</strong>, crash-resp<strong>on</strong>se, rescue, emergency<br />

medical, <str<strong>on</strong>g>and</str<strong>on</strong>g> hazardous substance protecti<strong>on</strong> but also provides emergency resp<strong>on</strong>se planning <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

community health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety educati<strong>on</strong> through the disseminati<strong>on</strong> of public safety in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> to the<br />

installati<strong>on</strong>. A Veterans Administrati<strong>on</strong> hospital <str<strong>on</strong>g>and</str<strong>on</strong>g> the 377th Medical Group’s Outpatient Clinic are the<br />

primary military medical facilities at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> (K<strong>AFB</strong> 2009b). A number of other hospitals <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

clinics, which are devoted to the public, are off-installati<strong>on</strong> in the City of Albuquerque. These facilities<br />

include the University of New Mexico Hospital <str<strong>on</strong>g>and</str<strong>on</strong>g> Kaseman Presbyterian Hospital (Google 2009).<br />

The Fire <str<strong>on</strong>g>and</str<strong>on</strong>g> Rescue Emergency Services Divisi<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> the City of Albuquerque provides fire suppressi<strong>on</strong>,<br />

crash-resp<strong>on</strong>se, rescue, emergency medical, <str<strong>on</strong>g>and</str<strong>on</strong>g> hazardous substance resp<strong>on</strong>se to the nearby City of<br />

Albuquerque. The Fire <str<strong>on</strong>g>and</str<strong>on</strong>g> Rescue Emergency Services Divisi<strong>on</strong> includes 23 fire engine companies,<br />

7 fire ladder companies, 3 hazardous materials resp<strong>on</strong>se units, <str<strong>on</strong>g>and</str<strong>on</strong>g> 18 medical resp<strong>on</strong>se ambulances (City<br />

of Albuquerque 2009a). The City of Albuquerque also has an approximately 500-pers<strong>on</strong> police <str<strong>on</strong>g>for</str<strong>on</strong>g>ce<br />

available to provide law en<str<strong>on</strong>g>for</str<strong>on</strong>g>cement services (City of Albuquerque 2009b). A mutual aid agreement is<br />

in place between the City of Albuquerque <str<strong>on</strong>g>and</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

Explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> Muniti<strong>on</strong>s Safety. Explosives, muniti<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> ordnance are currently not h<str<strong>on</strong>g>and</str<strong>on</strong>g>led, stored,<br />

or used at the area of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>; however, immediately to the east of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> is Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5). All aircraft shipments of explosives,<br />

muniti<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> ordnance to <str<strong>on</strong>g>and</str<strong>on</strong>g> from Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> utilize Pad 5.<br />

3.12 <strong>Air</strong>craft Safety<br />

3.12.1 Definiti<strong>on</strong> of the Resource<br />

<strong>Air</strong>craft safety <str<strong>on</strong>g>for</str<strong>on</strong>g> this <str<strong>on</strong>g>EA</str<strong>on</strong>g> is based <strong>on</strong> the physical risks associated with the movement of hazardous<br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g>. Under the Proposed Acti<strong>on</strong>, the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be used in c<strong>on</strong>juncti<strong>on</strong> with Pad 5<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> each <str<strong>on</strong>g>pad</str<strong>on</strong>g> would act as c<strong>on</strong>tingency if the other <str<strong>on</strong>g>pad</str<strong>on</strong>g> is unavailable. The type <str<strong>on</strong>g>and</str<strong>on</strong>g> quantity of current<br />

<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> operati<strong>on</strong>s at the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not change from existing operati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> there would be no<br />

increase in the quantity of aircraft utilizing the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, aircraft safety c<strong>on</strong>cerns that<br />

apply to aircraft flight operati<strong>on</strong>s, such as obstructi<strong>on</strong>s to flights, hazardous weather c<strong>on</strong>diti<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Bird/Wildlife <strong>Air</strong>craft Strike Hazard (BASH) issues, are not discussed in this <str<strong>on</strong>g>EA</str<strong>on</strong>g>.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-37


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Transportati<strong>on</strong> facilities provide <str<strong>on</strong>g>for</str<strong>on</strong>g> the movement of muniti<strong>on</strong>s materials <str<strong>on</strong>g>and</str<strong>on</strong>g> equipment to meet<br />

operating <str<strong>on</strong>g>and</str<strong>on</strong>g> missi<strong>on</strong> requirements. These facilities include <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s, flight line muniti<strong>on</strong>s holding<br />

points, primary <str<strong>on</strong>g>and</str<strong>on</strong>g> alternate muniti<strong>on</strong>s movement routes, vehicle parking, <str<strong>on</strong>g>and</str<strong>on</strong>g> load <str<strong>on</strong>g>and</str<strong>on</strong>g> unload plat<str<strong>on</strong>g>for</str<strong>on</strong>g>ms<br />

(railheads) (USAF 2004). Basic design <str<strong>on</strong>g>and</str<strong>on</strong>g> safety st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> muniti<strong>on</strong>s transportati<strong>on</strong> facilities, such<br />

as <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s, are provided in multiple USAF documents, including AFMAN 91-201, Explosives<br />

Safety St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards; <strong>Air</strong> Force H<str<strong>on</strong>g>and</str<strong>on</strong>g>book (AFH) 32-1084, Facility Requirements; AFI 32-1021, Planning<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Programming Military C<strong>on</strong>structi<strong>on</strong> (MILCON) Projects; <str<strong>on</strong>g>and</str<strong>on</strong>g> UFC 3-260-1, <strong>Air</strong>field <str<strong>on</strong>g>and</str<strong>on</strong>g> Heliport<br />

Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Design, am<strong>on</strong>g others. The USAF Muniti<strong>on</strong>s Facilities St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards Guide summarizes the<br />

multitude of USAF regulati<strong>on</strong>s into a single document that provides planning, site selecti<strong>on</strong> guidance, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

design st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> muniti<strong>on</strong>s-related facilities (USAF 2004).<br />

USAF policy <strong>on</strong> explosives safety requires the following (USAF 2009):<br />

<br />

<br />

<br />

Provide the maximum possible protecti<strong>on</strong> to pers<strong>on</strong>nel <str<strong>on</strong>g>and</str<strong>on</strong>g> property, both inside <str<strong>on</strong>g>and</str<strong>on</strong>g> outside the<br />

installati<strong>on</strong>, from the damaging effects of potential accidents involving ammuniti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

explosives<br />

Comply with the cardinal principle <str<strong>on</strong>g>for</str<strong>on</strong>g> explosives safety: Expose the minimum number of people<br />

to the minimum amount of explosives <str<strong>on</strong>g>for</str<strong>on</strong>g> the minimum amount of time<br />

Compliance with AFMAN 91-201 except when compliance with more restrictive local st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards<br />

is m<str<strong>on</strong>g>and</str<strong>on</strong>g>atory by an internati<strong>on</strong>al agreement.<br />

Design criteria <str<strong>on</strong>g>for</str<strong>on</strong>g> <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s include the following (USAF 1996, DOD 2008):<br />

<br />

<br />

<br />

<br />

<br />

The <str<strong>on</strong>g>pad</str<strong>on</strong>g> must be located to satisfy explosives safety st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards as prescribed in DOD Directive<br />

6055.9-STD, DOD Ammuniti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Explosives Safety St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards, <str<strong>on</strong>g>and</str<strong>on</strong>g> AFMAN 91-201.<br />

Medium-load pavement must be used <str<strong>on</strong>g>for</str<strong>on</strong>g> the <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> its access taxiway.<br />

Tiedown anchors <str<strong>on</strong>g>and</str<strong>on</strong>g> grounding points in the <str<strong>on</strong>g>pad</str<strong>on</strong>g> must be installed.<br />

Blue, flush-type taxiway lights around the edge of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s must be provided in accordance with<br />

AFI 32-1044, Visual <strong>Air</strong> Navigati<strong>on</strong> Systems, <str<strong>on</strong>g>and</str<strong>on</strong>g> AFMAN 32-1076, Design St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> Visual<br />

<strong>Air</strong> Navigati<strong>on</strong> Facilities.<br />

An access taxiway must be provided <str<strong>on</strong>g>for</str<strong>on</strong>g> access from the primary taxiway to the hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g>. The taxiway should be designed <str<strong>on</strong>g>for</str<strong>on</strong>g> the aircraft to taxi into the hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> under<br />

its own power.<br />

Per AFH 31-1084 <str<strong>on</strong>g>and</str<strong>on</strong>g> the USAF Muniti<strong>on</strong>s Facilities St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards Guide, paved shoulders are included in<br />

<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> as shown in Figure 3-9. Paved shoulders are authorized when it is necessary<br />

to protect the shoulder areas against jet blast; reduce maintenance of the unpaved shoulder area; support<br />

aircraft outrigger gear; or accommodate snow removal equipment, aircraft service vehicles, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

emergency vehicles (USAF 1996). Paved shoulders also provide locati<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> lighting <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>trol of<br />

FOD. Paved shoulders should be a minimum 10 feet (3.1 meters) wide with lights installed. Wider<br />

shoulders are required <str<strong>on</strong>g>for</str<strong>on</strong>g> wide-bodied aircraft (USAF 2004).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-38


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Source: USAF 1996<br />

Figure 3-9. Hot Cargo Pad Design Criteria<br />

Risk is the probability <str<strong>on</strong>g>and</str<strong>on</strong>g> severity of loss from exposure to a hazard, such as the loading of weap<strong>on</strong>s,<br />

ammuniti<strong>on</strong>, explosives, <str<strong>on</strong>g>and</str<strong>on</strong>g> other hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g> from various aircraft. The assessment step is the<br />

applicati<strong>on</strong> of quantitative or qualitative measures to determine the level of risk associated with a specific<br />

hazard. This process defines the probability <str<strong>on</strong>g>and</str<strong>on</strong>g> severity of a mishap that could result from the hazard<br />

based up<strong>on</strong> the exposure of pers<strong>on</strong>nel or assets to that hazard (USAF 2009).<br />

Historical mishap databases enable the military to calculate the mishap rates <str<strong>on</strong>g>for</str<strong>on</strong>g> each type of aircraft.<br />

These rates are based <strong>on</strong> the estimated flying time that an aircraft is expected to be in the airspace, the<br />

accident rate per 100,000 flying hours <str<strong>on</strong>g>for</str<strong>on</strong>g> that aircraft, <str<strong>on</strong>g>and</str<strong>on</strong>g> the annual flying hours <str<strong>on</strong>g>for</str<strong>on</strong>g> that aircraft. Since<br />

the incepti<strong>on</strong> of the USAF in 1947, aircraft accidents have steadily declined each year.<br />

Because of the potentially damaging effects of explosives mishaps, separate facilities, such as a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> (which is separate from the existing apr<strong>on</strong>) are provided <str<strong>on</strong>g>for</str<strong>on</strong>g> explosives operati<strong>on</strong>s based <strong>on</strong> the type<br />

of hazards involved (USAF 1996). Weap<strong>on</strong> systems such as guns, rockets, missiles, <str<strong>on</strong>g>and</str<strong>on</strong>g> flare dispensers<br />

pose an additi<strong>on</strong>al hazard because of their directi<strong>on</strong>al resp<strong>on</strong>se <str<strong>on</strong>g>and</str<strong>on</strong>g> potential l<strong>on</strong>g range if inadvertently<br />

activated <strong>on</strong> the ground. <strong>Air</strong>craft are positi<strong>on</strong>ed to present the minimum hazard to pers<strong>on</strong>nel <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

resources in the event of a mishap (USAF 2009).<br />

Per AFH 32-1084, a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> is required at installati<strong>on</strong>s where explosives or other dangerous<br />

materials must be loaded frequently <strong>on</strong> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> where existing apr<strong>on</strong>s cannot be used without<br />

violating QD safety criteria. The term QD refers to protecti<strong>on</strong> requirements from PESs to different kinds<br />

of ESs. The QD st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards were developed over many years <str<strong>on</strong>g>and</str<strong>on</strong>g> are based <strong>on</strong> explosives mishaps <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

tests. As discussed in Secti<strong>on</strong> 2.1.2, an IB separati<strong>on</strong> distance of 1,250 feet (approximately 0.24 miles) is<br />

required <str<strong>on</strong>g>for</str<strong>on</strong>g> Hazard Classificati<strong>on</strong> 1.1 explosives. At this distance some damage could still be expected<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-39


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

(i.e., st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard glass windows will shatter <str<strong>on</strong>g>and</str<strong>on</strong>g> unstrengthened buildings will receive 5 percent damage)<br />

(USAF 2009). The IB distance applies to several different types of ESs, including buildings <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

operati<strong>on</strong>s involving people not related to muniti<strong>on</strong>s/explosives work, joint DOD/n<strong>on</strong>-DOD use runways,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> high-density PTRs.<br />

3.12.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Pad 5 is the <strong>on</strong>ly <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> with a sufficient surrounding clear z<strong>on</strong>e to accommodate <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> (i.e., weap<strong>on</strong>s, ammuniti<strong>on</strong>, explosives, <str<strong>on</strong>g>and</str<strong>on</strong>g> other hazardous <str<strong>on</strong>g>cargo</str<strong>on</strong>g>). However, Pad 5 is<br />

deteriorating due to cracking, spalling, <str<strong>on</strong>g>and</str<strong>on</strong>g> failing of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>’s Portl<str<strong>on</strong>g>and</str<strong>on</strong>g> cement c<strong>on</strong>crete caused by ASR,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> disintegrati<strong>on</strong> of the taxiway’s asphalt due to age. The c<strong>on</strong>diti<strong>on</strong> of Pad 5 was rated SERIOUS (just<br />

above FAILED) <str<strong>on</strong>g>and</str<strong>on</strong>g> assigned a C-17 FOD rating of POOR (lowest possible rating) in a 2004 <strong>Air</strong> Force<br />

Civil Engineering Support Agency airfield c<strong>on</strong>diti<strong>on</strong> survey. The report ranked replacement of Pad 5 as<br />

the installati<strong>on</strong>’s highest priority (K<strong>AFB</strong> undated).<br />

The deficient c<strong>on</strong>diti<strong>on</strong> of Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> its taxiway have the potential to jeopardize aircraft safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> delay<br />

or abort critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s due to FOD <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft tire-cut potential. In additi<strong>on</strong>, the existing<br />

lighting at Pad 5 is not sufficient <str<strong>on</strong>g>and</str<strong>on</strong>g> further jeopardizes aircraft safety. During the past 5 years,<br />

approximately $1 milli<strong>on</strong> has been spent <strong>on</strong> repairs to the <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> taxiway, but a stable state of repair is<br />

difficult due to its c<strong>on</strong>tinual use (<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> is c<strong>on</strong>tinuously flown in <str<strong>on</strong>g>and</str<strong>on</strong>g> out of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>) <str<strong>on</strong>g>and</str<strong>on</strong>g> repairs<br />

are <strong>on</strong>going.<br />

3.13 Socioec<strong>on</strong>omics <str<strong>on</strong>g>and</str<strong>on</strong>g> Envir<strong>on</strong>mental Justice<br />

3.13.1 Definiti<strong>on</strong> of the Resource<br />

Socioec<strong>on</strong>omics. Socioec<strong>on</strong>omics is the relati<strong>on</strong>ship between ec<strong>on</strong>omies <str<strong>on</strong>g>and</str<strong>on</strong>g> social elements such as<br />

populati<strong>on</strong> levels <str<strong>on</strong>g>and</str<strong>on</strong>g> ec<strong>on</strong>omic activity. Factors that describe the socioec<strong>on</strong>omic envir<strong>on</strong>ment represent<br />

a composite of several interrelated <str<strong>on</strong>g>and</str<strong>on</strong>g> n<strong>on</strong>related attributes. There are several factors that can be used as<br />

indicators of ec<strong>on</strong>omic c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> a geographic area, such as demographics, median household<br />

income, unemployment rates, percentage of families living below the poverty level, employment, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

housing data. Data <strong>on</strong> employment identifies gross numbers of employees, employment by industry or<br />

trade, <str<strong>on</strong>g>and</str<strong>on</strong>g> unemployment trends. Data <strong>on</strong> pers<strong>on</strong>al income in a regi<strong>on</strong> are used to compare the be<str<strong>on</strong>g>for</str<strong>on</strong>g>e <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

after effects of any jobs created or lost as a result of a proposed acti<strong>on</strong>. Data <strong>on</strong> industrial, commercial,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> other sectors of the ec<strong>on</strong>omy provide baseline in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> about the ec<strong>on</strong>omic health of a regi<strong>on</strong>.<br />

Envir<strong>on</strong>mental Justice. C<strong>on</strong>siderati<strong>on</strong> of envir<strong>on</strong>mental justice c<strong>on</strong>cerns includes race, ethnicity, age,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> the poverty status of populati<strong>on</strong>s in the vicinity of a proposed acti<strong>on</strong>. Such in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> aids in<br />

evaluating whether a proposed acti<strong>on</strong> would render vulnerable any of the groups targeted <str<strong>on</strong>g>for</str<strong>on</strong>g> protecti<strong>on</strong> in<br />

EO 12898, Federal Acti<strong>on</strong>s to Address Envir<strong>on</strong>mental Justice in Minority Populati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> Low-Income<br />

Populati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> EO 13045, Protecti<strong>on</strong> of Children from Envir<strong>on</strong>mental Health Risks <str<strong>on</strong>g>and</str<strong>on</strong>g> Safety Risks.<br />

EO 12898 pertains to envir<strong>on</strong>mental justice issues <str<strong>on</strong>g>and</str<strong>on</strong>g> relates to various socioec<strong>on</strong>omic groups <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

disproporti<strong>on</strong>ate effects that could be imposed <strong>on</strong> them. EO 13045 ensures c<strong>on</strong>siderati<strong>on</strong> of<br />

envir<strong>on</strong>mental health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety risks to children from proposed acti<strong>on</strong>s. Appendix A includes additi<strong>on</strong>al<br />

in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> <strong>on</strong> EOs 12898 <str<strong>on</strong>g>and</str<strong>on</strong>g> 13045.<br />

3.13.2 Existing C<strong>on</strong>diti<strong>on</strong>s<br />

Demographics. The populati<strong>on</strong> of the Albuquerque Metropolitan Statistical Area (MSA), defined by the<br />

U.S. Census Bureau as Bernalillo, S<str<strong>on</strong>g>and</str<strong>on</strong>g>oval, <str<strong>on</strong>g>and</str<strong>on</strong>g> Valencia counties, was estimated to be 829,644 people<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-40


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

in 2008. The 2008 estimate represents a 16 percent increase, or 2 percent annual increase, from the 2000<br />

U.S. Census <str<strong>on</strong>g>for</str<strong>on</strong>g> the Albuquerque MSA populati<strong>on</strong> (U.S. Census Bureau 2000, U.S. Census Bureau 2008).<br />

The populati<strong>on</strong> of Bernalillo County was 635,139 in 2008, representing 32 percent of the State of New<br />

Mexico populati<strong>on</strong>. The State of New Mexico’s populati<strong>on</strong> totaled nearly 2,000,000 in 2008. Bernalillo<br />

County grew 14 percent from 2000 to 2008, while during this same time period S<str<strong>on</strong>g>and</str<strong>on</strong>g>oval County<br />

experienced a 36 percent increase in populati<strong>on</strong>. Based <strong>on</strong> 2000 U.S. Census data <str<strong>on</strong>g>and</str<strong>on</strong>g> 2008 U.S. Census<br />

Bureau estimates, the populati<strong>on</strong> of Valencia County grew by 9 percent from 2000 to 2008. The growth<br />

rate of populati<strong>on</strong> in the Albuquerque MSA (16 percent) was much greater than the growth rate of the<br />

State of New Mexico (9 percent) <str<strong>on</strong>g>and</str<strong>on</strong>g> of the United States (8 percent) over the same time period. See<br />

Table 3-9 <str<strong>on</strong>g>for</str<strong>on</strong>g> 2000 populati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> 2008 populati<strong>on</strong> estimate data (U.S. Census Bureau 2000, U.S. Census<br />

Bureau 2008).<br />

Table 3-9. 2000 Populati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> 2008 Populati<strong>on</strong> Estimates<br />

Locati<strong>on</strong> 2000 2008 Percentage Change<br />

United States 281,421,906 304,059,724 8.0%<br />

New Mexico 1,819,046 1,984,356 9.1%<br />

Albuquerque MSA 712,738 829,644 16.4%<br />

Bernalillo County 556,678 635,139 14.1%<br />

S<str<strong>on</strong>g>and</str<strong>on</strong>g>oval County 89,908 122,298 36.0%<br />

Valencia County 66,152 72,207 9.2%<br />

Sources: U.S. Census Bureau 2000, U.S. Census Bureau 2008<br />

According to the U.S. Census Bureau, the State of New Mexico c<strong>on</strong>tains <strong>on</strong>e of the largest percentages of<br />

minorities in the United States. The Hispanic populati<strong>on</strong> in New Mexico is the largest by percentage in<br />

the United States (42 percent), <str<strong>on</strong>g>and</str<strong>on</strong>g> the Native American populati<strong>on</strong> in New Mexico is the sec<strong>on</strong>d largest<br />

by percentage in the United States (10 percent). The n<strong>on</strong>-Hispanic White populati<strong>on</strong> in New Mexico is<br />

<strong>on</strong>e of the smallest in the country as well at 45 percent (U.S. Census Bureau 2000). The Black or African<br />

American populati<strong>on</strong> in New Mexico is 2 percent <str<strong>on</strong>g>and</str<strong>on</strong>g> the Asian or Pacific Isl<str<strong>on</strong>g>and</str<strong>on</strong>g>er populati<strong>on</strong> is 1<br />

percent, much less than the nati<strong>on</strong>al averages of 12 percent <str<strong>on</strong>g>and</str<strong>on</strong>g> 4 percent, respectively (U.S. Census<br />

Bureau 2000).<br />

Employment Characteristics. Approximately 1 percent of the Albuquerque MSA populati<strong>on</strong> is employed<br />

within the armed <str<strong>on</strong>g>for</str<strong>on</strong>g>ces (U.S. Census Bureau 2000). The three largest industries <str<strong>on</strong>g>and</str<strong>on</strong>g> the corresp<strong>on</strong>ding<br />

percentage of the work<str<strong>on</strong>g>for</str<strong>on</strong>g>ce employed within the industry are the educati<strong>on</strong>al, health, <str<strong>on</strong>g>and</str<strong>on</strong>g> social services<br />

industry (21 percent); the professi<strong>on</strong>al, scientific, management, administrative, <str<strong>on</strong>g>and</str<strong>on</strong>g> waste management<br />

services industry (13 percent); <str<strong>on</strong>g>and</str<strong>on</strong>g> the retail trade industry (12 percent). The c<strong>on</strong>structi<strong>on</strong> industry<br />

represents 8 percent of the work<str<strong>on</strong>g>for</str<strong>on</strong>g>ce. The average median household income <str<strong>on</strong>g>for</str<strong>on</strong>g> the Albuquerque MSA<br />

is $39,088, slightly less than the United States average of $41,994 (U.S. Census Bureau 2000)<br />

Unemployment in the Albuquerque MSA from 1999 to 2008, ranged from 3.9 to 5.3 percent annually. In<br />

August 2009 the unemployment rate climbed to 7.9 percent (BLS 2009).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The number of pers<strong>on</strong>s employed <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is greater than 31,000, making it the<br />

single largest employer in the Albuquerque MSA. There are 1,170 active-duty pers<strong>on</strong>nel <strong>on</strong> the<br />

installati<strong>on</strong>. Direct payroll expenditures from Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> exceed $2 billi<strong>on</strong> annually. When n<strong>on</strong>payroll<br />

expenditures associated with Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> are included total expenditures sum $4.6 billi<strong>on</strong>. The<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-41


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

number of indirect jobs that are created as a result of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> expenditures <str<strong>on</strong>g>and</str<strong>on</strong>g> employment are<br />

estimated at 23,500 jobs (K<strong>AFB</strong> 2002).<br />

Envir<strong>on</strong>mental Justice <str<strong>on</strong>g>and</str<strong>on</strong>g> Protecti<strong>on</strong> of Children. To provide a baseline measure <str<strong>on</strong>g>for</str<strong>on</strong>g> envir<strong>on</strong>mental<br />

justice an area around the installati<strong>on</strong> must be established to examine the impacts <strong>on</strong> minority <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

low-income populati<strong>on</strong>s. For the purpose of this analysis a 50-mile radius around Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> was<br />

evaluated to identify minority <str<strong>on</strong>g>and</str<strong>on</strong>g> low-income populati<strong>on</strong>s. This 50-mile radius includes numerous<br />

towns, villages, census-designated places, <str<strong>on</strong>g>and</str<strong>on</strong>g> cities. The largest of these is the City of Albuquerque with<br />

a populati<strong>on</strong> of 448,607. In the City of Albuquerque, 40 percent of the populati<strong>on</strong> is Hispanic <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

4 percent is Native American (see Table 3-10). The City of Rio Rancho is <strong>on</strong> the northwestern side of<br />

Albuquerque <str<strong>on</strong>g>and</str<strong>on</strong>g> has a populati<strong>on</strong> of 51,765 <str<strong>on</strong>g>and</str<strong>on</strong>g> is the sec<strong>on</strong>d largest city within 50 miles of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong>. The Hispanic populati<strong>on</strong> represents 28 percent of the total populati<strong>on</strong> in Rio Rancho <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

Native American populati<strong>on</strong> represents 2 percent of the total populati<strong>on</strong>. The third largest populati<strong>on</strong><br />

center within 50 miles of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is South Valley, situated to the west of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, c<strong>on</strong>taining<br />

39,060 pers<strong>on</strong>s. In South Valley the Hispanic populati<strong>on</strong> is 78 percent of the total populati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

Native American populati<strong>on</strong> is 2 percent of the total populati<strong>on</strong> (U.S. Census Bureau 2000).<br />

Race <str<strong>on</strong>g>and</str<strong>on</strong>g> Origin<br />

Table 3-10. Minority <str<strong>on</strong>g>and</str<strong>on</strong>g> Low-Income Characteristics (2000)<br />

City of<br />

Albuquerque<br />

City of Rio<br />

Rancho<br />

South<br />

Valley<br />

New<br />

Mexico<br />

United<br />

States<br />

Total Populati<strong>on</strong> 448,607 51,765 39,060 1,819,046 281,421,906<br />

Percent Under 5 Years of Age 6.9 7.5 7.9 7.2 6.8<br />

Percent Over 65 Years of Age 12.0 11.8 10.0 11.7 12.4<br />

Percent White 71.6 78.4 57.2 66.8 75.1<br />

Percent Black or African<br />

American<br />

3.1 2.7 1.1 1.9 12.3<br />

Percent American Indian <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Alaska Native<br />

3.9 2.4 2.0 9.5 12.3<br />

Percent Asian 2.2 1.5 0.3 1.1 12.3<br />

Percent Native Hawaiian <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Other Pacific Isl<str<strong>on</strong>g>and</str<strong>on</strong>g>er<br />

0.1 0.2 0.1 0.1 0.1<br />

Percent Other Race 14.8 10.9 35.0 17.0 5.5<br />

Percent Two or More Races 4.3 4.1 4.2 3.6 2.4<br />

Percent Hispanic or Latino 39.9 27.7 77.6 42.1 12.5<br />

Median Household Income $38,272 $47,169 $30,879 $34,133 $41,994<br />

Percent of Families Living<br />

Below Poverty<br />

10.0 3.7 32.1 14.5 9.2<br />

Source: U.S. Census Bureau 2000<br />

Note: Hispanic denotes a place of origin.<br />

The percentage of families living below the poverty level varies greatly throughout the metropolitan area<br />

of Albuquerque, with the City of Albuquerque having poverty levels similar to the State of New Mexico<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> the United States. South Valley has a higher poverty rate compared to the State of New Mexico <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

the United States, <str<strong>on</strong>g>and</str<strong>on</strong>g> Rio Rancho has a lower poverty rate than the State of New Mexico <str<strong>on</strong>g>and</str<strong>on</strong>g> the United<br />

States.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

3-42


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4. Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

This secti<strong>on</strong> describes the potential envir<strong>on</strong>mental c<strong>on</strong>sequences <strong>on</strong> the affected envir<strong>on</strong>ment of<br />

implementing the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the No Acti<strong>on</strong> Alternative. In Secti<strong>on</strong>s 4.1 to 4.13, each<br />

alternative is evaluated <str<strong>on</strong>g>for</str<strong>on</strong>g> its potential to affect physical, biological, <str<strong>on</strong>g>and</str<strong>on</strong>g> socioec<strong>on</strong>omic resources in<br />

accordance with 40 CFR 1508.8. Potential impacts <str<strong>on</strong>g>for</str<strong>on</strong>g> each resource area are described in terms of their<br />

significance. Significant impacts are those effects that would result in substantial changes to the<br />

envir<strong>on</strong>ment (as defined by 40 CFR 1508.27) <str<strong>on</strong>g>and</str<strong>on</strong>g> should receive the greatest attenti<strong>on</strong> in the<br />

decisi<strong>on</strong>-making process.<br />

4.1 L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use<br />

4.1.1 Evaluati<strong>on</strong> Criteria<br />

The significance of potential l<str<strong>on</strong>g>and</str<strong>on</strong>g> use impacts is based <strong>on</strong> the level of l<str<strong>on</strong>g>and</str<strong>on</strong>g> use sensitivity in areas affected<br />

by a proposed acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> compatibility of proposed acti<strong>on</strong>s with existing c<strong>on</strong>diti<strong>on</strong>s. In general, a l<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

use impact would be significant if it were to cause the following:<br />

<br />

<br />

<br />

<br />

<br />

Be inc<strong>on</strong>sistent or in n<strong>on</strong>compliance with existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> use plans or policies<br />

Preclude the viability of existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> use<br />

Preclude c<strong>on</strong>tinued use or occupati<strong>on</strong> of an area<br />

Be incompatible with adjacent l<str<strong>on</strong>g>and</str<strong>on</strong>g> use to the extent that public health or safety is threatened<br />

C<strong>on</strong>flict with planning criteria established to ensure the safety <str<strong>on</strong>g>and</str<strong>on</strong>g> protecti<strong>on</strong> of human life <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

property.<br />

4.1.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.1.2.1 Proposed Acti<strong>on</strong><br />

The Proposed Acti<strong>on</strong> would be in compliance with the l<str<strong>on</strong>g>and</str<strong>on</strong>g> use policies presented in the 2002 Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>Air</strong> Force Base, New Mexico General Plan, including the main goals of providing operati<strong>on</strong>al support <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

missi<strong>on</strong>s; promoting the health, safety, <str<strong>on</strong>g>and</str<strong>on</strong>g> quality of life of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s pers<strong>on</strong>nel; <str<strong>on</strong>g>and</str<strong>on</strong>g> applying<br />

space utilizati<strong>on</strong> st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards to improve efficiencies <str<strong>on</strong>g>and</str<strong>on</strong>g> reduce operating costs. The Proposed Acti<strong>on</strong><br />

would specifically satisfy several development objectives identified in the 2002 Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base,<br />

New Mexico General Plan to achieve these goals, such as achieving higher development densities,<br />

combining similar missi<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> siting facilities <str<strong>on</strong>g>for</str<strong>on</strong>g> maximum efficiency. The Proposed Acti<strong>on</strong> would be<br />

designated as <strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance l<str<strong>on</strong>g>and</str<strong>on</strong>g> use, which would be c<strong>on</strong>sistent with the existing<br />

<strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> Open Space uses at the proposed locati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> would be compatible<br />

with the Open Space l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses in the surrounding area. The l<str<strong>on</strong>g>and</str<strong>on</strong>g> use designati<strong>on</strong> of small porti<strong>on</strong>s of the<br />

Proposed Acti<strong>on</strong> area would need to be changed from Open Space to <strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance;<br />

however, this would c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>m to the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> Future L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Plan. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong><br />

would be c<strong>on</strong>sistent with the existing <str<strong>on</strong>g>and</str<strong>on</strong>g> future installati<strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use designati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> would comply with<br />

the 2002 Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, New Mexico General Plan. No impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use plans or policies<br />

would be expected.<br />

The Proposed Acti<strong>on</strong> would also be c<strong>on</strong>sistent with z<strong>on</strong>ing designati<strong>on</strong>s in surrounding off-installati<strong>on</strong><br />

areas, which include ordinances relating to the Albuquerque Internati<strong>on</strong>al Sunport. Regardless, the<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-1


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Proposed Acti<strong>on</strong> would not violate local z<strong>on</strong>ing ordinances because municipal z<strong>on</strong>ing regulati<strong>on</strong>s do not<br />

apply to Federal property. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would not result in any impacts <strong>on</strong> municipal<br />

l<str<strong>on</strong>g>and</str<strong>on</strong>g> use plans or policies.<br />

The Proposed Acti<strong>on</strong> would not preclude the viability of existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses, or the c<strong>on</strong>tinued use <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

occupati<strong>on</strong> of surrounding areas. The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be compatible with the surrounding<br />

<strong>Air</strong>craft Operati<strong>on</strong>s/Maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> Open Space l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would result<br />

in no impacts <strong>on</strong> existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> use viability or c<strong>on</strong>tinued l<str<strong>on</strong>g>and</str<strong>on</strong>g> occupati<strong>on</strong>.<br />

Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities would produce temporary, elevated noise levels that could be heard<br />

by pers<strong>on</strong>s immediately surrounding the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site (see Secti<strong>on</strong> 4.2.2 <str<strong>on</strong>g>for</str<strong>on</strong>g> envir<strong>on</strong>mental<br />

c<strong>on</strong>sequences related to noise). Operati<strong>on</strong> of the Proposed Acti<strong>on</strong> would not produce increase noise<br />

above ambient noise levels because the type <str<strong>on</strong>g>and</str<strong>on</strong>g> quantity of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> operati<strong>on</strong>s at the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not<br />

change from existing c<strong>on</strong>diti<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> there would be no increase in the quantity of aircraft utilizing the<br />

<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s. The Proposed Acti<strong>on</strong> would not result in significant impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use compatibility<br />

from noise producti<strong>on</strong>.<br />

As discussed in Secti<strong>on</strong> 3.1.2, several l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses <str<strong>on</strong>g>and</str<strong>on</strong>g> acti<strong>on</strong>s, including use of explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

development of people-intensive facilities not associated with flightline operati<strong>on</strong>s or other essential<br />

functi<strong>on</strong>s that must be sited within the Clear Z<strong>on</strong>e, are prohibited within the Runway 26 Clear Z<strong>on</strong>e <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

APZ I (USAF 1999). Major Comm<str<strong>on</strong>g>and</str<strong>on</strong>g>/Civil Engineering must approve alterati<strong>on</strong>s, minor additi<strong>on</strong>s, or<br />

improvements to existing facilities, <str<strong>on</strong>g>and</str<strong>on</strong>g> the c<strong>on</strong>structi<strong>on</strong> of new facilities in the Clear Z<strong>on</strong>e. The<br />

Proposed Acti<strong>on</strong> would be c<strong>on</strong>sistent with these regulati<strong>on</strong>s as it is a facility associated with flightline<br />

operati<strong>on</strong>s that must be within the Clear Z<strong>on</strong>e in order to provide service to <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> aircraft missi<strong>on</strong>s.<br />

There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, with approval from Major Comm<str<strong>on</strong>g>and</str<strong>on</strong>g>/Civil Engineering, the Proposed Acti<strong>on</strong> would comply<br />

with these regulati<strong>on</strong>s. The Proposed Acti<strong>on</strong> would not c<strong>on</strong>flict with planning criteria established to<br />

ensure the safety <str<strong>on</strong>g>and</str<strong>on</strong>g> protecti<strong>on</strong> of human life <str<strong>on</strong>g>and</str<strong>on</strong>g> property due to close proximity to an airport. Lessthan-significant<br />

impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use compatibility from safety issues related to proximity to an airport.<br />

The Proposed Acti<strong>on</strong> would require the establishment of a 1,250-foot QD arc, <str<strong>on</strong>g>and</str<strong>on</strong>g> would also be within<br />

the existing 1,250-foot QD arc <str<strong>on</strong>g>for</str<strong>on</strong>g> Pad 5. Operati<strong>on</strong> of both <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would be c<strong>on</strong>sidered<br />

compatible l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses because operati<strong>on</strong> of the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not occur simultaneously, rather each <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

would act as c<strong>on</strong>tingency if the other <str<strong>on</strong>g>pad</str<strong>on</strong>g> is unavailable. Prior to commencement of any work within the<br />

existing QD arc, all <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> roadway c<strong>on</strong>structi<strong>on</strong>, utilities, <str<strong>on</strong>g>and</str<strong>on</strong>g> electromagnetic radiati<strong>on</strong> sources must<br />

be coordinated with 377 ABW Weap<strong>on</strong>s Safety to determine if an explosives site plan (ESP) is required;<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> if an ESP is required, work cannot start until approval is granted by DDESB or Major Comm<str<strong>on</strong>g>and</str<strong>on</strong>g>.<br />

Operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be c<strong>on</strong>sistent with AFMAN 91-201. Compliance with<br />

these policies would ensure that the Proposed Acti<strong>on</strong> would result in less than significant impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

use compatibility from safety issues related to QD arcs.<br />

4.1.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, the Proposed Acti<strong>on</strong> would not be implemented <str<strong>on</strong>g>and</str<strong>on</strong>g> existing l<str<strong>on</strong>g>and</str<strong>on</strong>g> use<br />

c<strong>on</strong>diti<strong>on</strong>s would remain the same as discussed in Secti<strong>on</strong> 3.1.2. No impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use would be<br />

expected.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-2


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.2 Noise<br />

4.2.1 Evaluati<strong>on</strong> Criteria<br />

Noise impact analyses typically evaluate potential changes to the existing noise envir<strong>on</strong>ment that would<br />

result from implementati<strong>on</strong> of a proposed acti<strong>on</strong>. Potential changes in the acoustical envir<strong>on</strong>ment can be<br />

beneficial (i.e., if they reduce the number of sensitive receptors exposed to unacceptable noise levels or<br />

reduce the ambient sound level), negligible (i.e., if the total number of sensitive receptors to unacceptable<br />

noise levels is essentially unchanged), or adverse (i.e., if they result in increased sound exposure to<br />

unacceptable noise levels or ultimately increase the ambient sound level). Projected noise effects were<br />

evaluated qualitatively <str<strong>on</strong>g>for</str<strong>on</strong>g> the alternatives c<strong>on</strong>sidered.<br />

4.2.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.2.2.1 Proposed Acti<strong>on</strong><br />

The Proposed Acti<strong>on</strong> includes the c<strong>on</strong>structi<strong>on</strong> of a new <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, including the associated taxiway,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> repair of the taxiway to the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5) as discussed in Secti<strong>on</strong><br />

2.1.1. Noise from demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities would vary depending <strong>on</strong> the type of equipment<br />

being used, the area the activity would occur in, <str<strong>on</strong>g>and</str<strong>on</strong>g> the distance of the activity from the noise source. To<br />

predict how c<strong>on</strong>structi<strong>on</strong> activities would impact adjacent populati<strong>on</strong>s, noise from the probable<br />

c<strong>on</strong>structi<strong>on</strong> was estimated. For example, as shown in Table 3-2, c<strong>on</strong>structi<strong>on</strong> usually involves several<br />

pieces of equipment (e.g., dump truck <str<strong>on</strong>g>and</str<strong>on</strong>g> paver) that can be used simultaneously. Under the Proposed<br />

Acti<strong>on</strong>, the cumulative noise from the c<strong>on</strong>structi<strong>on</strong> equipment, during the busiest day, was estimated to<br />

determine the total impact of noise from c<strong>on</strong>structi<strong>on</strong> activities at a given distance. Examples of expected<br />

cumulative demoliti<strong>on</strong> noise during daytime hours at specified distances are shown in Table 4-1. These<br />

sound levels were predicted at 100, 200, 400, 800, <str<strong>on</strong>g>and</str<strong>on</strong>g> 1,200 feet from the source of the noise.<br />

Table 4-1. Predicted Noise Levels from Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong> Activities<br />

Distance from Noise Source<br />

Predicted Noise Level<br />

100 feet 86 dBA<br />

200 feet 80 dBA<br />

400 feet 74 dBA<br />

800 feet 68 dBA<br />

1,200 feet 64 dBA<br />

The proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would fall within the DNL 65 to 69 dBA noise c<strong>on</strong>tours, <str<strong>on</strong>g>and</str<strong>on</strong>g> the proposed<br />

taxiway would fall within the DNL 70 to 74 dBA noise c<strong>on</strong>tours from aircraft operati<strong>on</strong>s at Albuquerque<br />

Internati<strong>on</strong>al Sunport. Since multiple single noise events create the cumulative DNL value, the actual<br />

sound levels that a pers<strong>on</strong> hears within the area of the DNL noise c<strong>on</strong>tours fluctuates throughout a 24-<br />

hour period. C<strong>on</strong>sequently, populati<strong>on</strong>s within <str<strong>on</strong>g>and</str<strong>on</strong>g> adjacent to the Proposed Acti<strong>on</strong> are accustomed to<br />

fluctuati<strong>on</strong>s of noise levels in the 70 to 90 dBA range. Noise generati<strong>on</strong> would last <strong>on</strong>ly <str<strong>on</strong>g>for</str<strong>on</strong>g> the durati<strong>on</strong><br />

of c<strong>on</strong>structi<strong>on</strong> activities <str<strong>on</strong>g>and</str<strong>on</strong>g> would be isolated to normal working hours (i.e., between 7:00 a.m. <str<strong>on</strong>g>and</str<strong>on</strong>g> 5:00<br />

p.m.). C<strong>on</strong>sequently, demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities from the Proposed Acti<strong>on</strong> would result in<br />

impacts <strong>on</strong> the noise envir<strong>on</strong>ment; however, these impacts would be expected to be less than significant.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-3


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Operati<strong>on</strong> of the Proposed Acti<strong>on</strong> would not change the noise envir<strong>on</strong>ment from existing c<strong>on</strong>diti<strong>on</strong>s<br />

because, if implemented, the proposed <str<strong>on</strong>g>and</str<strong>on</strong>g> existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would act as c<strong>on</strong>tingency if the other<br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> is unavailable. The type <str<strong>on</strong>g>and</str<strong>on</strong>g> quantity of current <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> operati<strong>on</strong>s at the <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not change<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> there would be no increase in the quantity of aircraft utilizing the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e,<br />

operati<strong>on</strong> of the Proposed Acti<strong>on</strong> would not result in any impacts <strong>on</strong> the noise envir<strong>on</strong>ment.<br />

4.2.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, the Proposed Acti<strong>on</strong> would not be implemented, <str<strong>on</strong>g>and</str<strong>on</strong>g> the existing<br />

c<strong>on</strong>diti<strong>on</strong>s discussed in Secti<strong>on</strong> 3.2.2 would remain unchanged. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the ambient noise<br />

envir<strong>on</strong>ment would not change from existing c<strong>on</strong>diti<strong>on</strong>s.<br />

4.3 Visual Resources<br />

4.3.1 Evaluati<strong>on</strong> Criteria<br />

The Proposed Acti<strong>on</strong> would result in significant impacts <strong>on</strong> visual resources if it caused the following:<br />

<br />

<br />

<br />

Adversely influence a nati<strong>on</strong>al, state, or local park or recreati<strong>on</strong> area<br />

Degrade or diminish a Federal, state, or local scenic resource<br />

Create adverse visual intrusi<strong>on</strong>s or visual c<strong>on</strong>trasts affecting the quality of a l<str<strong>on</strong>g>and</str<strong>on</strong>g>scape.<br />

4.3.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.3.2.1 Proposed Acti<strong>on</strong><br />

During c<strong>on</strong>structi<strong>on</strong> activities, the area of the Proposed Acti<strong>on</strong> would have little aesthetic appeal.<br />

C<strong>on</strong>structi<strong>on</strong> equipment, including bulldozers, backhoes, fr<strong>on</strong>t-end loaders, dump trucks, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>crete<br />

mixing trucks, would be visible from the areas adjoining the Proposed Acti<strong>on</strong> site. Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong> wastes temporarily stored <str<strong>on</strong>g>for</str<strong>on</strong>g> disposal would be visible in piles <str<strong>on</strong>g>and</str<strong>on</strong>g> in dumpsters at the area<br />

of the Proposed Acti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> wastes would be visible in trucks <strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> off the installati<strong>on</strong> as it<br />

is being transported to l<str<strong>on</strong>g>and</str<strong>on</strong>g>fills. C<strong>on</strong>structi<strong>on</strong> supplies would also be visible during transport to <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

temporary storage at the project site. Although the c<strong>on</strong>structi<strong>on</strong> activities would adversely impact the<br />

installati<strong>on</strong>’s overall aesthetic appeal, the adverse impacts would be temporary (12- to 14-m<strong>on</strong>th<br />

durati<strong>on</strong>). Less-than-significant impacts <strong>on</strong> visual resources would be expected from c<strong>on</strong>structi<strong>on</strong><br />

activities.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would experience adverse effects <strong>on</strong> its overall visual c<strong>on</strong>diti<strong>on</strong> following the<br />

implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>. Although the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> its associated<br />

facilities, l<str<strong>on</strong>g>and</str<strong>on</strong>g>-based vehicles, <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft would alter the existing visual c<strong>on</strong>diti<strong>on</strong>s of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, it<br />

would be situated immediately east of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5). As such, the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>’s visual appearance would be c<strong>on</strong>sistent with the existing aesthetic c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

this area, <str<strong>on</strong>g>and</str<strong>on</strong>g> visual alterati<strong>on</strong> would be negligible. No additi<strong>on</strong>al aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> l<str<strong>on</strong>g>and</str<strong>on</strong>g>-based vehicles would<br />

be observable at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> following the c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The proposed<br />

<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> Pad 5 would not be used simultaneously, <str<strong>on</strong>g>and</str<strong>on</strong>g> the total volume of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> traffic at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would remain unchanged. The Proposed Acti<strong>on</strong> also includes the installati<strong>on</strong> of lighting at<br />

the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> improvements to lighting at Pad 5. Lighting at both <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would<br />

be designed to enhance the overall aesthetic c<strong>on</strong>diti<strong>on</strong> of the area. The Proposed Acti<strong>on</strong> would result in<br />

negligible changes to visual c<strong>on</strong>diti<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site; however, the effects <strong>on</strong> visual<br />

resources would be less than significant.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-4


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.3.2.2 No Acti<strong>on</strong> Alternative<br />

The No Acti<strong>on</strong> Alternative would result in c<strong>on</strong>tinuati<strong>on</strong> of the existing visual <str<strong>on</strong>g>and</str<strong>on</strong>g> aesthetic c<strong>on</strong>diti<strong>on</strong>s, as<br />

discussed in Secti<strong>on</strong> 3.3.2. C<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would not take place, <str<strong>on</strong>g>and</str<strong>on</strong>g> no<br />

changes to the installati<strong>on</strong>’s current aesthetic appearance would occur.<br />

4.4 <strong>Air</strong> Quality<br />

4.4.1 Evaluati<strong>on</strong> Criteria<br />

The Federal de minimis threshold emissi<strong>on</strong>s rates were established by the USEPA in the General<br />

C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity Rule to focus analysis requirements <strong>on</strong> those Federal acti<strong>on</strong>s with the potential to<br />

substantially affect air quality. Table 4-2 presents these thresholds, by regulated pollutant. As shown in<br />

Table 4-2, de minimis thresholds vary depending <strong>on</strong> the severity of the n<strong>on</strong>attainment area classificati<strong>on</strong>.<br />

Table 4-2. C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity de minimis Emissi<strong>on</strong>s Thresholds<br />

Pollutant Status Classificati<strong>on</strong> de minimis Limit (tpy)<br />

O 3 (measured as<br />

NO x or VOCs)<br />

CO<br />

PM 10<br />

PM 2.5 (measured<br />

directly, as SO 2 ,<br />

or as NO x )<br />

N<strong>on</strong>attainment<br />

Maintenance<br />

N<strong>on</strong>attainment/<br />

maintenance<br />

N<strong>on</strong>attainment /<br />

maintenance<br />

N<strong>on</strong>attainment/<br />

maintenance<br />

SO 2<br />

N<strong>on</strong>attainment/<br />

maintenance<br />

NO x<br />

N<strong>on</strong>attainment/<br />

maintenance<br />

Source: 40 CFR 93.153<br />

Extreme 10<br />

Severe 25<br />

Serious 50<br />

Moderate/marginal (inside oz<strong>on</strong>e<br />

transport regi<strong>on</strong>)<br />

50 (VOCs)/100 (NO x )<br />

All others 100<br />

Inside oz<strong>on</strong>e transport regi<strong>on</strong> 50 (VOCs)/100 (NO x )<br />

Outside oz<strong>on</strong>e transport regi<strong>on</strong> 100<br />

All 100<br />

Serious 70<br />

Moderate 100<br />

Not Applicable 100<br />

All 100<br />

All 100<br />

All 100<br />

The envir<strong>on</strong>mental c<strong>on</strong>sequences to local <str<strong>on</strong>g>and</str<strong>on</strong>g> regi<strong>on</strong>al air quality c<strong>on</strong>diti<strong>on</strong>s near a proposed Federal<br />

acti<strong>on</strong> are determined based up<strong>on</strong> the increases in regulated pollutant emissi<strong>on</strong>s relative to existing<br />

c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> ambient air quality. Specifically, the impact in NAAQS “attainment” areas would be<br />

c<strong>on</strong>sidered significant if the net increases in pollutant emissi<strong>on</strong>s from the Federal acti<strong>on</strong> would result in<br />

any <strong>on</strong>e of the following scenarios:<br />

<br />

Cause or c<strong>on</strong>tribute to a violati<strong>on</strong> of any nati<strong>on</strong>al or state ambient air quality st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-5


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

<br />

<br />

<br />

Expose sensitive receptors to substantially increased pollutant c<strong>on</strong>centrati<strong>on</strong>s<br />

Represent an increase of 10 percent or more in an affected AQCR emissi<strong>on</strong>s inventory<br />

Exceed any Evaluati<strong>on</strong> Criteria established by a SIP.<br />

Effects <strong>on</strong> air quality in NAAQS “n<strong>on</strong>attainment” areas are c<strong>on</strong>sidered significant if the net changes in<br />

project-related pollutant emissi<strong>on</strong>s result in any of the following scenarios:<br />

<br />

<br />

<br />

Cause or c<strong>on</strong>tribute to a violati<strong>on</strong> of any nati<strong>on</strong>al or state ambient air quality st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

Increase the frequency or severity of a violati<strong>on</strong> of any ambient air quality st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard<br />

Delay the attainment of any st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard or other milest<strong>on</strong>e c<strong>on</strong>tained in the SIP.<br />

With respect to the General C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity Rule, effects <strong>on</strong> air quality would be c<strong>on</strong>sidered significant if the<br />

proposed Federal acti<strong>on</strong> would result in an increase of a n<strong>on</strong>attainment or maintenance area’s emissi<strong>on</strong>s<br />

inventory by 10 percent or more <str<strong>on</strong>g>for</str<strong>on</strong>g> <strong>on</strong>e or more n<strong>on</strong>attainment pollutants, or if such emissi<strong>on</strong>s exceed de<br />

minimis threshold levels established in 40 CFR 93.153(b) <str<strong>on</strong>g>for</str<strong>on</strong>g> individual n<strong>on</strong>attainment pollutants or <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

pollutants <str<strong>on</strong>g>for</str<strong>on</strong>g> which the area has been redesignated as a maintenance area.<br />

In additi<strong>on</strong> to the de minimis emissi<strong>on</strong>s thresholds, Federal PSD regulati<strong>on</strong>s define air pollutant emissi<strong>on</strong>s<br />

to be significant if the source is within 10 kilometers of any Class I area, <str<strong>on</strong>g>and</str<strong>on</strong>g> emissi<strong>on</strong>s would cause an<br />

increase in the c<strong>on</strong>centrati<strong>on</strong> of any regulated pollutant in the Class I area of 1 μg/m 3 or more (40 CFR<br />

52.21(b)(23)(iii)).<br />

4.4.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.4.2.1 Proposed Acti<strong>on</strong><br />

Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> under the Proposed Acti<strong>on</strong> would result in<br />

impacts <strong>on</strong> air quality resources; however these impacts are expected to be less than significant. <strong>Air</strong><br />

quality impacts during c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> activities would result primarily from site-disturbing<br />

activities <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> of c<strong>on</strong>structi<strong>on</strong> equipment. All emissi<strong>on</strong>s associated with demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong> operati<strong>on</strong>s would be temporary in nature. The proposed project includes the c<strong>on</strong>structi<strong>on</strong><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> of a 4.2-acre <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> elements to tie the existing <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

together. The project also involves demolishing <str<strong>on</strong>g>and</str<strong>on</strong>g> removing existing aboveground infrastructure<br />

elements such as light poles, a pers<strong>on</strong>nel shelter, a storage shed, <str<strong>on</strong>g>and</str<strong>on</strong>g> various utility <str<strong>on</strong>g>and</str<strong>on</strong>g> lago<strong>on</strong><br />

infrastructures. It is not expected that emissi<strong>on</strong>s from the Proposed Acti<strong>on</strong> would c<strong>on</strong>tribute to or affect<br />

local or regi<strong>on</strong>al attainment status with the NAAQS. Emissi<strong>on</strong>s from the Proposed Acti<strong>on</strong> are<br />

summarized in Table 4-3. Emissi<strong>on</strong>s estimati<strong>on</strong> spreadsheets <str<strong>on</strong>g>and</str<strong>on</strong>g> methodology are included in<br />

Appendix C.<br />

The Proposed Acti<strong>on</strong> would generate particulate matter emissi<strong>on</strong>s as fugitive dust from ground-disturbing<br />

activities (e.g., road surface demoliti<strong>on</strong>, paving, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong>). A fugitive dust-c<strong>on</strong>trol c<strong>on</strong>structi<strong>on</strong><br />

permit from AEHD-AQD prescribing fugitive dust minimizati<strong>on</strong> procedures would be required <str<strong>on</strong>g>for</str<strong>on</strong>g> the<br />

Proposed Acti<strong>on</strong> because the acti<strong>on</strong> would result in ground disturbance of greater than 0.75 acres.<br />

Appropriate fugitive dust-c<strong>on</strong>trol measures would be employed during demoliti<strong>on</strong> activities to suppress<br />

emissi<strong>on</strong>s. Combusti<strong>on</strong> emissi<strong>on</strong>s of all criteria pollutants would result from the operati<strong>on</strong> of<br />

c<strong>on</strong>structi<strong>on</strong> equipment <str<strong>on</strong>g>and</str<strong>on</strong>g> portable generators during demoliti<strong>on</strong> activities, hauling demoliti<strong>on</strong> wastes<br />

from the project site, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> workers commuting to the project site. Fugitive dust <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

combusti<strong>on</strong> emissi<strong>on</strong>s associated with c<strong>on</strong>structi<strong>on</strong> equipment would produce slightly elevated air<br />

pollutant c<strong>on</strong>centrati<strong>on</strong>s. However, the effects would be temporary, fall off rapidly with distance from the<br />

Proposed Acti<strong>on</strong> site, <str<strong>on</strong>g>and</str<strong>on</strong>g> would not result in any l<strong>on</strong>g-term impacts.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-6


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Table 4-3. Estimated <strong>Air</strong> Emissi<strong>on</strong>s Resulting from the Proposed Acti<strong>on</strong><br />

Activity<br />

NO x<br />

tpy<br />

VOC<br />

tpy<br />

CO<br />

tpy<br />

SO 2<br />

tpy<br />

PM 10<br />

tpy<br />

PM 2.5<br />

tpy<br />

CO 2<br />

tpy<br />

C<strong>on</strong>structi<strong>on</strong><br />

Combusti<strong>on</strong><br />

10.513 0.743 4.389 0.491 0.691 0.670 1,216.674<br />

C<strong>on</strong>structi<strong>on</strong> Fugitive<br />

Dust<br />

-- -- -- -- 34.436 2.858 --<br />

Haul Truck On-Road 0.092 0.067 0.271 0.007 0.109 0.028 23.307<br />

C<strong>on</strong>structi<strong>on</strong> Commuter 1.412 1.878 20.191 0.060 0.762 0.208 293.250<br />

Total Proposed Acti<strong>on</strong><br />

Emissi<strong>on</strong>s<br />

12.02 2.69 24.85 0.56 36.00 3.76 1,533.23<br />

Percent of AMRGI<br />

Inventory<br />

0.0327% 0.0085% 0.0101% 0.0213% 0.0262% 0.0226% NA<br />

Fugitive dust emissi<strong>on</strong>s would vary from day to day depending <strong>on</strong> the level of activity <str<strong>on</strong>g>and</str<strong>on</strong>g> prevailing<br />

weather c<strong>on</strong>diti<strong>on</strong>s. The quantity of unc<strong>on</strong>trolled fugitive dust emissi<strong>on</strong>s from a c<strong>on</strong>structi<strong>on</strong> site is<br />

proporti<strong>on</strong>al to the area of l<str<strong>on</strong>g>and</str<strong>on</strong>g> being worked <str<strong>on</strong>g>and</str<strong>on</strong>g> the level of c<strong>on</strong>structi<strong>on</strong> activity. Fugitive dust<br />

emissi<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> various c<strong>on</strong>structi<strong>on</strong> activities were calculated using emissi<strong>on</strong>s factors <str<strong>on</strong>g>and</str<strong>on</strong>g> methodology<br />

published by the USEPA. Fugitive dust emissi<strong>on</strong> estimati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> methodology are included in<br />

Appendix C.<br />

Specific in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> describing the types of c<strong>on</strong>structi<strong>on</strong> equipment required <str<strong>on</strong>g>for</str<strong>on</strong>g> a specific task, the hours<br />

the equipment is operated, <str<strong>on</strong>g>and</str<strong>on</strong>g> the operating c<strong>on</strong>diti<strong>on</strong>s vary widely from project to project. For purposes<br />

of analysis, these parameters were estimated using established methodologies <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

experience with similar types of c<strong>on</strong>structi<strong>on</strong> projects. For the purpose of this analysis the durati<strong>on</strong> of<br />

this project would occur over a <strong>on</strong>e-year period. The estimated emissi<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> this project are presented in<br />

Table 4-3. Detailed assumpti<strong>on</strong>s used <str<strong>on</strong>g>for</str<strong>on</strong>g> estimating emissi<strong>on</strong>s are included in Appendix C.<br />

Since Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is in attainment <str<strong>on</strong>g>for</str<strong>on</strong>g> all criteria pollutants, General C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity Rule requirements are<br />

not applicable. In additi<strong>on</strong>, the Proposed Acti<strong>on</strong> would generate emissi<strong>on</strong>s below 10 percent of the<br />

emissi<strong>on</strong>s inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> the AMRGI AQCR <str<strong>on</strong>g>and</str<strong>on</strong>g> the emissi<strong>on</strong>s would be short-term. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the<br />

c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> activities associated with the Proposed Acti<strong>on</strong> would not have significant<br />

effects <strong>on</strong> air quality at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> or <strong>on</strong> regi<strong>on</strong>al or local air quality. Appendix C includes the air<br />

emissi<strong>on</strong> estimati<strong>on</strong> spreadsheets.<br />

Greenhouse Gases<br />

GHGs are gases that trap heat in the atmosphere. These emissi<strong>on</strong>s occur from natural processes <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

human activities. The accumulati<strong>on</strong> of GHGs in the atmosphere regulates the earth's temperature.<br />

Scientific evidence indicates a trend of increasing global temperature over the past century due to an<br />

increase in GHG emissi<strong>on</strong>s from human activities. The climate change associated with this global<br />

warming is predicted to produce negative envir<strong>on</strong>mental, ec<strong>on</strong>omic, <str<strong>on</strong>g>and</str<strong>on</strong>g> social c<strong>on</strong>sequences across the<br />

globe.<br />

Recent observed changes due to global warming include shrinking glaciers, thawing permafrost, a<br />

lengthened growing seas<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> shifts in plant <str<strong>on</strong>g>and</str<strong>on</strong>g> animal ranges. Predicti<strong>on</strong>s of l<strong>on</strong>g-term negative<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-7


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

envir<strong>on</strong>mental impacts due to global warming include sea level rise, changing weather patterns with<br />

increases in the severity of storms <str<strong>on</strong>g>and</str<strong>on</strong>g> droughts, changes to local <str<strong>on</strong>g>and</str<strong>on</strong>g> regi<strong>on</strong>al ecosystems including the<br />

potential loss of species, <str<strong>on</strong>g>and</str<strong>on</strong>g> a substantial reducti<strong>on</strong> in winter snow pack.<br />

The most comm<strong>on</strong> GHGs emitted from natural processes <str<strong>on</strong>g>and</str<strong>on</strong>g> human activities include CO 2 , methane<br />

(CH 4 ), <str<strong>on</strong>g>and</str<strong>on</strong>g> nitrous oxide (N 2 O). Examples of GHGs created <str<strong>on</strong>g>and</str<strong>on</strong>g> emitted primarily through human<br />

activities include fluorinated gases (hydro fluorocarb<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> per fluorocarb<strong>on</strong>s) <str<strong>on</strong>g>and</str<strong>on</strong>g> sulfur hexafluoride.<br />

Each GHG is assigned a global warming potential (GWP). The GWP is the ability of a gas or aerosol to<br />

trap heat in the atmosphere. The GWP rating system is st<str<strong>on</strong>g>and</str<strong>on</strong>g>ardized to CO 2 , which has a value of <strong>on</strong>e.<br />

For example, CH 4 has a GWP of 21, which means that it has a global warming effect 21 times greater<br />

than CO 2 <strong>on</strong> an equal-mass basis. To simplify analyses, total GHG emissi<strong>on</strong>s from a source are often<br />

expressed as a CO 2 equivalent (CO 2 e).<br />

Federal agencies are, <strong>on</strong> a nati<strong>on</strong>al scale, addressing emissi<strong>on</strong>s of GHGs by reducti<strong>on</strong>s m<str<strong>on</strong>g>and</str<strong>on</strong>g>ated in<br />

Federal laws <str<strong>on</strong>g>and</str<strong>on</strong>g> EOs, most recently, EO 13514, Leadership in Envir<strong>on</strong>mental, Energy, <str<strong>on</strong>g>and</str<strong>on</strong>g> Ec<strong>on</strong>omic<br />

Per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance. Several states have promulgated laws as a means to reduce statewide levels of GHG<br />

emissi<strong>on</strong>s. In additi<strong>on</strong>, groups of states (such as the Western Climate Initiative) have <str<strong>on</strong>g>for</str<strong>on</strong>g>med regi<strong>on</strong>ally<br />

based collectives to jointly address GHG pollutants.<br />

The Energy In<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> Administrati<strong>on</strong> states that in 2005, gross CO 2 emissi<strong>on</strong>s in New Mexico were<br />

59.5 milli<strong>on</strong> metric t<strong>on</strong>s of CO 2 (DOE 2009). Approximately 1,390 metric t<strong>on</strong>s of CO 2 (1,533 t<strong>on</strong>s) were<br />

estimated to be emitted by the proposed project. The CO 2 emitted is approximately 0.0023 percent of the<br />

New Mexico statewide CO 2 . There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would have negligible c<strong>on</strong>tributi<strong>on</strong> towards<br />

the New Mexico statewide GHG inventory. CO 2 emissi<strong>on</strong> estimates are included in Appendix C.<br />

4.4.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would not c<strong>on</strong>struct the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> or associated<br />

infrastructure, which would result in the c<strong>on</strong>tinuati<strong>on</strong> of the existing c<strong>on</strong>diti<strong>on</strong>s discussed in Secti<strong>on</strong><br />

3.4.2. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no direct or indirect envir<strong>on</strong>mental effects would be expected <strong>on</strong> local or regi<strong>on</strong>al air<br />

quality from implementati<strong>on</strong> of the No Acti<strong>on</strong> Alternative.<br />

4.5 Geology <str<strong>on</strong>g>and</str<strong>on</strong>g> Soils<br />

4.5.1 Evaluati<strong>on</strong> Criteria<br />

Protecti<strong>on</strong> of unique geological features, minimizati<strong>on</strong> of soil erosi<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> the siting of facilities in<br />

relati<strong>on</strong> to potential geologic hazards are c<strong>on</strong>sidered when evaluating the potential impacts of a proposed<br />

acti<strong>on</strong> <strong>on</strong> geological resources. Generally, adverse impacts can be avoided or minimized if proper<br />

c<strong>on</strong>structi<strong>on</strong> techniques, erosi<strong>on</strong>-c<strong>on</strong>trol <str<strong>on</strong>g>and</str<strong>on</strong>g> storm water management measures, <str<strong>on</strong>g>and</str<strong>on</strong>g> structural<br />

engineering design are incorporated into project development.<br />

Effects <strong>on</strong> geology <str<strong>on</strong>g>and</str<strong>on</strong>g> soils would be significant if they would alter the lithology, stratigraphy, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

geological structures that c<strong>on</strong>trol groundwater quality, distributi<strong>on</strong> of aquifers <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>fining beds, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

groundwater availability; or change the soil compositi<strong>on</strong>, structure, or functi<strong>on</strong> (including prime farml<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> other unique soils) within the envir<strong>on</strong>ment.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-8


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.5.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.5.2.1 Proposed Acti<strong>on</strong><br />

Under the Proposed Acti<strong>on</strong> no significant impacts <strong>on</strong> geological resources or soils would be expected.<br />

The Proposed Acti<strong>on</strong> would require disturbance of approximately 4.2 acres of previously disturbed <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

undisturbed l<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> of a new <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> disturbance of additi<strong>on</strong>al l<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

to c<strong>on</strong>struct a new taxiway. C<strong>on</strong>structi<strong>on</strong> activities would require removal of existing infrastructure<br />

within the project site. Following demoliti<strong>on</strong>, the project site would require clearing of vegetati<strong>on</strong>,<br />

grading, <str<strong>on</strong>g>and</str<strong>on</strong>g> paving. Clearing of vegetati<strong>on</strong> could increase erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong> potential. Soil<br />

erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sediment producti<strong>on</strong> would be minimized <str<strong>on</strong>g>for</str<strong>on</strong>g> all c<strong>on</strong>structi<strong>on</strong> operati<strong>on</strong>s as a result of<br />

following an approved sediment-<str<strong>on</strong>g>and</str<strong>on</strong>g>-erosi<strong>on</strong>-c<strong>on</strong>trol plan. In additi<strong>on</strong>, c<strong>on</strong>structi<strong>on</strong> BMPs would be<br />

implemented to minimize soil erosi<strong>on</strong>; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no significant impacts <strong>on</strong> soils would be anticipated at<br />

the project site.<br />

As a result of implementing the Proposed Acti<strong>on</strong>, soils would be compacted, <str<strong>on</strong>g>and</str<strong>on</strong>g> soil structure would be<br />

disturbed <str<strong>on</strong>g>and</str<strong>on</strong>g> modified. Soil productivity, which is the capacity of the soil to produce vegetative<br />

biomass, would decline in disturbed areas <str<strong>on</strong>g>and</str<strong>on</strong>g> would be eliminated in those areas within the footprint of<br />

the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> taxiway. Loss of soil structure due to compacti<strong>on</strong> from foot <str<strong>on</strong>g>and</str<strong>on</strong>g> vehicle<br />

traffic could result in changes in drainage patterns. Soil erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sediment c<strong>on</strong>trol measures would be<br />

included in the site plan to minimize l<strong>on</strong>g-term erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sediment producti<strong>on</strong>. Use of storm water<br />

c<strong>on</strong>trol measures that favor reinfiltrati<strong>on</strong> would minimize the potential <str<strong>on</strong>g>for</str<strong>on</strong>g> erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sediment<br />

producti<strong>on</strong> as a result of future storm events. However, as most of the site is <strong>on</strong>ly sparsely vegetated <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

has been previously disturbed, it is anticipated that clearing of vegetati<strong>on</strong> would not result in a significant<br />

impact <strong>on</strong> soil erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong>.<br />

C<strong>on</strong>structi<strong>on</strong> of the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would not require any infrastructure that would be susceptible to<br />

damage or impacts <strong>on</strong> inhabitants as a result of earthquakes. No impacts from geologic hazards would be<br />

expected.<br />

4.5.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, the 377 ABW would not c<strong>on</strong>struct a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> existing<br />

c<strong>on</strong>diti<strong>on</strong>s would remain. No effects <strong>on</strong> geological resources would be anticipated.<br />

4.6 Water Resources<br />

4.6.1 Evaluati<strong>on</strong> Criteria<br />

Evaluati<strong>on</strong> of impacts <strong>on</strong> water resources is based <strong>on</strong> water availability, quality, <str<strong>on</strong>g>and</str<strong>on</strong>g> use; existence of<br />

floodplains; <str<strong>on</strong>g>and</str<strong>on</strong>g> associated regulati<strong>on</strong>s. A proposed acti<strong>on</strong> would be adverse if it were to substantially<br />

affect water quality; substantially reduce water availability or supply to existing users; threaten or damage<br />

hydrologic characteristics; or violate established Federal, state, or local laws <str<strong>on</strong>g>and</str<strong>on</strong>g> regulati<strong>on</strong>s. The<br />

potential impact of flood hazards <strong>on</strong> a proposed acti<strong>on</strong> is important if such an acti<strong>on</strong> occurs in an area<br />

with a high probability of flooding.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-9


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.6.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.6.2.1 Proposed Acti<strong>on</strong><br />

Under the Proposed Acti<strong>on</strong>, less-than-significant impacts <strong>on</strong> water resources would be expected.<br />

Groundwater might be temporarily used <str<strong>on</strong>g>for</str<strong>on</strong>g> dust suppressi<strong>on</strong> during demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong><br />

activities, depending <strong>on</strong> site c<strong>on</strong>diti<strong>on</strong>s. If water applicati<strong>on</strong> were required <str<strong>on</strong>g>for</str<strong>on</strong>g> dust suppressi<strong>on</strong>, sufficient<br />

water resources are available <strong>on</strong> the installati<strong>on</strong>; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, less-than-significant adverse impacts <strong>on</strong><br />

groundwater availability would be expected.<br />

The Proposed Acti<strong>on</strong> would create ground disturbances <strong>on</strong> a small scale, which could in turn increase<br />

erosi<strong>on</strong> potential <str<strong>on</strong>g>and</str<strong>on</strong>g> runoff during heavy precipitati<strong>on</strong> events. Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> debris could<br />

reach waterways through wind or surface runoff if measures were not taken to keep debris <strong>on</strong> site. Proper<br />

housekeeping <str<strong>on</strong>g>and</str<strong>on</strong>g> retenti<strong>on</strong> of debris within the site boundaries would prevent c<strong>on</strong>structi<strong>on</strong> debris from<br />

entering waterways. The USEPA’s C<strong>on</strong>structi<strong>on</strong> General Permit outlines a set of provisi<strong>on</strong>s c<strong>on</strong>structi<strong>on</strong><br />

operators must follow to comply with the requirements of the NPDES storm water regulati<strong>on</strong>s. The<br />

NPDES storm water program requires c<strong>on</strong>structi<strong>on</strong> site operators engaged in clearing, grading, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

excavating activities that disturb 1 acre or more to obtain coverage under an NPDES permit <str<strong>on</strong>g>for</str<strong>on</strong>g> their<br />

storm water discharges. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> manages an active program <str<strong>on</strong>g>for</str<strong>on</strong>g> tracking <str<strong>on</strong>g>and</str<strong>on</strong>g> inspecting large<br />

(greater than 5 acres) <str<strong>on</strong>g>and</str<strong>on</strong>g> small (1 to 5 acres) c<strong>on</strong>structi<strong>on</strong> activities that require coverage under the<br />

NPDES program (K<strong>AFB</strong> 2002). Because the Proposed Acti<strong>on</strong> would disturb more than 1 acre<br />

(approximately 11 acres <str<strong>on</strong>g>for</str<strong>on</strong>g> proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> taxiway), it would require NPDES permit coverage, which<br />

would further require the preparati<strong>on</strong> of a Notice of Intent (NOI) to discharge storm water <str<strong>on</strong>g>and</str<strong>on</strong>g> preparati<strong>on</strong><br />

of a Storm Water Polluti<strong>on</strong> Preventi<strong>on</strong> Plan (SWPPP) that would be implemented during c<strong>on</strong>structi<strong>on</strong>.<br />

The SWPPP would be developed in accordance with the requirements of the C<strong>on</strong>structi<strong>on</strong> General permit.<br />

Prior to submissi<strong>on</strong> of the NOI to the USEPA, which is the NPDES permitting authority in New Mexico,<br />

the c<strong>on</strong>structi<strong>on</strong> operator would be required to submit the SWPPP to the 377 MSG/C<str<strong>on</strong>g>EA</str<strong>on</strong>g>NC <str<strong>on</strong>g>for</str<strong>on</strong>g> review.<br />

A SWPPP would identify BMPs to reduce erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> runoff from c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g>.<br />

As a new requirement under the CWA <str<strong>on</strong>g>Final</str<strong>on</strong>g> Rule <str<strong>on</strong>g>for</str<strong>on</strong>g> its NPDES C<strong>on</strong>structi<strong>on</strong> General Permit, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong> would be required to meet the n<strong>on</strong>-numeric effluent limitati<strong>on</strong>s of the CWA <str<strong>on</strong>g>and</str<strong>on</strong>g> design, install, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

maintain effective erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong> c<strong>on</strong>trols as described in Secti<strong>on</strong> 3.6.1. The implementati<strong>on</strong><br />

of these n<strong>on</strong>-numeric effluent limitati<strong>on</strong>s would minimize short-term adverse effects <strong>on</strong> surface waters<br />

from erosi<strong>on</strong>, sedimentati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> polluti<strong>on</strong>. In additi<strong>on</strong>, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would be subject to the new storm<br />

water design requirements of Secti<strong>on</strong> 438 of the EISA that require Federal c<strong>on</strong>structi<strong>on</strong> projects that<br />

disturb 5,000 square feet or more of l<str<strong>on</strong>g>and</str<strong>on</strong>g> to maintain or restore predevelopment site hydrology to the<br />

maximum extent technically feasible with respect to temperature, rate, volume, <str<strong>on</strong>g>and</str<strong>on</strong>g> durati<strong>on</strong> of flow.<br />

Under the Proposed Acti<strong>on</strong>, c<strong>on</strong>structi<strong>on</strong> c<strong>on</strong>tractors would be required to provide documentati<strong>on</strong> <strong>on</strong> how<br />

they would meet Secti<strong>on</strong> 438 of the EISA requirements. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no significant short-term or l<strong>on</strong>gterm,<br />

adverse impacts <strong>on</strong> water resources would be expected from the Proposed Acti<strong>on</strong>.<br />

Design of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would include storm water c<strong>on</strong>trol. Storm water from the proposed<br />

<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be incorporated into Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g>’s MS4; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no l<strong>on</strong>g-term adverse effects <strong>on</strong><br />

water resources from sheet runoff during storm events would be expected from the operati<strong>on</strong> of the <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. In additi<strong>on</strong>, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s MS4 permit requires that all c<strong>on</strong>structi<strong>on</strong> activities, regardless of<br />

size, implement BMPs to ensure that storm water pollutants do not enter the storm drainage system <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

that storm water pollutants are c<strong>on</strong>tained within the project area. All storm water drop inlets in the<br />

project area must be protected with a barrier (e.g., hay bales, socks, s<str<strong>on</strong>g>and</str<strong>on</strong>g> bags). C<strong>on</strong>tractors must<br />

minimize stock piles <str<strong>on</strong>g>and</str<strong>on</strong>g> keep the c<strong>on</strong>structi<strong>on</strong> area clean of debris, designate equipment <str<strong>on</strong>g>and</str<strong>on</strong>g> storage<br />

areas, ensure equipment are free of leaks, minimize exits <str<strong>on</strong>g>and</str<strong>on</strong>g> entrances to the project area, minimize track<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-10


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

out, <str<strong>on</strong>g>and</str<strong>on</strong>g> implement good housekeeping measures to ensure practices are reducing storm water pollutants<br />

to the maximum extent practicable.<br />

Heavy equipment (e.g., bulldozers, backhoes, dump trucks, c<strong>on</strong>crete mixers, asphalt vehicles) <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

generators would be <strong>on</strong> site throughout periods of demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong>. Fuels, hydraulic fluids,<br />

oils, <str<strong>on</strong>g>and</str<strong>on</strong>g> other lubricants would be stored <strong>on</strong> site during the project to support c<strong>on</strong>tractor vehicles <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

machinery. No other hazardous materials are anticipated to be stored <strong>on</strong> site during demoliti<strong>on</strong> or<br />

c<strong>on</strong>structi<strong>on</strong> activities. It is assumed that c<strong>on</strong>structi<strong>on</strong> pers<strong>on</strong>nel would follow appropriate BMPs to<br />

protect against potential petroleum or hazardous material spills. Proper housekeeping, maintenance of<br />

equipment, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>tainment of fuels <str<strong>on</strong>g>and</str<strong>on</strong>g> other potentially hazardous materials would be c<strong>on</strong>ducted to<br />

minimize the potential <str<strong>on</strong>g>for</str<strong>on</strong>g> a release of fluids into groundwater or surface waters. In the event of a spill,<br />

procedures outlined in Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>’s Hazardous Material Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Resp<strong>on</strong>se Plan<br />

would be followed to quickly c<strong>on</strong>tain <str<strong>on</strong>g>and</str<strong>on</strong>g> clean up a spill (see Secti<strong>on</strong>s 3.10 <str<strong>on</strong>g>and</str<strong>on</strong>g> 4.10 <str<strong>on</strong>g>for</str<strong>on</strong>g> more<br />

in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> <strong>on</strong> hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> wastes). There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, less-than-significant adverse impacts <strong>on</strong><br />

water quality would be expected as a result of the Proposed Acti<strong>on</strong>.<br />

The existing <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s are outside of the Tijeras Arroyo <str<strong>on</strong>g>and</str<strong>on</strong>g> Arroyo del Coyote<br />

100-year floodplains; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no direct impacts <strong>on</strong> floodplains would be expected. Although the<br />

quantity of storm water sheet flow from disturbed sites to the intermittent streams <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> could<br />

increase during demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities, this increase is not anticipated to be significant.<br />

There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would have less-than-significant impacts <strong>on</strong> floodplain flow<br />

characteristics.<br />

4.6.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> related comp<strong>on</strong>ents would not be<br />

c<strong>on</strong>structed <str<strong>on</strong>g>and</str<strong>on</strong>g> there would be no changes to current water resources. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no new impacts <strong>on</strong><br />

water resources would be expected as a result of the No Acti<strong>on</strong> Alternative. Without implementati<strong>on</strong> of<br />

the Proposed Acti<strong>on</strong>, the pavement c<strong>on</strong>diti<strong>on</strong>s at Pad 5 would c<strong>on</strong>tinue to deteriorate. Deteriorati<strong>on</strong> could<br />

lead to cracks in pavement, which would not prevent release of pollutants into soils or groundwater in the<br />

event of a spill; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, l<strong>on</strong>g-term, adverse effects could occur from the No Acti<strong>on</strong> Alternative.<br />

4.7 Biological Resources<br />

4.7.1 Evaluati<strong>on</strong> Criteria<br />

The level of impact <strong>on</strong> biological resources is based <strong>on</strong> (1) the importance (i.e., legal, commercial,<br />

recreati<strong>on</strong>al, ecological, or scientific) of the resource, (2) the proporti<strong>on</strong> of the resource that would be<br />

affected relative to its occurrence in the regi<strong>on</strong>, (3) the sensitivity of the resource to the proposed<br />

activities, <str<strong>on</strong>g>and</str<strong>on</strong>g> (4) the durati<strong>on</strong> of ecological ramificati<strong>on</strong>s. Impacts <strong>on</strong> biological resources are c<strong>on</strong>sidered<br />

significant if species or habitats of high c<strong>on</strong>cern are adversely affected over relatively large areas, or<br />

disturbances cause reducti<strong>on</strong>s in populati<strong>on</strong> size or distributi<strong>on</strong> of a species of special c<strong>on</strong>cern. A habitat<br />

perspective is used to provide a framework <str<strong>on</strong>g>for</str<strong>on</strong>g> analysis of general classes of effects (i.e., removal of<br />

critical habitat, noise, human disturbance).<br />

Determinati<strong>on</strong> of the significance of wetl<str<strong>on</strong>g>and</str<strong>on</strong>g> impacts is based <strong>on</strong> (1) the functi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> value of the<br />

wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>, (2) the proporti<strong>on</strong> of the wetl<str<strong>on</strong>g>and</str<strong>on</strong>g> that would be affected relative to the occurrence of similar<br />

wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s in the regi<strong>on</strong>, (3) the sensitivity of the wetl<str<strong>on</strong>g>and</str<strong>on</strong>g> to proposed activities, <str<strong>on</strong>g>and</str<strong>on</strong>g> (4) the durati<strong>on</strong> of<br />

ecological ramificati<strong>on</strong>s. Impacts <strong>on</strong> wetl<str<strong>on</strong>g>and</str<strong>on</strong>g> resources are c<strong>on</strong>sidered significant if high value wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

would be adversely affected.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-11


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Ground disturbance <str<strong>on</strong>g>and</str<strong>on</strong>g> noise associated with c<strong>on</strong>structi<strong>on</strong> activities might directly or indirectly cause<br />

potential effects <strong>on</strong> biological resources. Direct effects from ground disturbance were evaluated by<br />

identifying the types <str<strong>on</strong>g>and</str<strong>on</strong>g> locati<strong>on</strong>s of potential ground-disturbing activities in correlati<strong>on</strong> to important<br />

biological resources. Mortality of individuals, habitat removal, <str<strong>on</strong>g>and</str<strong>on</strong>g> damage or degradati<strong>on</strong> of habitats are<br />

effects that might be associated with ground-disturbing activities.<br />

Noise associated with a proposed acti<strong>on</strong> might be of sufficient magnitude to result in the direct loss of<br />

individuals <str<strong>on</strong>g>and</str<strong>on</strong>g> reduce reproductive output within certain ecological settings. Ultimately, extreme cases<br />

of such stresses could have the potential to lead to populati<strong>on</strong> declines or local or regi<strong>on</strong>al extincti<strong>on</strong>. To<br />

evaluate effects, c<strong>on</strong>siderati<strong>on</strong>s were given to the number of individuals or critical species involved,<br />

amount of habitat affected, relati<strong>on</strong>ship of the area of potential effect to total available habitat within the<br />

regi<strong>on</strong>, type of stressors involved, <str<strong>on</strong>g>and</str<strong>on</strong>g> magnitude of the effects.<br />

As a requirement under the ESA, Federal agencies must provide documentati<strong>on</strong> that ensures that agency<br />

acti<strong>on</strong>s do not adversely affect the existence of any threatened or endangered species. The ESA requires<br />

that all Federal agencies avoid “taking” threatened or endangered species, which includes jeopardizing<br />

threatened or endangered species habitat. Secti<strong>on</strong> 7 of the ESA establishes a c<strong>on</strong>sultati<strong>on</strong> process with<br />

the USFWS that ends with USFWS c<strong>on</strong>currence or a determinati<strong>on</strong> of the risk of jeopardy from a Federal<br />

agency project.<br />

4.7.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.7.2.1 Proposed Acti<strong>on</strong><br />

Vegetati<strong>on</strong><br />

The site of the Proposed Acti<strong>on</strong> lies within a previously disturbed area. The site c<strong>on</strong>sists of minimal<br />

vegetati<strong>on</strong>, mostly annual weeds <str<strong>on</strong>g>and</str<strong>on</strong>g> native grasses, with open asphalt <str<strong>on</strong>g>and</str<strong>on</strong>g> compacted gravel ground<br />

surfaces. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, impacts <strong>on</strong> vegetati<strong>on</strong> would be less than significant.<br />

Wildlife Species <str<strong>on</strong>g>and</str<strong>on</strong>g> Habitat<br />

There are several potential prairie dog col<strong>on</strong>ies immediately north <str<strong>on</strong>g>and</str<strong>on</strong>g> east of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>.<br />

Locati<strong>on</strong>s of burrowing owls within the proposed project area are discussed under Threatened <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Endangered Species.<br />

There is a small possibility that noise created during c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> activities could result in<br />

adverse effects <strong>on</strong> nearby wildlife. These effects would include subtle, widespread effects from the<br />

overall elevati<strong>on</strong> of ambient noise levels. This would result in reduced communicati<strong>on</strong>s ranges,<br />

interference with predator/prey detecti<strong>on</strong>, or habitat avoidance. More intense effects would include<br />

behavioral change, disorientati<strong>on</strong>, or hearing loss. Predictors of wildlife resp<strong>on</strong>se to noise include noise<br />

type (i.e., c<strong>on</strong>tinuous or intermittent), prior experience with noise, proximity to a noise source, stage in<br />

the breeding cycle, activity, age, <str<strong>on</strong>g>and</str<strong>on</strong>g> sex compositi<strong>on</strong>. Prior experience with noise is the most important<br />

factor in the resp<strong>on</strong>se of wildlife to noise, because wildlife can become accustomed (or habituate) to the<br />

noise. The rate of habituati<strong>on</strong> to short-term demoliti<strong>on</strong> noise is not known. Overall, impacts <strong>on</strong> wildlife<br />

would be less than significant.<br />

Existing c<strong>on</strong>diti<strong>on</strong>s include flying areas that are located near a major migratory flyway al<strong>on</strong>g the Rio<br />

Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e River. It is possible that the updated lighting infrastructure could result in adverse effects <strong>on</strong><br />

migratory birds in the area. In poor weather c<strong>on</strong>diti<strong>on</strong>s, such as low cloud ceiling, fog, rain, or poor<br />

visibility, lighted structures might not be visible to migrating birds <str<strong>on</strong>g>and</str<strong>on</strong>g> can cause bird kills because<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-12


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

nocturnal migrating species are attracted by lights <strong>on</strong> towers under these c<strong>on</strong>diti<strong>on</strong>s (USFWS undated).<br />

Although the lighting poles are not expected to exceed 200 feet in height, the possibility exists <str<strong>on</strong>g>for</str<strong>on</strong>g> the<br />

birds to be attracted to the lights in the Project area. Light attributes that reduce danger to migrating birds<br />

include dim lights, <str<strong>on</strong>g>and</str<strong>on</strong>g> lights with l<strong>on</strong>g flash time intervals <str<strong>on</strong>g>and</str<strong>on</strong>g> short flash durati<strong>on</strong>. These have been<br />

dem<strong>on</strong>strated to reduce the danger to migrating birds. Impacts are expected to be minimal due to the low<br />

pole height <str<strong>on</strong>g>and</str<strong>on</strong>g> design (i.e., single mast poles without support cables). Overall, due to the current status<br />

of the site <str<strong>on</strong>g>and</str<strong>on</strong>g> its locati<strong>on</strong> in a developed area, impacts <strong>on</strong> the wildlife species <str<strong>on</strong>g>and</str<strong>on</strong>g> habitat would be less<br />

than significant.<br />

Threatened <str<strong>on</strong>g>and</str<strong>on</strong>g> Endangered Species<br />

The burrowing owl (Athene cunicularia) is the <strong>on</strong>ly species of c<strong>on</strong>cern listed by the USFWS in the<br />

vicinity. There are three burrowing owl nesting locati<strong>on</strong>s within 400 feet of the QD clear z<strong>on</strong>e associated<br />

with the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong>e owl locati<strong>on</strong> within 50 feet of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

taxiway (Figure 3-8). During ground disturbing c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> activities, there is the<br />

possibility that at least <strong>on</strong>e of these nests could be disturbed. The category of species of c<strong>on</strong>cern, which<br />

applies to the burrowing owl, carries no legal requirement, but identifies those species that deserve special<br />

c<strong>on</strong>siderati<strong>on</strong> in management <str<strong>on</strong>g>and</str<strong>on</strong>g> planning. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> already has a program in place that identifies<br />

locati<strong>on</strong>s of nesting burrowing owls <str<strong>on</strong>g>and</str<strong>on</strong>g> has developed procedures to relocate owls if necessary. To<br />

avoid disturbances to potential nesting burrowing owls, a survey would be c<strong>on</strong>ducted prior to any ground<br />

disturbing demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities. If owls are present, ground disturbing demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong> activities would <strong>on</strong>ly commence after the owls have left from the area (i.e., October 15<br />

through March 15). Additi<strong>on</strong>ally, nesting burrows would be flagged <str<strong>on</strong>g>and</str<strong>on</strong>g> avoided during ground<br />

disturbing demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities, so that the nesting sites could still be viable after<br />

activities. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, any impacts <strong>on</strong> burrowing owls would be expected to be less than significant.<br />

Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

The USACE <str<strong>on</strong>g>and</str<strong>on</strong>g> USEPA regulate <str<strong>on</strong>g>and</str<strong>on</strong>g> permit dredge <str<strong>on</strong>g>and</str<strong>on</strong>g> fill activities within the waters of the United<br />

States, including wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s under the authority of Secti<strong>on</strong> 404 of the CWA. The USEPA reviews <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

provides input to the permit applicati<strong>on</strong>s.<br />

No wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s are located <strong>on</strong> the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no impacts <strong>on</strong> wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s would be<br />

expected.<br />

4.7.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, the 377 ABW would not c<strong>on</strong>struct the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> new<br />

taxiway. Selecti<strong>on</strong> of this alternative would result in c<strong>on</strong>tinued deteriorati<strong>on</strong> of the existing <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

that does not meet current envir<strong>on</strong>mental st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards. Furthermore, the frequent maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> repair to<br />

the existing <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would result in increased noise <str<strong>on</strong>g>and</str<strong>on</strong>g> disturbance by maintenance pers<strong>on</strong>nel <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

vehicles.<br />

4.8 Cultural Resources<br />

4.8.1 Evaluati<strong>on</strong> Criteria<br />

Adverse impacts <strong>on</strong> cultural resources can include physically altering, damaging, or destroying all or part<br />

of a resource; altering characteristics of the surrounding envir<strong>on</strong>ment that c<strong>on</strong>tribute to the resource’s<br />

significance; introducing visual or audible elements that are out of character with the property or that alter<br />

its setting; general neglect of the resource to the extent that it deteriorates or is destroyed; or the sale,<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-13


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

transfer, or lease of the property out of the agency ownership (or c<strong>on</strong>trol) without adequate legally<br />

en<str<strong>on</strong>g>for</str<strong>on</strong>g>ceable restricti<strong>on</strong>s or c<strong>on</strong>diti<strong>on</strong>s to ensure preservati<strong>on</strong> of the property’s historic significance.<br />

For the Proposed Acti<strong>on</strong>, ground-disturbing activities associated with the c<strong>on</strong>structi<strong>on</strong> of the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> its associated facilities, c<strong>on</strong>stitute the most relevant potential effects <strong>on</strong> cultural resources.<br />

4.8.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.8.2.1 Proposed Acti<strong>on</strong><br />

No cultural resources are known to be present within the proposed APE of the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> or the<br />

associated comp<strong>on</strong>ents. Accordingly, no adverse effects <strong>on</strong> any architectural or archaeological resources<br />

<strong>on</strong> the NRHP would be expected.<br />

It is however, recommended that any ground-disturbing c<strong>on</strong>structi<strong>on</strong> or maintenance activities should<br />

take into c<strong>on</strong>siderati<strong>on</strong> the potential discovery of previously undiscovered cultural resources. If any<br />

archaeological sites are identified during the demoliti<strong>on</strong>, c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>, or maintenance of the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, these sites should be documented <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluated <str<strong>on</strong>g>for</str<strong>on</strong>g> NRHP eligibility. Impacts<br />

<strong>on</strong> unevaluated <str<strong>on</strong>g>and</str<strong>on</strong>g> potentially eligible cultural resources could be significant if NRHP eligibility status<br />

has not yet been determined. Once documented <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluated through c<strong>on</strong>sultati<strong>on</strong> with the SHPO,<br />

adverse impacts <strong>on</strong> NRHP-eligible <str<strong>on</strong>g>and</str<strong>on</strong>g> -listed cultural resources should be avoided; if avoidance is not<br />

possible, then mitigati<strong>on</strong> of adverse effects is recommended.<br />

4.8.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, the baseline c<strong>on</strong>diti<strong>on</strong>s described in Secti<strong>on</strong> 3.8.2 would remain<br />

unchanged. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no significant impacts <strong>on</strong> cultural resources would occur as a result of the<br />

implementati<strong>on</strong> of the No Acti<strong>on</strong> Alternative.<br />

4.9 Infrastructure<br />

4.9.1 Evaluati<strong>on</strong> Criteria<br />

Effects <strong>on</strong> infrastructure are evaluated <str<strong>on</strong>g>for</str<strong>on</strong>g> their potential to disrupt or improve existing levels of service<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> create additi<strong>on</strong>al needs <str<strong>on</strong>g>for</str<strong>on</strong>g> energy (electric, natural gas, <str<strong>on</strong>g>and</str<strong>on</strong>g> liquid fuels), central heating <str<strong>on</strong>g>and</str<strong>on</strong>g> cooling,<br />

potable water, sanitary sewer, storm water systems, communicati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> solid waste management.<br />

Impacts might arise from energy needs created by either direct or indirect work<str<strong>on</strong>g>for</str<strong>on</strong>g>ce <str<strong>on</strong>g>and</str<strong>on</strong>g> populati<strong>on</strong><br />

changes related to installati<strong>on</strong> activities. An impact would be significant if implementati<strong>on</strong> of the<br />

Proposed Acti<strong>on</strong> resulted in the following effects <strong>on</strong> electrical power, natural gas, liquid fuels, central<br />

heating <str<strong>on</strong>g>and</str<strong>on</strong>g> cooling, potable water, sanitary sewer/wastewater, storm water, communicati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> solid<br />

waste systems:<br />

<br />

<br />

<br />

<br />

Exceeded capacity of a utility<br />

A l<strong>on</strong>g-term interrupti<strong>on</strong> of the utility<br />

A violati<strong>on</strong> of a permit c<strong>on</strong>diti<strong>on</strong><br />

A violati<strong>on</strong> of an approved plan <str<strong>on</strong>g>for</str<strong>on</strong>g> that utility.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-14


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.9.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.9.2.1 Proposed Acti<strong>on</strong><br />

Electrical Systems. The Proposed Acti<strong>on</strong> would require minimal amounts of electricity during<br />

c<strong>on</strong>structi<strong>on</strong> activities; however, because these activities would be limited to a short period (12- to<br />

14-m<strong>on</strong>th durati<strong>on</strong>), the increase in electrical dem<str<strong>on</strong>g>and</str<strong>on</strong>g> would <strong>on</strong>ly be temporary. Electrical service<br />

interrupti<strong>on</strong>s might be experienced should aboveground or underground electrical cables need to be<br />

rerouted outside of the proposed work area. Service interrupti<strong>on</strong>s might also be experienced when the<br />

lighting infrastructure <str<strong>on</strong>g>for</str<strong>on</strong>g> the existing <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s is c<strong>on</strong>nected to the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

electrical system.<br />

Following the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>, the overall electrical dem<str<strong>on</strong>g>and</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

would increase negligibly due to the added lighting infrastructure. As such, the Proposed Acti<strong>on</strong> would<br />

not result in significant effects <strong>on</strong> electrical systems.<br />

Natural Gas Systems. The Proposed Acti<strong>on</strong> would not alter the amount of natural gas used at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong>. Natural gas would not be used during c<strong>on</strong>structi<strong>on</strong> activities, <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would not require natural gas service.<br />

Liquid Fuel. The Proposed Acti<strong>on</strong> would not alter the quantities of liquid fuels (JP-8, diesel, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

gasoline) used at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> nor would it affect their h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling <str<strong>on</strong>g>and</str<strong>on</strong>g> storage. The Proposed Acti<strong>on</strong><br />

would not change aircraft or l<str<strong>on</strong>g>and</str<strong>on</strong>g>-based vehicle traffic volumes; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, liquid fuel dem<str<strong>on</strong>g>and</str<strong>on</strong>g> would<br />

remain unchanged.<br />

Central Heating <str<strong>on</strong>g>and</str<strong>on</strong>g> Cooling Systems. The Proposed Acti<strong>on</strong> would not impact the central heating<br />

system of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Central heating resources would not be used during c<strong>on</strong>structi<strong>on</strong> activities, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> facilities would not require central heating service.<br />

Water Supply Systems. C<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would require minimal amounts of<br />

water, primarily <str<strong>on</strong>g>for</str<strong>on</strong>g> dust-suppressi<strong>on</strong> purposes. This water would be obtained from the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

water supply system, <str<strong>on</strong>g>and</str<strong>on</strong>g> because c<strong>on</strong>structi<strong>on</strong> activities would be limited to a short period, the increase<br />

in water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> would <strong>on</strong>ly be temporary. Water service interrupti<strong>on</strong>s might be experienced should<br />

underground water lines need to be rerouted outside of the proposed work area. Service interrupti<strong>on</strong>s<br />

might also be experienced when the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> facilities are c<strong>on</strong>nected to the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

water supply system.<br />

Following the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>, the overall water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> could<br />

increase due to the added infrastructure at the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance<br />

activities. However, because the proposed <str<strong>on</strong>g>and</str<strong>on</strong>g> existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s would not be used simultaneously<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> the volume of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> traffic at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would remain unchanged, the potential increase in<br />

water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> from the use of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be largely offset by the reducti<strong>on</strong> in use<br />

of Pad 5. Any potential increase in water dem<str<strong>on</strong>g>and</str<strong>on</strong>g> from the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would<br />

be negligible in magnitude <str<strong>on</strong>g>and</str<strong>on</strong>g> within the current available capacity of the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> water supply<br />

system. As such, the Proposed Acti<strong>on</strong> would result in adverse effects <strong>on</strong> water systems; however, these<br />

effects would be expected to be less than significant.<br />

Sanitary Sewer <str<strong>on</strong>g>and</str<strong>on</strong>g> Wastewater Systems. The Proposed Acti<strong>on</strong> would not impact the sanitary sewer <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

wastewater systems of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Wastewater service would not be required <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong><br />

activities or during operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-15


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Storm Water Systems. C<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would require ground disturbance as<br />

heavy equipment would clear, grade, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>tour l<str<strong>on</strong>g>and</str<strong>on</strong>g> surfaces. These activities would temporarily<br />

disrupt natural <str<strong>on</strong>g>and</str<strong>on</strong>g> man-made storm water drainage methods, increase sedimentati<strong>on</strong> in runoff, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

increase the potential <str<strong>on</strong>g>for</str<strong>on</strong>g> storm water runoff to erode soil during c<strong>on</strong>structi<strong>on</strong> activities. Soil erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

sediment producti<strong>on</strong> would be minimized during the c<strong>on</strong>structi<strong>on</strong> period by following erosi<strong>on</strong>- <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

sediment-c<strong>on</strong>trol plans, <str<strong>on</strong>g>and</str<strong>on</strong>g> by using c<strong>on</strong>structi<strong>on</strong> BMPs that would minimize ground surface disturbance<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> attempt to provide adequate temporary storm water management techniques.<br />

The c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> the associated taxiways, vehicle parking areas,<br />

pers<strong>on</strong>nel shelters, <str<strong>on</strong>g>and</str<strong>on</strong>g> storage sheds could add as much as approximately 11 acres (4.2 acres <str<strong>on</strong>g>for</str<strong>on</strong>g> the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> approximately 7 acres <str<strong>on</strong>g>for</str<strong>on</strong>g> the new taxiway) of new impervious service at the<br />

area of the Proposed Acti<strong>on</strong>. This increase in impervious surface would reduce the amount of surface<br />

area <str<strong>on</strong>g>for</str<strong>on</strong>g> storm water to permeate into the ground <str<strong>on</strong>g>and</str<strong>on</strong>g> increase the amount of storm water runoff.<br />

L<strong>on</strong>g-term storm water management techniques, which might include the use of pipes, channels, culverts,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> impoundment basins, would be implemented to reduce <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>trol the volume of storm water runoff.<br />

The Proposed Acti<strong>on</strong> would result in adverse effects <strong>on</strong> storm water systems; however, with appropriate<br />

BMPs, these effects would be expected to be less than significant.<br />

Communicati<strong>on</strong>s Systems. Because the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5)<br />

would not be used simultaneously <str<strong>on</strong>g>and</str<strong>on</strong>g> the volume of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> traffic at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would remain<br />

unchanged, no net increase in communicati<strong>on</strong> dem<str<strong>on</strong>g>and</str<strong>on</strong>g> would be expected from the implementati<strong>on</strong> of the<br />

Proposed Acti<strong>on</strong>. The Proposed Acti<strong>on</strong> would not impact the communicati<strong>on</strong> systems of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

Solid Waste Management. The implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would generate minimal<br />

quantities of c<strong>on</strong>structi<strong>on</strong> waste. N<strong>on</strong>hazardous c<strong>on</strong>structi<strong>on</strong> waste, such as asphalt, c<strong>on</strong>crete, wood, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

n<strong>on</strong>recyclable metals, would be transported to the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill <str<strong>on</strong>g>for</str<strong>on</strong>g> disposal. Receptacles would<br />

be provided <str<strong>on</strong>g>for</str<strong>on</strong>g> municipal solid waste generated by worker activity. Municipal solid waste would be<br />

transported to the Rio Rancho L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill, because the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill accepts <strong>on</strong>ly n<strong>on</strong>hazardous<br />

c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> waste.<br />

To reduce the amount of l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill waste, materials that could be recycled or reused would be diverted from<br />

l<str<strong>on</strong>g>and</str<strong>on</strong>g>fills to the greatest extent possible. Cardboard wastes would be recycled as a functi<strong>on</strong> of the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong> Qualified Recycling Program. Miscellaneous salvageable metals would be transported to the<br />

Defense Reutilizati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Marketing Office <str<strong>on</strong>g>for</str<strong>on</strong>g> recycling or reuse. Clean fill material, ground up asphalt,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> broken-up cement would be diverted from l<str<strong>on</strong>g>and</str<strong>on</strong>g>fills <str<strong>on</strong>g>and</str<strong>on</strong>g> reused whenever possible.<br />

Following the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>, the amount of solid waste generated at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong> would not increase due to the operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e,<br />

the Proposed Acti<strong>on</strong> would result in adverse effects <strong>on</strong> solid waste resources.<br />

4.9.2.2 No Acti<strong>on</strong> Alternative<br />

The No Acti<strong>on</strong> Alternative would result in c<strong>on</strong>tinuati<strong>on</strong> of the existing c<strong>on</strong>diti<strong>on</strong>s of infrastructure<br />

resources, as discussed in Secti<strong>on</strong> 3.9.2. No additi<strong>on</strong>al effects <strong>on</strong> infrastructure resources would be<br />

expected as a result of the Proposed Acti<strong>on</strong> not being implemented.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-16


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.10 Hazardous Materials <str<strong>on</strong>g>and</str<strong>on</strong>g> Waste<br />

4.10.1 Evaluati<strong>on</strong> Criteria<br />

Impacts would be c<strong>on</strong>sidered significant if the Proposed Acti<strong>on</strong> resulted in worker, resident, or visitor<br />

exposure to hazardous materials or wastes, or if the acti<strong>on</strong> generated quantities of these materials bey<strong>on</strong>d<br />

the capability of current management procedures. Impacts <strong>on</strong> hazardous materials management would be<br />

c<strong>on</strong>sidered significant if the Proposed Acti<strong>on</strong> resulted in n<strong>on</strong>compliance with applicable Federal <str<strong>on</strong>g>and</str<strong>on</strong>g> New<br />

Mexico Envir<strong>on</strong>ment Department (NMED) regulati<strong>on</strong>s, or increased the amounts generated or procured<br />

bey<strong>on</strong>d current Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> waste management procedures <str<strong>on</strong>g>and</str<strong>on</strong>g> capacities. Impacts <strong>on</strong> the ERP would<br />

be c<strong>on</strong>sidered significant if the Proposed Acti<strong>on</strong> disturbed (or created) c<strong>on</strong>taminated sites resulting in<br />

adverse impacts <strong>on</strong> human health or the envir<strong>on</strong>ment.<br />

4.10.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.10.2.1 Proposed Acti<strong>on</strong><br />

Hazardous Materials <str<strong>on</strong>g>and</str<strong>on</strong>g> Petroleum Products. No impacts <strong>on</strong> hazardous materials management during<br />

demoliti<strong>on</strong> or c<strong>on</strong>structi<strong>on</strong> would be expected. Equipment used <str<strong>on</strong>g>for</str<strong>on</strong>g> demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities<br />

would require the use of petroleum products. C<strong>on</strong>tractors would be resp<strong>on</strong>sible <str<strong>on</strong>g>for</str<strong>on</strong>g> the management of<br />

hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> petroleum product usage, which would be h<str<strong>on</strong>g>and</str<strong>on</strong>g>led in accordance with Federal,<br />

state, <str<strong>on</strong>g>and</str<strong>on</strong>g> USAF regulati<strong>on</strong>s. C<strong>on</strong>tractors must report the use of hazardous materials to the 377<br />

MSG/C<str<strong>on</strong>g>EA</str<strong>on</strong>g>NC in order to be entered into the Hazardous Materials Management System (HMMS). If a<br />

material that is less hazardous can be used, the 377 MSG/C<str<strong>on</strong>g>EA</str<strong>on</strong>g>NC should make this recommendati<strong>on</strong>.<br />

Use of the HMMS system would also ensure that oz<strong>on</strong>e-depleting substances (ODSs) are not available <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

use. Use of ODSs in such products as refrigerants, aerosols, <str<strong>on</strong>g>and</str<strong>on</strong>g> fire suppressi<strong>on</strong> systems is not permitted<br />

by the DOD without a <str<strong>on</strong>g>for</str<strong>on</strong>g>mal request by waiver. There would be no new chemicals or toxic substances<br />

used or stored at the installati<strong>on</strong> in c<strong>on</strong>juncti<strong>on</strong> with the demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong>.<br />

The operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would not result in an increase in the type<br />

or quantity of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no impacts <strong>on</strong> hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> petroleum product<br />

management would be expected from the operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance activities.<br />

Hazardous <str<strong>on</strong>g>and</str<strong>on</strong>g> Petroleum Waste. No significant impacts would be expected from the generati<strong>on</strong> of<br />

hazardous wastes during demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities. It is anticipated that the quantity of<br />

hazardous wastes generated from these activities would be negligible. No impacts <strong>on</strong> the installati<strong>on</strong>’s<br />

hazardous waste management program would be expected from the c<strong>on</strong>structi<strong>on</strong> activities. C<strong>on</strong>tractors<br />

would be resp<strong>on</strong>sible <str<strong>on</strong>g>for</str<strong>on</strong>g> the disposal of hazardous wastes in accordance with Federal <str<strong>on</strong>g>and</str<strong>on</strong>g> state laws <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

regulati<strong>on</strong>s, as well as the installati<strong>on</strong>’s Hazardous Waste Management Plan. BMPs, such as use of drop<br />

cloths at refueling points <str<strong>on</strong>g>and</str<strong>on</strong>g> use sec<strong>on</strong>dary c<strong>on</strong>tainment when h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling hazardous materials, would be<br />

followed to ensure that c<strong>on</strong>taminati<strong>on</strong> from a spill would not occur. However, if a spill were to occur, the<br />

Hazardous Material Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Resp<strong>on</strong>se Plan outlines the appropriate measures <str<strong>on</strong>g>for</str<strong>on</strong>g> spill<br />

situati<strong>on</strong>s.<br />

The operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would not result in an increase in the type or quantity<br />

of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s. No impacts <strong>on</strong> hazardous <str<strong>on</strong>g>and</str<strong>on</strong>g> petroleum waste management would be expected<br />

from the operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance activities.<br />

Envir<strong>on</strong>mental Restorati<strong>on</strong> Program. The c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would require the<br />

disturbance of a small area (likely less than 0.5 acres) of the northwestern porti<strong>on</strong> of ERP site, WP-26.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-17


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

The area disturbed would overlap with soil vapor m<strong>on</strong>itoring well (MW) K<strong>AFB</strong>-2604, <str<strong>on</strong>g>and</str<strong>on</strong>g> could also<br />

affect MW K<strong>AFB</strong>-2606. In additi<strong>on</strong>, the c<strong>on</strong>structi<strong>on</strong> would overlap with groundwater MW K<strong>AFB</strong>-2622<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> MW K<strong>AFB</strong>-2602A (K<strong>AFB</strong> 2008e). These <str<strong>on</strong>g>and</str<strong>on</strong>g> other MWs around the periphery of the Proposed<br />

Acti<strong>on</strong> footprint are L<strong>on</strong>g Term M<strong>on</strong>itoring (LTM) wells <str<strong>on</strong>g>for</str<strong>on</strong>g> m<strong>on</strong>itoring soil vapor <str<strong>on</strong>g>and</str<strong>on</strong>g> groundwater<br />

comp<strong>on</strong>ents of the WP-26. Presently, WP-26 is in the remedial investigati<strong>on</strong> phase. During the<br />

c<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, BMPs should be followed to avoid damage to the existing<br />

MWs. Additi<strong>on</strong>al MWs may need to be installed in the future. These MWs would require c<strong>on</strong>tinued use,<br />

which could also require surface modificati<strong>on</strong> (i.e., modificati<strong>on</strong> to flush-covering).<br />

The NMED c<strong>on</strong>curs that the removal of the surface sewage sludge would alleviate any potential adverse<br />

effects <strong>on</strong> the envir<strong>on</strong>ment <str<strong>on</strong>g>and</str<strong>on</strong>g> human health from soil c<strong>on</strong>taminati<strong>on</strong> (Bitner 2009). Additi<strong>on</strong>ally, the<br />

Proposed Acti<strong>on</strong> includes setting the existing MWs flush with the paving of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>.<br />

This would allow <str<strong>on</strong>g>for</str<strong>on</strong>g> the c<strong>on</strong>tinued use of the MWs to aid in the remediati<strong>on</strong> of the soil vapor <str<strong>on</strong>g>and</str<strong>on</strong>g> ground<br />

water c<strong>on</strong>taminati<strong>on</strong>, <strong>on</strong>ce appropriate remedial acti<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> these areas are selected. C<strong>on</strong>sequently,<br />

c<strong>on</strong>structi<strong>on</strong> activities at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would result in impacts <strong>on</strong> the ERP site; however, these impacts<br />

would be expected to be less than significant.<br />

No significant impacts <strong>on</strong> ERP site WP-26 would be expected from the operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. While a remedial acti<strong>on</strong> has not been selected <str<strong>on</strong>g>for</str<strong>on</strong>g> the soil vapor <str<strong>on</strong>g>and</str<strong>on</strong>g> perched<br />

groundwater c<strong>on</strong>taminati<strong>on</strong> identified in the RFI, the samples with the highest identified levels of<br />

c<strong>on</strong>taminants were at the perched groundwater interface at approximately 200 feet bgs (K<strong>AFB</strong> 2008e). It<br />

is likely that the approved remedial acti<strong>on</strong> will require periodic access to the area <str<strong>on</strong>g>for</str<strong>on</strong>g> collecti<strong>on</strong> of media<br />

samples from the MWs. In additi<strong>on</strong>, because the final remedial abatement has not been selected,<br />

additi<strong>on</strong>al surface equipment, such as soil vapor extracti<strong>on</strong> blowers/piping, might need to be installed.<br />

While it is anticipated that interference with the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be minimal <str<strong>on</strong>g>and</str<strong>on</strong>g> required<br />

equipment installati<strong>on</strong> would be designed to operate from remote locati<strong>on</strong>s, some overlap might occur.<br />

No significant impacts associated with the four MMRP sites would be expected during c<strong>on</strong>structi<strong>on</strong> or<br />

operati<strong>on</strong>al activities under the Proposed Acti<strong>on</strong>. Use of the four historic ranges identified in the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong> MMRP that overlap with the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> site was disc<strong>on</strong>tinued prior to 1962, <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

Proposed Acti<strong>on</strong> area has underg<strong>on</strong>e significant alterati<strong>on</strong> in the intervening years. It is unlikely that<br />

quantities of MC <str<strong>on</strong>g>and</str<strong>on</strong>g> MECs, if any, would be encountered during c<strong>on</strong>structi<strong>on</strong>.<br />

Asbestos-C<strong>on</strong>taining Material. The c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> would not involve the h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling of ACMs; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would not result in any<br />

impacts related to ACMs.<br />

Lead-Based Paint. The c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would<br />

not involve the use of LBP; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would not result in any impacts related to<br />

LBP.<br />

Polychlorinated Biphenyls. The c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

would not involve the h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling of materials c<strong>on</strong>taining PCBs; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would not<br />

result in any impacts related to PCBs.<br />

Polluti<strong>on</strong> Preventi<strong>on</strong>. Less-than-significant impacts <strong>on</strong> the Polluti<strong>on</strong> Preventi<strong>on</strong> Program at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong> would be expected from implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>. An incremental increase in<br />

hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> wastes would be expected during c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> under the Proposed<br />

Acti<strong>on</strong>. Adherence to the Polluti<strong>on</strong> Preventi<strong>on</strong> Program <str<strong>on</strong>g>and</str<strong>on</strong>g> associated plans at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, in<br />

particular the Hazardous Material Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Resp<strong>on</strong>se Plan, would reduce adverse impacts<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-18


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

resulting from the Proposed Acti<strong>on</strong>. BMPs utilized during c<strong>on</strong>structi<strong>on</strong> activities would minimize<br />

impacts <strong>on</strong> the natural envir<strong>on</strong>ment.<br />

The operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would not result in an increase in the type<br />

or quantity of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s. No impacts <strong>on</strong> the Polluti<strong>on</strong> Preventi<strong>on</strong> Program would be expected<br />

from the operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance activities.<br />

4.10.2.2 No Acti<strong>on</strong> Alternative<br />

The No Acti<strong>on</strong> Alternative would result in no change to the existing hazardous materials or waste<br />

management c<strong>on</strong>diti<strong>on</strong>s discussed in Secti<strong>on</strong> 3.10.2. No impacts <strong>on</strong> hazardous materials or waste<br />

management would be expected as a result of the Proposed Acti<strong>on</strong> not being implemented.<br />

4.11 Safety<br />

4.11.1 Evaluati<strong>on</strong> Criteria<br />

If implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> were to increase risks associated with the safety of c<strong>on</strong>structi<strong>on</strong><br />

pers<strong>on</strong>nel, c<strong>on</strong>tractors, military pers<strong>on</strong>nel, or the local community; or hinder the ability to resp<strong>on</strong>d to an<br />

emergency, it would represent an adverse effect. An effect would be significant if implementati<strong>on</strong> of the<br />

Proposed Acti<strong>on</strong> were to substantially increase risks associated with the safety of c<strong>on</strong>structi<strong>on</strong> pers<strong>on</strong>nel,<br />

c<strong>on</strong>tractors, military pers<strong>on</strong>nel, or the local community; substantially hinder the ability to resp<strong>on</strong>d to an<br />

emergency; or introduce a new health or safety risk <str<strong>on</strong>g>for</str<strong>on</strong>g> which the installati<strong>on</strong> is not prepared or does not<br />

have adequate management <str<strong>on</strong>g>and</str<strong>on</strong>g> resp<strong>on</strong>se plans in place.<br />

4.11.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.11.2.1 Proposed Acti<strong>on</strong><br />

C<strong>on</strong>tractor Safety. Implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would slightly increase the health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety<br />

risk to c<strong>on</strong>tractors per<str<strong>on</strong>g>for</str<strong>on</strong>g>ming demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> work at the Proposed Acti<strong>on</strong> site during the<br />

normal workday because the level of such activity would increase. C<strong>on</strong>tractors would be required to<br />

establish <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety programs <str<strong>on</strong>g>for</str<strong>on</strong>g> their employees.<br />

The implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would require the disturbance of a small area of ground<br />

surface within the northwestern porti<strong>on</strong> WP-26 (likely less than 0.5 acres). While not part of the<br />

Proposed Acti<strong>on</strong>, remedial acti<strong>on</strong> to clean the surface of WP-26 will be c<strong>on</strong>ducted during Spring 2010.<br />

This surface remediati<strong>on</strong> will c<strong>on</strong>sist of removing <str<strong>on</strong>g>and</str<strong>on</strong>g> disposing of the top 5 inches of the ground surface,<br />

which is potentially c<strong>on</strong>taminated sewage sludge, within WP-26 in a manner c<strong>on</strong>sistent with Federal,<br />

state, <str<strong>on</strong>g>and</str<strong>on</strong>g> USAF regulati<strong>on</strong>s. The remedial acti<strong>on</strong> would not involve subsurface products or groundwater<br />

c<strong>on</strong>taminati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> m<strong>on</strong>itoring wells would remain in place to c<strong>on</strong>tinue tracking the c<strong>on</strong>taminati<strong>on</strong>.<br />

Although the surface remedial ef<str<strong>on</strong>g>for</str<strong>on</strong>g>ts would reduce the potential health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety c<strong>on</strong>cerns to c<strong>on</strong>tractors<br />

working <strong>on</strong> site, all c<strong>on</strong>tractors would still need to take health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety precauti<strong>on</strong>s to guard against<br />

potential exposure to c<strong>on</strong>taminates <str<strong>on</strong>g>and</str<strong>on</strong>g> pathogens at WP-26. Health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety precauti<strong>on</strong>s might include<br />

c<strong>on</strong>tractors listing exposure guidelines in the site specific health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety programs, <str<strong>on</strong>g>and</str<strong>on</strong>g> training all<br />

employees working <strong>on</strong> site how to reduce potential exposure to these c<strong>on</strong>taminates. If any soil potentially<br />

c<strong>on</strong>taining c<strong>on</strong>taminati<strong>on</strong> was discovered during the c<strong>on</strong>structi<strong>on</strong> of the Proposed Acti<strong>on</strong>, the c<strong>on</strong>tractor<br />

would be required to immediately stop work, report the discovery to the installati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> implement<br />

appropriate safety measures. Commencement of field activities would not c<strong>on</strong>tinue in this area until the<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-19


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

issue was investigated <str<strong>on</strong>g>and</str<strong>on</strong>g> resolved. In additi<strong>on</strong>, appropriate health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety procedures would need to<br />

be established to prevent exposure to groundwater c<strong>on</strong>taminants when existing m<strong>on</strong>itoring wells are<br />

modified (i.e., made flush with the ground surface).<br />

Military Pers<strong>on</strong>nel Safety. No effects <strong>on</strong> military pers<strong>on</strong>nel health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety would be expected during<br />

implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>. Installati<strong>on</strong> pers<strong>on</strong>nel would be required to vacate the area of the<br />

Proposed Acti<strong>on</strong> during c<strong>on</strong>structi<strong>on</strong> activities. The Proposed Acti<strong>on</strong> work site would be fenced <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

appropriate signs posted to further reduce safety risks to installati<strong>on</strong> pers<strong>on</strong>nel. The current <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

(Pad 5) would remain in service during the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>.<br />

Following the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would have two <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s,<br />

which would act as c<strong>on</strong>tingencies if the other <str<strong>on</strong>g>pad</str<strong>on</strong>g> was unavailable. Pad 5 would no l<strong>on</strong>ger need to be in<br />

c<strong>on</strong>tinuous service, <str<strong>on</strong>g>and</str<strong>on</strong>g> either <str<strong>on</strong>g>pad</str<strong>on</strong>g> could be shut down <str<strong>on</strong>g>for</str<strong>on</strong>g> required maintenance <str<strong>on</strong>g>and</str<strong>on</strong>g> safety improvements.<br />

With two available <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s, critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s would no l<strong>on</strong>ger be in jeopardy of being<br />

delayed or aborted due to un<str<strong>on</strong>g>for</str<strong>on</strong>g>eseen circumstances occurring at <strong>on</strong>e of the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s. The Proposed<br />

Acti<strong>on</strong> would also improve lighting c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> enhance security barricades at both Pad 5 <str<strong>on</strong>g>and</str<strong>on</strong>g> the<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>; both lighting <str<strong>on</strong>g>and</str<strong>on</strong>g> security improvements would create a safer envir<strong>on</strong>ment <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

military pers<strong>on</strong>nel working at the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s. The implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would<br />

result in beneficial effects <strong>on</strong> military pers<strong>on</strong>nel safety.<br />

Public Safety. No effects <strong>on</strong> public health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety would result from the implementati<strong>on</strong> of the<br />

Proposed Acti<strong>on</strong>. C<strong>on</strong>structi<strong>on</strong> activities would not pose a safety risk to the public or to off-installati<strong>on</strong><br />

areas. The Proposed Acti<strong>on</strong> work site would be fenced <str<strong>on</strong>g>and</str<strong>on</strong>g> appropriate signs posted to further reduce<br />

safety risks to the public. Access to the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be limited to authorized pers<strong>on</strong>nel.<br />

As such, the use of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would not be expected to result in effects<br />

<strong>on</strong> the public safety.<br />

Explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> Muniti<strong>on</strong>s Safety. No significant effects <strong>on</strong> explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> muniti<strong>on</strong>s safety would be<br />

expected during the implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>. Following implementati<strong>on</strong> of the Proposed<br />

Acti<strong>on</strong>, the use of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would result in changes to the h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling of explosives <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

muniti<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, because, by its very definiti<strong>on</strong>, the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be used to<br />

load <str<strong>on</strong>g>and</str<strong>on</strong>g> unload <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> (i.e., weap<strong>on</strong>s, ammuniti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> explosives). In order to maintain explosive<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> muniti<strong>on</strong>s safety, USAF regulati<strong>on</strong>s m<str<strong>on</strong>g>and</str<strong>on</strong>g>ate QD safety clearance z<strong>on</strong>es of a specific separati<strong>on</strong><br />

distance between PESs <str<strong>on</strong>g>and</str<strong>on</strong>g> ESs. Under the Proposed Acti<strong>on</strong>, the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be the<br />

PES <str<strong>on</strong>g>and</str<strong>on</strong>g> any inhabited buildings or public traffic routes would be ESs, <str<strong>on</strong>g>and</str<strong>on</strong>g> a separati<strong>on</strong> distance of<br />

1,250 feet (approximately 0.24 miles) would be required between the PES <str<strong>on</strong>g>and</str<strong>on</strong>g> ESs. No inhabited<br />

buildings, public roads, or other ESs are currently within this z<strong>on</strong>e, <str<strong>on</strong>g>and</str<strong>on</strong>g> no future c<strong>on</strong>structi<strong>on</strong> would be<br />

permitted in this z<strong>on</strong>e. Figure 2-1 illustrates the QD clear z<strong>on</strong>es <str<strong>on</strong>g>for</str<strong>on</strong>g> the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Pad 5.<br />

The Proposed Acti<strong>on</strong> does not call <str<strong>on</strong>g>for</str<strong>on</strong>g> an increase in the quantity of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> aircraft traffic at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong>; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the amount of explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> muniti<strong>on</strong>s transported via the existing <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g><br />

<str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>s together would not change. Additi<strong>on</strong>ally, the Proposed Acti<strong>on</strong> would not alter the storage or<br />

usage of explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> muniti<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would<br />

result in adverse effects <strong>on</strong> explosives <str<strong>on</strong>g>and</str<strong>on</strong>g> muniti<strong>on</strong>s safety; however, with the establishment of a QD<br />

clear z<strong>on</strong>e around the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, these effects would be expected to be less than significant.<br />

4.11.2.2 No Acti<strong>on</strong> Alternative<br />

The No Acti<strong>on</strong> Alternative would result in c<strong>on</strong>tinuati<strong>on</strong> of the existing safety c<strong>on</strong>diti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> their<br />

associated impacts, as discussed in Secti<strong>on</strong> 3.11.2.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-20


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.12 <strong>Air</strong>craft Safety<br />

4.12.1 Evaluati<strong>on</strong> Criteria<br />

Explosives risk assessments are a subset of the comm<str<strong>on</strong>g>and</str<strong>on</strong>g>er’s overall risk management program. An<br />

explosives risk assessment analyzes hazards associated with transporting, storing, disposing of, h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling<br />

or firing ammuniti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> explosive materials. Operati<strong>on</strong>al Risk Assessments, per AFPAM 91-215,<br />

Operati<strong>on</strong>al Risk Management Guidelines <str<strong>on</strong>g>and</str<strong>on</strong>g> Tools, can range from examining the relati<strong>on</strong>ship between<br />

a PES <str<strong>on</strong>g>and</str<strong>on</strong>g> an ES, to determine what effect <strong>on</strong>e has <strong>on</strong> the other in the event of an accidental explosi<strong>on</strong>, to<br />

ascertaining the worst credible event ramificati<strong>on</strong>s of an explosives h<str<strong>on</strong>g>and</str<strong>on</strong>g>ling mishap (USAF 1998b).<br />

Risk levels are calculated based <strong>on</strong> three criteria: the likelihood of a mishap, the exposure of pers<strong>on</strong>nel<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> resources to an explosives hazard, <str<strong>on</strong>g>and</str<strong>on</strong>g> the possible c<strong>on</strong>sequences of a mishap (USAF 1998b).<br />

The likelihood of a mishap is the relative probability an explosives mishap will occur based <strong>on</strong> the type of<br />

explosives involved, the level of activity at the PES, <str<strong>on</strong>g>and</str<strong>on</strong>g> external threats to the locati<strong>on</strong>. Each PES is<br />

categorized according to <strong>on</strong>e of five generalized probability levels as defined in AFMAN 91-215, which<br />

include frequent, likely, occasi<strong>on</strong>al, seldom, <str<strong>on</strong>g>and</str<strong>on</strong>g> unlikely (USAF 1998b).<br />

The severity of an explosive accident is categorized based <strong>on</strong> their effect <strong>on</strong> pers<strong>on</strong>nel, missi<strong>on</strong> capability,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> other resources according to Table 4-4.<br />

Category<br />

Table 4-4. Severity of a Mishap<br />

Criteria<br />

Greater than 5 related pers<strong>on</strong>nel fatalities or any unrelated fatality<br />

Catastrophic Missi<strong>on</strong> curtailed<br />

$10 milli<strong>on</strong> in damage<br />

Less than 5 related pers<strong>on</strong>nel fatalities<br />

Serious injury to unrelated pers<strong>on</strong>nel<br />

Critical<br />

Missi<strong>on</strong> interrupted<br />

$500,000 in damage<br />

Some serious injury to related pers<strong>on</strong>nel<br />

Moderate Missi<strong>on</strong> degraded<br />

$50,000 damage<br />

Minor injury<br />

Negligible Missi<strong>on</strong> unaffected<br />

$1,000 damage<br />

Source: USAF 2009<br />

Combining the severity <str<strong>on</strong>g>and</str<strong>on</strong>g> probability estimates <str<strong>on</strong>g>for</str<strong>on</strong>g> a mishap <str<strong>on</strong>g>for</str<strong>on</strong>g>ms a risk assessment <str<strong>on</strong>g>for</str<strong>on</strong>g> the potential<br />

hazard. By combining the probability of occurrence with severity, a matrix is created where intersecting<br />

rows <str<strong>on</strong>g>and</str<strong>on</strong>g> columns define a Risk Assessment Matrix. The Risk Assessment Matrix <str<strong>on</strong>g>for</str<strong>on</strong>g>ms the basis <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

judging both the acceptability of a risk <str<strong>on</strong>g>and</str<strong>on</strong>g> the management level at which the decisi<strong>on</strong> <strong>on</strong> acceptability<br />

will be made. The matrix might also be used to prioritize resources to resolve risks due to hazards or to<br />

st<str<strong>on</strong>g>and</str<strong>on</strong>g>ardize hazard notificati<strong>on</strong> or resp<strong>on</strong>se acti<strong>on</strong>s (USAF 1998b). A sample Risk Assessment Matrix is<br />

shown in Figure 4-1.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-21


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Source: USAF 1998b<br />

Figure 4-1. Sample Risk Assessment Matrix<br />

The possible c<strong>on</strong>sequences of an explosives mishap are based <strong>on</strong> the worst-case type <str<strong>on</strong>g>and</str<strong>on</strong>g> amount of<br />

explosives present, the c<strong>on</strong>structi<strong>on</strong> of both the PES <str<strong>on</strong>g>and</str<strong>on</strong>g> ES, <str<strong>on</strong>g>and</str<strong>on</strong>g> the distance between the PES <str<strong>on</strong>g>and</str<strong>on</strong>g> ES.<br />

The c<strong>on</strong>sequences of an explosive mishap are based <strong>on</strong> the effects of the blast, i.e., the violent release of<br />

energy from a det<strong>on</strong>ati<strong>on</strong>. Blast effects to an IB <str<strong>on</strong>g>for</str<strong>on</strong>g> Hazard Classificati<strong>on</strong> 1.1 explosives include the<br />

following (USAF 2009):<br />

<br />

<br />

<br />

Pers<strong>on</strong>nel in buildings are provided a degree of protecti<strong>on</strong> from death or fatal injury. Pers<strong>on</strong>nel<br />

injuries from projectile fragments <str<strong>on</strong>g>and</str<strong>on</strong>g> the failure of the exposed facility (including the possibility<br />

of fatalities) will depend up<strong>on</strong> the PES structure, the amount of ammuniti<strong>on</strong>, their fragmentati<strong>on</strong><br />

characteristics, <str<strong>on</strong>g>and</str<strong>on</strong>g> the strength of the ES structure.<br />

Unstrengthened buildings can be expected to sustain damage of approximately 5 percent of the<br />

building’s replacement cost.<br />

Glass breakage <str<strong>on</strong>g>and</str<strong>on</strong>g> structural damage can be reduced by means such as orientati<strong>on</strong> between the<br />

PES <str<strong>on</strong>g>and</str<strong>on</strong>g> the ES, <str<strong>on</strong>g>and</str<strong>on</strong>g> by keeping the surface area of exposed glass panels to a minimum. The use<br />

of blast resistant, rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced glass windows is recommended.<br />

4.12.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.12.2.1 Proposed Acti<strong>on</strong><br />

Per AFMAN 91-201, the probability of a mishap due to <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s of unserviceable or<br />

unpackaged material is unlikely (i.e., can be expected to occur infrequently in a typical career in the<br />

USAF), <str<strong>on</strong>g>and</str<strong>on</strong>g> the probability <str<strong>on</strong>g>for</str<strong>on</strong>g> serviceable package material is “practically impossible” (i.e., so rare, a<br />

mishap is not expected to occur during a typical career) (USAF 2009). There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the probability of an<br />

aircraft mishap from operati<strong>on</strong> of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> is expected to be Level E: Unlikely, as shown in<br />

Figure 4-1. A no-fly z<strong>on</strong>e would be en<str<strong>on</strong>g>for</str<strong>on</strong>g>ced over the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. Since aircraft would not<br />

be able to fly over the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>, the likelihood of a mishap involving aircraft other than the aircraft<br />

parked <strong>on</strong> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be very low. In additi<strong>on</strong>, adherence to USAF policy <strong>on</strong> explosives safety, as well as<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-22


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

design <str<strong>on</strong>g>and</str<strong>on</strong>g> safety st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards as described in Secti<strong>on</strong> 3.12.1 would also be expected to lessen the<br />

probability of an aircraft mishap.<br />

As discussed in Secti<strong>on</strong> 3.12.1, an IB separati<strong>on</strong> distance of 1,250 feet (approximately 0.24 miles) is<br />

required <str<strong>on</strong>g>for</str<strong>on</strong>g> Hazard Classificati<strong>on</strong> 1.1 explosives, <str<strong>on</strong>g>and</str<strong>on</strong>g> would be applied to the Proposed Acti<strong>on</strong>. As<br />

discussed in Secti<strong>on</strong> 2.1.2, there are several potential ESs in the general vicinity of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g>. However, n<strong>on</strong>e of the ESs would be within the IB distance <str<strong>on</strong>g>for</str<strong>on</strong>g> the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g>. Since there are no<br />

ESs within the IB distance, the severity of a mishap is expected to be negligible to moderate as described<br />

in Table 4-4. As discussed previously, at the IB distance some damage could still be expected<br />

(i.e., st<str<strong>on</strong>g>and</str<strong>on</strong>g>ard glass windows will shatter <str<strong>on</strong>g>and</str<strong>on</strong>g> unstrenthened buildings will receive 5 percent damage). In<br />

additi<strong>on</strong>, in the event that a mishap was to occur, pers<strong>on</strong>nel in the immediate vicinity of the aircraft could<br />

be injured. However, the lowest probability level of a mishap, Level E: Unlikely, would be expected.<br />

As shown <strong>on</strong> Figure 4-1, the combinati<strong>on</strong> of a probability level of Unlikely <str<strong>on</strong>g>and</str<strong>on</strong>g> a severity level of<br />

negligible to moderate would have a risk assessment level of “low.” There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, operati<strong>on</strong> of the proposed<br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> would be expected to have a less-than-significant, adverse impact <strong>on</strong> aircraft safety.<br />

C<strong>on</strong>structi<strong>on</strong> of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> per USAF explosives safety st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards would be expected to lessen the<br />

aircraft safety c<strong>on</strong>cerns associated with the current <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong> to negligible levels. The current<br />

aircraft safety c<strong>on</strong>cerns include FOD, aircraft tire-cut potential, <str<strong>on</strong>g>and</str<strong>on</strong>g> insufficient lighting due to the current<br />

state of the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. In additi<strong>on</strong> to c<strong>on</strong>structi<strong>on</strong> of the <str<strong>on</strong>g>pad</str<strong>on</strong>g> itself, the additi<strong>on</strong> of paved<br />

shoulders would also provide <str<strong>on</strong>g>for</str<strong>on</strong>g> the c<strong>on</strong>trol of FOD. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, operati<strong>on</strong> of the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be<br />

expected to have a less-than-significant, beneficial impact <strong>on</strong> aircraft safety. The improvements to the<br />

existing <str<strong>on</strong>g>pad</str<strong>on</strong>g> included under the Proposed Acti<strong>on</strong> would also be expected to have a beneficial impact <strong>on</strong><br />

aircraft safety since they would address the aircraft safety c<strong>on</strong>cerns associated with the current <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The<br />

proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would be used in c<strong>on</strong>juncti<strong>on</strong> with Pad 5 to ensure the critical <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s<br />

c<strong>on</strong>tinue unimpeded, thereby improving the ability of the 377 ABW to schedule <str<strong>on</strong>g>and</str<strong>on</strong>g> complete <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

missi<strong>on</strong>s, which would be expected to have a less-than-significant, beneficial impact <strong>on</strong> aircraft safety.<br />

4.12.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, the 377 ABW would not c<strong>on</strong>struct a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, taxiway, anti-ram<br />

cabling, DFPs, lighting, <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel shelters. The Pad 5 pavement c<strong>on</strong>diti<strong>on</strong> would c<strong>on</strong>tinue to<br />

deteriorate, causing FOD <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft tire-cut potential to increase to unacceptable levels. <strong>Air</strong>craft safety<br />

would be jeopardized, <str<strong>on</strong>g>and</str<strong>on</strong>g> critical <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s would be delayed or aborted, adversely impacting<br />

critical missi<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> throughout the world. Without lighting improvements, nighttime<br />

flying operati<strong>on</strong>s would be impaired <str<strong>on</strong>g>and</str<strong>on</strong>g> aircraft <str<strong>on</strong>g>and</str<strong>on</strong>g> pers<strong>on</strong>nel safety would be jeopardized.<br />

4.13 Socioec<strong>on</strong>omics <str<strong>on</strong>g>and</str<strong>on</strong>g> Envir<strong>on</strong>mental Justice<br />

4.13.1 Evaluati<strong>on</strong> Criteria<br />

Socioec<strong>on</strong>omics. This secti<strong>on</strong> addresses the potential <str<strong>on</strong>g>for</str<strong>on</strong>g> direct <str<strong>on</strong>g>and</str<strong>on</strong>g> indirect impacts that the Proposed<br />

Acti<strong>on</strong> could have <strong>on</strong> local or regi<strong>on</strong>al socioec<strong>on</strong>omics. Impacts <strong>on</strong> local or regi<strong>on</strong>al socioec<strong>on</strong>omics are<br />

evaluated according to their potential to stimulate the ec<strong>on</strong>omy through the purchase of goods or services<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> increases in employment. Similarly, impacts are evaluated to determine if overstimulati<strong>on</strong> of the<br />

ec<strong>on</strong>omy (e.g., the c<strong>on</strong>structi<strong>on</strong> industry’s ability to sufficiently meet the dem<str<strong>on</strong>g>and</str<strong>on</strong>g>s of a project) could<br />

occur as a result of the Proposed Acti<strong>on</strong>.<br />

Envir<strong>on</strong>mental Justice <str<strong>on</strong>g>and</str<strong>on</strong>g> Protecti<strong>on</strong> of Children. Ethnicity <str<strong>on</strong>g>and</str<strong>on</strong>g> poverty data are examined <str<strong>on</strong>g>for</str<strong>on</strong>g> the<br />

Albuquerque metropolitan area (50-mile radius around Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>) <str<strong>on</strong>g>and</str<strong>on</strong>g> compared to the State of New<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-23


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Mexico <str<strong>on</strong>g>and</str<strong>on</strong>g> the United States to determine if a low-income or minority populati<strong>on</strong> could be<br />

disproporti<strong>on</strong>ately affected by the Proposed Acti<strong>on</strong>.<br />

4.13.2 Envir<strong>on</strong>mental C<strong>on</strong>sequences<br />

4.13.2.1 Proposed Acti<strong>on</strong><br />

Under the Proposed Acti<strong>on</strong>, the 377 ABW would c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> adjacent to the existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The total cost of c<strong>on</strong>structi<strong>on</strong> to build the proposed<br />

<str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> is estimated at $14,600,000 (K<strong>AFB</strong> undated).<br />

Demographics. The number of workers who would be hired to c<strong>on</strong>struct a <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

would most likely come from within the greater Albuquerque area. Relocati<strong>on</strong> of c<strong>on</strong>structi<strong>on</strong> workers to<br />

meet dem<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong> would not be expected as the scope of c<strong>on</strong>structi<strong>on</strong> activities<br />

should not necessitate out-of-town workers to permanently relocate. No new staff is anticipated to be<br />

hired or transferred to Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The<br />

number of new residents who would move to the Albuquerque area as result of the Proposed Acti<strong>on</strong><br />

would be negligible; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, less-than-significant impacts <strong>on</strong> demographics would be expected as a<br />

result of the Proposed Acti<strong>on</strong>.<br />

Employment Characteristics. The c<strong>on</strong>structi<strong>on</strong> industry within the Albuquerque MSA should adequately<br />

provide the workers that would be required to c<strong>on</strong>struct the <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. The number of c<strong>on</strong>structi<strong>on</strong><br />

workers necessary <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong>, estimated to be less than 1 percent of all c<strong>on</strong>structi<strong>on</strong> workers<br />

in the Albuquerque area, is not large enough to outstrip the supply of the industry. Indirect beneficial<br />

impacts would result from the increase in payroll, tax revenues, purchase of materials, <str<strong>on</strong>g>and</str<strong>on</strong>g> purchase of<br />

goods <str<strong>on</strong>g>and</str<strong>on</strong>g> services in the area resulting in less-than-significant impacts <strong>on</strong> the socioec<strong>on</strong>omic climate of<br />

Albuquerque.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The temporary increase of c<strong>on</strong>structi<strong>on</strong> employees at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would represent a<br />

small increase in the total number of pers<strong>on</strong>s working <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> no additi<strong>on</strong>al facilities<br />

(e.g., housing <str<strong>on</strong>g>and</str<strong>on</strong>g> transportati<strong>on</strong>) would be necessary to accommodate the work<str<strong>on</strong>g>for</str<strong>on</strong>g>ce. Changes to<br />

employment <str<strong>on</strong>g>and</str<strong>on</strong>g> expenditures resulting from the Proposed Acti<strong>on</strong> would be negligible; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, lessthan-significant<br />

impacts would be expected.<br />

Envir<strong>on</strong>mental Justice <str<strong>on</strong>g>and</str<strong>on</strong>g> Protecti<strong>on</strong> of Children. The Albuquerque metropolitan area c<strong>on</strong>tains an<br />

elevated minority <str<strong>on</strong>g>and</str<strong>on</strong>g> low-income populati<strong>on</strong> in comparis<strong>on</strong> to the United States, but similar to the State<br />

of New Mexico (see Secti<strong>on</strong> 3.13.2). C<strong>on</strong>structi<strong>on</strong> activities would be c<strong>on</strong>centrated adjacent to the<br />

existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5); there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no minority populati<strong>on</strong> would be disproporti<strong>on</strong>ately impacted<br />

by the Proposed Acti<strong>on</strong>. Operati<strong>on</strong> of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> would not result in an increased<br />

number of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s, but would rather provide an additi<strong>on</strong>al <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> so that operati<strong>on</strong>s<br />

could c<strong>on</strong>tinue unimpeded. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, minority populati<strong>on</strong>s would not be disproporti<strong>on</strong>ately impacted in<br />

the l<strong>on</strong>g term. Indirect disproporti<strong>on</strong>ate negative impacts <strong>on</strong> minority, low income, <str<strong>on</strong>g>and</str<strong>on</strong>g> youth populati<strong>on</strong>s<br />

would not be expected as result of the Proposed Acti<strong>on</strong>.<br />

4.13.2.2 No Acti<strong>on</strong> Alternative<br />

Under the No Acti<strong>on</strong> Alternative, the c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g><br />

<str<strong>on</strong>g>pad</str<strong>on</strong>g> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would not occur. No impacts <strong>on</strong> socioec<strong>on</strong>omics would be expected as no additi<strong>on</strong>al<br />

jobs would be created, expenditures <str<strong>on</strong>g>for</str<strong>on</strong>g> goods <str<strong>on</strong>g>and</str<strong>on</strong>g> services to maintain the existing facilities would be<br />

minimal, <str<strong>on</strong>g>and</str<strong>on</strong>g> there would be no increase in tax revenue as a result of employee wages <str<strong>on</strong>g>and</str<strong>on</strong>g> sales receipts.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-24


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Also, impacts <strong>on</strong> envir<strong>on</strong>mental justice would not occur as part of the No Acti<strong>on</strong> Alternative as the<br />

existing <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> (Pad 5) would c<strong>on</strong>tinue operating under current c<strong>on</strong>diti<strong>on</strong>s.<br />

4.14 Cumulative Impacts<br />

CEQ defines cumulative impacts as the “impacts <strong>on</strong> the envir<strong>on</strong>ment that result from the incremental<br />

impact of the acti<strong>on</strong> when added to other past, present, <str<strong>on</strong>g>and</str<strong>on</strong>g> reas<strong>on</strong>ably <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable future acti<strong>on</strong>s<br />

regardless of what agency (Federal or n<strong>on</strong>-Federal) or pers<strong>on</strong> undertakes such other acti<strong>on</strong>s” (40 CFR<br />

1508.7). Cumulative impacts can result from individually minor but collectively significant acti<strong>on</strong>s<br />

taking place over a period of time by various agencies (Federal, state, <str<strong>on</strong>g>and</str<strong>on</strong>g> local) or individuals. In<str<strong>on</strong>g>for</str<strong>on</strong>g>med<br />

decisi<strong>on</strong>making is served by c<strong>on</strong>siderati<strong>on</strong> of cumulative impacts resulting from projects that are<br />

proposed, under c<strong>on</strong>structi<strong>on</strong>, recently completed, or anticipated to be implemented in the reas<strong>on</strong>ably<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable future. Reas<strong>on</strong>ably <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable future acti<strong>on</strong>s c<strong>on</strong>sist of activities that have been approved<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> can be evaluated with respect to their effects.<br />

This secti<strong>on</strong> briefly summarizes past, current, <str<strong>on</strong>g>and</str<strong>on</strong>g> reas<strong>on</strong>ably <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable future projects within the same<br />

general geographic <str<strong>on</strong>g>and</str<strong>on</strong>g> time scope as the Proposed Acti<strong>on</strong>. The geographic scope of the analysis varies<br />

by resource area. For example, the geographic scope of cumulative impacts <strong>on</strong> noise, geology <str<strong>on</strong>g>and</str<strong>on</strong>g> soils,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> safety is very narrow <str<strong>on</strong>g>and</str<strong>on</strong>g> focused <strong>on</strong> the locati<strong>on</strong> of the resource. The geographic scope of l<str<strong>on</strong>g>and</str<strong>on</strong>g> use,<br />

air quality, infrastructure, transportati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> socioec<strong>on</strong>omics is much broader <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>siders more<br />

county- or regi<strong>on</strong>wide activities.<br />

The past, current, <str<strong>on</strong>g>and</str<strong>on</strong>g> reas<strong>on</strong>ably <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable projects, identified below, make up the cumulative impact<br />

scenario <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong>. The cumulative impact scenario is then added to the Proposed Acti<strong>on</strong>’s<br />

impacts <strong>on</strong> the individual resource areas analyzed in Secti<strong>on</strong> 4 to determine the cumulative impacts of the<br />

Proposed Acti<strong>on</strong>. In accordance with CEQ guidance, the current effects of past acti<strong>on</strong>s are c<strong>on</strong>sidered in<br />

aggregate as appropriate <str<strong>on</strong>g>for</str<strong>on</strong>g> each resource area without delving into the historical details of individual<br />

past acti<strong>on</strong>s.<br />

4.14.1 Impact Analysis<br />

4.14.1.1 Past Acti<strong>on</strong>s<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> has been used <str<strong>on</strong>g>for</str<strong>on</strong>g> military missi<strong>on</strong>s since the 1930s <str<strong>on</strong>g>and</str<strong>on</strong>g> has c<strong>on</strong>tinuously been developed<br />

as DOD missi<strong>on</strong>s, organizati<strong>on</strong>s, needs, <str<strong>on</strong>g>and</str<strong>on</strong>g> strategies have evolved. Development <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> of<br />

training ranges have impacted thous<str<strong>on</strong>g>and</str<strong>on</strong>g>s of acres with synergistic <str<strong>on</strong>g>and</str<strong>on</strong>g> cumulative impacts <strong>on</strong> soil,<br />

wildlife habitats, water quality, <str<strong>on</strong>g>and</str<strong>on</strong>g> noise. Beneficial effects, too, have resulted from the operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

management of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> including, but not limited to, increased employment <str<strong>on</strong>g>and</str<strong>on</strong>g> income <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Bernalillo County, the City of Albuquerque, <str<strong>on</strong>g>and</str<strong>on</strong>g> its surrounding communities; restorati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

enhancement of sensitive resources such as the Coyote Springs wetl<str<strong>on</strong>g>and</str<strong>on</strong>g> area; c<strong>on</strong>sumptive <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

n<strong>on</strong>c<strong>on</strong>sumptive recreati<strong>on</strong> opportunities; <str<strong>on</strong>g>and</str<strong>on</strong>g> increased knowledge of the history <str<strong>on</strong>g>and</str<strong>on</strong>g> pre-history of the<br />

regi<strong>on</strong> through numerous cultural resources surveys <str<strong>on</strong>g>and</str<strong>on</strong>g> studies.<br />

4.14.1.2 Present <str<strong>on</strong>g>and</str<strong>on</strong>g> Reas<strong>on</strong>ably Foreseeable Acti<strong>on</strong>s<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> is a large military installati<strong>on</strong> that is c<strong>on</strong>tinually evolving. Projects that were examined <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

potential cumulative impacts are included in Table 4-5.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-25


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Table 4-5. Present <str<strong>on</strong>g>and</str<strong>on</strong>g> Reas<strong>on</strong>ably Foreseeable Acti<strong>on</strong>s at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Project Name<br />

HC-130 <str<strong>on</strong>g>and</str<strong>on</strong>g> MC-130<br />

<strong>Air</strong>craft Simulator<br />

Facilities<br />

Heavy Weap<strong>on</strong>s Range<br />

C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Demoliti<strong>on</strong> of Military<br />

Support Facilities<br />

Army <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force<br />

Exchange Service<br />

(AAFES) Base<br />

Exchange Shopping<br />

Center<br />

C<strong>on</strong>struct New Fire<br />

Stati<strong>on</strong><br />

498th Nuclear System<br />

Wing Facility<br />

Descripti<strong>on</strong><br />

The 58th Special Operati<strong>on</strong>s Wing proposes to c<strong>on</strong>struct new HC-130 <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

MC-130 simulator facilities at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The proposed c<strong>on</strong>structi<strong>on</strong><br />

would include <strong>on</strong>e-story facilities in the southwestern secti<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

The 377 ABW is proposing to establish <str<strong>on</strong>g>and</str<strong>on</strong>g> use a heavy weap<strong>on</strong>s range in the<br />

southeastern secti<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, approximately 0.25 miles east of the<br />

Starfire Optical Range facilities al<strong>on</strong>g Mount Washingt<strong>on</strong> Road. The<br />

proposed range would encompass the existing M60 range. It would include<br />

two firing positi<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> firing lines <str<strong>on</strong>g>and</str<strong>on</strong>g> would use the existing targets at the<br />

M60 range. Firing distance would be approximately 7,300 feet. Firing<br />

positi<strong>on</strong> two would be used <str<strong>on</strong>g>for</str<strong>on</strong>g> sniper heavy weap<strong>on</strong>s (0.50 caliber) <str<strong>on</strong>g>and</str<strong>on</strong>g> would<br />

fire in a more southerly directi<strong>on</strong> to the existing target area, approximately<br />

3,800 feet.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> proposes to demolish <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>struct several military pers<strong>on</strong>nel<br />

support facilities in the developed area in the northwestern porti<strong>on</strong> of the<br />

installati<strong>on</strong>. The areas include the Visiting Officer Quarters Complex, the<br />

Main Enlisted Dormitory Campus, the N<strong>on</strong>commissi<strong>on</strong>ed Officer Academy,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Dormitory Campus 2. Approximately 36 acres would be included in the<br />

c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> activities. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> currently has a surplus<br />

of old subst<str<strong>on</strong>g>and</str<strong>on</strong>g>ard dormitory spaces that this project would help eliminate.<br />

AAFES proposes to c<strong>on</strong>struct <str<strong>on</strong>g>and</str<strong>on</strong>g> operate a new 95,421-square-foot Shopping<br />

Center <strong>on</strong> an approximately 2.3-acre developed site between the existing<br />

Commissary (Building 20180) <str<strong>on</strong>g>and</str<strong>on</strong>g> existing Base Exchange (Building 20170)<br />

<strong>on</strong> Pennsylvania Avenue. The project also includes demoliti<strong>on</strong> of the 1,540-<br />

square-foot existing satellite pharmacy (Building 20167), closure of a porti<strong>on</strong><br />

(approximately 345 feet) of Pennsylvania Avenue, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> of<br />

approximately 492 feet of new road to c<strong>on</strong>nect Texas Street with Pennsylvania<br />

Avenue north of the new Shopping Center. The new Shopping Center would<br />

include a new Base Exchange, pharmacy, <str<strong>on</strong>g>and</str<strong>on</strong>g> retail laundry/dry cleaning, a<br />

beauty/barber shop, c<strong>on</strong>cessi<strong>on</strong> kiosks, five food c<strong>on</strong>cepts with a food court,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> other similar services.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> proposes to replace Fire Stati<strong>on</strong> 3 within the Manzano Base<br />

area. The proposed structure would be approximately 7,300 square feet, <strong>on</strong>e<br />

story, with three high-bay drive-through apparatus stalls. The new structure<br />

would be located al<strong>on</strong>g a main road in the south-central secti<strong>on</strong> of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong>. The acti<strong>on</strong> also includes the demoliti<strong>on</strong> of an approximately<br />

4,300-square-foot fire stati<strong>on</strong> (Building 638) within the Manzano Base area.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> proposes to c<strong>on</strong>struct a 32,400-square-foot facility to house the<br />

newly <str<strong>on</strong>g>for</str<strong>on</strong>g>med 498th Nuclear Systems Wing. This facility would be a twostory,<br />

steel-framed structure with rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced c<strong>on</strong>crete foundati<strong>on</strong>, floors, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced mas<strong>on</strong>ry walls. The c<strong>on</strong>structi<strong>on</strong> further includes tying in to<br />

utilities <str<strong>on</strong>g>and</str<strong>on</strong>g> communicati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> parking <str<strong>on</strong>g>for</str<strong>on</strong>g> 120 vehicles. The facility would<br />

accommodate approximately 200 pers<strong>on</strong>nel. The new facility locati<strong>on</strong> is<br />

proposed between “G” <str<strong>on</strong>g>and</str<strong>on</strong>g> “H” Avenues west of Wyoming Boulevard directly<br />

behind the Nuclear Weap<strong>on</strong>s Center (Building 20325).<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-26


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Project Name<br />

<strong>Air</strong> Force Nuclear<br />

Weap<strong>on</strong>s Center<br />

Sustainment Center<br />

Building Demoliti<strong>on</strong> at<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong><br />

Security Forces<br />

Complex<br />

Military Working Dog<br />

Facility<br />

Descripti<strong>on</strong><br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> proposes to c<strong>on</strong>struct a 15,946-square-foot sustainment center<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> the Nuclear Weap<strong>on</strong>s Center. This facility would be a two-story, steelframed<br />

structure built as a Sensitive Compartmented In<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> Facility with<br />

rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced c<strong>on</strong>crete foundati<strong>on</strong>, floors, <str<strong>on</strong>g>and</str<strong>on</strong>g> rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced mas<strong>on</strong>ry walls. The<br />

c<strong>on</strong>structi<strong>on</strong> further includes tying in to utilities <str<strong>on</strong>g>and</str<strong>on</strong>g> communicati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

parking <str<strong>on</strong>g>for</str<strong>on</strong>g> vehicles. The facility would accommodate approximately 36<br />

pers<strong>on</strong>nel. The new facility locati<strong>on</strong> is proposed between “G” <str<strong>on</strong>g>and</str<strong>on</strong>g> “H”<br />

Avenues west of Wyoming Boulevard directly behind the Nuclear Weap<strong>on</strong>s<br />

Center (Building 20325) <str<strong>on</strong>g>and</str<strong>on</strong>g> south of the proposed 498th Nuclear Systems<br />

Wing facility.<br />

The 377 ABW proposes to demolish 23 buildings <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> to make<br />

space available <str<strong>on</strong>g>for</str<strong>on</strong>g> future c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> to fulfill its missi<strong>on</strong> as installati<strong>on</strong><br />

host through better site utilizati<strong>on</strong>. N<strong>on</strong>e of the buildings proposed <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

demoliti<strong>on</strong> are currently occupied or used by installati<strong>on</strong> pers<strong>on</strong>nel. General<br />

demoliti<strong>on</strong> activities would include removal of foundati<strong>on</strong>s, floor, wall,<br />

ceiling, <str<strong>on</strong>g>and</str<strong>on</strong>g> roofing materials; <str<strong>on</strong>g>and</str<strong>on</strong>g> removing electrical substati<strong>on</strong>s providing<br />

power to these facilities; <str<strong>on</strong>g>and</str<strong>on</strong>g> removing, capping <str<strong>on</strong>g>and</str<strong>on</strong>g> rerouting sewer, gas,<br />

water, <str<strong>on</strong>g>and</str<strong>on</strong>g> steam lines outside of the work areas. Equipment such as<br />

bulldozers, backhoes, fr<strong>on</strong>t-end loaders, dump trucks, tractor-trailers, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

generators would be required to support the proposed demoliti<strong>on</strong> activities.<br />

The 377 ABW proposes to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a Security Forces<br />

Complex at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> to provide adequate space <str<strong>on</strong>g>and</str<strong>on</strong>g> modern facilities to<br />

house all 377th Security Forces Squadr<strong>on</strong> administrative <str<strong>on</strong>g>and</str<strong>on</strong>g> support functi<strong>on</strong>s<br />

in a c<strong>on</strong>solidated locati<strong>on</strong>. The 37th Security Forces Squadr<strong>on</strong> functi<strong>on</strong>s that<br />

would be transferred to the new 377th Security Forces Complex include base<br />

operati<strong>on</strong>s center with comm<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>trol facility, administrati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> office<br />

space, training rooms, auditorium or assembly room, guard mount, hardened<br />

armory <str<strong>on</strong>g>for</str<strong>on</strong>g> weap<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> ammuniti<strong>on</strong> storage, c<strong>on</strong>finement facilities, law<br />

en<str<strong>on</strong>g>for</str<strong>on</strong>g>cement, logistics warehouse, general storage, vehicle garage with<br />

maintenance area, <str<strong>on</strong>g>and</str<strong>on</strong>g> associated communicati<strong>on</strong>s functi<strong>on</strong>s. One existing<br />

building within the proposed footprint of the 377th Security Forces Complex<br />

would be demolished.<br />

The 377 ABW proposes to c<strong>on</strong>struct, operate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain a military working<br />

dog facility according to the <strong>Air</strong> Force “Design Guide <str<strong>on</strong>g>for</str<strong>on</strong>g> Military Working<br />

Dog Facilities.” Building c<strong>on</strong>structi<strong>on</strong> would be rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced c<strong>on</strong>crete<br />

foundati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced mas<strong>on</strong>ry walls with insulated st<str<strong>on</strong>g>and</str<strong>on</strong>g>ing seam metal<br />

roofing. The kennel building would be approximately 2,600-square-feet, with<br />

16 indoor/outdoor kennels <str<strong>on</strong>g>and</str<strong>on</strong>g> 2 isolati<strong>on</strong> kennels, joined to a 2,500-squarefoot<br />

administrative/support building by a covered walkway. Depending <strong>on</strong> the<br />

site, c<strong>on</strong>structi<strong>on</strong> of a new obedience course might also be required. Three<br />

alternative sites have been proposed: (1) north of the existing military working<br />

dog building near the intersecti<strong>on</strong> of Barrack <str<strong>on</strong>g>and</str<strong>on</strong>g> Manzano roads, (2) in the<br />

southern porti<strong>on</strong> of the cant<strong>on</strong>ment area near the intersecti<strong>on</strong> of Wyoming<br />

Boulevard <str<strong>on</strong>g>and</str<strong>on</strong>g> Pennsylvania Avenue, <str<strong>on</strong>g>and</str<strong>on</strong>g> (3) in the cant<strong>on</strong>ment area at the<br />

southeastern corner of M <str<strong>on</strong>g>and</str<strong>on</strong>g> Pennsylvania Avenues.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-27


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Project Name<br />

21st Explosive<br />

Ordinance Divisi<strong>on</strong><br />

Expansi<strong>on</strong><br />

Spacecraft Comp<strong>on</strong>ent<br />

Integrati<strong>on</strong> Lab<br />

Descripti<strong>on</strong><br />

The 21st Explosive Ordinance Divisi<strong>on</strong> proposes to c<strong>on</strong>struct a facility<br />

expansi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> site improvements <str<strong>on</strong>g>for</str<strong>on</strong>g> the 21st Explosive Ordinance Divisi<strong>on</strong><br />

Weap<strong>on</strong>s of Mass Destructi<strong>on</strong> Company Complex at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The 21st<br />

Explosive Ordinance Divisi<strong>on</strong> currently operates from a 90-acre property<br />

leased by the Army within Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The current site has seven<br />

structures, six of which are subst<str<strong>on</strong>g>and</str<strong>on</strong>g>ard <str<strong>on</strong>g>and</str<strong>on</strong>g> do not have adequate fire<br />

protecti<strong>on</strong>. The 21st Explosive Ordinance Divisi<strong>on</strong> proposes to exp<str<strong>on</strong>g>and</str<strong>on</strong>g> this<br />

site to a total of 280 acres, add three permanent structures, demolish five of the<br />

six subst<str<strong>on</strong>g>and</str<strong>on</strong>g>ard structures, add two temporary storage c<strong>on</strong>tainers, tie into<br />

nearby utilities, c<strong>on</strong>struct water tanks <str<strong>on</strong>g>for</str<strong>on</strong>g> fire suppressi<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>struct<br />

several c<strong>on</strong>crete <str<strong>on</strong>g>pad</str<strong>on</strong>g>s <str<strong>on</strong>g>for</str<strong>on</strong>g> training tasks.<br />

Proposed lease acti<strong>on</strong> to c<strong>on</strong>vert underutilized space, including a <str<strong>on</strong>g>for</str<strong>on</strong>g>mer<br />

military family housing area <str<strong>on</strong>g>and</str<strong>on</strong>g> a recreati<strong>on</strong>al use area, to use <str<strong>on</strong>g>for</str<strong>on</strong>g> office,<br />

commercial, <str<strong>on</strong>g>and</str<strong>on</strong>g> senior c<strong>on</strong>tinuum care space at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>.<br />

4.14.2 Cumulative Impact Analysis by Resource Area<br />

4.14.2.1 L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use<br />

A significant impact <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use would occur if any acti<strong>on</strong> is inc<strong>on</strong>sistent with adopted l<str<strong>on</strong>g>and</str<strong>on</strong>g> use plans or<br />

would substantially alter those resources required <str<strong>on</strong>g>for</str<strong>on</strong>g> supporting or benefiting the current use of the site<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> adjacent property. The Proposed Acti<strong>on</strong> is c<strong>on</strong>sistent with the 2002 Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, New<br />

Mexico General Plan, <str<strong>on</strong>g>and</str<strong>on</strong>g> would not impact municipal plans or policies. The Proposed Acti<strong>on</strong> would<br />

result in less-than-significant impacts <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use compatibility related to noise producti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> safety<br />

issues. However, the Proposed Acti<strong>on</strong>, when c<strong>on</strong>sidered with other potential alterati<strong>on</strong>s of l<str<strong>on</strong>g>and</str<strong>on</strong>g> use,<br />

would not be expected to result in a significant cumulative adverse effect <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use compatibility. All<br />

reas<strong>on</strong>able past, present, <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable acti<strong>on</strong>s <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> are c<strong>on</strong>sistent with the 2002 Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>Air</strong> Force Base, New Mexico General Plan.<br />

4.14.2.2 Noise<br />

The noise generated by the Proposed Acti<strong>on</strong>, when c<strong>on</strong>sidered with other existing <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed projects<br />

<strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, would not be c<strong>on</strong>sidered a significant cumulative impact. The cumulative effect of the<br />

proposed <str<strong>on</strong>g>and</str<strong>on</strong>g> future project would result in <strong>on</strong>ly temporary increases in ambient noise levels during<br />

demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities.<br />

4.14.2.3 Visual Resources<br />

Although the collective implementati<strong>on</strong> of various projects at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> could result in cumulative<br />

impacts <strong>on</strong> visual resources at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, the impacts would not be significant. The exiting visual<br />

c<strong>on</strong>diti<strong>on</strong>s at the installati<strong>on</strong> c<strong>on</strong>sist of military <str<strong>on</strong>g>and</str<strong>on</strong>g> community infrastructure, <str<strong>on</strong>g>and</str<strong>on</strong>g> there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, most<br />

projects would be c<strong>on</strong>sistent with these existing c<strong>on</strong>diti<strong>on</strong>s. Impacts <strong>on</strong> visual resources from reas<strong>on</strong>ably<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable projects, <str<strong>on</strong>g>and</str<strong>on</strong>g> thus cumulative impacts, would be c<strong>on</strong>trolled by following the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong><br />

Force Base Architectural Compatibility Plan, which attempts to ensure that future development is<br />

per<str<strong>on</strong>g>for</str<strong>on</strong>g>med in a way that limits effects <strong>on</strong> visual resources <str<strong>on</strong>g>and</str<strong>on</strong>g> is c<strong>on</strong>sistent with existing architectural <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

visual st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards (AAFES 2008). Adherence to the architectural compatibility plan would prevent<br />

significant visual cumulative impacts from occurring in the future.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-28


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.14.2.4 <strong>Air</strong> Quality<br />

The Proposed Acti<strong>on</strong> would result in low levels of air emissi<strong>on</strong>s below de minimis thresholds that would<br />

not be regi<strong>on</strong>ally significant. The Proposed Acti<strong>on</strong> would generate short-term emissi<strong>on</strong>s below<br />

10 percent of the emissi<strong>on</strong>s inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> the AMRGI AQCR <str<strong>on</strong>g>and</str<strong>on</strong>g> negligibly c<strong>on</strong>tribute towards the New<br />

Mexico statewide GHG inventory. However, the Proposed Acti<strong>on</strong> would not c<strong>on</strong>tribute significantly to<br />

adverse cumulative impacts <strong>on</strong> air quality at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> or regi<strong>on</strong>ally.<br />

4.14.2.5 Geology <str<strong>on</strong>g>and</str<strong>on</strong>g> Soils<br />

The Proposed Acti<strong>on</strong>, when combined with other reas<strong>on</strong>ably <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable projects, would not result in<br />

significant cumulative impacts <strong>on</strong> geology <str<strong>on</strong>g>and</str<strong>on</strong>g> soils. The Proposed Acti<strong>on</strong> would result in cumulative<br />

impacts <strong>on</strong> soil erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong>, but would not reduce prime farml<str<strong>on</strong>g>and</str<strong>on</strong>g> soils or agricultural<br />

producti<strong>on</strong>. SWPPP measures <str<strong>on</strong>g>and</str<strong>on</strong>g> BMPs would be implemented to c<strong>on</strong>trol erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong><br />

during demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities, which would minimize impacts.<br />

4.14.2.6 Water Resources<br />

The cumulative effects of the Proposed Acti<strong>on</strong> would result primarily from soil erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong><br />

that could impact water quality <str<strong>on</strong>g>and</str<strong>on</strong>g> surface waters. When c<strong>on</strong>sidered with potential disturbances <strong>on</strong><br />

water resources from future acti<strong>on</strong>s, it would not be expected to have a significant cumulative impact <strong>on</strong><br />

water resources. Implementati<strong>on</strong> of BMPs would minimize potential <str<strong>on</strong>g>for</str<strong>on</strong>g> adverse effects <strong>on</strong> water<br />

resources associated with the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> future acti<strong>on</strong>s.<br />

4.14.2.7 Biological Resources<br />

Implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> other reas<strong>on</strong>ably <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable projects would not result in a<br />

significant cumulative impact <strong>on</strong> biological resources. Because the Proposed Acti<strong>on</strong> would occur in a<br />

previously disturbed area that does not c<strong>on</strong>tain much vegetati<strong>on</strong> or important biological habitats, it would<br />

not be expected to impact vegetati<strong>on</strong> or wildlife habitats. The Proposed Acti<strong>on</strong> could have less than<br />

significant adverse impacts <strong>on</strong> burrowing owls <str<strong>on</strong>g>and</str<strong>on</strong>g> migratory birds, which when combined with other<br />

projects could result in cumulative impacts. Although growth <str<strong>on</strong>g>and</str<strong>on</strong>g> development can be expected to<br />

c<strong>on</strong>tinue outside of Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> within the surrounding natural areas, significant cumulative adverse<br />

effects <strong>on</strong> these resources would not be expected when added to the effects of activities associated with<br />

the Proposed Acti<strong>on</strong>.<br />

4.14.2.8 Cultural Resources<br />

The Proposed Acti<strong>on</strong> would not result in a cumulative impact <strong>on</strong> cultural resources. There are no known<br />

cultural resources within the footprint of the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, thus, no impacts are anticipated.<br />

4.14.2.9 Infrastructure<br />

The Proposed Acti<strong>on</strong> has the potential to result in adverse cumulative impacts <strong>on</strong> electrical, water supply,<br />

wastewater, storm water, <str<strong>on</strong>g>and</str<strong>on</strong>g> solid waste management services. The 2002 Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, New<br />

Mexico General Plan addresses the capacity <str<strong>on</strong>g>and</str<strong>on</strong>g> the need to upgrade all elements of infrastructure to<br />

support additi<strong>on</strong>al projects at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. An upgrade of any infrastructure comp<strong>on</strong>ent to support<br />

future c<strong>on</strong>structi<strong>on</strong> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> would largely result in beneficial effects <str<strong>on</strong>g>for</str<strong>on</strong>g> the installati<strong>on</strong>.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-29


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.14.2.10 Hazardous Materials <str<strong>on</strong>g>and</str<strong>on</strong>g> Waste<br />

Implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> other reas<strong>on</strong>ably <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable projects would not be expected<br />

to result in a significant cumulative impact <strong>on</strong> hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> waste. The Proposed Acti<strong>on</strong><br />

would result in a negligible increase in the generati<strong>on</strong> of hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> wastes; however, all<br />

materials would be h<str<strong>on</strong>g>and</str<strong>on</strong>g>led <str<strong>on</strong>g>and</str<strong>on</strong>g> disposed of appropriately. Future projects would incorporate measures to<br />

limit or c<strong>on</strong>trol hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> waste into their design <str<strong>on</strong>g>and</str<strong>on</strong>g> operati<strong>on</strong> plans. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the<br />

effects of the Proposed Acti<strong>on</strong>, when combined with other <strong>on</strong>going <str<strong>on</strong>g>and</str<strong>on</strong>g> proposed projects <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong>, would not be c<strong>on</strong>sidered a significant cumulative effect.<br />

4.14.2.11 Safety<br />

No cumulative impacts <strong>on</strong> health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety would be expected. The implementati<strong>on</strong> of effective health<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> safety plans, including those <str<strong>on</strong>g>for</str<strong>on</strong>g> explosives safety, which follow Federal, state, <str<strong>on</strong>g>and</str<strong>on</strong>g> local OSHA<br />

policies, at the work site during demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> during facility operati<strong>on</strong> would reduce or<br />

eliminate cumulative health <str<strong>on</strong>g>and</str<strong>on</strong>g> safety impacts <strong>on</strong> c<strong>on</strong>tractors, military pers<strong>on</strong>nel, <str<strong>on</strong>g>and</str<strong>on</strong>g> the general public.<br />

4.14.2.12 <strong>Air</strong>craft Safety<br />

The Proposed Acti<strong>on</strong> would have beneficial impacts <strong>on</strong> aircraft safety due to reducti<strong>on</strong> of aircraft safety<br />

c<strong>on</strong>cerns, such as FOD, aircraft tire-cut potential, <str<strong>on</strong>g>and</str<strong>on</strong>g> insufficient lighting, <str<strong>on</strong>g>and</str<strong>on</strong>g> improvement of the ability<br />

to schedule <str<strong>on</strong>g>and</str<strong>on</strong>g> complete <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> missi<strong>on</strong>s. It is unlikely any of the other reas<strong>on</strong>ably <str<strong>on</strong>g>for</str<strong>on</strong>g>eseeable<br />

projects would affect aircraft safety; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, the Proposed Acti<strong>on</strong> would not result in any cumulative<br />

impacts.<br />

4.14.2.13 Socioec<strong>on</strong>omics <str<strong>on</strong>g>and</str<strong>on</strong>g> Envir<strong>on</strong>mental Justice<br />

Implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would result in beneficial impacts <strong>on</strong> the regi<strong>on</strong>’s ec<strong>on</strong>omy. No<br />

impacts <strong>on</strong> residential areas, populati<strong>on</strong>, or minority or low-income families off-installati<strong>on</strong> would occur.<br />

These effects, when combined with the other projects currently proposed or <strong>on</strong>going at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>,<br />

would not be c<strong>on</strong>sidered a significant cumulative impact.<br />

4.14.3 Unavoidable Adverse Impacts<br />

Unavoidable adverse impacts would result from implementati<strong>on</strong> of the Proposed Acti<strong>on</strong>. N<strong>on</strong>e of these<br />

impacts would be significant.<br />

Energy. The use of n<strong>on</strong>renewable resources is an unavoidable occurrence, although not c<strong>on</strong>sidered<br />

significant. The Proposed Acti<strong>on</strong> would require use of fossil fuels, a n<strong>on</strong>renewable natural resource.<br />

Energy supplies, although relatively small, would be committed to the Proposed Acti<strong>on</strong>.<br />

Geology <str<strong>on</strong>g>and</str<strong>on</strong>g> Soils. Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities would result in temporary soil disturbance;<br />

however, implementati<strong>on</strong> of BMPs <str<strong>on</strong>g>and</str<strong>on</strong>g> erosi<strong>on</strong>-c<strong>on</strong>trol measures would limit the envir<strong>on</strong>mental<br />

c<strong>on</strong>sequences. Although these impacts would be unavoidable, the impact <strong>on</strong> soils would not be expected<br />

to be significant.<br />

Hazardous Materials <str<strong>on</strong>g>and</str<strong>on</strong>g> Waste. The generati<strong>on</strong> of hazardous materials <str<strong>on</strong>g>and</str<strong>on</strong>g> wastes during demoliti<strong>on</strong><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities would be unavoidable; however, these wastes would be negligible <str<strong>on</strong>g>and</str<strong>on</strong>g> h<str<strong>on</strong>g>and</str<strong>on</strong>g>led<br />

in accordance with Federal, state, <str<strong>on</strong>g>and</str<strong>on</strong>g> USAF policies <str<strong>on</strong>g>and</str<strong>on</strong>g> would not be expected to result in a significant<br />

impact.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-30


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

4.14.4 Compatibility of the Proposed Acti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Alternatives with the<br />

Objectives of Federal, Regi<strong>on</strong>al, <str<strong>on</strong>g>and</str<strong>on</strong>g> Local L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Plans, Policies,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> C<strong>on</strong>trols<br />

The Proposed Acti<strong>on</strong> would occur entirely within Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. Demoliti<strong>on</strong>, c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance activities would not be incompatible with any current l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The<br />

Proposed Acti<strong>on</strong> would not c<strong>on</strong>flict with any applicable off-installati<strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use ordinances. The<br />

Proposed Acti<strong>on</strong> would follow all applicable permitting, c<strong>on</strong>structi<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> safety requirements.<br />

4.14.5 Relati<strong>on</strong>ship Between Short-term Uses <str<strong>on</strong>g>and</str<strong>on</strong>g> L<strong>on</strong>g-term Productivity<br />

Short-term uses of the biophysical comp<strong>on</strong>ents of the human envir<strong>on</strong>ment include direct c<strong>on</strong>structi<strong>on</strong>related<br />

disturbances <str<strong>on</strong>g>and</str<strong>on</strong>g> direct effects associated with an increase in populati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> activity that occurs<br />

over a period of less than 5 years. L<strong>on</strong>g-term uses of the human envir<strong>on</strong>ment include those effects<br />

occurring over a period of more than 5 years, including permanent resource loss.<br />

Implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would not require short-term resource uses that would result in<br />

l<strong>on</strong>g-term compromises of productivity. The Proposed Acti<strong>on</strong> would not result in intensificati<strong>on</strong> of l<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

use at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the surrounding area. Implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> would not<br />

represent a significant loss of open space. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e, it is anticipated that the Proposed Acti<strong>on</strong> would not<br />

result in any cumulative l<str<strong>on</strong>g>and</str<strong>on</strong>g> use or aesthetic impacts.<br />

4.14.6 Irreversible <str<strong>on</strong>g>and</str<strong>on</strong>g> Irretrievable Commitment of Resources<br />

Irreversible <str<strong>on</strong>g>and</str<strong>on</strong>g> irretrievable resource commitments are related to the use of n<strong>on</strong>renewable resources <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

the effects that use of these resources would have <strong>on</strong> future generati<strong>on</strong>s. Irreversible effects primarily<br />

result from use or destructi<strong>on</strong> of a specific resource that cannot be replaced within a reas<strong>on</strong>able timeframe<br />

(e.g., energy <str<strong>on</strong>g>and</str<strong>on</strong>g> minerals). The irreversible <str<strong>on</strong>g>and</str<strong>on</strong>g> irretrievable commitments of resources that would result<br />

from implementati<strong>on</strong> of the Proposed Acti<strong>on</strong> involve the c<strong>on</strong>sumpti<strong>on</strong> of material resources used <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong>, energy resources, l<str<strong>on</strong>g>and</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> human labor resources. The use of these resources is c<strong>on</strong>sidered<br />

to be permanent.<br />

Material Resources. Material resources utilized <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong> include c<strong>on</strong>structi<strong>on</strong> materials,<br />

c<strong>on</strong>crete <str<strong>on</strong>g>and</str<strong>on</strong>g> asphalt, <str<strong>on</strong>g>and</str<strong>on</strong>g> various material supplies. Most of the materials that would be c<strong>on</strong>sumed are<br />

not in short supply, would not limit other unrelated c<strong>on</strong>structi<strong>on</strong> activities, <str<strong>on</strong>g>and</str<strong>on</strong>g> would not be c<strong>on</strong>sidered<br />

significant.<br />

Energy Resources. Energy resources used <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong> would be irretrievably lost. This<br />

includes petroleum-based products (such as gasoline <str<strong>on</strong>g>and</str<strong>on</strong>g> diesel) <str<strong>on</strong>g>and</str<strong>on</strong>g> electricity. During demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>structi<strong>on</strong> activities, gasoline <str<strong>on</strong>g>and</str<strong>on</strong>g> diesel would be used <str<strong>on</strong>g>for</str<strong>on</strong>g> the operati<strong>on</strong> of vehicles <str<strong>on</strong>g>and</str<strong>on</strong>g> equipment.<br />

Electricity <str<strong>on</strong>g>and</str<strong>on</strong>g> minimal amounts gasoline <str<strong>on</strong>g>and</str<strong>on</strong>g> diesel would be used during operati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of<br />

the proposed <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>. C<strong>on</strong>sumpti<strong>on</strong> of these energy resources would not place a significant<br />

dem<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>on</strong> their availability in the regi<strong>on</strong>; there<str<strong>on</strong>g>for</str<strong>on</strong>g>e, no significant effects would be expected.<br />

Biological Resources. The Proposed Acti<strong>on</strong> would result in minor loss of vegetati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> wildlife habitat.<br />

Because the project area has been previously disturbed, the loss would be minimal <str<strong>on</strong>g>and</str<strong>on</strong>g> not c<strong>on</strong>sidered<br />

significant.<br />

Human Resources. The use of human resources <str<strong>on</strong>g>for</str<strong>on</strong>g> demoliti<strong>on</strong>, c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

maintenance activities is c<strong>on</strong>sidered an irretrievable loss <strong>on</strong>ly in that it would preclude such pers<strong>on</strong>nel<br />

from engaging in other work activities. However, the use of human resources <str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong><br />

represents employment opportunities <str<strong>on</strong>g>and</str<strong>on</strong>g> is c<strong>on</strong>sidered beneficial.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-31


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

THIS PAGE INTENTIONALLY LEFT BLANK<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

4-32


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

5. List of Preparers<br />

This <str<strong>on</strong>g>EA</str<strong>on</strong>g> has been prepared under the directi<strong>on</strong> of the 377 ABW at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. The individual<br />

c<strong>on</strong>tractors that c<strong>on</strong>tributed to the preparati<strong>on</strong> of this document are listed below.<br />

Alvin Banguilan<br />

HDR|e²M<br />

M.A. Anthropology<br />

B.S. Anthropology<br />

Years of Experience: 18<br />

Louise Baxter<br />

HDR|e²M<br />

M.P.A. Public Administrati<strong>on</strong><br />

B.S. Political Science<br />

Years of Experience: 19<br />

Tom Bl<strong>on</strong>kowski<br />

HDR|e²M<br />

B.A. Envir<strong>on</strong>mental Ec<strong>on</strong>omics<br />

Years of Experience: 1<br />

Shann<strong>on</strong> Cauley, USACE CWD, CPSS<br />

HDR|e²M<br />

B.S. Geology<br />

Graduate Studies Natural Resources<br />

Graduate Studies Geology<br />

USACE Certified Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g> Delineator<br />

Certified Professi<strong>on</strong>al Soil Scientist<br />

Years of Experience: 25<br />

Melissa Clark<br />

HDR|e²M<br />

B.S. Envir<strong>on</strong>mental Resources Engineering<br />

Years of Experience: 8<br />

Paul D’Ornellas<br />

HDR|e²M<br />

B.A. Chemistry<br />

Years of Experience: 1<br />

Timothy Didlake<br />

HDR|e²M<br />

B.S. Earth Sciences<br />

Years of Experience: 1<br />

Elaine Dubin<br />

HDR|e²M<br />

B.S. Earth Science<br />

Years of Experience: 3<br />

Sylvia F<strong>on</strong>tes, CIH<br />

HDR|e²M<br />

M.S. Occupati<strong>on</strong>al Health<br />

B.S. Biochemistry<br />

Years of Experience: 24<br />

Stuart Gottlieb<br />

HDR|e²M<br />

B.A. Geography<br />

Years of Experience: 7<br />

Megan Griffin<br />

HDR|e²M<br />

M.S. Biology<br />

B.S. Envir<strong>on</strong>mental Science<br />

Years of Experience: 4<br />

Leigh Hagan<br />

HDR|e²M<br />

MESM Envir<strong>on</strong>mental Science <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Management<br />

B.S. Biology<br />

Years of Experience: 5<br />

Michael Jennings<br />

HDR|e²M<br />

B.A. Archaeology<br />

Years of Experience: 10<br />

R<strong>on</strong>ald E. Lamb, CEP<br />

HDR|e²M<br />

M.S. Envir<strong>on</strong>mental Science<br />

M.A. Political Science<br />

B.A. Political Science<br />

Years of Experience: 24<br />

Shad Manning<br />

HDR|e²M<br />

M.S. Envir<strong>on</strong>mental Science<br />

B.A. Paleobiology<br />

B.A. Anthropology<br />

Years of Experience: 4<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

5-1


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Jeffrey McCann<br />

HDR|e²M<br />

B.G.S. Geological Sciences<br />

Years of Experience: 29<br />

Cheryl Myers<br />

HDR|e²M<br />

A.A.S. Nursing<br />

Years of Experience: 21<br />

Rebecca Oldham<br />

HDR|e²M<br />

B.S. English<br />

Years of Experience: 18<br />

Tanya Perry<br />

HDR|e²M<br />

B.S. Envir<strong>on</strong>mental Science<br />

B.A. Communicati<strong>on</strong>s<br />

Years of Experience: 9<br />

Adam Teepe<br />

HDR|e²M<br />

MESM Envir<strong>on</strong>mental Science <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Management<br />

B.S. Envir<strong>on</strong>mental Geology<br />

Years of Experience: 6<br />

Jeffrey Weiler<br />

HDR|e²M<br />

M.S. Resource Ec<strong>on</strong>omics/Envir<strong>on</strong>mental<br />

Management<br />

B.A. Political Science<br />

Years of Experience: 34<br />

Audrey Wessel<br />

HDR|e²M<br />

M.S. Envir<strong>on</strong>mental Science <str<strong>on</strong>g>and</str<strong>on</strong>g> Policy<br />

B.S. Wildlife Science<br />

Years of Experience: 3<br />

Patrick Solom<strong>on</strong><br />

HDR|e²M<br />

M.S. Geography<br />

B.A. Geography<br />

Years of Experience: 15<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

5-2


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

6. References<br />

AAFES 2008<br />

Bitner 2009<br />

BLS 2009<br />

City of<br />

Albuquerque<br />

2008<br />

City of<br />

Albuquerque<br />

2009a<br />

City of<br />

Albuquerque<br />

2009b<br />

DOD 2008<br />

DOD 2010<br />

DOE 2009<br />

FHWA 1980<br />

FICON 1992<br />

Army <str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Exchange Services (AAFES). 2008. Envir<strong>on</strong>mental Assessment<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Operati<strong>on</strong> of the Westside Shoppette/Gas Stati<strong>on</strong> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>Air</strong> Force Base, Albuquerque, Bernalillo County, New Mexico. August 2008.<br />

Bitner, Ludie. 2009. Pers<strong>on</strong>al communicati<strong>on</strong> between Ludie Bitner (Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>)<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Leigh Hagan (HDR|e²M) regarding NMED decisi<strong>on</strong> <strong>on</strong> ERP site (WP-26). 16<br />

December 2009.<br />

U.S. Department of Labor, Bureau of Labor Statistics (BLS). 2009. “Local Area<br />

Unemployment Rates.” Available <strong>on</strong>line: . Accessed<br />

21 October 2009<br />

City of Albuquerque. 2008. Generalized L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Map of the Albuquerque<br />

Metropolitan Area. Printed 8 July 2008. Available <strong>on</strong>line:<br />

. Accessed 19<br />

October 2009.<br />

City of Albuquerque. 2009. “Emergency Medical Services.” Available <strong>on</strong>line:<br />

. Accessed 19 October 2009.<br />

City of Albuquerque. 2009. “Police Department Area Comm<str<strong>on</strong>g>and</str<strong>on</strong>g> Locati<strong>on</strong>s.”<br />

Available <strong>on</strong>line: . Accessed<br />

19 October 2009.<br />

Department of Defense (DOD). 2008. <strong>Air</strong>field <str<strong>on</strong>g>and</str<strong>on</strong>g> Heliport Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Design.<br />

Unified Facilities Criteria (UFC) 3-260-01. 17 November 2008. Available <strong>on</strong>line:<br />

.<br />

DOD. 2010. Memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um from Dorothy Robyn (Office of the Under Secretary of<br />

Defense) regarding DOD Implementati<strong>on</strong> of Storm Water Requirements under Secti<strong>on</strong><br />

439 of the Energy Independence <str<strong>on</strong>g>and</str<strong>on</strong>g> Security Act. 19 January 2010.<br />

U.S. Department of Energy (DOE). 2009. State Carb<strong>on</strong> Dioxide Emissi<strong>on</strong>s Summary<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> New Mexico, 2005. Energy In<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> Administrati<strong>on</strong>. Available <strong>on</strong>line:<br />

. Accessed 19 October 2009.<br />

Federal Highway Administrati<strong>on</strong> (FHWA). 1980. Caltrans Noise Manual. Report<br />

FHWA/CA/TL-80/07. March 1980. Available <strong>on</strong>line:<br />

. Accessed<br />

30 October 2008.<br />

Federal Interagency Committee <strong>on</strong> Noise (FICON). 1992. Federal Agency Review of<br />

Selected <strong>Air</strong>port Noise Analysis Issues. August 1992.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

6-1


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

Forest City<br />

2005<br />

Google 2009<br />

Grant 1981<br />

Holmes 2009<br />

K<strong>AFB</strong><br />

undated<br />

K<strong>AFB</strong> 1997a<br />

Forest City Covingt<strong>on</strong> New Mexico, LLC. 2005. Mesa Del Sol Level A Community<br />

Master Plan. June 2005. Available <strong>on</strong>line: . Accessed 19 October 2009.<br />

Google. 2009. Google Maps Search <str<strong>on</strong>g>for</str<strong>on</strong>g> Hospitals near Albuquerque New Mexico.<br />

Available <strong>on</strong>line: . Accessed 2 December 2009.<br />

Grant, P.R. 1981. Geothermal Potential <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> L<str<strong>on</strong>g>and</str<strong>on</strong>g>s, Bernalillo County,<br />

New Mexico. S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Nati<strong>on</strong>al Laboratories. 1981.<br />

Holmes, Mark. 2009. Pers<strong>on</strong>al communicati<strong>on</strong> between Mark Holmes (Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>)<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Leigh Hagan (HDR|e²M) regarding ERP site (WP-26). 17 December 2009.<br />

K<strong>AFB</strong>. Undated. FY 2012 Military C<strong>on</strong>structi<strong>on</strong> Project Data. Project Title: C<strong>on</strong>struct<br />

Hot Cargo Pad. Project Number MHMV 073105. Form 1391. Undated.<br />

K<strong>AFB</strong>. 1997. Envir<strong>on</strong>mental Assessment of Proposed Building Demoliti<strong>on</strong> at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>Air</strong> Force Base. March 1997.<br />

K<strong>AFB</strong> 1997b K<strong>AFB</strong>. 1997. Management Acti<strong>on</strong> Plan, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base. December 1997.<br />

K<strong>AFB</strong> 1999<br />

K<strong>AFB</strong> 2001<br />

K<strong>AFB</strong> 2002<br />

K<strong>AFB</strong>. 1999. Polluti<strong>on</strong> Preventi<strong>on</strong> Management Acti<strong>on</strong> Plan, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base.<br />

July 1999.<br />

K<strong>AFB</strong>. 2001. Spill Preventi<strong>on</strong> C<strong>on</strong>trol <str<strong>on</strong>g>and</str<strong>on</strong>g> Countermeasures Plan, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force<br />

Base. January 2001.<br />

K<strong>AFB</strong>. 2002. General Plan, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, New Mexico.<br />

K<strong>AFB</strong> 2003 K<strong>AFB</strong>. 2003. <str<strong>on</strong>g>Final</str<strong>on</strong>g> Envir<strong>on</strong>mental Assessment <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base 2002<br />

C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Demoliti<strong>on</strong> Projects. January 2003.<br />

K<strong>AFB</strong> 2004a<br />

K<strong>AFB</strong> 2004b<br />

K<strong>AFB</strong> 2007<br />

K<strong>AFB</strong> 2008a<br />

K<strong>AFB</strong>. 2004. <str<strong>on</strong>g>Final</str<strong>on</strong>g> Surveying Report <str<strong>on</strong>g>for</str<strong>on</strong>g> Mountain Plover <str<strong>on</strong>g>and</str<strong>on</strong>g> Gray Vireo Populati<strong>on</strong>s<br />

at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. February 2004.<br />

K<strong>AFB</strong>. 2004. Hazardous Waste Management Plan, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base.<br />

December 2004.<br />

K<strong>AFB</strong>. 2007. Integrated Natural Resources Management Plan <str<strong>on</strong>g>for</str<strong>on</strong>g> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force<br />

Base. July 2007.<br />

K<strong>AFB</strong>. 2008. Ecological <str<strong>on</strong>g>and</str<strong>on</strong>g> Human Health Risk Assessment <str<strong>on</strong>g>for</str<strong>on</strong>g> Solid Waste<br />

Management Unit WP 26, Sewage Lago<strong>on</strong>s, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base. November 2008.<br />

Available <strong>on</strong>line: .<br />

K<strong>AFB</strong> 2008b K<strong>AFB</strong>. 2008. General Plan, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, New Mexico. 2008.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

6-2


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

K<strong>AFB</strong> 2008c<br />

K<strong>AFB</strong> 2008d<br />

K<strong>AFB</strong> 2008e<br />

K<strong>AFB</strong>. 2008. Hazardous Material Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Resp<strong>on</strong>se Plan. 15 May<br />

2008.<br />

K<strong>AFB</strong>. 2008. “Plant List of Species Known to Occur <strong>on</strong> Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base.”<br />

Based <strong>on</strong> Appendix A: plant species known or expected to occur <strong>on</strong> K<strong>AFB</strong>, In: Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>AFB</strong> fish <str<strong>on</strong>g>and</str<strong>on</strong>g> wildlife plan (1996). April 2008.<br />

K<strong>AFB</strong>. 2008. Resource C<strong>on</strong>servati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Recovery Act Facility Investigati<strong>on</strong> Work<br />

Plan <str<strong>on</strong>g>for</str<strong>on</strong>g> Solid Waste Management Unit WP 26, Sewage Lago<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> Golf Course Main<br />

P<strong>on</strong>d, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base. April 2008. Available <strong>on</strong>line:<br />

.<br />

K<strong>AFB</strong> 2009a K<strong>AFB</strong>. 2009. <str<strong>on</strong>g>Final</str<strong>on</strong>g> 2008 Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base Emissi<strong>on</strong>s Inventory. June 2009.<br />

K<strong>AFB</strong> 2009b<br />

Kitt 2010<br />

K<strong>AFB</strong>. 2009. “Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base Units. New Mexico Veterans Affairs Health<br />

Care System.” Available <strong>on</strong>line: .<br />

Accessed 19 October 2009.<br />

Kitt, Steve. 2010. Pers<strong>on</strong>al communicati<strong>on</strong> from Steve Kitt (Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>) to Jeffrey<br />

McCann (HDR|e²M) regarding capacity of the Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill <str<strong>on</strong>g>and</str<strong>on</strong>g> debris sent<br />

from Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> to Rio Rancho l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill. 12 January 2010.<br />

Krieg 2010 Krieg, Sheryl. 2010. Pers<strong>on</strong>al communicati<strong>on</strong> from Sheryl Krieg (Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>) to J.<br />

Barry Shupe (Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>) regarding Missi<strong>on</strong> Partners at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. 20 April<br />

2010.<br />

NMED<br />

undated<br />

NMRPTC<br />

1999<br />

NRCS 2009<br />

Segura 2010<br />

U.S. Census<br />

Bureau 2000<br />

New Mexico Envir<strong>on</strong>ment Department (NMED). Undated. Amended Public Notice Of<br />

Filing Of Applicati<strong>on</strong> By Waste Management Of New Mexico, Inc. For A Solid Waste<br />

(Municipal/Special) L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill Permit Renewal And Modificati<strong>on</strong> Including A Vertical<br />

Expansi<strong>on</strong> At The Rio Rancho L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill In Rio Rancho, New Mexico. Undated.<br />

Available <strong>on</strong>line:<br />

. Accessed 13<br />

January 2010.<br />

New Mexico Rare Plant Technical Council (NMRPTC). 1999. “New Mexico Rare<br />

Plants.” Albuquerque, NM: New Mexico Rare Plants Home Page. Latest update: 4<br />

September 2009. Available <strong>on</strong>line: . Accessed October<br />

2009.<br />

Natural Resources C<strong>on</strong>servati<strong>on</strong> Service (NRCS). 2009. “Web Soil Survey.”<br />

Available <strong>on</strong>line: .<br />

Accessed 6 May 2009.<br />

Segura, Chris. 2010. Pers<strong>on</strong>al communicati<strong>on</strong> from Chris Segura (Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>) to<br />

Jeffrey McCann (HDR|e²M) regarding wastewater flow at Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>. 13 January<br />

2010.<br />

U.S. Census Bureau. 2000. “American Fact Finder.” Available <strong>on</strong>line:<br />

. Accessed 21 October 2009.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

6-3


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

U.S. Census<br />

Bureau 2008<br />

USACE 1987<br />

USACE 2007<br />

USACE 2006<br />

U.S. Census Bureau. 2008. “American Fact Finder.” Available <strong>on</strong>line:<br />

.<br />

Accessed 21 October 2009.<br />

U.S. Army Corps of Engineers (USACE). 1987. Corps of Engineers Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s<br />

Delineati<strong>on</strong> Manual. Technical report Y-97-1. January 1987.<br />

USACE. 2007. Comprehensive Site Evaluati<strong>on</strong> Phase I Report: <strong>Air</strong> Force Military<br />

Muniti<strong>on</strong>s Resp<strong>on</strong>se Program, Volumes I <str<strong>on</strong>g>and</str<strong>on</strong>g> II. Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force Base, Albuquerque,<br />

New Mexico. Omaha District. February 2007.<br />

USACE. 2006. Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g> Inventory <str<strong>on</strong>g>and</str<strong>on</strong>g> Delineati<strong>on</strong>, <str<strong>on</strong>g>Final</str<strong>on</strong>g> Report, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>Air</strong> Force<br />

Base, Albuquerque, New Mexico. December 2006.<br />

USAF 1996 U.S. <strong>Air</strong> Force (USAF). 1996. Facility Requirements. <strong>Air</strong> Force H<str<strong>on</strong>g>and</str<strong>on</strong>g>book (AFH) 32-<br />

1084. 1 September 1996. Available <strong>on</strong>line:<br />

.<br />

USAF 1998a USAF. 1998. L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Planning. <strong>Air</strong> Force Pamphlet 32-1010 (AFPAM32-1010). 1<br />

November 1998. Available <strong>on</strong>line: .<br />

Accessed 19 October<br />

2009.<br />

USAF 1998b<br />

USAF. 1998. Operati<strong>on</strong>al Risk Management (ORM) Guidelines <str<strong>on</strong>g>and</str<strong>on</strong>g> Tools. <strong>Air</strong> Force<br />

Pamphlet (AFPAM) 91-215. 1 July 1998<br />

USAF 1999 USAF. 1999. AICUZ Program Managers’ Guide. <strong>Air</strong> Force H<str<strong>on</strong>g>and</str<strong>on</strong>g>book (AFH) 32-<br />

7084. 1 March 1999. Available <strong>on</strong>line:<br />

. Accessed 22 October 2009.<br />

USAF 2004<br />

USAF 2009<br />

USEPA 1971<br />

USEPA 1974<br />

USAF. 2004. U.S. <strong>Air</strong> Force Muniti<strong>on</strong>s Facilities St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards Guide. Volumes I <str<strong>on</strong>g>and</str<strong>on</strong>g> II.<br />

31 May 2004. Available <strong>on</strong>line:<br />

.<br />

USAF. 2009. Explosives Safety St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards. <strong>Air</strong> Force Manual (AFMAN) 91-201 <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

<strong>Air</strong> Force Guidance Memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um to AFMAN 91-201. Memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um dated 19 October<br />

2009. AFMAN 91-201 dated 17 November 2008. Available <strong>on</strong>line:<br />

.<br />

U.S. Envir<strong>on</strong>mental Protecti<strong>on</strong> Agency (USEPA). 1971. Noise from C<strong>on</strong>structi<strong>on</strong><br />

Equipment <str<strong>on</strong>g>and</str<strong>on</strong>g> Operati<strong>on</strong>s, Building Equipment, <str<strong>on</strong>g>and</str<strong>on</strong>g> Home Appliances. 31 December<br />

1971.<br />

USEPA. 1974. In<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> <strong>on</strong> Levels of Envir<strong>on</strong>mental Noise Requisite to Protect<br />

Public Health <str<strong>on</strong>g>and</str<strong>on</strong>g> Welfare with an Adequate Margin of Safety. Publicati<strong>on</strong> No. 550/9-<br />

74-004, Washingt<strong>on</strong> D.C. March 1974.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

6-4


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

USEPA 1996<br />

USEPA 2009a<br />

USEPA 2009b<br />

USEPA <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

USACE 2007a<br />

USEPA <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

USACE<br />

2007b<br />

USFWS<br />

undated<br />

USGS 2009<br />

Voynick 1997<br />

Waste<br />

Management<br />

2010<br />

Wendorf <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Reed 1955<br />

USEPA. 1996. “Approval <str<strong>on</strong>g>and</str<strong>on</strong>g> Promulgati<strong>on</strong> of Implementati<strong>on</strong> Plans <str<strong>on</strong>g>and</str<strong>on</strong>g> Designati<strong>on</strong><br />

of Areas <str<strong>on</strong>g>for</str<strong>on</strong>g> <strong>Air</strong> Quality Planning Purposes.” Available <strong>on</strong>line:<br />

. Accessed<br />

19 October 2009.<br />

USEPA. 2009. “Nati<strong>on</strong>al Ambient <strong>Air</strong> Quality St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards.” Available <strong>on</strong>line:<br />

. Accessed 21 October 2009.<br />

USEPA. 2009. USEPA – <strong>Air</strong>Data NET Tier Report <str<strong>on</strong>g>for</str<strong>on</strong>g> The Albuquerque-Mid Rio<br />

Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Intrastate (AMRGI) <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong> (AQCR). Available <strong>on</strong>line:<br />

. Accessed 19 October 2009.<br />

USEPA <str<strong>on</strong>g>and</str<strong>on</strong>g> USACE. 2007. Clean Water Act Jurisdicti<strong>on</strong> Following the U.S. Supreme<br />

Court’s Decisi<strong>on</strong> in Rapanos v. United States & Carabell v. United States. 5 June 2007.<br />

USEPA <str<strong>on</strong>g>and</str<strong>on</strong>g> USACE. Memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um <str<strong>on</strong>g>for</str<strong>on</strong>g> Director of Civil Works <str<strong>on</strong>g>and</str<strong>on</strong>g> US EPA Regi<strong>on</strong>al<br />

Administrators. Subject: U.S. Envir<strong>on</strong>mental Protecti<strong>on</strong> Agency (EPA) <str<strong>on</strong>g>and</str<strong>on</strong>g> U.S. Army<br />

Corps of Engineers (Corps) Coordinati<strong>on</strong> <strong>on</strong> Jurisdicti<strong>on</strong>al Determinati<strong>on</strong>s (JDs) under<br />

Clean Water Act (CWA) Secti<strong>on</strong> 404 in Light of the SWANCC <str<strong>on</strong>g>and</str<strong>on</strong>g> Rapanos Supreme<br />

Court Decisi<strong>on</strong>s. 5 June 2007.<br />

U.S. Fish <str<strong>on</strong>g>and</str<strong>on</strong>g> Wildlife Service (USFWS). Undated. “New Mexico Ecological Services<br />

Field Office recommendati<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> project proposals involving Communicati<strong>on</strong> Towers.”<br />

Available <strong>on</strong>line:<br />

. Accessed 10<br />

January 2010.<br />

U.S. Geological Survey (USGS). 2009. USGS Seismic Hazards Maps. Available<br />

<strong>on</strong>line: . Accessed 20 October 2009.<br />

Voynick, S.M. 1997. New Mexico Rockhounding: A Guide to Minerals, Gemst<strong>on</strong>es,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> Fossils. Mountain Press Publishing Co., Missoula, M<strong>on</strong>tana. 1997.<br />

Waste Management. 2010. “The Rio Rancho L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill: L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill Permit Executive<br />

Summary.” Available <strong>on</strong>line:<br />

. Accessed 13 January<br />

2010.<br />

Wendorf, F. <str<strong>on</strong>g>and</str<strong>on</strong>g> E.K. Reed. 1955. An Alternate Rec<strong>on</strong>structi<strong>on</strong> Prehistory. El Palacio,<br />

62:131-173. 1955.<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

6-5


<str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> Addressing C<strong>on</strong>structi<strong>on</strong>, Operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Maintenance of a Hot Cargo Pad<br />

THIS PAGE INTENTIONALLY LEFT BLANK<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong>, NM January 2011<br />

6-6


APPENDIX A<br />

APPLICABLE LAWS, REGULATIONS, POLICIES, AND PLANNING CRITERIA


Appendix A<br />

Applicable Laws, Regulati<strong>on</strong>s, Policies, <str<strong>on</strong>g>and</str<strong>on</strong>g> Planning Criteria<br />

When c<strong>on</strong>sidering the affected envir<strong>on</strong>ment, the various physical, biological, ec<strong>on</strong>omic, <str<strong>on</strong>g>and</str<strong>on</strong>g> social<br />

envir<strong>on</strong>mental factors must be c<strong>on</strong>sidered. In additi<strong>on</strong> to the Nati<strong>on</strong>al Envir<strong>on</strong>mental Policy Act (NEPA),<br />

there are other envir<strong>on</strong>mental laws as well as Executive Orders (EOs) to be c<strong>on</strong>sidered when preparing<br />

envir<strong>on</strong>mental analyses. These laws are summarized below.<br />

NOTE: This is not a complete list of all applicable laws, regulati<strong>on</strong>s, policies, <str<strong>on</strong>g>and</str<strong>on</strong>g> planning criteria<br />

potentially applicable to documents, however, it does provide a general summary <str<strong>on</strong>g>for</str<strong>on</strong>g> use as a reference.<br />

General<br />

EO 13423, Strengthening Federal Envir<strong>on</strong>mental, Energy, <str<strong>on</strong>g>and</str<strong>on</strong>g> Transportati<strong>on</strong> Management (January 24,<br />

2007 [superseding EO 13123 <str<strong>on</strong>g>and</str<strong>on</strong>g> EO 13149]) directs Federal agencies c<strong>on</strong>duct their activities under the<br />

law in support of their respective missi<strong>on</strong>s in an envir<strong>on</strong>mentally, ec<strong>on</strong>omically <str<strong>on</strong>g>and</str<strong>on</strong>g> fiscally sound,<br />

integrated, c<strong>on</strong>tinuously improving, efficient, <str<strong>on</strong>g>and</str<strong>on</strong>g> sustainable manner. EO 13423 sets several Federal<br />

energy <str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>mental management requirements in areas such as energy efficiency, greenhouse gas<br />

reducti<strong>on</strong>, renewable power, building per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance, water c<strong>on</strong>servati<strong>on</strong>, alternative fuel/hybrid vehicles,<br />

petroleum c<strong>on</strong>servati<strong>on</strong>, alternative fuel, polluti<strong>on</strong> preventi<strong>on</strong>, envir<strong>on</strong>mentally sound procurement, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

electr<strong>on</strong>ics management.<br />

EO 13514, Federal Leadership in Envir<strong>on</strong>mental, Energy, <str<strong>on</strong>g>and</str<strong>on</strong>g> Ec<strong>on</strong>omic Per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance (October 5, 2009)<br />

directs Federal agencies to improve water use efficiency <str<strong>on</strong>g>and</str<strong>on</strong>g> management; implement high per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance<br />

sustainable Federal building design, c<strong>on</strong>structi<strong>on</strong>, operati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> management; <str<strong>on</strong>g>and</str<strong>on</strong>g> advance regi<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

local integrated planning by identifying <str<strong>on</strong>g>and</str<strong>on</strong>g> analyzing impacts from energy usage <str<strong>on</strong>g>and</str<strong>on</strong>g> alternative energy<br />

sources. EO 13514 also directs Federal agencies to prepare <str<strong>on</strong>g>and</str<strong>on</strong>g> implement a Strategic Sustainability<br />

Per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance Plan to manage its greenhouse gas emissi<strong>on</strong>s, water use, polluti<strong>on</strong> preventi<strong>on</strong>, regi<strong>on</strong>al<br />

development <str<strong>on</strong>g>and</str<strong>on</strong>g> transportati<strong>on</strong> planning, <str<strong>on</strong>g>and</str<strong>on</strong>g> sustainable building design; <str<strong>on</strong>g>and</str<strong>on</strong>g> promote sustainability in<br />

its acquisiti<strong>on</strong> of goods <str<strong>on</strong>g>and</str<strong>on</strong>g> services. Secti<strong>on</strong> 2(g) requires new c<strong>on</strong>structi<strong>on</strong>, major renovati<strong>on</strong>, or repair<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> alterati<strong>on</strong> of buildings to comply with the Guiding Principles <str<strong>on</strong>g>for</str<strong>on</strong>g> Federal Leadership in High<br />

Per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance <str<strong>on</strong>g>and</str<strong>on</strong>g> Sustainable Buildings. The CEQ regulati<strong>on</strong>s at 40 CFR 1502.16(e) direct agencies to<br />

c<strong>on</strong>sider the energy requirements <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>servati<strong>on</strong> potential of various alternatives <str<strong>on</strong>g>and</str<strong>on</strong>g> mitigati<strong>on</strong><br />

measures.<br />

Noise<br />

The <strong>Air</strong> Installati<strong>on</strong> Compatible Use Z<strong>on</strong>e (AICUZ) Program, (AFI 32-7063), provides guidance to air<br />

bases <str<strong>on</strong>g>and</str<strong>on</strong>g> local communities in planning l<str<strong>on</strong>g>and</str<strong>on</strong>g> uses compatible with airfield operati<strong>on</strong>s. The AICUZ<br />

program describes existing aircraft noise <str<strong>on</strong>g>and</str<strong>on</strong>g> flight safety z<strong>on</strong>es <strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> near USAF installati<strong>on</strong>s.<br />

A Memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um issued by the Under Secretary of Defense <strong>on</strong> June 16, 2009, directed all DOD<br />

comp<strong>on</strong>ents to use the 80 Day-Night A-Weighted (DNL) noise c<strong>on</strong>tour to identify populati<strong>on</strong>s at the most<br />

risk of potential hearing loss in all future envir<strong>on</strong>mental impact statements. Per the Memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um, DOD<br />

comp<strong>on</strong>ents will use as a part of the analysis, as appropriate, a calculati<strong>on</strong> of the Potential Hearing Loss<br />

(PHL) of the at risk populati<strong>on</strong>. The PHL methodology is defined in U.S. Envir<strong>on</strong>mental Protecti<strong>on</strong><br />

Agency (USEPA) Report No. 44/9-82-105, Guidelines <str<strong>on</strong>g>for</str<strong>on</strong>g> Noise Impact Analysis.<br />

A-1


L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use<br />

L<str<strong>on</strong>g>and</str<strong>on</strong>g> use planning in the USAF is guided by L<str<strong>on</strong>g>and</str<strong>on</strong>g> Use Planning Bulletin, Base Comprehensive Planning<br />

(HQ USAF/LEEVX, August 1, 1986). This document provides <str<strong>on</strong>g>for</str<strong>on</strong>g> the use of 12 basic l<str<strong>on</strong>g>and</str<strong>on</strong>g> use types<br />

found <strong>on</strong> a USAF installati<strong>on</strong>. In additi<strong>on</strong>, l<str<strong>on</strong>g>and</str<strong>on</strong>g> use guidelines established by the U.S. Department of<br />

Housing <str<strong>on</strong>g>and</str<strong>on</strong>g> Urban Development (HUD) <str<strong>on</strong>g>and</str<strong>on</strong>g> based <strong>on</strong> findings of the Federal Interagency Committee <strong>on</strong><br />

Noise (FICON) are used to recommend acceptable levels of noise exposure <str<strong>on</strong>g>for</str<strong>on</strong>g> l<str<strong>on</strong>g>and</str<strong>on</strong>g> use.<br />

<strong>Air</strong> Quality<br />

The Clean <strong>Air</strong> Act (CAA) of 1970, <str<strong>on</strong>g>and</str<strong>on</strong>g> Amendments of 1977 <str<strong>on</strong>g>and</str<strong>on</strong>g> 1990, recognizes that increases in air<br />

polluti<strong>on</strong> result in danger to public health <str<strong>on</strong>g>and</str<strong>on</strong>g> welfare. To protect <str<strong>on</strong>g>and</str<strong>on</strong>g> enhance the quality of the Nati<strong>on</strong>’s<br />

air resources, the CAA authorizes the U.S. Envir<strong>on</strong>mental Protecti<strong>on</strong> Agency (USEPA) to set six Nati<strong>on</strong>al<br />

Ambient <strong>Air</strong> Quality St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards (NAAQSs) which regulate carb<strong>on</strong> m<strong>on</strong>oxide, lead, nitrogen dioxide,<br />

oz<strong>on</strong>e, sulfur dioxide, <str<strong>on</strong>g>and</str<strong>on</strong>g> particulate matter polluti<strong>on</strong> emissi<strong>on</strong>s. The CAA seeks to reduce or eliminate<br />

the creati<strong>on</strong> of pollutants at their source, <str<strong>on</strong>g>and</str<strong>on</strong>g> designates this resp<strong>on</strong>sibility to state <str<strong>on</strong>g>and</str<strong>on</strong>g> local governments.<br />

States are directed to utilize financial <str<strong>on</strong>g>and</str<strong>on</strong>g> technical assistance as well as leadership from the Federal<br />

government to develop implementati<strong>on</strong> plans to achieve NAAQS. Geographic areas are officially<br />

designated by the USEPA as being in attainment or n<strong>on</strong>attainment to pollutants in relati<strong>on</strong> to their<br />

compliance with NAAQS. Geographic regi<strong>on</strong>s established <str<strong>on</strong>g>for</str<strong>on</strong>g> air quality planning purposes are<br />

designated as <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong>s (AQCRs). Pollutant c<strong>on</strong>centrati<strong>on</strong> levels are measured at<br />

designated m<strong>on</strong>itoring stati<strong>on</strong>s within the AQCR. An area with insufficient m<strong>on</strong>itoring data is designated<br />

as unclassifiable. Secti<strong>on</strong> 309 of the CAA authorizes USEPA to review <str<strong>on</strong>g>and</str<strong>on</strong>g> comment <strong>on</strong> impact<br />

statements prepared by other agencies.<br />

An agency should c<strong>on</strong>sider what effect an acti<strong>on</strong> might have <strong>on</strong> NAAQS due to short-term increases in air<br />

polluti<strong>on</strong> during c<strong>on</strong>structi<strong>on</strong> as well as l<strong>on</strong>g-term increases resulting from changes in traffic patterns.<br />

For acti<strong>on</strong>s in attainment areas, a Federal agency could also be subject to USEPA’s Preventi<strong>on</strong> of<br />

Significant Deteriorati<strong>on</strong> (PSD) regulati<strong>on</strong>s. These regulati<strong>on</strong>s apply to new major stati<strong>on</strong>ary sources <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

modificati<strong>on</strong>s to such sources. Although few agency facilities will actually emit pollutants, increases in<br />

polluti<strong>on</strong> can result from a change in traffic patterns or volume. Secti<strong>on</strong> 118 of the CAA waives Federal<br />

immunity from complying with the CAA <str<strong>on</strong>g>and</str<strong>on</strong>g> states all Federal agencies will comply with all Federal- <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

state-approved requirements.<br />

The General C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity Rule requires that any Federal acti<strong>on</strong> meet the requirements of a State<br />

Implementati<strong>on</strong> Plan (SIP) or Federal Implementati<strong>on</strong> Plan. More specifically, CAA c<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity is<br />

ensured when a Federal acti<strong>on</strong> does not cause a new violati<strong>on</strong> of the NAAQS; c<strong>on</strong>tribute to an increase in<br />

the frequency or severity of violati<strong>on</strong>s of NAAQS; or delay the timely attainment of any NAAQS, interim<br />

progress milest<strong>on</strong>es, or other milest<strong>on</strong>es toward achieving compliance with the NAAQS.<br />

The General C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity Rule applies <strong>on</strong>ly to acti<strong>on</strong>s in n<strong>on</strong>attainment or maintenance areas <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

c<strong>on</strong>siders both direct <str<strong>on</strong>g>and</str<strong>on</strong>g> indirect emissi<strong>on</strong>s. The rule applies <strong>on</strong>ly to Federal acti<strong>on</strong>s that are c<strong>on</strong>sidered<br />

“regi<strong>on</strong>ally significant” or where the total emissi<strong>on</strong>s from the acti<strong>on</strong> meet or exceed the de minimis<br />

thresholds presented in 40 CFR 93.153. An acti<strong>on</strong> is regi<strong>on</strong>ally significant when the total n<strong>on</strong>attainment<br />

pollutant emissi<strong>on</strong>s exceed 10 percent of the AQCR’s total emissi<strong>on</strong>s inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> that n<strong>on</strong>attainment<br />

pollutant. If a Federal acti<strong>on</strong> does not meet or exceed the de minimis thresholds <str<strong>on</strong>g>and</str<strong>on</strong>g> is not c<strong>on</strong>sidered<br />

regi<strong>on</strong>ally significant, then a full C<strong>on</strong><str<strong>on</strong>g>for</str<strong>on</strong>g>mity Determinati<strong>on</strong> is not required.<br />

A-2


Safety<br />

AFI 91-202, USAF Mishap Preventi<strong>on</strong> Program, implements <strong>Air</strong> Force Policy Directive (AFPD) 91-2,<br />

Safety Programs. It establishes mishap preventi<strong>on</strong> program requirements (including the Bird/Wildlife<br />

<strong>Air</strong>craft Strike Hazard [BASH] Program), assigns resp<strong>on</strong>sibilities <str<strong>on</strong>g>for</str<strong>on</strong>g> program elements, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>tains<br />

program management in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong>. This instructi<strong>on</strong> applies to all USAF pers<strong>on</strong>nel.<br />

AFI 91-301, <strong>Air</strong> Force Occupati<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g> Envir<strong>on</strong>mental Safety, Fire Protecti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Health (AFOSH)<br />

Program, implements AFPD 91-3, Occupati<strong>on</strong>al Safety <str<strong>on</strong>g>and</str<strong>on</strong>g> Health, by outlining the AFOSH Program.<br />

The purpose of the AFOSH Program is to minimize loss of USAF resources <str<strong>on</strong>g>and</str<strong>on</strong>g> to protect USAF<br />

pers<strong>on</strong>nel from occupati<strong>on</strong>al deaths, injuries, or illnesses by managing risks. In c<strong>on</strong>juncti<strong>on</strong> with the<br />

USAF Mishap Preventi<strong>on</strong> Program, these st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards ensure all USAF workplaces meet Federal safety <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

health requirements. This instructi<strong>on</strong> applies to all USAF activities.<br />

Geological Resources<br />

Recognizing that milli<strong>on</strong>s of acres per year of prime farml<str<strong>on</strong>g>and</str<strong>on</strong>g> are lost to development, C<strong>on</strong>gress passed<br />

the Farml<str<strong>on</strong>g>and</str<strong>on</strong>g> Protecti<strong>on</strong> Policy Act to minimize the extent to which Federal programs c<strong>on</strong>tribute to the<br />

unnecessary <str<strong>on</strong>g>and</str<strong>on</strong>g> irreversible c<strong>on</strong>versi<strong>on</strong> of farml<str<strong>on</strong>g>and</str<strong>on</strong>g> (7 CFR Part 658). Prime farml<str<strong>on</strong>g>and</str<strong>on</strong>g> are soils that<br />

have a combinati<strong>on</strong> of soil <str<strong>on</strong>g>and</str<strong>on</strong>g> l<str<strong>on</strong>g>and</str<strong>on</strong>g>scape properties that make them highly suitable <str<strong>on</strong>g>for</str<strong>on</strong>g> cropl<str<strong>on</strong>g>and</str<strong>on</strong>g>, such as<br />

high inherent fertility, good water-holding capacity, deep or thick effective rooting z<strong>on</strong>es, <str<strong>on</strong>g>and</str<strong>on</strong>g> are not<br />

subject to periodic flooding. Under the Farml<str<strong>on</strong>g>and</str<strong>on</strong>g> Protecti<strong>on</strong> Policy Act, agencies are encouraged to<br />

c<strong>on</strong>serve prime or unique farml<str<strong>on</strong>g>and</str<strong>on</strong>g>s when alternatives are practicable. Some activities that are not subject<br />

to the Farml<str<strong>on</strong>g>and</str<strong>on</strong>g> Protecti<strong>on</strong> Policy Act include Federal permitting <str<strong>on</strong>g>and</str<strong>on</strong>g> licensing, projects <strong>on</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g> already<br />

in urban development or used <str<strong>on</strong>g>for</str<strong>on</strong>g> water storage, c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> nati<strong>on</strong>al defense purposes, or<br />

c<strong>on</strong>structi<strong>on</strong> of new minor sec<strong>on</strong>dary structures such as a garage or storage shed.<br />

Water Resources<br />

The Clean Water Act (CWA) of 1977 is an amendment to the Federal Water Polluti<strong>on</strong> C<strong>on</strong>trol Act of<br />

1972, is administered by USEPA, <str<strong>on</strong>g>and</str<strong>on</strong>g> sets the basic structure <str<strong>on</strong>g>for</str<strong>on</strong>g> regulating discharges of pollutants into<br />

U.S. waters. The CWA requires USEPA to establish water quality st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> specified c<strong>on</strong>taminants<br />

in surface waters <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g>bids the discharge of pollutants from a point source into navigable waters without<br />

a Nati<strong>on</strong>al Pollutant Discharge Eliminati<strong>on</strong> System (NPDES) permit. NPDES permits are issued by<br />

USEPA or the appropriate state if it has assumed resp<strong>on</strong>sibility. Secti<strong>on</strong> 404 of the CWA establishes a<br />

Federal program to regulate the discharge of dredge <str<strong>on</strong>g>and</str<strong>on</strong>g> fill material into waters of the United States.<br />

Secti<strong>on</strong> 404 permits are issued by the U.S. Army Corps of Engineers (USACE). Waters of the United<br />

States include interstate <str<strong>on</strong>g>and</str<strong>on</strong>g> intrastate lakes, rivers, streams, <str<strong>on</strong>g>and</str<strong>on</strong>g> wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s that are used <str<strong>on</strong>g>for</str<strong>on</strong>g> commerce,<br />

recreati<strong>on</strong>, industry, sources of fish, <str<strong>on</strong>g>and</str<strong>on</strong>g> other purposes. The objective of the CWA is to restore <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

maintain the chemical, physical, <str<strong>on</strong>g>and</str<strong>on</strong>g> biological integrity of the Nati<strong>on</strong>’s waters. Each agency should<br />

c<strong>on</strong>sider the impact <strong>on</strong> water quality from acti<strong>on</strong>s such as the discharge of dredge or fill material into U.S.<br />

waters from c<strong>on</strong>structi<strong>on</strong>, or the discharge of pollutants as a result of facility occupati<strong>on</strong>.<br />

Secti<strong>on</strong> 303(d) of the CWA requires states <str<strong>on</strong>g>and</str<strong>on</strong>g> USEPA to identify waters not meeting state water-quality<br />

st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>and</str<strong>on</strong>g> to develop Total Maximum Daily Loads (TMDLs). A TMDL is the maximum amount of a<br />

pollutant that a waterbody can receive <str<strong>on</strong>g>and</str<strong>on</strong>g> still be in compliance with state water-quality st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards. After<br />

determining TMDLs <str<strong>on</strong>g>for</str<strong>on</strong>g> impaired waters, states are required to identify all point <str<strong>on</strong>g>and</str<strong>on</strong>g> n<strong>on</strong>point sources of<br />

polluti<strong>on</strong> in a watershed that are c<strong>on</strong>tributing to the impairment <str<strong>on</strong>g>and</str<strong>on</strong>g> to develop an implementati<strong>on</strong> plan<br />

that will allocate reducti<strong>on</strong>s to each source to meet the state st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards. The TMDL program is currently<br />

the Nati<strong>on</strong>’s most comprehensive attempt to restore <str<strong>on</strong>g>and</str<strong>on</strong>g> improve water quality. The TMDL program does<br />

not explicitly require the protecti<strong>on</strong> of riparian areas. However, implementati<strong>on</strong> of the TMDL plans<br />

A-3


typically calls <str<strong>on</strong>g>for</str<strong>on</strong>g> restorati<strong>on</strong> of riparian areas as <strong>on</strong>e of the required management measures <str<strong>on</strong>g>for</str<strong>on</strong>g> achieving<br />

reducti<strong>on</strong>s in n<strong>on</strong>point source pollutant loadings.<br />

The USEPA issued a <str<strong>on</strong>g>Final</str<strong>on</strong>g> Rule <str<strong>on</strong>g>for</str<strong>on</strong>g> the CWA c<strong>on</strong>cerning technology-based Effluent Limitati<strong>on</strong>s<br />

Guidelines <str<strong>on</strong>g>and</str<strong>on</strong>g> New Source Per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> the C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Development point source<br />

category. All NPDES storm water permits issued by the USEPA or states must incorporate requirements<br />

established in the <str<strong>on</strong>g>Final</str<strong>on</strong>g> Rule. As of February 1, 2010 all new c<strong>on</strong>structi<strong>on</strong> (or demoliti<strong>on</strong>) sites that<br />

disturb 1 acre or more of l<str<strong>on</strong>g>and</str<strong>on</strong>g> are required to meet the n<strong>on</strong>-numeric effluent limitati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> design,<br />

install, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain effective erosi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> sedimentati<strong>on</strong> c<strong>on</strong>trols, which include:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

C<strong>on</strong>trol storm water volume <str<strong>on</strong>g>and</str<strong>on</strong>g> velocity to minimize erosi<strong>on</strong><br />

C<strong>on</strong>trol storm water discharges including both peak flow rates <str<strong>on</strong>g>and</str<strong>on</strong>g> total storm water volume<br />

Minimize the amount of soil exposed during c<strong>on</strong>structi<strong>on</strong> activities<br />

Minimize the disturbance of steep slopes<br />

Minimize sediment discharges from the site using c<strong>on</strong>trols that address factors such as the<br />

amount, frequency, intensity <str<strong>on</strong>g>and</str<strong>on</strong>g> durati<strong>on</strong> of precipitati<strong>on</strong>, the nature of resulting storm water<br />

runoff, <str<strong>on</strong>g>and</str<strong>on</strong>g> soil characteristics, including the range of soil particle sizes expected to be present <strong>on</strong><br />

the site<br />

Provide <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain natural buffers around surface waters, direct storm water to vegetated areas<br />

to increase sediment removal <str<strong>on</strong>g>and</str<strong>on</strong>g> maximize storm water infiltrati<strong>on</strong> where feasible<br />

Minimize erosi<strong>on</strong> at outlets <str<strong>on</strong>g>and</str<strong>on</strong>g> downstream channel <str<strong>on</strong>g>and</str<strong>on</strong>g> stream bank erosi<strong>on</strong><br />

Minimize soil compacti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> preserve topsoil where feasible.<br />

In additi<strong>on</strong>, c<strong>on</strong>structi<strong>on</strong> site owners <str<strong>on</strong>g>and</str<strong>on</strong>g> operators that disturb <strong>on</strong>e or more acres of l<str<strong>on</strong>g>and</str<strong>on</strong>g> are required to<br />

use BMPs to ensure that soil disturbed during c<strong>on</strong>structi<strong>on</strong> activities does not pollute nearby water bodies.<br />

Under the <str<strong>on</strong>g>Final</str<strong>on</strong>g> Rule <str<strong>on</strong>g>for</str<strong>on</strong>g> the CWA, USEPA is promulgating a series of n<strong>on</strong>-numeric effluent limitati<strong>on</strong>s,<br />

as well as a numeric effluent limitati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> the pollutant turbidity. USEPA is phasing in the numeric<br />

effluent limitati<strong>on</strong> over 4 years to allow permitting authorities adequate time to develop m<strong>on</strong>itoring<br />

requirements <str<strong>on</strong>g>and</str<strong>on</strong>g> to allow the regulated community time to prepare <str<strong>on</strong>g>for</str<strong>on</strong>g> compliance with the numeric<br />

effluent limitati<strong>on</strong>. Effective August 1, 2011, c<strong>on</strong>structi<strong>on</strong> activities disturbing a total of 20 or more acres<br />

at <strong>on</strong>e time, including n<strong>on</strong>-c<strong>on</strong>tiguous l<str<strong>on</strong>g>and</str<strong>on</strong>g> disturbances that take place at the same time <str<strong>on</strong>g>and</str<strong>on</strong>g> are part of a<br />

larger comm<strong>on</strong> plan of development, must comply with the numeric effluent limitati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> turbidity in<br />

additi<strong>on</strong> to the n<strong>on</strong>-numeric effluent limitati<strong>on</strong>s. The maximum daily turbidity limitati<strong>on</strong> will be 280<br />

nephelometric turbidity units. On February 2, 2014, c<strong>on</strong>structi<strong>on</strong> site owners <str<strong>on</strong>g>and</str<strong>on</strong>g> operators that disturb<br />

10 or more acres of l<str<strong>on</strong>g>and</str<strong>on</strong>g> at <strong>on</strong>e time are required to m<strong>on</strong>itor discharges from the site <str<strong>on</strong>g>and</str<strong>on</strong>g> comply with the<br />

numeric effluent limitati<strong>on</strong>. The USEPA’s limitati<strong>on</strong>s are based <strong>on</strong> its assessment of what specific<br />

technologies can reliably achieve. Permittees can select management practices or technologies that are<br />

best suited <str<strong>on</strong>g>for</str<strong>on</strong>g> site-specific c<strong>on</strong>diti<strong>on</strong>s.<br />

Secti<strong>on</strong> 438 of the Energy Independence <str<strong>on</strong>g>and</str<strong>on</strong>g> Security Act (EISA) (42 U.S.C. Secti<strong>on</strong> 17094) establishes<br />

into law new storm water design requirements <str<strong>on</strong>g>for</str<strong>on</strong>g> Federal c<strong>on</strong>structi<strong>on</strong> projects that disturb a footprint<br />

greater than 5,000 square-feet of l<str<strong>on</strong>g>and</str<strong>on</strong>g>. EISA Secti<strong>on</strong> 438 requirements are independent of storm water<br />

requirements under the CWA. The project footprint c<strong>on</strong>sists of all horiz<strong>on</strong>tal hard surfaces <str<strong>on</strong>g>and</str<strong>on</strong>g> disturbed<br />

areas associated with the project development. Under these requirements, predevelopment site hydrology<br />

must be maintained or restored to the maximum extent technically feasible with respect to temperature,<br />

rate, volume, <str<strong>on</strong>g>and</str<strong>on</strong>g> durati<strong>on</strong> of flow. Predevelopment hydrology shall be modeled or calculated using<br />

A-4


ecognized tools <str<strong>on</strong>g>and</str<strong>on</strong>g> must include site-specific factors such as soil type, ground cover, <str<strong>on</strong>g>and</str<strong>on</strong>g> ground slope.<br />

Site design shall incorporate storm water retenti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> reuse technologies such as bioretenti<strong>on</strong> areas,<br />

permeable pavements, cisterns/recycling, <str<strong>on</strong>g>and</str<strong>on</strong>g> green roofs to the maximum extent technically feasible.<br />

Post-c<strong>on</strong>structi<strong>on</strong> analyses shall be c<strong>on</strong>ducted to evaluate the effectiveness of the as-built storm water<br />

reducti<strong>on</strong> features. As stated in a DOD memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um dated January 19, 2010, these regulati<strong>on</strong>s will be<br />

incorporated into applicable DOD Unified Facilities Criteria within 6 m<strong>on</strong>ths. Additi<strong>on</strong>al guidance is<br />

provided in the USEPA’s Technical Guidance <strong>on</strong> Implementing the Stormwater Runoff Requirements <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Federal Projects under Secti<strong>on</strong> 438 of the Energy Independence <str<strong>on</strong>g>and</str<strong>on</strong>g> Security Act.<br />

The Coastal Z<strong>on</strong>e Management Act (CZMA) of 1972 declares a nati<strong>on</strong>al policy to preserve, protect, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

develop, <str<strong>on</strong>g>and</str<strong>on</strong>g>, where possible, restore or enhance the resources of the Nati<strong>on</strong>’s coastal z<strong>on</strong>e. The coastal<br />

z<strong>on</strong>e refers to the coastal waters <str<strong>on</strong>g>and</str<strong>on</strong>g> the adjacent shorelines including isl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, transiti<strong>on</strong>al <str<strong>on</strong>g>and</str<strong>on</strong>g> intertidal<br />

areas, salt marshes, wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> beaches, <str<strong>on</strong>g>and</str<strong>on</strong>g> includes the Great Lakes. The CZMA encourages states<br />

to exercise their full authority over the coastal z<strong>on</strong>e, through the development of l<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> water use<br />

programs in cooperati<strong>on</strong> with Federal <str<strong>on</strong>g>and</str<strong>on</strong>g> local governments. States may apply <str<strong>on</strong>g>for</str<strong>on</strong>g> grants to help develop<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> implement management programs to achieve wise use of the l<str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>and</str<strong>on</strong>g> water resources of the coastal<br />

z<strong>on</strong>e. Development projects affecting l<str<strong>on</strong>g>and</str<strong>on</strong>g> or water use or natural resources of a coastal z<strong>on</strong>e, must<br />

ensure the project is, to the maximum extent practicable, c<strong>on</strong>sistent with the state’s coastal z<strong>on</strong>e<br />

management program.<br />

The Safe Drinking Water Act (SDWA) of 1974 establishes a Federal program to m<strong>on</strong>itor <str<strong>on</strong>g>and</str<strong>on</strong>g> increase the<br />

safety of all commercially <str<strong>on</strong>g>and</str<strong>on</strong>g> publicly supplied drinking water. C<strong>on</strong>gress amended the SDWA in 1986,<br />

m<str<strong>on</strong>g>and</str<strong>on</strong>g>ating dramatic changes in nati<strong>on</strong>wide safeguards <str<strong>on</strong>g>for</str<strong>on</strong>g> drinking water <str<strong>on</strong>g>and</str<strong>on</strong>g> establishing new Federal<br />

en<str<strong>on</strong>g>for</str<strong>on</strong>g>cement resp<strong>on</strong>sibility <strong>on</strong> the part of USEPA. The 1986 amendments to the SDWA require USEPA<br />

to establish Maximum C<strong>on</strong>taminant Levels (MCLs), Maximum C<strong>on</strong>taminant Level Goals (MCLGs), <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Best Available Technology (BAT) treatment techniques <str<strong>on</strong>g>for</str<strong>on</strong>g> organic, inorganic, radioactive, <str<strong>on</strong>g>and</str<strong>on</strong>g> microbial<br />

c<strong>on</strong>taminants; <str<strong>on</strong>g>and</str<strong>on</strong>g> turbidity. MCLGs are maximum c<strong>on</strong>centrati<strong>on</strong>s below which no negative human<br />

health effects are known to exist. The 1996 amendments set current Federal MCLs, MCLGs, <str<strong>on</strong>g>and</str<strong>on</strong>g> BATs<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> organic, inorganic, microbiological, <str<strong>on</strong>g>and</str<strong>on</strong>g> radiological c<strong>on</strong>taminants in public drinking water supplies.<br />

The Wild <str<strong>on</strong>g>and</str<strong>on</strong>g> Scenic Rivers Act of 1968 provides <str<strong>on</strong>g>for</str<strong>on</strong>g> a wild <str<strong>on</strong>g>and</str<strong>on</strong>g> scenic river system by recognizing the<br />

remarkable values of specific rivers of the Nati<strong>on</strong>. These selected rivers <str<strong>on</strong>g>and</str<strong>on</strong>g> their immediate envir<strong>on</strong>ment<br />

are preserved in a free-flowing c<strong>on</strong>diti<strong>on</strong>, without dams or other c<strong>on</strong>structi<strong>on</strong>. The policy not <strong>on</strong>ly<br />

protects the water quality of the selected rivers but also provides <str<strong>on</strong>g>for</str<strong>on</strong>g> the enjoyment of present <str<strong>on</strong>g>and</str<strong>on</strong>g> future<br />

generati<strong>on</strong>s. Any river in a free-flowing c<strong>on</strong>diti<strong>on</strong> is eligible <str<strong>on</strong>g>for</str<strong>on</strong>g> inclusi<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> can be authorized as such<br />

by an Act of C<strong>on</strong>gress, an act of state legislature, or by the Secretary of the Interior up<strong>on</strong> the<br />

recommendati<strong>on</strong> of the governor of the state(s) through which the river flows.<br />

EO 11988, Floodplain Management (May 24, 1977), directs agencies to c<strong>on</strong>sider alternatives to avoid<br />

adverse effects <str<strong>on</strong>g>and</str<strong>on</strong>g> incompatible development in floodplains. An agency may locate a facility in a<br />

floodplain if the head of the agency finds there is no practicable alternative. If it is found there is no<br />

practicable alternative, the agency must minimize potential harm to the floodplain, <str<strong>on</strong>g>and</str<strong>on</strong>g> circulate a notice<br />

explaining why the acti<strong>on</strong> is to be located in the floodplain prior to taking acti<strong>on</strong>. <str<strong>on</strong>g>Final</str<strong>on</strong>g>ly, new<br />

c<strong>on</strong>structi<strong>on</strong> in a floodplain must apply accepted floodproofing <str<strong>on</strong>g>and</str<strong>on</strong>g> flood protecti<strong>on</strong> to include elevating<br />

structures above the base flood level rather than filling in l<str<strong>on</strong>g>and</str<strong>on</strong>g>.<br />

Biological Resources<br />

The Endangered Species Act (ESA) of 1973 establishes a Federal program to c<strong>on</strong>serve, protect, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

restore threatened <str<strong>on</strong>g>and</str<strong>on</strong>g> endangered plants <str<strong>on</strong>g>and</str<strong>on</strong>g> animals <str<strong>on</strong>g>and</str<strong>on</strong>g> their habitats. The ESA specifically charges<br />

Federal agencies with the resp<strong>on</strong>sibility of using their authority to c<strong>on</strong>serve threatened <str<strong>on</strong>g>and</str<strong>on</strong>g> endangered<br />

A-5


species. All Federal agencies must ensure any acti<strong>on</strong> they authorize, fund, or carry out is not likely to<br />

jeopardize the c<strong>on</strong>tinued existence of an endangered or threatened species or result in the destructi<strong>on</strong> of<br />

critical habitat <str<strong>on</strong>g>for</str<strong>on</strong>g> these species, unless the agency has been granted an exempti<strong>on</strong>. The Secretary of the<br />

Interior, using the best available scientific data, determines which species are officially endangered or<br />

threatened, <str<strong>on</strong>g>and</str<strong>on</strong>g> the U.S. Fish <str<strong>on</strong>g>and</str<strong>on</strong>g> Wildlife Service (USFWS) maintains the list. A list of Federal<br />

endangered species can be obtained from the Endangered Species Divisi<strong>on</strong>, USFWS (505-248-6920).<br />

States might also have their own lists of threatened <str<strong>on</strong>g>and</str<strong>on</strong>g> endangered species which can be obtained by<br />

calling the appropriate State Fish <str<strong>on</strong>g>and</str<strong>on</strong>g> Wildlife office. Some species, such as the bald eagle, also have<br />

laws specifically <str<strong>on</strong>g>for</str<strong>on</strong>g> their protecti<strong>on</strong> (e.g., Bald Eagle Protecti<strong>on</strong> Act [16 U.S.C. 668]).<br />

The Migratory Bird Treaty Act (MBTA) of 1918, as amended, implements treaties <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>venti<strong>on</strong>s<br />

between the United States, Canada, Japan, Mexico, <str<strong>on</strong>g>and</str<strong>on</strong>g> the <str<strong>on</strong>g>for</str<strong>on</strong>g>mer Soviet Uni<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> the protecti<strong>on</strong> of<br />

migratory birds. Unless otherwise permitted by regulati<strong>on</strong>s, the MBTA makes it unlawful to pursue,<br />

hunt, take, capture, or kill; attempt to take, capture or kill; possess, offer to or sell, barter, purchase,<br />

deliver, or cause to be shipped, exported, imported, transported, carried, or received any migratory bird,<br />

part, nest, egg, or product, manufactured or not. The MBTA also makes it unlawful to ship, transport or<br />

carry from <strong>on</strong>e state, territory, or district to another, or through a <str<strong>on</strong>g>for</str<strong>on</strong>g>eign country, any bird, part, nest, or<br />

egg that was captured, killed, taken, shipped, transported, or carried c<strong>on</strong>trary to the laws from where it<br />

was obtained; <str<strong>on</strong>g>and</str<strong>on</strong>g> import from Canada any bird, part, nest, or egg obtained c<strong>on</strong>trary to the laws of the<br />

province from which it was obtained. The U.S. Department of the Interior has authority to arrest, with or<br />

without a warrant, a pers<strong>on</strong> violating the MBTA.<br />

EO 11514, Protecti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Enhancement of Envir<strong>on</strong>mental Quality (March 5, 1970), states that the<br />

President, with assistance from the Council <strong>on</strong> Envir<strong>on</strong>mental Quality (CEQ), will lead a nati<strong>on</strong>al ef<str<strong>on</strong>g>for</str<strong>on</strong>g>t<br />

to provide leadership in protecting <str<strong>on</strong>g>and</str<strong>on</strong>g> enhancing the envir<strong>on</strong>ment <str<strong>on</strong>g>for</str<strong>on</strong>g> the purpose of sustaining <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

enriching human life. Federal agencies are directed to meet nati<strong>on</strong>al envir<strong>on</strong>mental goals through their<br />

policies, programs, <str<strong>on</strong>g>and</str<strong>on</strong>g> plans. Agencies should also c<strong>on</strong>tinually m<strong>on</strong>itor <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluate their activities to<br />

protect <str<strong>on</strong>g>and</str<strong>on</strong>g> enhance the quality of the envir<strong>on</strong>ment. C<strong>on</strong>sistent with NEPA, agencies are directed to share<br />

in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> about existing or potential envir<strong>on</strong>mental problems with all interested parties, including the<br />

public, in order to obtain their views.<br />

EO 11990, Protecti<strong>on</strong> of Wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s (May 24, 1977), directs agencies to c<strong>on</strong>sider alternatives to avoid<br />

adverse effects <str<strong>on</strong>g>and</str<strong>on</strong>g> incompatible development in wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s. Federal agencies are to avoid new<br />

c<strong>on</strong>structi<strong>on</strong> in wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s, unless the agency finds there is no practicable alternative to c<strong>on</strong>structi<strong>on</strong> in the<br />

wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>, <str<strong>on</strong>g>and</str<strong>on</strong>g> the proposed c<strong>on</strong>structi<strong>on</strong> incorporates all possible measures to limit harm to the wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>.<br />

Agencies should use ec<strong>on</strong>omic <str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>mental data, agency missi<strong>on</strong> statements, <str<strong>on</strong>g>and</str<strong>on</strong>g> any other<br />

pertinent in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> when deciding whether or not to build in wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s. EO 11990 directs each agency<br />

to provide <str<strong>on</strong>g>for</str<strong>on</strong>g> early public review of plans <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> in wetl<str<strong>on</strong>g>and</str<strong>on</strong>g>s.<br />

EO 13186, C<strong>on</strong>servati<strong>on</strong> of Migratory Birds (January 10, 2001), creates a more comprehensive strategy<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> the c<strong>on</strong>servati<strong>on</strong> of migratory birds by the Federal government. EO 13186 provides a specific<br />

framework <str<strong>on</strong>g>for</str<strong>on</strong>g> the Federal government’s compliance with its treaty obligati<strong>on</strong>s to Canada, Mexico,<br />

Russia, <str<strong>on</strong>g>and</str<strong>on</strong>g> Japan. EO 13186 provides broad guidelines <strong>on</strong> c<strong>on</strong>servati<strong>on</strong> resp<strong>on</strong>sibilities <str<strong>on</strong>g>and</str<strong>on</strong>g> requires the<br />

development of more detailed guidance in a Memor<str<strong>on</strong>g>and</str<strong>on</strong>g>um of Underst<str<strong>on</strong>g>and</str<strong>on</strong>g>ing (MOU). EO 13186 will be<br />

coordinated <str<strong>on</strong>g>and</str<strong>on</strong>g> implemented by the USFWS. The MOU will outline how Federal agencies will promote<br />

c<strong>on</strong>servati<strong>on</strong> of migratory birds. EO 13186 requires the support of various c<strong>on</strong>servati<strong>on</strong> planning ef<str<strong>on</strong>g>for</str<strong>on</strong>g>ts<br />

already in progress; incorporati<strong>on</strong> of bird c<strong>on</strong>servati<strong>on</strong> c<strong>on</strong>siderati<strong>on</strong>s into agency planning, including<br />

NEPA analyses; <str<strong>on</strong>g>and</str<strong>on</strong>g> reporting annually <strong>on</strong> the level of take of migratory birds.<br />

A-6


Cultural Resources<br />

The American Indian Religious Freedom Act of 1978 <str<strong>on</strong>g>and</str<strong>on</strong>g> Amendments of 1994 recognize that freedom<br />

of religi<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> all people is an inherent right, <str<strong>on</strong>g>and</str<strong>on</strong>g> traditi<strong>on</strong>al American Indian religi<strong>on</strong>s are an<br />

indispensable <str<strong>on</strong>g>and</str<strong>on</strong>g> irreplaceable part of Indian life. It also recognized the lack of Federal policy <strong>on</strong> this<br />

issue <str<strong>on</strong>g>and</str<strong>on</strong>g> made it the policy of the United States to protect <str<strong>on</strong>g>and</str<strong>on</strong>g> preserve the inherent right of religious<br />

freedom <str<strong>on</strong>g>for</str<strong>on</strong>g> Native Americans. The 1994 Amendments provide clear legal protecti<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> the religious<br />

use of peyote cactus as a religious sacrament. Federal agencies are resp<strong>on</strong>sible <str<strong>on</strong>g>for</str<strong>on</strong>g> evaluating their<br />

acti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> policies to determine if changes should be made to protect <str<strong>on</strong>g>and</str<strong>on</strong>g> preserve the religious cultural<br />

rights <str<strong>on</strong>g>and</str<strong>on</strong>g> practices of Native Americans. These evaluati<strong>on</strong>s must be made in c<strong>on</strong>sultati<strong>on</strong> with native<br />

traditi<strong>on</strong>al religious leaders.<br />

The Archaeological Resource Protecti<strong>on</strong> Act (ARPA) of 1979 protects archaeological resources <strong>on</strong> public<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> American Indian l<str<strong>on</strong>g>and</str<strong>on</strong>g>s. It provides fel<strong>on</strong>y-level penalties <str<strong>on</strong>g>for</str<strong>on</strong>g> the unauthorized excavati<strong>on</strong>, removal,<br />

damage, alterati<strong>on</strong>, or defacement of any archaeological resource, defined as material remains of past<br />

human life or activities which are at least 100 years old. Be<str<strong>on</strong>g>for</str<strong>on</strong>g>e archaeological resources are excavated or<br />

removed from public l<str<strong>on</strong>g>and</str<strong>on</strong>g>s, the Federal l<str<strong>on</strong>g>and</str<strong>on</strong>g> manager must issue a permit detailing the time, scope,<br />

locati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> specific purpose of the proposed work. ARPA also fosters the exchange of in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong><br />

about archaeological resources between governmental agencies, the professi<strong>on</strong>al archaeological<br />

community, <str<strong>on</strong>g>and</str<strong>on</strong>g> private individuals. ARPA is implemented by regulati<strong>on</strong>s found in 43 CFR Part 7.<br />

The Nati<strong>on</strong>al Historic Preservati<strong>on</strong> Act (NHPA) of 1966 sets <str<strong>on</strong>g>for</str<strong>on</strong>g>th nati<strong>on</strong>al policy to identify <str<strong>on</strong>g>and</str<strong>on</strong>g> preserve<br />

properties of state, local, <str<strong>on</strong>g>and</str<strong>on</strong>g> nati<strong>on</strong>al significance. The NHPA establishes the Advisory Council <strong>on</strong><br />

Historic Preservati<strong>on</strong> (ACHP), State Historic Preservati<strong>on</strong> Officers (SHPOs), <str<strong>on</strong>g>and</str<strong>on</strong>g> the Nati<strong>on</strong>al Register of<br />

Historic Places (NRHP). ACHP advises the President, C<strong>on</strong>gress, <str<strong>on</strong>g>and</str<strong>on</strong>g> Federal agencies <strong>on</strong> historic<br />

preservati<strong>on</strong> issues. Secti<strong>on</strong> 106 of the NHPA directs Federal agencies to take into account effects of<br />

their undertakings (acti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> authorizati<strong>on</strong>s) <strong>on</strong> properties included in or eligible <str<strong>on</strong>g>for</str<strong>on</strong>g> the NRHP.<br />

Secti<strong>on</strong> 110 sets inventory, nominati<strong>on</strong>, protecti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> preservati<strong>on</strong> resp<strong>on</strong>sibilities <str<strong>on</strong>g>for</str<strong>on</strong>g> federally owned<br />

cultural properties. Secti<strong>on</strong> 106 of the act is implemented by regulati<strong>on</strong>s of the ACHP, 36 CFR Part 800.<br />

Agencies should coordinate studies <str<strong>on</strong>g>and</str<strong>on</strong>g> documents prepared under Secti<strong>on</strong> 106 with NEPA where<br />

appropriate. However, NEPA <str<strong>on</strong>g>and</str<strong>on</strong>g> NHPA are separate statutes <str<strong>on</strong>g>and</str<strong>on</strong>g> compliance with <strong>on</strong>e does not<br />

c<strong>on</strong>stitute compliance with the other. For example, acti<strong>on</strong>s which qualify <str<strong>on</strong>g>for</str<strong>on</strong>g> a categorical exclusi<strong>on</strong><br />

under NEPA might still require Secti<strong>on</strong> 106 review under NHPA. It is the resp<strong>on</strong>sibility of the agency<br />

official to identify properties in the area of potential effects, <str<strong>on</strong>g>and</str<strong>on</strong>g> whether they are included or eligible <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

inclusi<strong>on</strong> in the NRHP. Secti<strong>on</strong> 110 of the NHPA requires Federal agencies to identify, evaluate, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

nominate historic property under agency c<strong>on</strong>trol to the NRHP.<br />

The Native American Graves Protecti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Repatriati<strong>on</strong> Act of 1990 establishes rights of American<br />

Indian tribes to claim ownership of certain “cultural items,” defined as Native American human remains,<br />

funerary objects, sacred objects, <str<strong>on</strong>g>and</str<strong>on</strong>g> objects of cultural patrim<strong>on</strong>y, held or c<strong>on</strong>trolled by Federal agencies.<br />

Cultural items discovered <strong>on</strong> Federal or tribal l<str<strong>on</strong>g>and</str<strong>on</strong>g>s are, in order of primacy, the property of lineal<br />

descendants, if these can be determined, <str<strong>on</strong>g>and</str<strong>on</strong>g> then the tribe owning the l<str<strong>on</strong>g>and</str<strong>on</strong>g> where the items were<br />

discovered or the tribe with the closest cultural affiliati<strong>on</strong> with the items. Discoveries of cultural items <strong>on</strong><br />

Federal or tribal l<str<strong>on</strong>g>and</str<strong>on</strong>g> must be reported to the appropriate American Indian tribe <str<strong>on</strong>g>and</str<strong>on</strong>g> the Federal agency<br />

with jurisdicti<strong>on</strong> over the l<str<strong>on</strong>g>and</str<strong>on</strong>g>. If the discovery is made as a result of a l<str<strong>on</strong>g>and</str<strong>on</strong>g> use, activity in the area must<br />

stop <str<strong>on</strong>g>and</str<strong>on</strong>g> the items must be protected pending the outcome of c<strong>on</strong>sultati<strong>on</strong> with the affiliated tribe.<br />

EO 11593, Protecti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Enhancement of the Cultural Envir<strong>on</strong>ment (May 13, 1971), directs the Federal<br />

government to provide leadership in the preservati<strong>on</strong>, restorati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintenance of the historic <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

cultural envir<strong>on</strong>ment. Federal agencies are required to locate <str<strong>on</strong>g>and</str<strong>on</strong>g> evaluate all Federal sites under their<br />

jurisdicti<strong>on</strong> or c<strong>on</strong>trol which might qualify <str<strong>on</strong>g>for</str<strong>on</strong>g> listing <strong>on</strong> the NRHP. Agencies must allow the ACHP to<br />

A-7


comment <strong>on</strong> the alterati<strong>on</strong>, demoliti<strong>on</strong>, sale, or transfer of property which is likely to meet the criteria <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

listing as determined by the Secretary of the Interior in c<strong>on</strong>sultati<strong>on</strong> with the SHPO. Agencies must also<br />

initiate procedures to maintain federally owned sites listed <strong>on</strong> the NRHP.<br />

EO 13007, Indian Sacred Sites (May 24, 1996), provides that agencies managing Federal l<str<strong>on</strong>g>and</str<strong>on</strong>g>s, to the<br />

extent practicable, permitted by law, <str<strong>on</strong>g>and</str<strong>on</strong>g> not inc<strong>on</strong>sistent with agency functi<strong>on</strong>s, shall accommodate<br />

American Indian religious practiti<strong>on</strong>ers’ access to <str<strong>on</strong>g>and</str<strong>on</strong>g> cerem<strong>on</strong>ial use of American Indian sacred sites,<br />

shall avoid adversely affecting the physical integrity of such sites, <str<strong>on</strong>g>and</str<strong>on</strong>g> shall maintain the c<strong>on</strong>fidentiality<br />

of such sites. Federal agencies are resp<strong>on</strong>sible <str<strong>on</strong>g>for</str<strong>on</strong>g> in<str<strong>on</strong>g>for</str<strong>on</strong>g>ming tribes of proposed acti<strong>on</strong>s that could restrict<br />

future access to or cerem<strong>on</strong>ial use of, or adversely affect the physical integrity of, sacred sites.<br />

EO 13287, Preserve America (March 3, 2003), orders Federal agencies to take a leadership role in<br />

protecti<strong>on</strong>, enhancement, <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>temporary use of historic properties owned by the Federal government,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> promote intergovernmental cooperati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> partnerships <str<strong>on</strong>g>for</str<strong>on</strong>g> preservati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> use of historic<br />

properties. EO 13287 established new accountability <str<strong>on</strong>g>for</str<strong>on</strong>g> agencies with respect to inventories <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

stewardship.<br />

Socioec<strong>on</strong>omics <str<strong>on</strong>g>and</str<strong>on</strong>g> Envir<strong>on</strong>mental Justice<br />

EO 12898, Federal Acti<strong>on</strong>s to Address Envir<strong>on</strong>mental Justice in Minority Populati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> Low-Income<br />

Populati<strong>on</strong>s (February 11, 1994), directs Federal agencies to make achieving envir<strong>on</strong>mental justice part<br />

of their missi<strong>on</strong>. Agencies must identify <str<strong>on</strong>g>and</str<strong>on</strong>g> address the adverse human health or envir<strong>on</strong>mental effects<br />

that its activities have <strong>on</strong> minority <str<strong>on</strong>g>and</str<strong>on</strong>g> low-income populati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> develop agencywide envir<strong>on</strong>mental<br />

justice strategies. The strategy must list “programs, policies, planning <str<strong>on</strong>g>and</str<strong>on</strong>g> public participati<strong>on</strong> processes,<br />

en<str<strong>on</strong>g>for</str<strong>on</strong>g>cement, <str<strong>on</strong>g>and</str<strong>on</strong>g>/or rulemakings related to human health or the envir<strong>on</strong>ment that should be revised to<br />

promote en<str<strong>on</strong>g>for</str<strong>on</strong>g>cement of all health <str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>mental statutes in areas with minority populati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> lowincome<br />

populati<strong>on</strong>s, ensure greater public participati<strong>on</strong>, improve research <str<strong>on</strong>g>and</str<strong>on</strong>g> data collecti<strong>on</strong> relating to<br />

the health of <str<strong>on</strong>g>and</str<strong>on</strong>g> envir<strong>on</strong>ment of minority populati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> low-income populati<strong>on</strong>s, <str<strong>on</strong>g>and</str<strong>on</strong>g> identify<br />

differential patterns of c<strong>on</strong>sumpti<strong>on</strong> of natural resources am<strong>on</strong>g minority populati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> low-income<br />

populati<strong>on</strong>s.” A copy of the strategy <str<strong>on</strong>g>and</str<strong>on</strong>g> progress reports must be provided to the Federal Working<br />

Group <strong>on</strong> Envir<strong>on</strong>mental Justice. Resp<strong>on</strong>sibility <str<strong>on</strong>g>for</str<strong>on</strong>g> compliance with EO 12898 is with each Federal<br />

agency.<br />

EO 13045, Protecti<strong>on</strong> of Children from Envir<strong>on</strong>mental Health Risks <str<strong>on</strong>g>and</str<strong>on</strong>g> Safety Risks (April 21, 1997),<br />

directs Federal agencies to make it a high priority to identify <str<strong>on</strong>g>and</str<strong>on</strong>g> assess envir<strong>on</strong>mental health risks <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

safety risks that may disproporti<strong>on</strong>ately affect children; <str<strong>on</strong>g>and</str<strong>on</strong>g> ensure that their policies, programs, activities,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards address disproporti<strong>on</strong>ate risks to children that result from envir<strong>on</strong>mental health risks or<br />

safety risks.<br />

Hazardous Materials <str<strong>on</strong>g>and</str<strong>on</strong>g> Waste<br />

The Comprehensive Envir<strong>on</strong>mental Resp<strong>on</strong>se, Compensati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> Liability Act (CERCLA) of 1980<br />

authorizes USEPA to resp<strong>on</strong>d to spills <str<strong>on</strong>g>and</str<strong>on</strong>g> other releases of hazardous substances to the envir<strong>on</strong>ment, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

authorizes the Nati<strong>on</strong>al Oil <str<strong>on</strong>g>and</str<strong>on</strong>g> Hazardous Substances Polluti<strong>on</strong> C<strong>on</strong>tingency Plan. CERCLA also<br />

provides a Federal “Superfund” to resp<strong>on</strong>d to emergencies immediately. Although the “Superfund”<br />

provides funds <str<strong>on</strong>g>for</str<strong>on</strong>g> cleanup of sites where potentially resp<strong>on</strong>sible parties cannot be identified, USEPA is<br />

authorized to recover funds through damages collected from resp<strong>on</strong>sible parties. This funding process<br />

places the ec<strong>on</strong>omic burden <str<strong>on</strong>g>for</str<strong>on</strong>g> cleanup <strong>on</strong> polluters.<br />

The Polluti<strong>on</strong> Preventi<strong>on</strong> Act (PPA) of 1990 encourages manufacturers to avoid the generati<strong>on</strong> of<br />

polluti<strong>on</strong> by modifying equipment <str<strong>on</strong>g>and</str<strong>on</strong>g> processes; redesigning products, substituting raw materials; <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

A-8


making improvements in management techniques, training, <str<strong>on</strong>g>and</str<strong>on</strong>g> inventory c<strong>on</strong>trol. C<strong>on</strong>sistent with<br />

polluti<strong>on</strong> preventi<strong>on</strong> principles, EO 13423, Strengthening Federal Envir<strong>on</strong>mental, Energy, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Transportati<strong>on</strong> Management (January 24, 2007 [revoking EO 13148]) sets a goal <str<strong>on</strong>g>for</str<strong>on</strong>g> all Federal agencies<br />

that promotes envir<strong>on</strong>mental practices, including acquisiti<strong>on</strong> of biobased, envir<strong>on</strong>mentally preferable,<br />

energy-efficient, water-efficient, <str<strong>on</strong>g>and</str<strong>on</strong>g> recycled-c<strong>on</strong>tent products, <str<strong>on</strong>g>and</str<strong>on</strong>g> use of paper of at least 30 percent<br />

post-c<strong>on</strong>sumer fiber c<strong>on</strong>tent. In additi<strong>on</strong>, EO 13423 sets a goal that requires Federal agencies to ensure<br />

that they reduce the quantity of toxic <str<strong>on</strong>g>and</str<strong>on</strong>g> hazardous chemicals <str<strong>on</strong>g>and</str<strong>on</strong>g> materials acquired, used, or disposed<br />

of, increase diversi<strong>on</strong> of solid waste as appropriate, <str<strong>on</strong>g>and</str<strong>on</strong>g> maintain cost-effective waste preventi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

recycling programs in their facilities. Additi<strong>on</strong>ally, in Federal Register Volume 58 Number 18 (January<br />

29, 1993), CEQ provides guidance to Federal agencies <strong>on</strong> how to “incorporate polluti<strong>on</strong> preventi<strong>on</strong><br />

principles, techniques, <str<strong>on</strong>g>and</str<strong>on</strong>g> mechanisms into their planning <str<strong>on</strong>g>and</str<strong>on</strong>g> decisi<strong>on</strong>making processes <str<strong>on</strong>g>and</str<strong>on</strong>g> to evaluate<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> report those ef<str<strong>on</strong>g>for</str<strong>on</strong>g>ts, as appropriate, in documents pursuant to NEPA.”<br />

The Resource C<strong>on</strong>servati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Recovery Act (RCRA) of 1976 is an amendment to the Solid Waste<br />

Disposal Act. RCRA authorizes USEPA to provide <str<strong>on</strong>g>for</str<strong>on</strong>g> “cradle-to-grave” management of hazardous<br />

waste <str<strong>on</strong>g>and</str<strong>on</strong>g> sets a framework <str<strong>on</strong>g>for</str<strong>on</strong>g> the management of n<strong>on</strong>hazardous municipal solid waste. Under RCRA,<br />

hazardous waste is c<strong>on</strong>trolled from generati<strong>on</strong> to disposal through tracking <str<strong>on</strong>g>and</str<strong>on</strong>g> permitting systems, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

restricti<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>trols <strong>on</strong> the placement of waste <strong>on</strong> or into the l<str<strong>on</strong>g>and</str<strong>on</strong>g>. Under RCRA, a waste is defined<br />

as hazardous if it is ignitable, corrosive, reactive, toxic, or listed by USEPA as being hazardous. With the<br />

Hazardous <str<strong>on</strong>g>and</str<strong>on</strong>g> Solid Waste Amendments (HSWA) of 1984, C<strong>on</strong>gress targeted stricter st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>for</str<strong>on</strong>g> waste<br />

disposal <str<strong>on</strong>g>and</str<strong>on</strong>g> encouraged polluti<strong>on</strong> preventi<strong>on</strong> by prohibiting the l<str<strong>on</strong>g>and</str<strong>on</strong>g> disposal of particular wastes. The<br />

HSWA amendments strengthen c<strong>on</strong>trol of both hazardous <str<strong>on</strong>g>and</str<strong>on</strong>g> n<strong>on</strong>hazardous waste <str<strong>on</strong>g>and</str<strong>on</strong>g> emphasize the<br />

preventi<strong>on</strong> of polluti<strong>on</strong> of groundwater.<br />

The Superfund Amendments <str<strong>on</strong>g>and</str<strong>on</strong>g> Reauthorizati<strong>on</strong> Act (SARA) of 1986 m<str<strong>on</strong>g>and</str<strong>on</strong>g>ates str<strong>on</strong>g clean-up<br />

st<str<strong>on</strong>g>and</str<strong>on</strong>g>ards <str<strong>on</strong>g>and</str<strong>on</strong>g> authorizes USEPA to use a variety of incentives to encourage settlements. Title III of<br />

SARA authorizes the Emergency Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Community Right to Know Act (EPCRA), which requires<br />

facility operators with “hazardous substances” or “extremely hazardous substances” to prepare<br />

comprehensive emergency plans <str<strong>on</strong>g>and</str<strong>on</strong>g> to report accidental releases. If a Federal agency acquires a<br />

c<strong>on</strong>taminated site, it can be held liable <str<strong>on</strong>g>for</str<strong>on</strong>g> cleanup as the property owner/operator. A Federal agency can<br />

also incur liability if it leases a property, as the courts have found lessees liable as “owners.” However, if<br />

the agency exercises due diligence by c<strong>on</strong>ducting a Phase I Envir<strong>on</strong>mental Site Assessment, it can claim<br />

the “innocent purchaser” defense under CERCLA. According to Title 42 United States Code (U.S.C.)<br />

9601(35), the current owner/operator must show it undertook “all appropriate inquiry into the previous<br />

ownership <str<strong>on</strong>g>and</str<strong>on</strong>g> uses of the property c<strong>on</strong>sistent with good commercial or customary practice” be<str<strong>on</strong>g>for</str<strong>on</strong>g>e<br />

buying the property to use this defense.<br />

The Toxic Substance C<strong>on</strong>trol Act (TSCA) of 1976 c<strong>on</strong>sists of four titles. Title I established requirements<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> authorities to identify <str<strong>on</strong>g>and</str<strong>on</strong>g> c<strong>on</strong>trol toxic chemical hazards to human health <str<strong>on</strong>g>and</str<strong>on</strong>g> the envir<strong>on</strong>ment.<br />

TSCA authorized USEPA to gather in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong> <strong>on</strong> chemical risks, require companies to test chemicals<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> toxic effects, <str<strong>on</strong>g>and</str<strong>on</strong>g> regulate chemicals with unreas<strong>on</strong>able risk. TSCA also singled out polychlorinated<br />

biphenyls (PCBs) <str<strong>on</strong>g>for</str<strong>on</strong>g> regulati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g>, as a result, PCBs are being phased out. PCBs are persistent when<br />

released into the envir<strong>on</strong>ment <str<strong>on</strong>g>and</str<strong>on</strong>g> accumulate in the tissues of living organisms. They have been shown<br />

to cause adverse health effects <strong>on</strong> laboratory animals <str<strong>on</strong>g>and</str<strong>on</strong>g> could cause adverse health effects in humans.<br />

TSCA <str<strong>on</strong>g>and</str<strong>on</strong>g> its regulati<strong>on</strong>s govern the manufacture, processing, distributi<strong>on</strong>, use, marking, storage,<br />

disposal, clean-up, <str<strong>on</strong>g>and</str<strong>on</strong>g> release reporting requirements <str<strong>on</strong>g>for</str<strong>on</strong>g> numerous chemicals like PCBs. TSCA Title II<br />

provides statutory framework <str<strong>on</strong>g>for</str<strong>on</strong>g> “Asbestos Hazard Emergency Resp<strong>on</strong>se,” which applies <strong>on</strong>ly to<br />

schools. TSCA Title III, “Indoor Rad<strong>on</strong> Abatement,” states indoor air in buildings of the United States<br />

should be as free of rad<strong>on</strong> as the outside ambient air. Federal agencies are required to c<strong>on</strong>duct studies <strong>on</strong><br />

the extent of rad<strong>on</strong> c<strong>on</strong>taminati<strong>on</strong> in buildings they own. TSCA Title IV, “Lead Exposure Reducti<strong>on</strong>,”<br />

directs Federal agencies to “c<strong>on</strong>duct a comprehensive program to promote safe, effective, <str<strong>on</strong>g>and</str<strong>on</strong>g> af<str<strong>on</strong>g>for</str<strong>on</strong>g>dable<br />

A-9


m<strong>on</strong>itoring, detecti<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> abatement of lead-based paint <str<strong>on</strong>g>and</str<strong>on</strong>g> other lead exposure hazards.” Further, any<br />

Federal agency having jurisdicti<strong>on</strong> over a property or facility must comply with all Federal, state,<br />

interstate, <str<strong>on</strong>g>and</str<strong>on</strong>g> local requirements c<strong>on</strong>cerning lead-based paint.<br />

A-10


APPENDIX B<br />

INTERAGENCY AND INTERGOVERNMENTAL COORDINATION FOR<br />

ENVIRONMENTAL PLANNING (IICEP) MATERIALS


Appendix B<br />

Interagency <str<strong>on</strong>g>and</str<strong>on</strong>g> Intergovernmental Coordinati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Envir<strong>on</strong>mental Planning (IICEP) Materials<br />

The 377th <strong>Air</strong> Base Wing (377 ABW) solicited comments <strong>on</strong> the Draft Envir<strong>on</strong>mental Assessment (<str<strong>on</strong>g>EA</str<strong>on</strong>g>)<br />

by distributing letters to potentially interested Federal, state, <str<strong>on</strong>g>and</str<strong>on</strong>g> local agencies; Native American tribes;<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> other stakeholder groups or individuals, <str<strong>on</strong>g>and</str<strong>on</strong>g> by publishing a Notice of Availability (NOA) in The<br />

Albuquerque Journal that provided notificati<strong>on</strong> that the Draft <str<strong>on</strong>g>EA</str<strong>on</strong>g> was available <str<strong>on</strong>g>for</str<strong>on</strong>g> review. Two<br />

government agency comments were received from the Albuquerque Envir<strong>on</strong>mental Health Department<br />

(AEHD) <strong>Air</strong> Quality Divisi<strong>on</strong> (AQD) <str<strong>on</strong>g>and</str<strong>on</strong>g> the New Mexico Department of Game <str<strong>on</strong>g>and</str<strong>on</strong>g> Fish. The<br />

distributi<strong>on</strong> lists of potentially interested parties, examples of the IICEP notificati<strong>on</strong> letters, the NOA, <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

the two comments received follow in this appendix.<br />

Federal, State, <str<strong>on</strong>g>and</str<strong>on</strong>g> Local Agencies<br />

Ms. Mary Lou Le<strong>on</strong>ard<br />

City of Albuquerque<br />

Acting Envir<strong>on</strong>mental Health Department<br />

Director<br />

P.O. Box 1293<br />

Albuquerque, NM 87103<br />

Ms. Georgia Cleverly<br />

New Mexico Envir<strong>on</strong>ment Department<br />

Office of Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> Per<str<strong>on</strong>g>for</str<strong>on</strong>g>mance<br />

P.O. Box 5469<br />

Santa Fe, NM 87502-5469<br />

Ms. Terra M<strong>on</strong>asco<br />

New Mexico Game <str<strong>on</strong>g>and</str<strong>on</strong>g> Fish<br />

Assistant Chief of C<strong>on</strong>servati<strong>on</strong> Services<br />

Divisi<strong>on</strong><br />

P.O. Box 25112<br />

Santa Fe, NM 87504<br />

Mr. Robert Campell<strong>on</strong>e<br />

U.S. Fish <str<strong>on</strong>g>and</str<strong>on</strong>g> Wildlife Service<br />

Divisi<strong>on</strong> of Planning<br />

P.O. Box 1306<br />

Albuquerque, NM 87103<br />

Ms. Jackie Andrew<br />

Southwestern Regi<strong>on</strong> NEPA Coordinator<br />

U.S. Forest Service<br />

333 Broadway Boulevard SE<br />

Albuquerque, NM 87102<br />

Ms. Julie Alc<strong>on</strong><br />

U.S. Army Corps of Engineers<br />

Chief of Envir<strong>on</strong>mental Resources Secti<strong>on</strong><br />

4101 Jeffers<strong>on</strong> Plaza NE<br />

Albuquerque, NM 87109<br />

B-1


Example IICEP Letter to Federal, State, <str<strong>on</strong>g>and</str<strong>on</strong>g> Local Agencies<br />

B-2


Native American Tribes<br />

Isleta Pueblo<br />

Governor Robert Benavidez<br />

P.O. Box 1270<br />

Isleta Pueblo, NM 87022<br />

Pueblo of Zuni<br />

Governor Norman Cooeyate<br />

P.O. Box 339<br />

Zuni, NM 87327<br />

White Mountain Apache<br />

R<strong>on</strong>nie Lupe, Chairman<br />

Tribal Council<br />

P.O. Box 700<br />

Whiteriver, AZ 85941<br />

Ysleta del Sur Pueblo<br />

Governor Frank Paiz<br />

119 S Old Pueblo Road<br />

P.O. Box 17579 – Ysleta Stati<strong>on</strong><br />

El Paso, TX 79917<br />

Michael Burgess, Tribal Chairman<br />

Comanche Indian Tribe<br />

P.O. Box 908<br />

Lawt<strong>on</strong>, OK 73507<br />

Jicarilla Apache Nati<strong>on</strong><br />

President Levi Pesata<br />

P.O. Box 507<br />

Dulce, NM 87528<br />

Mescalero Apache Tribe<br />

President Carlet<strong>on</strong> Naiche-Palmer<br />

P.O. Box 227<br />

Mescalero, NM 88340<br />

Pueblo of Nambe<br />

Governor Ernest Mirabal<br />

Route 1, Box 117-BB<br />

Santa Fe, NM 87506<br />

Navajo Nati<strong>on</strong><br />

President Joe Shirley, Jr.<br />

P.O. Box 9000<br />

Window Rock, AZ 86515<br />

Ohkay Owingeh<br />

Governor Marcelino Aguino<br />

P.O. Box 1099<br />

San Juan Pueblo, NM 87566<br />

Pueblo of Acoma<br />

Governor Ch<str<strong>on</strong>g>and</str<strong>on</strong>g>ler Sanchez<br />

P.O. Box 309<br />

Acoma, NM 87034<br />

Pueblo of Cochiti<br />

Governor John F. Pecos<br />

P.O. Box 70<br />

Cochiti Pueblo, NM 87072<br />

Pueblo of Jemez<br />

Governor David Toledo<br />

P.O. Box 100<br />

Jemez Pueblo, NM 87024<br />

Pueblo of Laguna<br />

Governor John Ant<strong>on</strong>io, Sr.<br />

P.O. Box 194<br />

Laguna Pueblo, NM 87026<br />

Pueblo of Picuris<br />

Governor Gerald Nailor<br />

P.O. Box 127<br />

Penasco, NM 87553<br />

Pueblo of Pojoaque<br />

Governor George Rivera<br />

78 Cities of Gold Road<br />

Santa Fe, NM 87506<br />

Pueblo of San Felipe<br />

Governor Anth<strong>on</strong>y Ortiz<br />

P.O. Box 4339<br />

San Felipe Pueblo, NM 87001<br />

Pueblo of San Ildef<strong>on</strong>so<br />

Governor Le<strong>on</strong> T. Roybal<br />

Route 5, Box 315 –A<br />

Santa Fe, NM 87506<br />

Pueblo of S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia<br />

Governor Joe M. Lujan<br />

481 S<str<strong>on</strong>g>and</str<strong>on</strong>g>ia Loop<br />

Bernalillo, NM 87004<br />

B-3


Pueblo of Santa Ana<br />

Governor Bruce Sanchez<br />

2 Dove Road<br />

Santa Ana Pueblo, NM 87004<br />

Pueblo of Santa Clara<br />

Governor Walter Dasheno<br />

P.O. Box 580<br />

Espanola, NM 87532<br />

Pueblo of Santo Domingo<br />

Governor Everett F. Chavez<br />

P.O. Box 99<br />

Santo Domingo Pueblo, NM 87052<br />

Pueblo of Tesuque<br />

Governor Mark Mitchell<br />

Route 42, Box 360-T<br />

Santa Fe, NM 87506<br />

Pueblo of Zia<br />

Governor Ivan Pino<br />

135 Capitol Square Drive<br />

Zia Pueblo, NM 87053-6013<br />

Hopi Tribal Council<br />

P.O. Box 123<br />

Kykotsmovi, AZ 86039<br />

Pueblo of Taos<br />

Governor Ruben A. Romero<br />

P.O. Box 1846<br />

Taos, NM 87571<br />

B-4


Example IICEP Letter to Native American Tribes<br />

B-5


B-6


B-7


Notice of Availability<br />

B-8


Comments Received <strong>on</strong> the Draft Envir<strong>on</strong>mental Assessment<br />

Resp<strong>on</strong>ses to agency comments requiring clarificati<strong>on</strong> are included below in Table B-1.<br />

B-9


B-10


B-11


B-12


Table B-1. Resp<strong>on</strong>ses to Comments Received <strong>on</strong> the Draft Envir<strong>on</strong>mental Assessment<br />

Secti<strong>on</strong> Commenter Comment Summary Resp<strong>on</strong>se<br />

<strong>Air</strong> Quality<br />

Albuquerque<br />

Envir<strong>on</strong>mental<br />

Health<br />

Department<br />

(AEHD) <strong>Air</strong><br />

Quality<br />

Divisi<strong>on</strong><br />

(AQD)<br />

The AEHD-AQD reviewed the <str<strong>on</strong>g>EA</str<strong>on</strong>g><br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> determined that some of the<br />

demoliti<strong>on</strong> activities may require<br />

notificati<strong>on</strong>s <str<strong>on</strong>g>and</str<strong>on</strong>g> permit<br />

applicati<strong>on</strong> submittals. The<br />

AEHD-AQD describe the potential<br />

need <str<strong>on</strong>g>for</str<strong>on</strong>g> notificati<strong>on</strong> requirements<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> potential asbestos removal, a<br />

Fugitive Dust C<strong>on</strong>structi<strong>on</strong> Permit,<br />

crushing <str<strong>on</strong>g>and</str<strong>on</strong>g> screening equipment<br />

permits, <str<strong>on</strong>g>and</str<strong>on</strong>g> an air quality permit<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> the operati<strong>on</strong> of n<strong>on</strong>-road<br />

engines.<br />

As stated in Secti<strong>on</strong>s 1, 2, <str<strong>on</strong>g>and</str<strong>on</strong>g> 3<br />

of this <str<strong>on</strong>g>EA</str<strong>on</strong>g>, Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> will<br />

obtain a Fugitive Dust<br />

C<strong>on</strong>structi<strong>on</strong> Permit <str<strong>on</strong>g>and</str<strong>on</strong>g> all<br />

other necessary air quality<br />

permits prior to the start of<br />

c<strong>on</strong>structi<strong>on</strong>. Asphalt will <strong>on</strong>ly<br />

be crushed <str<strong>on</strong>g>and</str<strong>on</strong>g> screened if<br />

rebar is not present. Secti<strong>on</strong> 2<br />

of the <str<strong>on</strong>g>Final</str<strong>on</strong>g> <str<strong>on</strong>g>EA</str<strong>on</strong>g> has been<br />

updated <str<strong>on</strong>g>for</str<strong>on</strong>g> clarificati<strong>on</strong> to<br />

include this in<str<strong>on</strong>g>for</str<strong>on</strong>g>mati<strong>on</strong>. The<br />

Kirtl<str<strong>on</strong>g>and</str<strong>on</strong>g> <strong>AFB</strong> l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill will<br />

obtain any necessary air quality<br />

permits prior to initiating<br />

crushing <str<strong>on</strong>g>and</str<strong>on</strong>g> screening<br />

activities.<br />

B-13


THIS PAGE INTENTIONALLY LEFT BLANK<br />

B-14


APPENDIX C<br />

AIR QUALITY SUPPORTING DOCUMENTATION


Summary<br />

Combusti<strong>on</strong><br />

Fugitive<br />

Grading<br />

Haul Truck On-Road<br />

C<strong>on</strong>structi<strong>on</strong> Commuter<br />

Summarizes total emissi<strong>on</strong>s.<br />

Estimates emissi<strong>on</strong>s from n<strong>on</strong>-road equipment exhaust.<br />

Estimates particulate emissi<strong>on</strong>s from c<strong>on</strong>structi<strong>on</strong> activities including earthmoving, vehicle traffic, <str<strong>on</strong>g>and</str<strong>on</strong>g> windblown dust.<br />

Estimates the number of days of site preparati<strong>on</strong>, to be used <str<strong>on</strong>g>for</str<strong>on</strong>g> estimating heavy equipment exhaust<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> earthmoving dust emissi<strong>on</strong>s.<br />

Estimates emissi<strong>on</strong>s from haul trucks removing materials from the job site.<br />

Estimates emissi<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> workers commuting to the site.<br />

AQCR Summarizes total emissi<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g> the Albuquerque-Mid Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Intrastate <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong> Tier report <str<strong>on</strong>g>for</str<strong>on</strong>g> 2002,<br />

Tier Report<br />

to be used to compare the project to regi<strong>on</strong>al emissi<strong>on</strong>s.<br />

C-1 Summary


<strong>Air</strong> Quality Emissi<strong>on</strong>s from Proposed Acti<strong>on</strong><br />

NO x VOC CO SO 2 PM 10 PM 2.5 CO 2<br />

(t<strong>on</strong>) (t<strong>on</strong>) (t<strong>on</strong>) (t<strong>on</strong>) (t<strong>on</strong>) (t<strong>on</strong>) (t<strong>on</strong>)<br />

Proposed Project C<strong>on</strong>structi<strong>on</strong> Combusti<strong>on</strong> 10.513 0.743 4.389 0.491 0.691 0.670 1,216.674<br />

C<strong>on</strong>structi<strong>on</strong> Fugitive Dust - - - - 34.436 2.858 -<br />

Haul Truck On-Road 0.092 0.067 0.271 0.007 0.109 0.028 23.307<br />

C<strong>on</strong>structi<strong>on</strong> Commuter 1.412 1.878 20.191 0.060 0.762 0.208 293.250<br />

TOTAL Proposed Project 12.017 2.688 24.851 0.558 35.999 3.765 1,533.231<br />

Note: Total PM 10 / 2.5 fugitive dust emissi<strong>on</strong>s are assuming USEPA 50% c<strong>on</strong>trol efficiencies.<br />

CO 2 emissi<strong>on</strong>s c<strong>on</strong>verted to metric t<strong>on</strong>s = 1,390.641 metric t<strong>on</strong>s<br />

C-2 Summary


Since future year budgets were not readily available, actual 2002 air emissi<strong>on</strong>s inventories <str<strong>on</strong>g>for</str<strong>on</strong>g> the counties were used as<br />

an approximati<strong>on</strong> of the regi<strong>on</strong>al inventory. Because the Proposed Acti<strong>on</strong> is several orders of magnitude below significance,<br />

the c<strong>on</strong>clusi<strong>on</strong> would be the same, regardless of whether future year budget data set were used.<br />

Albuquerque-Mid Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Intrastate <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong> 152<br />

Point <str<strong>on</strong>g>and</str<strong>on</strong>g> Area Sources Combined<br />

NO x VOC CO SO 2 PM 10 PM 2.5<br />

Year (tpy) (tpy) (tpy) (tpy) (tpy) (tpy)<br />

2002 36,778 31,651 245,346 2,619 137,376 16,676<br />

Source: USEPA-<strong>Air</strong>Data NET Tier Report (http://www.epa.gov/air/data/geosel.html).<br />

Determinati<strong>on</strong> Significance (Significance Threshold = 10%)<br />

Proposed Project<br />

Point <str<strong>on</strong>g>and</str<strong>on</strong>g> Area Sources Combined<br />

NO x VOC CO SO 2 PM 10 PM 2.5<br />

(tpy) (tpy) (tpy) (tpy) (tpy) (tpy)<br />

Regi<strong>on</strong>al Emissi<strong>on</strong>s 36,778 31,651 245,346 2,619 137,376 16,676<br />

Project Emissi<strong>on</strong>s 12.02 2.69 24.85 0.56 36.00 3.76<br />

Proposed Project % 0.0327% 0.0085% 0.0101% 0.0213% 0.0262% 0.0226%<br />

C-3 Summary


Combusti<strong>on</strong> Emissi<strong>on</strong>s<br />

Combusti<strong>on</strong> Emissi<strong>on</strong>s of VOC, NO x , SO 2 , CO, PM 2.5 , PM 10, <str<strong>on</strong>g>and</str<strong>on</strong>g> CO 2 due to C<strong>on</strong>structi<strong>on</strong><br />

General C<strong>on</strong>structi<strong>on</strong> Activities<br />

Area Disturbed<br />

C<strong>on</strong>structi<strong>on</strong> of anti-terrorism <str<strong>on</strong>g>for</str<strong>on</strong>g>ce protecti<strong>on</strong> (AT/FP) measures 182,952 ft 2 Assume area disturbed is the same size as the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

Removal of existing aboveground infrastructure 182,952 ft 2 Assume area disturbed is the same size as the proposed <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

Demolish small asphalt parking <str<strong>on</strong>g>and</str<strong>on</strong>g> storage area NE of Pad 5 400 ft 2 Area determined from K<strong>AFB</strong> 2009 DOPAA, Figure 2-1<br />

C<strong>on</strong>structi<strong>on</strong> of paved shoulder 10,000 ft 2 Assume 10 foot extensi<strong>on</strong> off the perimeter of the <str<strong>on</strong>g>pad</str<strong>on</strong>g><br />

C<strong>on</strong>structi<strong>on</strong> of a pers<strong>on</strong>al shelter 900 ft 2 Assume a building footprint of 30 ft. x 30 ft.<br />

Hot Pad C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Demoliti<strong>on</strong> Activities<br />

C<strong>on</strong>structi<strong>on</strong> of <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g> 392,952 ft 2 Includes <str<strong>on</strong>g>hot</str<strong>on</strong>g> <str<strong>on</strong>g>cargo</str<strong>on</strong>g> <str<strong>on</strong>g>pad</str<strong>on</strong>g>, c<strong>on</strong>crete area separator, <str<strong>on</strong>g>and</str<strong>on</strong>g> taxiway <str<strong>on</strong>g>for</str<strong>on</strong>g> both <str<strong>on</strong>g>pad</str<strong>on</strong>g>s<br />

Demoliti<strong>on</strong> of Pad 5 taxiway 70,000 ft 2 Area determined from K<strong>AFB</strong> 2009 DOPAA, Figure 2-1<br />

Total General C<strong>on</strong>structi<strong>on</strong> Area: 377,204 ft 2<br />

8.7 acres<br />

Total Hot Pad C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Demoliti<strong>on</strong> Area: 462,952 ft 2<br />

10.6 acres<br />

Total Disturbed Area: 840,156 ft 2<br />

19 acres<br />

C<strong>on</strong>structi<strong>on</strong> Durati<strong>on</strong>:<br />

12 m<strong>on</strong>ths<br />

Annual C<strong>on</strong>structi<strong>on</strong> Activity: 240 days/yr Assume 12 m<strong>on</strong>ths, 4 weeks per m<strong>on</strong>th, 5 days per week.<br />

C-4 Project Combusti<strong>on</strong>


Emissi<strong>on</strong> Factors Used <str<strong>on</strong>g>for</str<strong>on</strong>g> C<strong>on</strong>structi<strong>on</strong> Equipment<br />

References: Guide to <strong>Air</strong> Quality Assessment, SMAQMD, 2004; <str<strong>on</strong>g>and</str<strong>on</strong>g> U.S. EPA NONROAD Emissi<strong>on</strong>s Model, Versi<strong>on</strong> 2005.0.0<br />

Emissi<strong>on</strong> factors are taken from the NONROAD model <str<strong>on</strong>g>and</str<strong>on</strong>g> were provided to e²M by Larry L<str<strong>on</strong>g>and</str<strong>on</strong>g>man of the <strong>Air</strong> Quality <str<strong>on</strong>g>and</str<strong>on</strong>g> Modeling Center<br />

(L<str<strong>on</strong>g>and</str<strong>on</strong>g>man.Larry@epamail.epa.gov) <strong>on</strong> 12/14/07. Factors provided are <str<strong>on</strong>g>for</str<strong>on</strong>g> the weighted average US fleet <str<strong>on</strong>g>for</str<strong>on</strong>g> CY2007.<br />

Assumpti<strong>on</strong>s regarding the type <str<strong>on</strong>g>and</str<strong>on</strong>g> number of equipment are from SMAQMD Table 3-1 unless otherwise noted.<br />

Grading<br />

Paving<br />

Demoliti<strong>on</strong><br />

No. Reqd. a NO x<br />

VOC b CO<br />

c<br />

SO 2 PM 10 PM 2.5 CO 2<br />

Equipment per 10 acres (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day)<br />

Bulldozer 1 13.60 0.96 5.50 1.02 0.89 0.87 1456.90<br />

Motor Grader 1 9.69 0.73 3.20 0.80 0.66 0.64 1141.65<br />

Water Truck 1 18.36 0.89 7.00 1.64 1.00 0.97 2342.98<br />

Total per 10 acres of activity 3 41.64 2.58 15.71 0.83 2.55 2.47 4941.53<br />

No. Reqd. a NO x<br />

VOC b CO<br />

c<br />

SO 2 PM 10 PM 2.5 CO 2<br />

Equipment per 10 acres (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day)<br />

Paver 1 3.83 0.37 2.06 0.28 0.35 0.34 401.93<br />

Roller 1 4.82 0.44 2.51 0.37 0.43 0.42 536.07<br />

Truck 2 36.71 1.79 14.01 3.27 1.99 1.93 4685.95<br />

Total per 10 acres of activity 4 45.37 2.61 18.58 0.91 2.78 2.69 5623.96<br />

No. Reqd. a NO x<br />

VOC b CO<br />

c<br />

SO 2 PM 10 PM 2.5 CO 2<br />

Equipment per 10 acres (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day)<br />

Loader 1 13.45 0.99 5.58 0.95 0.93 0.90 1360.10<br />

Haul Truck 1 18.36 0.89 7.00 1.64 1.00 0.97 2342.98<br />

Total per 10 acres of activity 2 31.81 1.89 12.58 0.64 1.92 1.87 3703.07<br />

Building C<strong>on</strong>structi<strong>on</strong><br />

Stati<strong>on</strong>ary<br />

Mobile (n<strong>on</strong>-road)<br />

No. Reqd. a NO x<br />

VOC b CO<br />

c<br />

SO 2 PM 10 PM 2.5 CO 2<br />

Equipment d per 10 acres (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day)<br />

Generator Set 1 2.38 0.32 1.18 0.15 0.23 0.22 213.06<br />

Industrial Saw 1 2.62 0.32 1.97 0.20 0.32 0.31 291.92<br />

Welder 1 1.12 0.38 1.50 0.08 0.23 0.22 112.39<br />

Truck 1 18.36 0.89 7.00 1.64 1.00 0.97 2342.98<br />

Forklift 1 5.34 0.56 3.33 0.40 0.55 0.54 572.24<br />

Crane 1 9.57 0.66 2.39 0.65 0.50 0.49 931.93<br />

Total per 10 acres of activity 6 39.40 3.13 17.38 3.12 2.83 2.74 4464.51<br />

Note: Footnotes <str<strong>on</strong>g>for</str<strong>on</strong>g> tables are <strong>on</strong> following page<br />

C-5 Project Combusti<strong>on</strong>


Architectural Coatings<br />

No. Reqd. a NO x<br />

VOC b CO<br />

c<br />

SO 2 PM 10 PM 2.5 CO 2<br />

Equipment per 10 acres (lb/day) (lb/day) (lb/day) (lb/day) (lb/day) (lb/day)<br />

<strong>Air</strong> Compressor 1 3.57 0.37 1.57 0.25 0.31 0.30 359.77<br />

Total per 10 acres of activity 1 3.57 0.37 1.57 0.25 0.31 0.30 359.77<br />

a) The SMAQMD 2004 guidance suggests a default equipment fleet <str<strong>on</strong>g>for</str<strong>on</strong>g> each activity, assuming 10 acres of that activity,<br />

(e.g., 10 acres of grading, 10 acres of paving, etc.). The default equipment fleet is increased <str<strong>on</strong>g>for</str<strong>on</strong>g> each 10 acre increment<br />

in the size of the c<strong>on</strong>structi<strong>on</strong> project. That is, a 26 acre project would round to 30 acres <str<strong>on</strong>g>and</str<strong>on</strong>g> the fleet size would be<br />

three times the default fleet <str<strong>on</strong>g>for</str<strong>on</strong>g> a 10 acre project.<br />

b) The SMAQMD 2004 reference lists emissi<strong>on</strong> factors <str<strong>on</strong>g>for</str<strong>on</strong>g> reactive organic gas (ROG). For the purposes of this worksheet ROG = VOC.<br />

The NONROAD model c<strong>on</strong>tains emissi<strong>on</strong>s factors <str<strong>on</strong>g>for</str<strong>on</strong>g> total HC <str<strong>on</strong>g>and</str<strong>on</strong>g> <str<strong>on</strong>g>for</str<strong>on</strong>g> VOC. The factors used here are the VOC factors.<br />

c) The NONROAD emissi<strong>on</strong> factors assume that the average fuel burned in n<strong>on</strong>road trucks is 1100 ppm sulfur. Trucks that would be used<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> the Proposed Acti<strong>on</strong>s will all be fueled by highway grade diesel fuel which cannot exceed 500 ppm sulfur. These estimates there<str<strong>on</strong>g>for</str<strong>on</strong>g>e overestimate<br />

SO2 emissi<strong>on</strong>s by more than a factor of two.<br />

d) Typical equipment fleet <str<strong>on</strong>g>for</str<strong>on</strong>g> building c<strong>on</strong>structi<strong>on</strong> was not itemized in SMAQMD 2004 guidance. The equipment list above was<br />

assumed based <strong>on</strong> SMAQMD 1994 guidance.<br />

C-6 Project Combusti<strong>on</strong>


PROJECT-SPECIFIC EMISSION FACTOR SUMMARY<br />

Equipment<br />

Project-Specific Emissi<strong>on</strong> Factors (lb/day)<br />

Source<br />

Multiplier* NO x VOC CO SO 2 ** PM 10 PM 2.5 CO 2<br />

Grading Equipment<br />

1 41.641 2.577 15.710 0.833 2.546 2.469 4941.526<br />

Paving Equipment<br />

1 45.367 2.606 18.578 0.907 2.776 2.693 5623.957<br />

Demoliti<strong>on</strong> Equipment<br />

1 31.808 1.886 12.584 0.636 1.923 1.865 3703.074<br />

Building C<strong>on</strong>structi<strong>on</strong><br />

1 39.396 3.130 17.382 3.116 2.829 2.744 4464.512<br />

<strong>Air</strong> Compressor <str<strong>on</strong>g>for</str<strong>on</strong>g> Architectural Coating<br />

1 3.574 0.373 1.565 0.251 0.309 0.300 359.773<br />

Architectural Coating**<br />

2.445<br />

*The equipment multiplier is an integer that represents units of 10 acres <str<strong>on</strong>g>for</str<strong>on</strong>g> purposes of estimating the number of equipment required <str<strong>on</strong>g>for</str<strong>on</strong>g> the project.<br />

**Emissi<strong>on</strong> factor is from the evaporati<strong>on</strong> of solvents during painting, per "<strong>Air</strong> Quality Thresholds of Significance", SMAQMD, 1994<br />

Example: SMAQMD Emissi<strong>on</strong> Factor <str<strong>on</strong>g>for</str<strong>on</strong>g> Grading Equipment NOx = (Total Grading NOx per 10 acre)*(Equipment Multiplier)<br />

Summary of Input Parameters<br />

Total Area Total Area Total Days<br />

(ft 2 ) (acres)<br />

Grading: 587,204 13.48 5<br />

Paving: 402,952 9.25 45<br />

Demoliti<strong>on</strong>: 253,352 5.82 291<br />

Building C<strong>on</strong>structi<strong>on</strong>: 900 0.02 240<br />

Architectural Coating 900 0.02 20 (per SMAQMD "<strong>Air</strong> Quality of Thresholds of Significance", 1994)<br />

NOTE: The 'Total Days' estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> paving is calculated by dividing the total number of acres by 0.21 acres/day, which is a factor derived from the 2005 M<str<strong>on</strong>g>EA</str<strong>on</strong>g>NS<br />

Heavy C<strong>on</strong>structi<strong>on</strong> Cost Data, 19th Editi<strong>on</strong>, <str<strong>on</strong>g>for</str<strong>on</strong>g> 'Asphaltic C<strong>on</strong>crete Pavement, Lots <str<strong>on</strong>g>and</str<strong>on</strong>g> Driveways - 6" st<strong>on</strong>e base', which provides an estimate of square<br />

feet paved per day. There is also an estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> 'Plain Cement C<strong>on</strong>crete Pavement', however the estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> asphalt is used because it is more c<strong>on</strong>servative.<br />

The 'Total 'Days' estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> demoliti<strong>on</strong> is calculated by dividing the total number of acres by 0.02 acres/day, which is a factor also derived from the 2005<br />

M<str<strong>on</strong>g>EA</str<strong>on</strong>g>NS reference. This is calculated by averaging the demoliti<strong>on</strong> estimates from 'Building Demoliti<strong>on</strong> - Small Buildings, C<strong>on</strong>crete', assuming a height<br />

of 30 feet <str<strong>on</strong>g>for</str<strong>on</strong>g> a two-story building; from 'Building Footings <str<strong>on</strong>g>and</str<strong>on</strong>g> Foundati<strong>on</strong>s Demoliti<strong>on</strong> - 6" Thick, Plain C<strong>on</strong>crete'; <str<strong>on</strong>g>and</str<strong>on</strong>g> from 'Demolish, Remove<br />

Pavement <str<strong>on</strong>g>and</str<strong>on</strong>g> Curb - C<strong>on</strong>crete to 6" thick, rod rein<str<strong>on</strong>g>for</str<strong>on</strong>g>ced'. Paving is double-weighted since projects typically involve more paving demoliti<strong>on</strong>.<br />

The 'Total Days' estimate <str<strong>on</strong>g>for</str<strong>on</strong>g> building c<strong>on</strong>structi<strong>on</strong> is assumed to be 230 days, unless project-specific data is known.<br />

Total Project Emissi<strong>on</strong>s by Activity (lbs)<br />

NO x VOC CO SO 2 PM 10 PM 2.5 CO 2<br />

Grading Equipment 208.21 12.88 78.55 4.16 12.73 12.35 24,708<br />

Paving 2,041.53 117.26 836.03 40.83 124.92 121.18 253,078<br />

Demoliti<strong>on</strong> 9,249.90 548.32 3,659.46 185.00 559.28 542.50 1,076,884<br />

Building C<strong>on</strong>structi<strong>on</strong> 9,455.12 751.15 4,171.75 747.92 678.97 658.60 1,071,483<br />

Architectural Coatings 71.48 56.36 31.31 5.02 6.19 6.00 7,195<br />

Total Emissi<strong>on</strong>s (lbs): 21,026.23 1,485.98 8,777.10 982.94 1,382.09 1,340.62 2,433,348<br />

Results: Total Project Annual Emissi<strong>on</strong> Rates<br />

NO x VOC CO SO 2 PM 10 PM 2.5 CO 2<br />

Total Project Emissi<strong>on</strong>s (lbs) 21,026.23 1,485.98 8,777.10 982.94 1,382.09 1,340.62 2,433,348<br />

Total Project Emissi<strong>on</strong>s (t<strong>on</strong>s) 10.51 0.74 4.39 0.49 0.69 0.67 1,216.67<br />

C-7 Project Combusti<strong>on</strong>


C<strong>on</strong>structi<strong>on</strong> Fugitive Dust Emissi<strong>on</strong>s<br />

C<strong>on</strong>structi<strong>on</strong> Fugitive Dust Emissi<strong>on</strong> Factors<br />

Emissi<strong>on</strong> Factor Units Source<br />

General C<strong>on</strong>structi<strong>on</strong> Activities 0.19 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th MRI 1996; EPA 2001; EPA 2006<br />

New Road C<strong>on</strong>structi<strong>on</strong> 0.42 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th MRI 1996; EPA 2001; EPA 2006<br />

PM 2.5 Emissi<strong>on</strong>s<br />

PM 2.5 Multiplier 0.10 (10% of PM 10 EPA 2001; EPA 2006<br />

emissi<strong>on</strong>s assumed<br />

to be PM 2.5 )<br />

C<strong>on</strong>trol Efficiency 0.50 (assume 50% c<strong>on</strong>trol EPA 2001; EPA 2006<br />

efficiency <str<strong>on</strong>g>for</str<strong>on</strong>g> PM 10<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> PM 2.5 emissi<strong>on</strong>s)<br />

Project Assumpti<strong>on</strong>s<br />

New Hot Pad C<strong>on</strong>structi<strong>on</strong> (0.42 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th)<br />

Durati<strong>on</strong> of C<strong>on</strong>structi<strong>on</strong> Project<br />

Area<br />

12 m<strong>on</strong>ths<br />

9.0 acres<br />

General C<strong>on</strong>structi<strong>on</strong> Activities (0.19 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th)<br />

Durati<strong>on</strong> of C<strong>on</strong>structi<strong>on</strong> Project<br />

12 m<strong>on</strong>ths<br />

Area<br />

10.3 acres<br />

Project Emissi<strong>on</strong>s (t<strong>on</strong>s/year)<br />

PM 10 unc<strong>on</strong>trolled PM 10 c<strong>on</strong>trolled PM 2.5 unc<strong>on</strong>trolled PM 2.5 c<strong>on</strong>trolled<br />

Demoliti<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> New Hot Pad C<strong>on</strong>structi<strong>on</strong> 45.47 22.73 4.55 2.27<br />

C<strong>on</strong>structi<strong>on</strong> Activities 23.41 11.70 1.17 0.59<br />

Total 68.87 34.44 5.72 2.86<br />

C-8 Project Fugitive


C<strong>on</strong>structi<strong>on</strong> Fugitive Dust Emissi<strong>on</strong> Factors<br />

General C<strong>on</strong>structi<strong>on</strong> Activities Emissi<strong>on</strong> Factor<br />

0.19 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th Source: MRI 1996; EPA 2001; EPA 2006<br />

The area-based emissi<strong>on</strong> factor <str<strong>on</strong>g>for</str<strong>on</strong>g> c<strong>on</strong>structi<strong>on</strong> activities is based <strong>on</strong> a study completed by the Midwest Research Institute (MRI) Improvement of Specific Emissi<strong>on</strong> Factors (BACM<br />

Project No. 1), March 29, 1996. The MRI study evaluated seven c<strong>on</strong>structi<strong>on</strong> projects in Nevada <str<strong>on</strong>g>and</str<strong>on</strong>g> Cali<str<strong>on</strong>g>for</str<strong>on</strong>g>nia (Las Vegas, Coachella Valley, South Coast <strong>Air</strong> Basin, <str<strong>on</strong>g>and</str<strong>on</strong>g> the San<br />

Joaquin Valley). The study determined an average emissi<strong>on</strong> factor of 0.11 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th <str<strong>on</strong>g>for</str<strong>on</strong>g> sites without large-scale cut/fill operati<strong>on</strong>s. A worst-case emissi<strong>on</strong> factor of 0.42<br />

t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th was calculated <str<strong>on</strong>g>for</str<strong>on</strong>g> sites with active large-scale earth moving operati<strong>on</strong>s. The m<strong>on</strong>thly emissi<strong>on</strong> factors are based <strong>on</strong> 168 work-hours per m<strong>on</strong>th (MRI 1996). A<br />

subsequent MRI Report in 1999, Estimating Particulate Matter Emissi<strong>on</strong>s From C<strong>on</strong>structi<strong>on</strong> Operati<strong>on</strong>s, calculated the 0.19 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th emissi<strong>on</strong> factor by applying 25% of<br />

the large-scale earthmoving emissi<strong>on</strong> factor (0.42 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th) <str<strong>on</strong>g>and</str<strong>on</strong>g> 75% of the average emissi<strong>on</strong> factor (0.11 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th). The 0.19 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th<br />

emissi<strong>on</strong> factor is referenced by the EPA <str<strong>on</strong>g>for</str<strong>on</strong>g> n<strong>on</strong>-residential c<strong>on</strong>structi<strong>on</strong> activities in recent procedures documents <str<strong>on</strong>g>for</str<strong>on</strong>g> the Nati<strong>on</strong>al Emissi<strong>on</strong> Inventory (EPA 2001; EPA 2006). The<br />

0.19 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th emissi<strong>on</strong> factor represents a refinement of EPA's original AP-42 area-based total suspended particulate (TSP) emissi<strong>on</strong> factor in Secti<strong>on</strong> 13.2.3 Heavy<br />

C<strong>on</strong>structi<strong>on</strong> Operati<strong>on</strong>s. In additi<strong>on</strong> to the EPA, this methodology is also supported by the South Coast <strong>Air</strong> Quality Management District as well as the Western Regi<strong>on</strong>al <strong>Air</strong><br />

Partnership (WRAP) which is funded by the EPA <str<strong>on</strong>g>and</str<strong>on</strong>g> is administered jointly by the Western Governor's Associati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> the Nati<strong>on</strong>al Tribal Envir<strong>on</strong>mental Council. The emissi<strong>on</strong><br />

factor is assumed to encompass a variety of n<strong>on</strong>-residential c<strong>on</strong>structi<strong>on</strong> activities including building c<strong>on</strong>structi<strong>on</strong> (commercial, industrial, instituti<strong>on</strong>al, governmental), public works,<br />

<str<strong>on</strong>g>and</str<strong>on</strong>g> travel <strong>on</strong> unpaved roads. The EPA Nati<strong>on</strong>al Emissi<strong>on</strong> Inventory documentati<strong>on</strong> assumes that the emissi<strong>on</strong> factors are unc<strong>on</strong>trolled <str<strong>on</strong>g>and</str<strong>on</strong>g> recommends a c<strong>on</strong>trol efficiency of 50%<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> PM 10 <str<strong>on</strong>g>and</str<strong>on</strong>g> PM 2.5 in PM n<strong>on</strong>attainment areas.<br />

New Road C<strong>on</strong>structi<strong>on</strong> Emissi<strong>on</strong> Factor<br />

0.42 t<strong>on</strong> PM 10 /acre-m<strong>on</strong>th Source: MRI 1996; EPA 2001; EPA 2006<br />

The emissi<strong>on</strong> factor <str<strong>on</strong>g>for</str<strong>on</strong>g> new road c<strong>on</strong>structi<strong>on</strong> is based <strong>on</strong> the worst-case c<strong>on</strong>diti<strong>on</strong>s emissi<strong>on</strong> factor from the MRI 1996 study described above (0.42 t<strong>on</strong>s PM 10 /acre-m<strong>on</strong>th). It is<br />

assumed that road c<strong>on</strong>structi<strong>on</strong> involves extensive earthmoving <str<strong>on</strong>g>and</str<strong>on</strong>g> heavy c<strong>on</strong>structi<strong>on</strong> vehicle travel resulting in emissi<strong>on</strong>s that are higher than other general c<strong>on</strong>structi<strong>on</strong> projects.<br />

The 0.42 t<strong>on</strong> PM10/acre-m<strong>on</strong>th emissi<strong>on</strong> factor <str<strong>on</strong>g>for</str<strong>on</strong>g> road c<strong>on</strong>structi<strong>on</strong> is referenced in recent procedures documents <str<strong>on</strong>g>for</str<strong>on</strong>g> the EPA Nati<strong>on</strong>al Emissi<strong>on</strong> Inventory (EPA 2001; EPA 2006).<br />

PM 2.5 Multiplier 0.10<br />

PM 2.5 emissi<strong>on</strong>s are estimated by applying a particle size multiplier of 0.10 to PM 10 emissi<strong>on</strong>s. This methodology is c<strong>on</strong>sistent with the procedures documents <str<strong>on</strong>g>for</str<strong>on</strong>g> the Nati<strong>on</strong>al<br />

Emissi<strong>on</strong> Inventory (EPA 2006).<br />

C<strong>on</strong>trol Efficiency <str<strong>on</strong>g>for</str<strong>on</strong>g> PM 10 <str<strong>on</strong>g>and</str<strong>on</strong>g> PM 2.5 0.50<br />

The EPA Nati<strong>on</strong>al Emissi<strong>on</strong> Inventory documentati<strong>on</strong> recommends a c<strong>on</strong>trol efficiency of 50% <str<strong>on</strong>g>for</str<strong>on</strong>g> PM 10 <str<strong>on</strong>g>and</str<strong>on</strong>g> PM 2.5 in PM n<strong>on</strong>attainment areas (EPA 2006). Wetting c<strong>on</strong>trols will be<br />

applied during project c<strong>on</strong>structi<strong>on</strong>.<br />

References:<br />

EPA 2001. Procedures Document <str<strong>on</strong>g>for</str<strong>on</strong>g> Nati<strong>on</strong>al Emissi<strong>on</strong>s Inventory, Criteria <strong>Air</strong> Pollutants, 1985-1999. EPA-454/R-01-006. Office of <strong>Air</strong> Quality Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards, United<br />

States Envir<strong>on</strong>mental Protecti<strong>on</strong> Agency. March 2001.<br />

EPA 2006. Documentati<strong>on</strong> <str<strong>on</strong>g>for</str<strong>on</strong>g> the <str<strong>on</strong>g>Final</str<strong>on</strong>g> 2002 N<strong>on</strong>point Sector (Feb 06 versi<strong>on</strong>) Nati<strong>on</strong>al Emissi<strong>on</strong> Inventory <str<strong>on</strong>g>for</str<strong>on</strong>g> Criteria <str<strong>on</strong>g>and</str<strong>on</strong>g> Hazardous <strong>Air</strong> Pollutants. Prepared <str<strong>on</strong>g>for</str<strong>on</strong>g>: Emissi<strong>on</strong>s<br />

Inventory <str<strong>on</strong>g>and</str<strong>on</strong>g> Analysis Group (C339-02) <strong>Air</strong> Quality Assessment Divisi<strong>on</strong> Office of <strong>Air</strong> Quality Planning <str<strong>on</strong>g>and</str<strong>on</strong>g> St<str<strong>on</strong>g>and</str<strong>on</strong>g>ards, United States Envir<strong>on</strong>mental Protecti<strong>on</strong> Agency. July 2006.<br />

MRI 1996. Improvement of Specific Emissi<strong>on</strong> Factors (BACM Project No. 1). Midwest Research Institute (MRI). Prepared <str<strong>on</strong>g>for</str<strong>on</strong>g> the Cali<str<strong>on</strong>g>for</str<strong>on</strong>g>nia South Coast <strong>Air</strong> Quality Management<br />

District, March 29, 1996.<br />

C-9 Project Fugitive


Grading Schedule<br />

Estimate of time required to grade a specified area.<br />

Input Parameters<br />

C<strong>on</strong>structi<strong>on</strong> area:<br />

Qty Equipment:<br />

13.5 acres/yr (from Combusti<strong>on</strong> Worksheet)<br />

5.0 (calculated based <strong>on</strong> 3 pieces of equipment <str<strong>on</strong>g>for</str<strong>on</strong>g> every 10 acres)<br />

Assumpti<strong>on</strong>s.<br />

Terrain is mostly flat.<br />

An average of 6" soil is excavated from <strong>on</strong>e half of the site <str<strong>on</strong>g>and</str<strong>on</strong>g> backfilled to the other half of the site; no soil is hauled off-site or borrowed.<br />

200 hp bulldozers are used <str<strong>on</strong>g>for</str<strong>on</strong>g> site clearing.<br />

300 hp bulldozers are used <str<strong>on</strong>g>for</str<strong>on</strong>g> stripping, excavati<strong>on</strong>, <str<strong>on</strong>g>and</str<strong>on</strong>g> backfill.<br />

Vibratory drum rollers are used <str<strong>on</strong>g>for</str<strong>on</strong>g> compacting.<br />

Stripping, Excavati<strong>on</strong>, Backfill <str<strong>on</strong>g>and</str<strong>on</strong>g> Compacti<strong>on</strong> require an average of two passes each.<br />

Excavati<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Backfill are assumed to involve <strong>on</strong>ly half of the site.<br />

Calculati<strong>on</strong> of days required <str<strong>on</strong>g>for</str<strong>on</strong>g> <strong>on</strong>e piece of equipment to grade the specified area.<br />

Reference: Means Heavy C<strong>on</strong>structi<strong>on</strong> Cost Data, 19th Ed., R. S. Means, 2005.<br />

Means Line No. Operati<strong>on</strong> Descripti<strong>on</strong> Output Units<br />

Acres per<br />

equip-day)<br />

equip-days<br />

per acre<br />

Acres/yr<br />

(projectspecific)<br />

Equip-days<br />

per year<br />

2230 200 0550 Site Clearing Dozer & rake, medium brush 8 acre/day 8 0.13 13.48 1.69<br />

2230 500 0300 Stripping Topsoil & stockpiling, adverse soil 1,650 cu. yd/day 2.05 0.49 13.48 6.59<br />

2315 432 5220 Excavati<strong>on</strong> Bulk, open site, comm<strong>on</strong> earth, 150' haul 800 cu. yd/day 0.99 1.01 6.74 6.80<br />

2315 120 5220 Backfill Structural, comm<strong>on</strong> earth, 150' haul 1,950 cu. yd/day 2.42 0.41 6.74 2.79<br />

2315 310 5020 Compacti<strong>on</strong> Vibrating roller, 6 " lifts, 3 passes 2,300 cu. yd/day 2.85 0.35 13.48 4.73<br />

TOTAL 22.59<br />

Calculati<strong>on</strong> of days required <str<strong>on</strong>g>for</str<strong>on</strong>g> the indicated pieces of equipment to grade the designated acreage.<br />

(Equip)(day)/yr: 22.59<br />

Qty Equipment: 5.00<br />

Grading days/yr: 4.52<br />

C-10 Project Grading


Haul Truck Emissi<strong>on</strong>s<br />

Emissi<strong>on</strong>s from hauling c<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> demoliti<strong>on</strong> debris are estimated in this spreadsheet.<br />

Emissi<strong>on</strong> Estimati<strong>on</strong> Method References: United States <strong>Air</strong> Force (USAF) Institute <str<strong>on</strong>g>for</str<strong>on</strong>g> Envir<strong>on</strong>ment, Safety <str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Occupati<strong>on</strong>al Health Risk Analysis (IERA) <strong>Air</strong> Emissi<strong>on</strong>s Inventory Guidance Document <str<strong>on</strong>g>for</str<strong>on</strong>g> Mobile Sources at <strong>Air</strong> Force<br />

Installati<strong>on</strong>s (Revised December 2003).<br />

US EPA Estimating 2003 Building-Related C<strong>on</strong>structi<strong>on</strong> <str<strong>on</strong>g>and</str<strong>on</strong>g> Demoliti<strong>on</strong> Materials Amounts (March 2009).<br />

Assumpti<strong>on</strong>s:<br />

Haul trucks carry 20 cubic yards of material per trip.<br />

The average distance from the project site to the base l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill is 10 miles, <str<strong>on</strong>g>and</str<strong>on</strong>g> from the project site to the offsite Cerro Colorado L<str<strong>on</strong>g>and</str<strong>on</strong>g>fill is 30 miles.<br />

Assume 85% of demoliti<strong>on</strong> waste would go to the base l<str<strong>on</strong>g>and</str<strong>on</strong>g>fill <str<strong>on</strong>g>and</str<strong>on</strong>g> 15% would be transported offsite. There<str<strong>on</strong>g>for</str<strong>on</strong>g>e a haul truck will have a weighted<br />

average of 26 miles round trip.<br />

Estimated number of trips required by haul trucks = total amount of material demolished <strong>on</strong> installati<strong>on</strong>/20 cubic yards per truck<br />

Typical n<strong>on</strong>-residential demoliti<strong>on</strong> materials generati<strong>on</strong> per unit area: 158 lb/ft 2 EPA 2009<br />

Total demoliti<strong>on</strong> waste removed: 253,352 ft 2 From Project Combusti<strong>on</strong><br />

Total demoliti<strong>on</strong> waste: 40,029,616 lbs Density of demoliti<strong>on</strong> waste * project area<br />

Density of demoliti<strong>on</strong> waste: 150 lbs/ft 3 Density of c<strong>on</strong>crete (EPA 2009)<br />

Total volume of demoliti<strong>on</strong> waste: 9,884 cubic yards<br />

Number of trucks required to haul demoliti<strong>on</strong> waste: 494 Heavy duty diesel haul trucks (20 CY)<br />

Miles per round trip: 26 miles Weighted average<br />

Heavy Duty Diesel Vehicle (HDDV) Average Emissi<strong>on</strong> Factors (grams/mile)<br />

NO x VOC CO SO 2 PM 10 PM 2.5 CO 2<br />

HDDV 6.500 4.7000 19.10 0.512 7.7 2.01 1646<br />

Notes:<br />

Emissi<strong>on</strong> factors <str<strong>on</strong>g>for</str<strong>on</strong>g> all pollutants except CO 2 are from USAF IERA 2003.<br />

Emissi<strong>on</strong> factors <str<strong>on</strong>g>for</str<strong>on</strong>g> PM, PM 10 , SO x are from HDDV in Table 4-50 (USAF IERA 2003).<br />

Emissi<strong>on</strong> factors <str<strong>on</strong>g>for</str<strong>on</strong>g> VOC, CO, <str<strong>on</strong>g>and</str<strong>on</strong>g> NO x are from Tables 4-41 through 4-43 <str<strong>on</strong>g>for</str<strong>on</strong>g> the 2010 calendar year, 2000 model year (USAF IERA 2003).<br />

Diesel fuel produces 22.384 pounds of CO 2 per gall<strong>on</strong>.<br />

It is assumed that the average HDDV has a fuel ec<strong>on</strong>omy of 6.17 miles per gall<strong>on</strong>, Table 4-51 (USAF IERA 2003)<br />

CO 2 emissi<strong>on</strong> factor = 22.384 lbs CO 2 /gall<strong>on</strong> diesel * gall<strong>on</strong> diesel/6.17 miles * 453.6 g/lb<br />

HDDV Haul Truck Emissi<strong>on</strong>s<br />

NO x VOC CO SO 2 PM 10 PM 2.5 CO 2<br />

lbs 184.12 133.14 541.04 14.50 218.97 56.94 46614.63<br />

t<strong>on</strong>s 0.09 0.07 0.27 0.01 0.11 0.03 23.31<br />

Example Calculati<strong>on</strong>: NO x emissi<strong>on</strong>s (lbs) = 26 miles per round trip * 494 trips * NO x emissi<strong>on</strong> factor (g/mile) * lb/453.6 g<br />

C-11 Haul Truck On-Road


C<strong>on</strong>structi<strong>on</strong> Commuter Emissi<strong>on</strong>s<br />

Emissi<strong>on</strong>s from c<strong>on</strong>structi<strong>on</strong> workers commuting to the job site are estimated in this spreadsheet.<br />

Emissi<strong>on</strong> Estimati<strong>on</strong> Method: United States <strong>Air</strong> Force (USAF) Institute <str<strong>on</strong>g>for</str<strong>on</strong>g> Envir<strong>on</strong>ment, Safety <str<strong>on</strong>g>and</str<strong>on</strong>g> Occupati<strong>on</strong>al Health Risk Analysis (IERA) <strong>Air</strong> Emissi<strong>on</strong>s Inventory Guidance Document<br />

<str<strong>on</strong>g>for</str<strong>on</strong>g> Mobile Sources at <strong>Air</strong> Force Installati<strong>on</strong>s (Revised December 2003).<br />

Assumpti<strong>on</strong>s:<br />

Passenger vehicle emissi<strong>on</strong> factors <str<strong>on</strong>g>for</str<strong>on</strong>g> scenario year 2010 are used.<br />

Assume up to 48 workers would be required at the site.<br />

Passenger vehicle model year 2000 is used.<br />

The average roundtrip commute <str<strong>on</strong>g>for</str<strong>on</strong>g> a c<strong>on</strong>structi<strong>on</strong> worker =<br />

Number of c<strong>on</strong>structi<strong>on</strong> days =<br />

Number of c<strong>on</strong>structi<strong>on</strong> workers (daily) =<br />

Riders per vehicle =<br />

Number of vehicles (daily) =<br />

50 miles<br />

240 days<br />

48 people<br />

1 pers<strong>on</strong><br />

48 vehicles<br />

Average On-Road Vehicle Emissi<strong>on</strong> Factors (grams/mile)<br />

Vehicle Type<br />

Vehicle Type<br />

Category NO x VOC CO SO x PM 10 PM 2.5 CO 2 Category<br />

Default Fuel Ec<strong>on</strong>omies <str<strong>on</strong>g>for</str<strong>on</strong>g> On‐Road Vehicles<br />

Default Fuel<br />

Ec<strong>on</strong>omy (mpg)<br />

LDGV 2.1 2.9 33.1 0.072 0.71 0.20 391.97 Light Duty Gasoline Vehicles LDGV 22.64<br />

LDGT1 2.2 3.2 35.2 0.096 1.08 0.29 526.04 Light SUVs <str<strong>on</strong>g>and</str<strong>on</strong>g> Pickups LDGT1 16.87<br />

LDGT2 2.5 3.5 38.6 0.098 2.58 0.66 535.24 Heavy SUVs <str<strong>on</strong>g>and</str<strong>on</strong>g> Pickups LDGT2 16.58<br />

HDGV 2.9 3.5 41.1 0.154 5.51 1.42 843.56 Heavy Duty Gasoline Vehicles HDGV 10.52<br />

LDDV 1.2 0.6 1.7 0.116 0.80 0.28 373.70 Light Duty Diesel Vehicles LDDV 27.17<br />

LDDT 1.5 1.1 2.9 0.157 1.59 0.48 505.90 Light Duty Diesel Trucks LDDT 20.07<br />

HDDV 6.5 4.7 19.1 0.512 7.73 2.01 1645.60 Heavy Duty Diesel Vehicles HDDV 6.17<br />

MC 0.6 6.5 41.0 0.032 0.08 0.03 177.48 Motorcycles MC 50.00<br />

Notes:<br />

Notes:<br />

Emissi<strong>on</strong> factors <str<strong>on</strong>g>for</str<strong>on</strong>g> all pollutants except CO 2 are from USAF IERA 2003. Values from Table 4-51 (USAF IERA 2003).<br />

Emissi<strong>on</strong> factors <str<strong>on</strong>g>for</str<strong>on</strong>g> PM, PM 10 , SO x are from Table 4-50 (USAF IERA 2003).<br />

Emissi<strong>on</strong> factors <str<strong>on</strong>g>for</str<strong>on</strong>g> VOC, CO, <str<strong>on</strong>g>and</str<strong>on</strong>g> NO x are from Tables 4-2 through 4-49 <str<strong>on</strong>g>for</str<strong>on</strong>g> the 2010 calendar year, 2000 model year (USAF IERA 2003).<br />

It is assumed that the average vehicle will produce 19.564 pounds of CO 2 per gall<strong>on</strong> of gas used <str<strong>on</strong>g>and</str<strong>on</strong>g> 22.384 pounds of CO 2 per gall<strong>on</strong><br />

of diesel used (http://www.eia.doe.gov/oiaf/1605/coefficients.html).<br />

Using the default fuel ec<strong>on</strong>omy <str<strong>on</strong>g>for</str<strong>on</strong>g> the vehicle type categories in USAF IERA Table 4-51, the CO 2 emissi<strong>on</strong> factor was estimated.<br />

Example: HDDV CO 2 emissi<strong>on</strong> factor = 22.384 lbs CO 2 /gall<strong>on</strong> diesel * gall<strong>on</strong> diesel/6.17 miles * 453.6 g/lb = 1645.60 g/mile<br />

On-Road Vehicle Emissi<strong>on</strong>s (Annual)<br />

Vehicle Type<br />

Average On‐Road Vehicle Mix<br />

Vehicle Type Average On-Road<br />

Category NO x VOC CO SO x PM 10 PM 2.5 CO 2 Category Vehicle Mix (%)<br />

LDGV 1837.33 2537.27 28959.87 62.99 621.19 174.98 342943.79 LDGV 68.9<br />

LDGT1 318.48 463.24 5095.62 13.90 156.34 41.98 76150.00 LDGT1 11.4<br />

LDGT2 269.84 377.78 4166.35 10.58 278.48 71.24 57771.62 LDGT2 8.5<br />

HDGV 55.24 66.67 782.86 2.93 104.95 27.05 16067.77 HDGV 1.5<br />

LDDV 59.43 29.71 84.19 5.74 39.62 13.87 18506.96 LDDV 3.9<br />

LDDT 36.19 26.54 69.97 3.79 38.36 11.58 12205.80 LDDT 1.9<br />

HDDV 239.37 173.08 703.37 18.85 284.66 74.02 60600.05 HDDV 2.9<br />

MC 7.62 82.54 520.63 0.41 1.02 0.38 2253.77 MC 1<br />

Total (lbs) 2823.49 3756.83 40382.86 119.20 1524.62 415.10 586499.77 Notes:<br />

Total (t<strong>on</strong>s) 1.41 1.88 20.19 0.06 0.76 0.21 293.25 Vehicle mix is from Table 6-1 (USAF IERA 2003).<br />

Example Calculati<strong>on</strong>: NO x emissi<strong>on</strong>s (lbs) = 48 vehicles * percent of vehicle mix /100 * NO x emissi<strong>on</strong> factor (g/mile) * 50 miles/day * number of c<strong>on</strong>structi<strong>on</strong> days * lb/453.6 g<br />

C-12 C<strong>on</strong>structi<strong>on</strong> Commuter


Albuquerque-Mid Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Intrastate <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong> 152<br />

Point Source Emissi<strong>on</strong>s<br />

Area Source Emissi<strong>on</strong>s (N<strong>on</strong>-Point <str<strong>on</strong>g>and</str<strong>on</strong>g> Mobile Sources)<br />

Row # State County CO NOx PM10 PM2.5 SO2 VOC CO NOx PM10 PM2.5 SO2 VOC<br />

1 NM Bernalillo Co 1,179 1,199 177 119 43.6 310 184,071 23,731 61,715 8,064 1,524 24,000<br />

2 NM S<str<strong>on</strong>g>and</str<strong>on</strong>g>avol Co 346 186 94.5 92.6 0.40 62.4 39,031 4,519 36,517 4,274 603 4,517<br />

3 NM Valencia Co 153 296 1.24 1.07 0 27.1 20,566 6,847 38,871 4,125 448 2,734<br />

Gr<str<strong>on</strong>g>and</str<strong>on</strong>g><br />

Total 1,678 1,681 273 213 44 400 243,668 35,097 137,103 16,463 2,575 31,251<br />

SOURCE:<br />

http://www.epa.gov/air/data/geosel.html<br />

USEPA - <strong>Air</strong>Data NET Tier Report<br />

*Net <strong>Air</strong> polluti<strong>on</strong> sources (area <str<strong>on</strong>g>and</str<strong>on</strong>g> point) in t<strong>on</strong>s per year (2002)<br />

Site visited <strong>on</strong> 19 Oct 2009.<br />

Albuquerque-Mid Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Intrastate <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong> 152 (40 CFR 81.83)<br />

Total 2002 Point Source <str<strong>on</strong>g>and</str<strong>on</strong>g> Area Source Emissi<strong>on</strong>s <str<strong>on</strong>g>for</str<strong>on</strong>g><br />

Albuquerque-Mid Rio Gr<str<strong>on</strong>g>and</str<strong>on</strong>g>e Intrastate <strong>Air</strong> Quality C<strong>on</strong>trol Regi<strong>on</strong><br />

CO NOx PM10 PM2.5 SO2 VOC<br />

Bernalillo 185,250 24,930 61,892 8,183 1,568 24,310<br />

Total 245,346 36,778 137,376 16,676 2,619 31,651<br />

C-13 AQCR Tier Report


THIS PAGE INTENTIONALLY LEFT BLANK<br />

C-14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!