Draft RD/RAWP<br />

<strong>Remedial</strong><br />

<strong>Action</strong> at IR Site 25<br />

Former NAS Moffett Field<br />

Moffett Field, California<br />

feasible. Decontamination will proceed until<br />

all sediment <strong>and</strong> residues are removed. Waste<br />

liquids will be contained <strong>and</strong> disposed of properly.<br />

6.7 INSPECTIONS<br />

Inspections to be conducted during the site remediation of IR Site 25<br />

are described in the QCP<br />

(Appendix A).<br />

6.8 DEMOBILIZATION<br />

ITSI willl demobilize earthwork equipment <strong>and</strong> personnel as activities are completed. Upon<br />

completion of all site<br />

activities, the ITSI field<br />

representative will inspect the equipment storage<br />

area <strong>and</strong> sediment laydown areas, to verify that all project-related equipment, trash, <strong>and</strong> debris<br />

have been collected <strong>and</strong> properly<br />

disposed.<br />

Demobilization will also include the disposition of government-owned property,<br />

if any; removal<br />

of equipment, tools, <strong>and</strong> supplies; removal of<br />

temporary fencing, traffic control devices, signs,<br />

storage containers, portable toilets, <strong>and</strong> refuse containers. A final site inspectionn will be held<br />

by<br />

the Navy, ITSI, <strong>and</strong> other stakeholders (NASA ARC, MROSD) as may be required.<br />

28