Description Unit Data<br />

WIND GENERATION<br />

Location<br />

Erris, Mayo<br />

Capacity zoned within 25km MW 3000MW approx.<br />

Predicted wind at 100m+ height m/s 10<br />

Capacity factor expected % 52<br />

Required optimum capacity MW 1850<br />

Number of turbines if 3MW rated - 615<br />

class 1, 1A Type<br />

Hub Height m 130+<br />

Turbine separation 360 degrees m 500<br />

Connection to Glinsk kV 110/220 AC XLPE<br />

underground or similar<br />

Projected annual power production TWhr 8.3<br />

ENERGY STORAGE HUB<br />

Operating head m 295.5<br />

Reservoir volume m3 8,900,000<br />

Energy storage capacity<br />

MWhr 6,000/cycle<br />

Minimum drawdown, fill rate hours 6,7<br />

Rated capacity MW 960<br />

Projected annual power storage TWhr 3.25<br />

HVDC TRANSMISSION<br />

Cable Type - Bipole, buried<br />

From location (1,2) - Glinsk, Mayo<br />

To location (1) - AC system Woodland<br />

To location (2) - DC interconnector, Woodland<br />

Cable length km 270 approx<br />

Commutation - Voltage Sourced<br />

Maximum cable power (certified) MW 550<br />

Maximum output combined cables MW 1100<br />

Projected average power MW 1000 for 7400 hours/year<br />

<strong>Organic</strong> <strong>Power</strong> Ltd<br />

Issued September 2011<br />

FBD House, Mardyke Street, Skibbereen,<br />

County Cork, Ireland<br />

Tel: +353 (0)28 51951<br />

E-mail: info@organicpower.ie<br />

Web : www.organicpower.ie

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!