8. O&MMC Funded Projects. Minor Construction ($100,000 to<br />
$1,500,000) .<br />
ASO 11000.8<br />
13 Sep 10<br />
a. Amounts from $100,000 - $750,000 (R-2) - Commandant of the<br />
<strong>Marine</strong> <strong>Corps</strong> or commanders of various Naval systems commands.<br />
b. Over $750,000 - Not allowed, except that minor<br />
construction performed solely for correction of threats to life,<br />
safety, or health may be approved by CMC (LFF-2) for up to<br />
$1,500,000. For other construction requirements see paragraph 15<br />
below.<br />
9. Equipment Installation ($100,000 or more). Commandant of the<br />
<strong>Marine</strong> <strong>Corps</strong> or commanders of various Naval systems commands.<br />
10. M-2 Repair (over $300,000)<br />
a. Up to $5,000,000 - Commandant of the <strong>Marine</strong> <strong>Corps</strong> or<br />
commanders of various Naval systems commands. Some projects<br />
under $5,000,000 may require higher level approvals, in which<br />
case CMC (LFF) will prepare an endorsement and forward the<br />
project to the appropriate approval authority. For projects<br />
requiring no further approvals, project approval shall be as<br />
designated by CMC (LFF).<br />
b. Over $5,000,000 - Assistant Secretary of the Navy<br />
(Installations and Environment)<br />
11. Environmental Projects<br />
a. R-2 ($100,000 - $750,000)<br />
b. M-2 (over $300,000)<br />
12. Military Construction Projects (MILCON). All construction or<br />
improvement projects having a funded cost in excess of $750,000,<br />
except those performed solely for correction of threats to life,<br />
safety, or health must be included in the biannual MILCON Projects<br />
Program. MILCON Projects are individually authorized and funded<br />
by Congress.<br />
a. Unspecified Minor Construction (UMC) ($750,000 <br />
$1,500,000) urgent projects that cannot wait for the next regular<br />
MILCON submission. Specific criteria are contained in reference<br />
(m) .<br />