eceive all directions and instructions from the CPC Engineer, on behalf of<br />

the Contractor.<br />

3.2.7. The Contractor shall supply crane operators, riggers & helpers with the<br />

crane.<br />

3.2.8. Cables, wire slings, I bolts, D - shackles will be supplied by CPC and those<br />

have to be returned before leaving the Refinery premises. Any shortages will<br />

be deducted from the final bill.<br />

3.2.9. Fuel (Diesel) may be supplied to the contractor if requested at the market<br />

price prevailing at the date of filling and total cost of such supplies will be<br />

deducted from the progress payment and final bill. See appendix IV<br />

3.2.10. Selected contractor shall not employ CPC permanent or casual (labor) for<br />

any work included in this tender<br />

3.3. Time schedule and service cost<br />

3.3.1. Shut down is scheduled to be started tentatively in the first half of the July<br />

2012 and the durations will be 33 days; the service will be required only for<br />

10days. However the shutdown time will be change due to unavoidable<br />

circumstance.<br />

3.3.2. Working time during shutdown<br />

Sunday, Monday, Tuesday, Wednesday<br />

Thursday<br />

Friday<br />

0730- 1930 hrs<br />

0730-1630 hrs<br />

3.3.3. Other holidays such as Poya days, mercantile holidays and Public holidays<br />

are considered to be working days during the shutdown period.<br />

3.3.4. Normally Saturdays are holidays. However the selected contractor may have<br />

to work even on Saturdays and long working hours depending on the<br />

criticalness of the Job. No payment will be entitled on Saturdays for<br />

being idling.<br />

3.3.5. The contract shall be carried out on daily & hourly basis for the specified<br />

period as in table-1 all hiring charges shall cover the salaries and other<br />

expenses of operators, supervisor and helpers. Mobilization and<br />

demobilization charges shall include all transport and setting up charges.<br />

Finally the tender shall cover the cost of all the work contributions<br />

stipulated in this document, taxes if applicable, Bidders are strictly advised<br />

to follow the given price schedules. Offers which are not in compliance with<br />

the price schedule will not be considered for evaluation and will be rejected<br />

and if taxes are not mentioned separately, such taxes will be considered as<br />

not relevant for the bid.<br />

3.3.6. All offered rates in the SCHEDULE OF PRICES will not be allowed to change<br />

within the bid validity period due to any change of the prices of fuel and<br />

other consumables in the market.<br />

3.4. Sanitation Facilities<br />

3.4.1. Toilets<br />

Contractor and his employees shall use the toilets and washing facilities<br />

reserved for contractors. No other facilities shall be used by his personnel.<br />