27.04.2015 Views

City of Forest Park Starr Park Outdoor Pool Bid Specification for Pool ...

City of Forest Park Starr Park Outdoor Pool Bid Specification for Pool ...

City of Forest Park Starr Park Outdoor Pool Bid Specification for Pool ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

7. Grout in new tile.<br />

8. Saw cut the coping and install a bead <strong>of</strong> caulk.<br />

9. Coping cut shall be made through the full thickness <strong>of</strong> the deck slab.<br />

10. Cut shall be pressure washed and allowed to dry be<strong>for</strong>e caulk (vulchem 116 or equal) is<br />

applied.<br />

11. Water line tile will be done be<strong>for</strong>e re-plastering <strong>of</strong> pool.<br />

102.2 – EXPANSION JOINTS IN POOL<br />

1. Remove all existing expansion joint tile.<br />

2. Remove all <strong>of</strong> the backer rod and or filler material.<br />

3. Furnish and install rod and tile with new tile 4”x4” that is chemical resistant, frost pro<strong>of</strong><br />

and is non-skid ceramic tile. Color – black.<br />

102.3 – STAIR TRIM TILE<br />

1. Furnish and replace stair trim tile with new tile that is chemical resistant, frost pro<strong>of</strong> and<br />

non-skid tile – color to be chosen by Owner.<br />

103 – MAIN DRAIN<br />

1. Drain grates and frames must be VGB certified and comply with ANSI/ASME<br />

A112.19.8-2007 <strong>for</strong> use in swimming pool.<br />

2. Remove existing main drain frame and grate.<br />

3. Verify sumps meet VGB requirements.<br />

4. Net opening in each floor outlet covering or grating shall be at least four times the area so<br />

that maximum velocity <strong>of</strong> the water passing the grate will not exceed one and one-half<br />

feet per second (1-1/2fps)<br />

5. Saw cut out 18’x18’ section <strong>of</strong> pool floor. Install new 18’x18’ waterway (or equivalent)<br />

grates and frame.<br />

104 – SKIMMERS<br />

1. Skimmers shall comply with NSF International Standard 50 and VGB compliant.<br />

2. Saw cut deck and remove existing skimmers and piping.<br />

3. Remove existing skimmer throats.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!