Draft RD/RAWP<br />

<strong>Remedial</strong><br />

<strong>Action</strong> at IR Site 25<br />

Former NAS Moffett Field<br />

Moffett Field, California<br />

rules regarding characterization,<br />

<strong>and</strong> all disposal facilities used during this project will be<br />

licensed waste facilities with permits <strong>and</strong> licenses in place.<br />

Other chemical-specific ARARs in the ROD address water quality. All actions taken during<br />

the<br />

RA, including water diversion (Section 4.2), will conform<br />

to requirements stipulated in the Basin<br />

<strong>Plan</strong> promulgated by<br />

the Water Board.<br />

Location-specific ARARs in the IR Site 25 ROD addresss biological issues <strong>and</strong> include the<br />

Endangered Species Act (ESA); the Migratory Bird Treaty Act (MBTA) of 1972; <strong>and</strong> the<br />

Coastal Zone Management Act. As described in subsequent sectionss of the RD/ RAWP, all RA<br />

activities<br />

will be conducted in conformance with these biological ARARs.<br />

Other location-specific ARARs in the ROD address navigable waters <strong>and</strong> protection of wetl<strong>and</strong>s.<br />

As described herein, the RA activities will not result in releases of excavated sediment <strong>and</strong> will<br />

not affect the course,<br />

location, condition, or capacity of adjacent navigable waters. Wetl<strong>and</strong>s<br />

will be restored as necessary to provide for habitat restoration <strong>and</strong> the recovery of wetl<strong>and</strong> areas<br />

will be monitored.<br />

3.3 LIST OF DRAWINGS<br />

Appendix<br />

D is the set of technical RD drawings. These drawings form the basiss of the RA<br />

activities<br />

to be implemented in the field. Information in the drawings includes the location <strong>and</strong><br />

planned depth of excavation, <strong>and</strong><br />

the resulting volume off sediment to<br />

be removed from each<br />

polygon. The Civil Site <strong>Plan</strong>s (CSPs) indicate in detail the polygonss to be excavated, as<br />

identifiedd in the pre-design study<br />

(KCH, 2011). The CSPs were generated using<br />

the computer-<br />

<strong>and</strong><br />

aided design (CAD) system <strong>and</strong> the GIS used<br />

by the Navy <strong>and</strong> NASAA ARC. The northing easting coordinates of the corners of each polygon to be excavated will be forwarded to the<br />

excavation team for delineating the target areas in the field.<br />

14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!