ASO 11000.8<br />
13 Sep 10<br />
Upon final determination of requirements, the FDO and in<br />
conjunction with the AC/S MCCS will determine, using the Facility<br />
Planning Document (FPD) , the best means of satisfying deficiencies<br />
in terms of specific projects. These projects will then be listed<br />
on the Summary for Correction of Deficiencies (NAVFAC Form 10956)<br />
by category (i.e., club, exchange, commissary, or recreation) and<br />
fiscal year and included in the appropriate construction program<br />
submission.<br />
5. Projects Submitted for <strong>MCO</strong>N (APF). Projects proposed for<br />
MILCON funding will go through the review process as described in<br />
reference (n). The FDD will issue a call biannually requesting<br />
candidate MILCON projects four to nine fiscal years in the future.<br />
6. Projects Submitted for MCCS CCF (NAF). Projects proposed will<br />
be developed and forwarded with the required documentation as<br />
outlined in reference (n) to MCCS for inclusion of financial<br />
documentation and forwarding to HQMC (MR) , with a copy to HQMC<br />
(LFF) .<br />
7. Projects Submitted for Local Funding, APF or NAF<br />
a. APF minor construction requests will be submitted per the<br />
annual call for projects as previously described in Chapter 6.<br />
b. NAF minor construction requests will be submitted to the<br />
AC/S MCCS for evaluation and forwarding to FDD for preliminary<br />
design and cost estimating. After project documentation has been<br />
developed,_ it is returned to MCCS for approval and funding as<br />
appropriate.<br />
8. NAF Project Approval Authority<br />
a. Funding Authority<br />
(1) Projects less than $200K are normally budgeted for,<br />
approved, funded, and capitalized at the local level. (The NAF<br />
Construction Committee will consider requests for a lesser amount<br />
on a case-by-case basis depending on the financial wherewithal of<br />
the requesting command) .<br />
(2) Projects less $500K MAY be approved by the<br />
installation commander using solely local funds. If they are over<br />
$200K, they are to be transferred to CMC for depreciation.<br />
Constructions projects between $200K-$500K must be reported to<br />
Congress via OSD.<br />
7-2 ENCLOSURE (1)