(a) MCO P11000.7C w/CH 1 - MCAS Cherry Point - Marine Corps
(a) MCO P11000.7C w/CH 1 - MCAS Cherry Point - Marine Corps
(a) MCO P11000.7C w/CH 1 - MCAS Cherry Point - Marine Corps
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
ASO 11000.8<br />
13 Sep 10<br />
b. The Environmental Affairs Officer will prepare all<br />
documentation required for compliance with environmental<br />
protection laws and regulations, such as Environmental Impact<br />
Statements, Environmental Assessments, and Decision Memoranda,<br />
utilizing siting and scoping data provided by the FDO. The FDO<br />
will insure that significant environmental studies, documents,<br />
permit applications, and mitigation plans, which are not available<br />
in-house through EAD, are programmed into the scope and cost<br />
estimate for the projects for completion by contract services.<br />
c. The FDO will prepare Figure 7-1, and compile the complete<br />
submittal package per current guidance and regulations and submit<br />
to Headquarters <strong>Marine</strong> <strong>Corps</strong>.<br />
15. Document Distribution. R-2 and MILCON items that are<br />
submitted for funding and their relevant priority lists will be<br />
distributed locally as follows:<br />
a. Director of Facilities.<br />
b. FEO.<br />
c. Assistant Chief of Staff, G-4, 2d MAW - (copies of 2d MAW<br />
projects) .<br />
d. FMO.<br />
16. Real Estate and Property Records<br />
a. The Equipment Planning and Programming Division, FDD,<br />
shall be responsible for:<br />
(1) The preparation of all out-grants/licenses/leases.<br />
(2) Review of existing facility records to ensure<br />
accuracy.<br />
(3) Updating of facility records to reflect changes due to<br />
acquisition, excess/survey, maintenance, improvement, self-help,<br />
etc., as required.<br />
(4) Submittal of required record reports (i.e., semiannual<br />
lease reviews).<br />
6-6 ENCLOSURE (1)