RAILWAY ELECTRIFICATION<br />

SECUNDERABAD<br />

TENDER NOTICE<br />

For and on behalf of the President of the Union of India, Dy Chief Signal and Telecommunications Eng<strong>in</strong>eer, Railway Electrification, Secunderabad <strong>in</strong>vites<br />

sealed tenders (open) for the follow<strong>in</strong>g works:<br />

Completion<br />

Cost of Tender form<br />

Approximate<br />

Tender No.<br />

Description of work<br />

period<br />

E.M.D<br />

(Rs.)<br />

value (Rs.)<br />

(Rs.)<br />

In person By Post<br />

RESC/S&T//Tender/KGI- Telecom work <strong>in</strong> connection with 25KV 28,61,849/- 6 months. 57,240/- 3380/- 3880/-<br />

CPJ/01,<br />

<strong>electrification</strong> <strong>in</strong> KGI to CPJ of KGI-MYS section of<br />

dated:07.02.2012. south Western Railway.<br />

Sl.No. Description Time Date<br />

1 Last date of issue of Tender Documents <strong>in</strong> person 17-30 Hrs 12-03-2012<br />

2 Last date of issue of Tender Documents by post 17-30 Hrs 02-03-2012<br />

3 Clos<strong>in</strong>g of Tender Box 15-00 Hrs 13-03-2012<br />

4 Open<strong>in</strong>g of Tender Box 15-30 Hrs 13-03-2012<br />

If the date of open<strong>in</strong>g of tenders happens to be a declared holiday at a later date, the tenders will be opened on the next work<strong>in</strong>g day at the<br />

stipulated time.<br />

Tenderers are requested to submit their offers between 14hrs to 15hrs on the open<strong>in</strong>g date, <strong>in</strong> sealed covers – <strong>in</strong> the tender box.<br />

Tenderers are requested to sign on all papers of tender document, before submitt<strong>in</strong>g the offer <strong>in</strong> tender box – otherwise the tender<br />

will be considered <strong>in</strong>valid.<br />

For further tender conditions/ details (available <strong>in</strong> the tender documents) and for download<strong>in</strong>g of tender documents, please visit<br />

our website http://www.core.<strong>in</strong>dian<strong>railway</strong>s.<strong>gov</strong>.<strong>in</strong>/<br />

Eligibility Criteria for works cost<strong>in</strong>g more than 50 lakh rupees :-<br />

Total contract amount received: The Tenderer should have received total contract amount, <strong>in</strong> the last three f<strong>in</strong>ancial years i.e. three previous f<strong>in</strong>ancial years<br />

and current f<strong>in</strong>ancial year (with reference to the date of open<strong>in</strong>g of tender) m<strong>in</strong>imum of 150% of advertised tender value of the work. An attested certificate<br />

from the employer/ client/ Audited balance sheet duly certified by the Chartered Accountant must be submitted for the same.<br />

Work experience: The Tenderer should have completed, <strong>in</strong> the last three f<strong>in</strong>ancial years i.e. three previous f<strong>in</strong>ancial years and current year (with reference to<br />

the date of open<strong>in</strong>g of tender) at least one similar work (def<strong>in</strong>ed <strong>in</strong> tender document), for a m<strong>in</strong>imum value of 35% of advertised tender value of work. All the<br />

documents <strong>in</strong> support of the eligibility criteria shall be submitted duly attested by a gazetted officer. Offers received with out relevant document support<strong>in</strong>g<br />

eligibility criteria will not be considered. No post tender correspondence will be enterta<strong>in</strong>ed from the tenderers.<br />

Deputy Chief Signal & Telecom. Eng<strong>in</strong>eer,<br />

Railway Electrification, Secunderabad -71.<br />

for and on behalf of the President of the Union of India.<br />

Information regard<strong>in</strong>g Date and time of tender open<strong>in</strong>g, EMD amount, work description, period of completion,<br />

Tender notice number, application cost – given <strong>in</strong> this page is f<strong>in</strong>al and will have overrid<strong>in</strong>g priority over any other<br />

<strong>in</strong>formation conta<strong>in</strong>ed <strong>in</strong> the tender booklet for these items.<br />

NOTE:<br />

1(a) The above Earnest Money deposit shall be furnished <strong>in</strong> the form of Cash/FDR/DD drawn <strong>in</strong> favor of Dy FA&CAO/RE/SC valid for a period of 90 days from the date<br />

of Tender Open<strong>in</strong>g. Earnest Money <strong>in</strong> the form of Bank Guarantee Bonds is not acceptable.<br />

(b) If the Tenderer desires to furnish <strong>in</strong> cash towards EMD, they should deposit the amount <strong>in</strong> the Divisional Cashier‟s office (Pay)/Railway<br />

Electrification/Secunderabad before the tender submission and obta<strong>in</strong> money receipt, which should be enclosed with the Tender.<br />

(c) The stand<strong>in</strong>g Earnest Money Deposit, if any with the Railway, will not be considered for the purpose of this Tender.<br />

(d) The Tender form, which is not accompanied with the requisite Earnest Money, will summarily be rejected. The “On Account” name of the tender should be specifically<br />

and clearly mentioned on the EMD certificate. The tender document should be dropped <strong>in</strong> the sealed box kept <strong>in</strong> the office of the undersigned or any other location as<br />

specified below. Railway is not responsible for any postal delays <strong>in</strong> transmission of the tender booklets by Regd. Post. Railways reserve the right to cancel the tender at<br />

any time without assign<strong>in</strong>g any reason thereto.<br />

2 The tender should be submitted <strong>in</strong> the prescribed form obta<strong>in</strong>ed from the office of the Deputy Chief Signal &<br />

Telecom Eng<strong>in</strong>eer (Railway Electrification), Secunderabad on submission of Cash Receipt as per the cost <strong>in</strong>dicated<br />

above <strong>in</strong> person.<br />

3 The cost of Tender documents should be remitted to the Sr.Divisional Cashier (Pay), Railway Electrification, Secunderabad, and the Money Receipt so obta<strong>in</strong>ed should<br />

be submitted <strong>in</strong> orig<strong>in</strong>al along with a letter of request to the Deputy Chief Signal & Telecom Eng<strong>in</strong>eer (Railway Electrification), Secunderabad for issue of Tender<br />

Documents. Please note that money receipt so obta<strong>in</strong>ed will only be accepted. Direct payment to the office of the undersigned will not be enterta<strong>in</strong>ed. Money orders<br />

are not accepted. EMD should be <strong>in</strong> favor of Dy.FA&CAO/RE/SC<br />

4 In case the tenderer is not <strong>in</strong> a position to take the schedule <strong>in</strong> person, clear authorization letter duly attest<strong>in</strong>g the specimen signature should be produced.<br />

5 The tender documents are not transferable and cost of the tender documents is not transferable & refundable.<br />

6. The tender documents duly completed <strong>in</strong> all respects shall be dropped <strong>in</strong> the tender box kept for the purpose at the<br />

follow<strong>in</strong>g places:<br />

Tender Hall, Dy.CEE/RE/SBC office, 2 nd floor, Bangalore Central Railway Station Build<strong>in</strong>g Platform No:1, Railway Electrification office. Ph:<br />

09741422300/ 09448344700<br />

7 Tenders will be opened at the above place <strong>in</strong> the presence of those tenderers who are present at that time.<br />

8 If dur<strong>in</strong>g the process the tender f<strong>in</strong>alization, it is detected that tenderer has submitted tender documents after mak<strong>in</strong>g any changes/ additions/ deletions <strong>in</strong> the tender<br />

documents down loaded from website, his offer will be summarily rejected and the earnest money deposited by the tenderer shall be forfeited by the Railway.<br />

Contractor’s signature with stamp Page 1


NAME OF WORK: Telecom work <strong>in</strong> connection with 25KV <strong>electrification</strong> <strong>in</strong> KGI to CPJ of KGI-MYS section of south Western Railway.<br />

S.NO.<br />

1<br />

Schedule<br />

SCHEDULE<br />

ESTIMATED AMOUNT<br />

RUPEES IN FIGURES<br />

Rs.<br />

28,61,849/-<br />

TENDERER’S OFFER ON PAR<br />

OR ABOVE OR BELOW (IN<br />

PERCENTAGE)<br />

(+) OR ( -)<br />

In Figures<br />

In Words<br />

TENDERERS TO NOTE:<br />

1. Tenderer is requested to quote only percentage of their rates <strong>in</strong> comparison with the estimated rates.<br />

2. Tenderer should not quote <strong>in</strong>dividual item wise rates.<br />

3. Percentages quoted for <strong>in</strong>dividual items or groups not <strong>in</strong> accordance with the Schedule will be summarily rejected.<br />

4. 1% of the bill will be deducted towards a statutory requirement of “workers welfare fund”.<br />

5. The work is to be executed <strong>in</strong> SWRly and hence the practices and draw<strong>in</strong>gs of SWR will be followed unless otherwise<br />

specified.<br />

SIGNATURE OF TENDERER<br />

EXAMPLE:<br />

1. If the tenderer <strong>in</strong>tends to quote their rates on par with estimated rates, they have to write `RATES AT PAR’.<br />

2. If the tenderer is <strong>in</strong>tended to quote his rate `ABOVE’ percentage of the estimated rates, he has to write (+)<br />

Plus %.<br />

3. If the tenderer is <strong>in</strong>tended to quote his rates `BELOW’ percentage of the estimated rates, he has to write (-)<br />

M<strong>in</strong>us %.<br />

Dy.Chief Signal & Telecom.Eng<strong>in</strong>eer (Railway Electrification),<br />

Secunderabad – 71.<br />

Note:<br />

1. The tenderer is requested to go through the schedule thoroughly before quot<strong>in</strong>g their offer.<br />

2. Stores for this work is situated at Vikarabad, hence all material to be lifted/handed over from this store only –<br />

unless otherwise directed by officer-<strong>in</strong>-charge of the work.<br />

Contractor’s signature with stamp Page 2


VOLUME - I<br />

<br />

<br />

SALIENT FEATURES OF THIS TENDER<br />

Tenderers are requested to go through the “Check List for submission of Tender Document” given as “Annexure-1” <strong>in</strong> chapter-I of Volume-II carefully.<br />

Tenderer are requested specifically go through the tender conditions perta<strong>in</strong><strong>in</strong>g to Earnest Money, Security Deposit, Performance Guarantee,<br />

besides other tender conditions before submitt<strong>in</strong>g their offer.<br />

CONTENTS<br />

S. No. PART DESCRIPTION PAGE NO.<br />

1 I GENERAL INSTRUCTIONS<br />

2 II SCHEDULE OF QUANTITIES<br />

3 III TECHNICAL SPECIFICATIONS (ENCLOSURE-I)<br />

TECHNICAL SPECIFICATIONS (ENCLOSURE- II)<br />

ALL ARE<br />

IN CONTINUATION<br />

TENDERER‟S SCHEME OF WORK & TIME SCHEDULE (FORM - 1), DECLARATION<br />

4 IV SCHEDULE OF RATES FOR SUPPLY AND ERECTION PORTION (ENCLOSURE III)<br />

VOLUME - I<br />

PART - I<br />

GENERAL INSTRUCTIONS<br />

1.Offer letter.<br />

2.Annexure 'A' specifications & draw<strong>in</strong>gs to be supplied with tender paper.<br />

3.Information concern<strong>in</strong>g various paras of Volume II.<br />

4.Information about Modification/ addition <strong>in</strong> para 5.18 & 5.19 of Technical specifications, Draw<strong>in</strong>gs and Technical <strong>in</strong>structions for signall<strong>in</strong>g works<br />

(2002 Edition).<br />

To,<br />

The President of India<br />

Act<strong>in</strong>g through<br />

Chief Project Manager/<br />

Dy. Chief Signal & Telecom Eng<strong>in</strong>eer/<br />

Assistant Signal & Telecom Eng<strong>in</strong>eer,<br />

Railway Electrification,<br />

Secunderabad<br />

1.OFFER LETTER<br />

I/We -------------------------------------------------------------------------- have read the various conditions of the tender attached hereto and hereby agree to ABIDE BY<br />

THE SAID CONDITIONS. I/ We also agree to keep this tender open for acceptance for a period of 90 days from the date fixed for open<strong>in</strong>g of the same and <strong>in</strong><br />

default thereof. I/ We will be liable for forfeiture of my/ our Earnest Money. I/ We offer to do the work as detailed <strong>in</strong> Page 1, above.<br />

1. I/We also hereby agree to abide by the general and special conditions of contract and to carry out the work accord<strong>in</strong>g to the specifications for materials<br />

and works laid down by the Railway and present contract.<br />

2. A sum of Rs. as mentrioned <strong>in</strong> Page number 1, above is hereby forwarded as “Earnest Money”. The full value of “Earnest Money” shall stand<br />

forfeited without prejudice to any other rights or remedies if,<br />

(a) I/ We do not execute the Contract Agreement with<strong>in</strong> 15 (Fifteen) DAYS after the issue of LOA as specified <strong>in</strong> Para 4.0 of Chapter- II, Volume-II i.e.<br />

Special Conditions of Contract.<br />

Or<br />

(b) I/ we do not commence the work with<strong>in</strong> 10 days after receipt of orders to that effect.<br />

3. Until a formal agreement is prepared and executed the acceptance of this tender shall constitute a b<strong>in</strong>d<strong>in</strong>g contract between us subject to<br />

modifications, as may be mutually agreed to between us and <strong>in</strong>dicated <strong>in</strong> the “LETTER OF ACCEPTANCE” of my/ our offer for this work.<br />

CONTRACTOR‟S ADDRESS:<br />

-----------------------------------<br />

-------------------------------------<br />

-----------------------------------<br />

--------------------------------------<br />

SIGNATURE OF CONTRACTOR<br />

DATE:<br />

Contractor’s signature with stamp Page 3


WITNESS:-<br />

1. SIGNATURE:<br />

NAME:<br />

DATE:<br />

ADDRESS:<br />

2. SIGNATURE:<br />

NAME:<br />

DATE:<br />

ADDRESS:<br />

INFORMATION ABOUT VOLUME-II (May-2006) INSTRUCTIONS TO TENDERERS AND CONDITIONS OF TENDERING AND SPECIAL CONDITIONS OF<br />

CONTRACT.<br />

1. Name of work<br />

Please refer to Page 1, above.<br />

(In terms of Para 1.1 of Chapter-I,<br />

Volume-II)<br />

2 The list of addresses to which<br />

correspondence and documents relat<strong>in</strong>g<br />

to contract should be sent as per para 2<br />

of Chapter-II, Volume-II.<br />

3 RE/Stores Depot for Railway Supply<br />

materials <strong>in</strong> terms of Para 8.1 of Chapter-<br />

II Volume-II.<br />

4 List of the materials to be supplied by the<br />

Railways <strong>in</strong> terms of Para 8.1 of Chapter-<br />

II Volume-II.<br />

5 List of the material for on account<br />

payment <strong>in</strong> terms of Para 28.3.1 of<br />

Chapter- II Volume-II.<br />

6 List of the items perta<strong>in</strong><strong>in</strong>g to supply &<br />

<strong>in</strong>stallation schedule for which 85%<br />

payment will be admissible <strong>in</strong> case of<br />

delay <strong>in</strong> execution on Railways account <strong>in</strong><br />

terms of para 28.3.2 of Chapter-II<br />

Volume-II.<br />

As per Annexure „B‟<br />

Please refer to Page 2, above under Note-2.<br />

As per Annexure „C‟<br />

As per Annexure „D‟<br />

As per Annexure „E‟<br />

TENTATIVE MINI PLANS, SPECIFICATIONS AND DRAWINGS TO BE SUPPLIED WITH TENDER PAPER.<br />

S.N. Description Draw<strong>in</strong>g No.<br />

1 Tentative M<strong>in</strong>i Plans for Modification<br />

of Central/ End Panel at 4 stations &<br />

Interested tenderers are requested to collect these documents from the<br />

office of Dy.CSTE/RE/SC, follow<strong>in</strong>g the due procedure.<br />

MACLS Modification<br />

2 Godamgurra<br />

3 Dharur<br />

4 Rukhmapur<br />

5 Mantatti<br />

6 Cable Term<strong>in</strong>ation Board Drg.No.CORE/S&T/ALD/SK/505/2001<br />

7 Composite Relay racks Drg.No.CORE/S&T/ALD/SK/504/2001<br />

ANNEXURE „A‟<br />

ANNEXURE „B‟<br />

I. LIST OF ADDRESSES FOR ALL POLICY, CONTRACTUAL AND COMMERCIAL MATTERS:<br />

I PRIOR TO & AFTER AWARD OF THE CONTRACT:<br />

Chief Project Manager,<br />

Railway Electrification, Secunderabad-500071<br />

II. FOR SECURITY DEPOSITS:<br />

The Dy F<strong>in</strong>ancial Advisor& Chief Accounts Officer,<br />

Railway Electrification,Secunderabad -500071<br />

III. FOR MATTERS RELATING TO PARTICULAR DESIGN AND WORKING DRAWINGS:<br />

The Dy Chief Signal & Telecom Eng<strong>in</strong>eer,<br />

Railway Electrification, Near Hyderabad Bhavan,<br />

Secunderabad-500071<br />

IV. MATTERS RELATED TO PROGRESS OF FIELD WORKS, SCHEDULE OF QUANTITIES AND SUBMISSION OF BILLS WILL BE INTIMATED IN<br />

DUE COURSE BY<br />

The Deputy Chief Signal & Telecom Eng<strong>in</strong>eer,<br />

Railway Electrification, Secunderabad-500071<br />

V. AUTHORITY TO WHOM DETAILED TIME SCHEDULE IS TO BE SUBMITTED BY CONTRACTOR<br />

The Deputy Chief Signal & Telecom Eng<strong>in</strong>eer,<br />

Railway Electrification, Secunderabad-500071<br />

ANNEXURE „C‟<br />

Contractor’s signature with stamp Page 4


LIST OF MATERIALS TO BE SUPPLIED BY RAILWAYS.<br />

(A) Signal<strong>in</strong>g items.<br />

1. All types of relays.<br />

2. Surge dischargers.<br />

3 Block <strong>in</strong>struments, Block bell equipment and Filter unit.<br />

4. Underground Signal<strong>in</strong>g cables, Alum<strong>in</strong>um Power Cables, 4/6 Quad and PIJF telecom cables.<br />

5. Inverters.<br />

6. Voltage Stabilizers.<br />

7 SM‟S control frames<br />

8. Two position m<strong>in</strong>i levers, Rack & P<strong>in</strong>ion levers.<br />

9. Po<strong>in</strong>t Rodd<strong>in</strong>g (solid) 32 mm as mentioned <strong>in</strong> schedule.<br />

10. Po<strong>in</strong>t mach<strong>in</strong>es.<br />

11. DG sets.<br />

12. AC immunized motors for po<strong>in</strong>t mach<strong>in</strong>es.<br />

13. Axle Counters/ Digital Axle Counters.<br />

14. Integrated Power Supply System.<br />

15. Data loggers, Modem, Central monitor<strong>in</strong>g Unit, FEP along with Soft wares & UPS.<br />

16. Block prov<strong>in</strong>g by axle Counters (Axle Counters, Multiplexers with its Rack, S.M‟s Block Panel, Comb<strong>in</strong>er/Converter & 4 W/2W Converter Cards.<br />

17. LED Signal Light<strong>in</strong>g Unit of all colours & types.<br />

18. Secondary Cells/Low ma<strong>in</strong>tenance lead acid cell.<br />

19. All types of transformers.<br />

20. All types of Charger <strong>in</strong>clud<strong>in</strong>g track feed battery chargers<br />

(B) Eng<strong>in</strong>eer<strong>in</strong>g items<br />

1. Gauge tie plates.<br />

2. Mach<strong>in</strong>ed fishplates with longer nuts and bolts.<br />

3. Wooden sleepers.<br />

4. Glued Jo<strong>in</strong>ts.<br />

ANNEXURE „D‟<br />

Schedule - 1<br />

LIST OF MATERIALS FOR “ON ACCOUNT PAYMENT” IN TERMS OF PARA 28.3.1 OF SPECIAL CONDITIONS OF CONTRACT.<br />

S.No. SOR Brief Description<br />

Item No.<br />

1 310 Supply of SLB/BSLB/SB<br />

2 312 Supply of CLS post 3.6 M etc.<br />

3 313 Supply of CLS post 4.6 M etc<br />

4 314 Supply of CLS post 5.6 M etc<br />

5 315 Supply of CLS unit 2 Aspect etc.<br />

6 316 Supply of CLS unit 3 Aspect etc.<br />

7 317 Supply of CLS unit 4 Aspect etc.<br />

8 318 Supply of CLS unit 3 Aspect with 1 way route <strong>in</strong>dicator etc.<br />

9 319 Supply of CLS unit 3 Aspect with 2 way route <strong>in</strong>dicator etc.<br />

10 320 Supply of CLS unit 3 Aspect with 3 way route <strong>in</strong>dicator etc.<br />

11 321 Supply of CLS unit 3 Aspect with 4 way route <strong>in</strong>dicator etc.<br />

12 322 Supply of CLS unit 2 Aspect with 1 way route <strong>in</strong>dicator etc.<br />

13 323 Supply of CLS unit 2 Aspect with 2 way route <strong>in</strong>dicator stencil type etc.<br />

14 324 Supply of CLS unit 2 Aspect with 2 way route <strong>in</strong>dicator etc.<br />

15 325 Supply of CLS unit 2 Aspect with 3 way route <strong>in</strong>dicator etc.<br />

16 326 Supply of position light shunt signal unit complete etc.<br />

17 327 Supply of position light shunt signal unit with base and post etc.<br />

18 336 Supply of Electric Po<strong>in</strong>t Detector.<br />

19 337 Supply of Electric Po<strong>in</strong>t Detector.<br />

20 364 Supply of Apparatus case s<strong>in</strong>gle.<br />

21 365 Supply of Apparatus case half.<br />

22 366 Supply of Junction Box.<br />

23 367 Supply of Call<strong>in</strong>g ON signal unit complete.<br />

24 419 Supply of Double pole MCB 5 Amp.<br />

25 426 Supply of ICDP switches.<br />

ANNEXURE „E‟<br />

Schedule - 2<br />

LIST OF MATERIAL FOR ON ACCOUNT PAYMENT IN TERMS OF PARA 28.3.2 OF SPECIAL CONDITIONS OF CONTRACT FOR SUPPLY &<br />

INSTALLATION SCHEDULE.<br />

S. No. SOR Item No. Description of items<br />

1 339 Wire <strong>in</strong>sulator.<br />

2. 340 Rod Insulator (Steel + Nylon).<br />

3. 341,342,<br />

343 & 344<br />

Lock bar complete, clip & stop, Radial guide, Trestle1/2/3 way complete, CI<br />

foundation A type.<br />

4. 345 Ground lever frame.<br />

5. 346 Rotary key transmitter.<br />

6. 349 Ground connection for Electric Po<strong>in</strong>t Mach<strong>in</strong>e.<br />

Contractor’s signature with stamp Page 5


7. 352,353,<br />

B „Type Choke, Track Feed Resistance, Track Lead Jn. Box.<br />

354,355<br />

8. 356 B‟ Type Choke, Track Feed Resistance.<br />

9. 357 E‟ Type Lock.<br />

10. 361 P/G/C Marker.<br />

11. 410 Circuit Controller 4 way.<br />

12. 411 Circuit Controller 6 way.<br />

13. 412 Circuit Controller 8 way.<br />

14. 413 Lever lock with circuit controller.<br />

15. 416 & 418 Lum<strong>in</strong>ous Indicator.<br />

16. 432 Magneto Telephone.<br />

INFORMATION ABOUT MODIFICATION/ ADDITION IN PARA 5.18 & 5.19 OF TECHNICAL SPECIFICATIONS, DRAWINGS AND TECHNICAL<br />

INSTRUCTIONS FOR SIGNALLING WORKS (2002 EDITION).<br />

1. Para 5.18 of technical Replaced to read as:-<br />

specification, draw<strong>in</strong>gs and For each station cable route plan will be prepared by contractor by show<strong>in</strong>g<br />

technical <strong>in</strong>structions for signal<strong>in</strong>g exact location of cable at an <strong>in</strong>tervals of not more than 200 Meters or wherever<br />

works.<br />

there is change <strong>in</strong> alignment so that the same is located easily by the Railway<br />

official/ contractor. Proposed cable route plan should be submitted to Divisional<br />

Authorities (Sr. DSTE, Sr. DEE, Sr. DEN) and obta<strong>in</strong><strong>in</strong>g permission from them <strong>in</strong><br />

writ<strong>in</strong>g before the cable lay<strong>in</strong>g work at the station. However under the exigencies<br />

of the local conditions or for any consideration the Eng<strong>in</strong>eer <strong>in</strong>-charge of the<br />

work will mark the route of the cables <strong>in</strong> chalk or lime, as per cable route plan/<br />

cable plan and the Eng<strong>in</strong>eer's <strong>in</strong>struction to him, which shall be taken by the<br />

contractor shall lay the cables only along this route. The contractor shall be<br />

present at the time of mark<strong>in</strong>g the route of the cables and he shall furnish to the<br />

Eng<strong>in</strong>eer's representative required quantities of lime, rope, labour etc. for<br />

2 Follow<strong>in</strong>g additional para are<br />

added <strong>in</strong> technical specification<br />

draw<strong>in</strong>gs and technical<br />

<strong>in</strong>structions for signal<strong>in</strong>g works<br />

New Para 5.18.1 to be added as.<br />

carry<strong>in</strong>g out this work at the cost of the contractor.<br />

The contractor shall study the approved cable route plan and follow it<br />

meticulously to ensure the safety of the already laid Railway cables, emergency<br />

sockets etc are not endangered.<br />

3 New Para 5.18.2 to be added as. The name of the contractor, his contact telephone number, the nature of the<br />

work shall be notified <strong>in</strong> Divisional Test-room by representative of Eng<strong>in</strong>eer <strong>in</strong>charge<br />

of the work.<br />

4 New Para 5.18.3 to be added as. Completion cable route plan should be f<strong>in</strong>alized station by station as soon as the<br />

work is completed.<br />

5 New Para 5.19.1 to be added as. The work of excavat<strong>in</strong>g the trench and lay<strong>in</strong>g of the cable should proceed <strong>in</strong><br />

quick succession, leav<strong>in</strong>g a m<strong>in</strong>imum time between the two activities.<br />

Contractor’s signature with stamp Page 6


VOLUME - I<br />

PART – II<br />

SCHEDULE<br />

Name of the work: Telecom work <strong>in</strong> connection with 25KV <strong>electrification</strong> <strong>in</strong> KGI to CPJ of KGI-MYS section of south<br />

Western Railway.<br />

Sl. DESCRIPTION OF SCHEDULE Unit Qty Basic Amount<br />

No.<br />

Rate<br />

1 Excavation of cable trench <strong>in</strong> all k<strong>in</strong>ds of soil except hard mts 12000 25.8 309600<br />

rocky areas <strong>in</strong>clud<strong>in</strong>g clear<strong>in</strong>g of roots of trees, rocks, bushes<br />

etc. to a depth of 1.0 M and to a width of 0.3 Mtrs. . If the<br />

depth of 1M could not be reached due to site conditions or<br />

depth required is more than one meter the contractor will be<br />

paid proportionately but at any condition the depth should not<br />

be less than 0.6mtr.<br />

2 Excavation of trench to a depth of 1Mtr. from ground level mts 500 292.8 146400<br />

trak/road cross<strong>in</strong>g of cables, supply and lay<strong>in</strong>g of double wall<br />

corrugated pipes (103.5 mm <strong>in</strong>ner dia & 120 mm outer dia),<br />

refill<strong>in</strong>g the trench by ramm<strong>in</strong>g and consolidat<strong>in</strong>g it as per the<br />

<strong>in</strong>struction of Railway Eng<strong>in</strong>eer at site. Dur<strong>in</strong>g excavation of<br />

trench it has to be ensured that the excavated soil does not mix<br />

with the ballast available. Lay<strong>in</strong>g of cables not <strong>in</strong>cluded <strong>in</strong> this<br />

schedule.[Double wall corrugated pipes 103.5 mm <strong>in</strong>ner dia &<br />

120 mm outer dia conform<strong>in</strong>g to specification No. IS 14930<br />

(Part 2) :2001 with socket/coupler and all other miscellaneous<br />

materials required for the work shall be supplied by the<br />

contractor.]<br />

3 Provision of GI pipes 50mm dia 3.65MM thick with offset at Mtrs. 600 386.80 232080<br />

both ends and suitable coupl<strong>in</strong>g and bends wherever required<br />

as per Railway requirement, over the cement bridges, girder<br />

bridges, dra<strong>in</strong>age, culverts/hill cutt<strong>in</strong>gs etc. In case of cement<br />

concrete bridges/culverts GI pipes are to be provided with<br />

brick masonary of size 300mmX300mmX300mm at an<br />

<strong>in</strong>terval of 2m.In case of girder bridges clamps as per drg.<br />

no.UBL/SG/CON/10/2004 ALT-1/as advised by Rly Eng<strong>in</strong>eer<br />

are to be provided at every 2m with all fixtures and supports<br />

and the pipe ends are to be closed with brick masonary<br />

abutments of size 0.5mX0.5mX0.5m. The pipes are to be<br />

provided with holes of dia 10mm at every 1m.<br />

[GI pipe 50mm dia 3.6mm thick, bricks, cement, river sand,<br />

MS angles and flats for fixtures, bitum<strong>in</strong>ous compound and all<br />

other miscellaneous materials required for the work shall be<br />

supplied by the Contractor] If clamps are used it should be<br />

fitted with red oride before fix<strong>in</strong>g.<br />

4 Lay<strong>in</strong>g of Telecommunication cables as per cable plan <strong>in</strong> the Mtrs. 15000 7.80 117000<br />

cable trench, masonry ducts, RCC Pipes and GI Pipes.<br />

5 Plac<strong>in</strong>g of one row of country bricks of size approximately Mtrs. 8000 42.4 339200<br />

Contractor’s signature with stamp Page 7


220mm x 100mm x 60mm breadthwise horizontally above the<br />

cables <strong>in</strong> 0.3m width trench.<br />

[Country bricks of size 220mm x 100mm x 60 mm<br />

(approximately) shall be supplied by the Contractor].<br />

6 Refill<strong>in</strong>g of cable trench throughout with Earth and<br />

consolidat<strong>in</strong>g the trench after lay<strong>in</strong>g the telecom cables to a<br />

depth of 1.0.M and to a width of 0.3 Mtrs.If the depth of 1M is<br />

not available due to site conditions the contractor will be paid<br />

proportionately.<br />

7 Supply of jo<strong>in</strong>t kit conform<strong>in</strong>g to RDSO specificaiton<br />

No.IRS-TC 77/2006 Revision1 or latest for quad cable.<br />

8 Supply of 10 pair CT box with WAGO term<strong>in</strong>al type of<br />

Phonics make<br />

9 Supply of 20 pair CT box with WAGO term<strong>in</strong>al type of<br />

Phonics make<br />

10 Supply of Emergency Socket boxes of FRP make conform<strong>in</strong>g<br />

to specification RDSO/SPN/TC/44/2002.<br />

11 Supply of Emergency Socket 6 p<strong>in</strong> flat as per RDSO Spec.<br />

No. IRS/TC/42/87 with latest amendments.<br />

12 Supply of 10 pair swith board cable PVC <strong>in</strong>sulated and PVC<br />

Sheathed <strong>in</strong> standrard colour code of 0.5mm dia.<br />

13 Supply of transmission measur<strong>in</strong>g set as per IRS:TC-43/97 of<br />

M/s ANU or equilent.<br />

14 Supply of Digital Earth tester Det-1 with metal carry<strong>in</strong>g box<br />

and auxiliary earth<strong>in</strong>g net.<br />

15 Supply of 2/3 power extension board cater<strong>in</strong>g for 5A/15A<br />

work<strong>in</strong>g with fuse .<br />

16 Supply of 2T VF transformer 470:1120 ohms impedence<br />

conform<strong>in</strong>g to specification No. IRS-TC-76/2000.<br />

17 Table, similar to MST make Model-MST-106 hav<strong>in</strong>g 18mm<br />

Prelam<strong>in</strong>ated teak f<strong>in</strong>ish particle board top Size:1365mm x<br />

680mm x 735mm Ht.hav<strong>in</strong>g 3 steel drawers on the right side<br />

fitted with 25mm square tubular pipe frame duly pa<strong>in</strong>ted <strong>in</strong><br />

TA Grey.<br />

18 S' type tubular chair frame made out of 25mm (1") OD Black<br />

pipe of 1.6MM (16 Gague) thick with cont<strong>in</strong>uous tubular<br />

handle fitted with Local/Ord<strong>in</strong>ary wood Arms, Seat & Black<br />

duly polished (Natural/Colourless) and f<strong>in</strong>ished and knitted<br />

with Nylon Cane. Anti-rust/Chemical treatment is given to the<br />

tubular structure. The bottom of the tubular structure is<br />

Mtrs. 12700 6.20 78740<br />

Nos. 30 2290.00 68700<br />

Nos. 10 2000.00 20000<br />

Nos. 4 3000.00 12000<br />

Nos. 30 2100.00 63000<br />

Nos. 30 280.00 8400<br />

mts 200 50.00 10000<br />

No. 1 25000.00 25000<br />

No. 1 4500.00 4500<br />

Nos. 5 300.00 1500<br />

Nos. 25 1000.00 25000<br />

Nos. 5 4000.00 20000<br />

Nos. 5 1500.00 7500<br />

provided with good quality and long last<strong>in</strong>g bushes.<br />

19 Supply of tools kit compris<strong>in</strong>g of the follow<strong>in</strong>g tools: Set 1 48000.00 48000<br />

1. Kronne <strong>in</strong>sertion tool - 5 Nos.<br />

2. Digital multi meter (Motwane) - 2 No.<br />

3. Electronic <strong>in</strong>sulation tester 100volts dual range Model No.<br />

IT/100/II or equivalent - 2 No.<br />

4. Blow torch work<strong>in</strong>g on LPG with follow<strong>in</strong>g accessories<br />

(a)Universal Handle<br />

1No.<br />

Contractor’s signature with stamp Page 8


(b)Burner<br />

8Nos.<br />

(c)Neck Tubes<br />

2Nos.<br />

(d)Gas hose pipe<br />

Mts.<br />

(e)Spanner<br />

1No.<br />

(f)Swivel Type Regulat<strong>in</strong>g Valve 1No.<br />

(g)Branded Cyl<strong>in</strong>der of 2Kg. Capacity 2Nos.<br />

5. Solder<strong>in</strong>g iron (Temparature controlled - 35W) - 2 N0s.<br />

6. Screw driver set - Taparia make - 1 No.<br />

7. Double ended spanner set of 12 Nos-Taparia make- 1 set.<br />

8. Cutt<strong>in</strong>g Piler - 6" - Taparia make - 2 Nos.<br />

9. Nose Plier - 6" - Taparia make - 2 Nos.<br />

10. Wire stripper - 2 Nos.<br />

11. Cable jo<strong>in</strong>ters Collassible tool kit Compris<strong>in</strong>g the<br />

follow<strong>in</strong>g<br />

(a) Hacksaw frame<br />

1No.<br />

(b)Hacksaw Blade<br />

5Nos<br />

(c)Hot chisel 12 <strong>in</strong>ches<br />

1No.<br />

(d)Adjustable Spanner 2<strong>in</strong>ches jaw 1No.<br />

(e)Scissors 15 <strong>in</strong>ches<br />

1No<br />

(f)D<strong>in</strong> Cutter 15 <strong>in</strong>ches<br />

1No.<br />

(g)Ball pean Hammer 1 1/2 lbs 1No.<br />

(h)File Flat 5 <strong>in</strong>ches<br />

1No.<br />

(i)Triangular File smooth<br />

1No.<br />

(j)Steel tape 3M<br />

1No.<br />

(k)Steel tape 30M<br />

1No.<br />

(l)Solder<strong>in</strong>g iron soldron 50watts 1No.<br />

(m)Solder<strong>in</strong>g iron 25 watts<br />

1No.<br />

(n)Knife 8 <strong>in</strong>ches<br />

1No.<br />

(o)Knife 12 <strong>in</strong>ches<br />

1No.<br />

20 Supply of gas blow lamp suitable for shr<strong>in</strong>k<strong>in</strong>g thermal Nos 2 2000.00 4000<br />

sleeves<br />

21 supply of light weight portable control telephone<strong>in</strong> ABS body Nos 2 2200 4400<br />

22 Survey of cable route, cable plann<strong>in</strong>g, EMC plann<strong>in</strong>g and Mtrs 13000 4 52000<br />

preparation and submission of prelim<strong>in</strong>ary survey report <strong>in</strong><br />

draw<strong>in</strong>g form, one kilometer per page with details of<br />

protection proposed for the cable <strong>in</strong> five copies <strong>in</strong> paper and<br />

also one soft copy <strong>in</strong> CD. The report should give details of<br />

bridges, stations, powerl<strong>in</strong>e cross<strong>in</strong>gs other telecom cable<br />

cross<strong>in</strong>gs etc.This report should be submitted with<strong>in</strong> 30 days<br />

of LOA received.<br />

23 Excavation of cable trench <strong>in</strong> hard laterite/rocky areas to a Mtrs. 500 180 90000<br />

depth of 1.0m and to a width of 0.3m, If the depth of 1M<br />

could not be reached due to site conditions the contractor will<br />

be paid proportionately.<br />

24 Concret<strong>in</strong>g of cable laid <strong>in</strong> the trench or GI pipe/DWC pipe <strong>in</strong><br />

which cable is already laid to a size of 300mmX300mm with<br />

1:3:6 mortar.<br />

(All the meterials required for the work should be supplied by<br />

Mtrs. 300 330.00 99000<br />

Contractor’s signature with stamp Page 9


the contractor)<br />

25 Chisel cutt<strong>in</strong>g <strong>in</strong> rockey soil if the rock is visible from sureace<br />

upto 300mm by excavation of trench and by chisel cutt<strong>in</strong>g<br />

upto a depth of 200 mm and width of 200mm and levell<strong>in</strong>g the<br />

surface with soil and concret<strong>in</strong>g as per the details shown <strong>in</strong> the<br />

draw<strong>in</strong>g<br />

26 Excavation of jo<strong>in</strong>t pit/coil pit upto a size of 1mx1.5mx1.5m<br />

for provid<strong>in</strong>g jo<strong>in</strong>t/coil at Jo<strong>in</strong>t locations and at culverts,<br />

bridges, LC gates etc. This <strong>in</strong>cludes back fill<strong>in</strong>g and ramm<strong>in</strong>g<br />

of the pit after the cable lay<strong>in</strong>g and consolidation of the soil<br />

well as disposal of soil as per plan or as advised by the<br />

Railway representative.<br />

27 Provision of normal jo<strong>in</strong>t of Heat Shr<strong>in</strong>kable type complete<br />

for 6 quad cable. After the jo<strong>in</strong>t<strong>in</strong>g the through cable has to be<br />

tested for <strong>in</strong>sulation resistance and loop resistance <strong>in</strong> presents<br />

of Railway Eng<strong>in</strong>eer and <strong>in</strong> case of any defects the jo<strong>in</strong>t<strong>in</strong>g<br />

has to be re-done free of cost by the contractor.Thermal<br />

sleevees to be provided over the <strong>in</strong>divisual conductors after<br />

jo<strong>in</strong>t<strong>in</strong>g the conductors.<br />

[Heat Shr<strong>in</strong>kable jo<strong>in</strong>t<strong>in</strong>g kit conform<strong>in</strong>g to RDSO<br />

specificaiton No.IRS-TC 77/2006 covered <strong>in</strong> the supply<br />

portion has to be used for this purpose. The Contractor should<br />

supply thermal sleeves and all other small items free of cost<br />

which are required for mak<strong>in</strong>g a jo<strong>in</strong>t.Only gas blower to be<br />

used for blow<strong>in</strong>g].<br />

28 Provision of derivation jo<strong>in</strong>t for Emergency Control us<strong>in</strong>g<br />

thermoshr<strong>in</strong>kable jo<strong>in</strong>t<strong>in</strong>g kit us<strong>in</strong>g m<strong>in</strong>iature tapp<strong>in</strong>g<br />

transformer of 470:1120ohms impedance . One pair for auto<br />

phone wires should be taken out and dropped <strong>in</strong> separately<br />

and term<strong>in</strong>ated <strong>in</strong> the EMC box. After the jo<strong>in</strong>t<strong>in</strong>g the through<br />

cable has to be tested for <strong>in</strong>sulation resistance and loop<br />

resistance <strong>in</strong> presents of Railway Eng<strong>in</strong>eer and <strong>in</strong> case of any<br />

defects the jo<strong>in</strong>t<strong>in</strong>g has to be re-done free of cost by the<br />

contractor.Thermal sleevees to be provided over the <strong>in</strong>divisual<br />

conductors after jo<strong>in</strong>t<strong>in</strong>g the conductors.<br />

[Thermoshr<strong>in</strong>kable jo<strong>in</strong>t<strong>in</strong>g kit confirm<strong>in</strong>g to RDSO<br />

specification No. IRS-TC 77/2006 and 2T transformer of<br />

impedene 470:1120 ohms covered <strong>in</strong> the supply portion<br />

should be used for this work.The Contractor should supply<br />

thermal sleeves and all other small items free of cost which<br />

are required for mak<strong>in</strong>g a jo<strong>in</strong>t.Only gas blower to be used for<br />

jo<strong>in</strong>t<strong>in</strong>g].<br />

29 Provision of straight through jo<strong>in</strong>t on 10 pair PIJF cable us<strong>in</strong>g<br />

thermoshr<strong>in</strong>kable jo<strong>in</strong>t<strong>in</strong>g kit as per Spec.No.IRS-TC<br />

57/2006.Thermal sleevees to be provided over the <strong>in</strong>divisual<br />

conductors after jo<strong>in</strong>t<strong>in</strong>g the conductors.<br />

[Thermoshr<strong>in</strong>kable jo<strong>in</strong>t<strong>in</strong>g kit confirm<strong>in</strong>g to RDSO<br />

specification No. IRS-TC 57/2006 covered <strong>in</strong> the supply<br />

Mtrs. 300 450.00 135000<br />

Nos. 50 600.00 30000<br />

Nos. 5 2000.00 10000<br />

Nos. 20 3500.00 70000<br />

Nos. 6 1500.00 9000<br />

Contractor’s signature with stamp Page 10


portion should be used for this work.The Contractor should<br />

supply all other small items free of cost which are required for<br />

mak<strong>in</strong>g a jo<strong>in</strong>t.].<br />

30 Fix<strong>in</strong>g of 10 pair CT box and term<strong>in</strong>ation of cable at the<br />

station/LC gates, etc., This <strong>in</strong>cludes fix<strong>in</strong>g of PIJF cables and<br />

CT box on the wall with necessary wooden plank and PVC<br />

pipe for entire length of the cable <strong>in</strong>side the room.<br />

[10 pair CT box covered <strong>in</strong> the supply portion should be used<br />

for this work. All other required materials shall be supplied by<br />

the Contractor].<br />

31 Fix<strong>in</strong>g of 20 pair CT box and term<strong>in</strong>ation of cable at the<br />

station/LC gates, pump house, etc., This <strong>in</strong>cludes fix<strong>in</strong>g of<br />

PIJF cables and CT box on the wall with wood plank for<br />

entire length of the cable <strong>in</strong>side the room.<br />

[20 pair CT box covered <strong>in</strong> the supply portion should be used<br />

for this work. Wooden plank and all other required<br />

miscellaneous materials shall be supplied by the Contractor].<br />

32 Cutt<strong>in</strong>g of groove on walls/floor for fix<strong>in</strong>g of PVC pipe 50mm<br />

dia and draw<strong>in</strong>g the cable through it and resurfac<strong>in</strong>g to<br />

orig<strong>in</strong>al condition<br />

33 Supply and fix<strong>in</strong>g of PVC cas<strong>in</strong>g and capp<strong>in</strong>g / PVC pipe of<br />

m<strong>in</strong>imum 25 mm size or higher as per the requirement at<br />

site on the wall/floor etc., us<strong>in</strong>g bends, couplers and T jo<strong>in</strong>ts<br />

& flexible pipe wherever necessary with fixtures. (All<br />

required materials for fix<strong>in</strong>g to be arranged by contractor).<br />

34 Provision of Emergency Communication along the Railway<br />

track and level cross<strong>in</strong>gs.fabrication of emergency post as per<br />

Drg. No.UBL/SG/CON/6/2004 and fix<strong>in</strong>g of emergency<br />

socket post and bury<strong>in</strong>g the post to a depth of 1m after entry<br />

of cable. The post should be pa<strong>in</strong>ted with redoxide before<br />

<strong>in</strong>stallation This <strong>in</strong>cludes term<strong>in</strong>ation of derivation cables on<br />

term<strong>in</strong>ation strip <strong>in</strong>side the Emergency socket, pa<strong>in</strong>t<strong>in</strong>g of<br />

Emergency socket post with alternate yellow and black strips<br />

of 6" width. The pa<strong>in</strong>t used should be standard quality and 2<br />

coats of pa<strong>in</strong>ts should be applied. The EMC post should be<br />

pa<strong>in</strong>ted with red oxide base before pa<strong>in</strong>t<strong>in</strong>g.<br />

[Emergency Socket boxes conform<strong>in</strong>g to specification<br />

RDSO/SPN/TC/44/2002 with sockets 6 p<strong>in</strong> flat as per RDSO<br />

Spec. No. IRS/TC/42/87 with latest amendment and Draw<strong>in</strong>g<br />

No.15220(Adv) covered <strong>in</strong> the supply portion shoul be used<br />

for this work]<br />

[Rail posts for fix<strong>in</strong>g EMC sockets of different lengths will be<br />

supplied by Railways]<br />

[All fix<strong>in</strong>g bolts and nuts, pa<strong>in</strong>ts and all other miscellaneous<br />

materials required for the work shall be supplied by the<br />

Contractor].<br />

35 Supply of 100 pair krone term<strong>in</strong>al complete with mount<strong>in</strong>g<br />

arrangements. The item shall be supplied from DOT/BSNL<br />

Nos. 10 1500.00 15000<br />

Nos. 5 1800.00 9000<br />

Mtrs. 100 150.00 15000<br />

Mtrs 250 50.00 12500<br />

Nos. 25 3500.00 87500<br />

Nos 10 1600 16000<br />

Contractor’s signature with stamp Page 11


approved firms krone make.<br />

36 Supply of 4 Way station equipment with DTMF signall<strong>in</strong>g to RDSO<br />

Spec. IRS: TC.60/93 or latest with telephone to spec. Tc. 38/97 or<br />

latest Tummala Make.<br />

37 Supply of res<strong>in</strong> similar to C compound (250 gms) with hardener(50<br />

gms).<br />

38 Supply, lay<strong>in</strong>g and <strong>in</strong>stallation of 150 mm dia RCC pipe ( Standrard<br />

length of 200 mts) as protection for 6 quad cable under culverts/<br />

bridgea and at TSS/SP/SSP etc. The RCC pipe with collars to be<br />

supplied by the contractor as per Spec No.IS:458, NP2 clause and<br />

should be <strong>in</strong>spected by the representative of DY. CSTE/RE/Sc.<br />

While thread<strong>in</strong>g the cable through these pipes the contractor<br />

should do th etrench<strong>in</strong>g to the required depth wherever necessary<br />

as adviced by the site eng<strong>in</strong>eer for which no extra charge will be<br />

paid. This encludes carr<strong>in</strong>g them from stock at staion to the work<br />

spot with out caus<strong>in</strong>g any damage and plac<strong>in</strong>g them <strong>in</strong> the cable<br />

trench duly clear<strong>in</strong>g the ballast etc <strong>in</strong> the trenches.Gap between<br />

the RCC pipe and collar ha sto be closed us<strong>in</strong>g cement motor. All<br />

the required materials to be supplied by the contractor only<br />

39 Transport<strong>in</strong>g, Supply and <strong>in</strong>stallation of concrete(RCC) route<br />

<strong>in</strong>dicators at <strong>in</strong>tervals of 50 mts on the cable route and also at<br />

places or corner wherever the route of cable changes and jo<strong>in</strong>t<br />

markers for jo<strong>in</strong>ts as per technical specification. There should be<br />

Standrard RCC ‘SWR 6 QUAD” and logo engraved and pa<strong>in</strong>ted.They<br />

shall be pa<strong>in</strong>ted with green when placed at jo<strong>in</strong>t location and<br />

pa<strong>in</strong>ted with red for normal <strong>in</strong>dication. The RCC route <strong>in</strong>dicators<br />

are to be <strong>in</strong>spected by the officer <strong>in</strong>charge of the work before<br />

<strong>in</strong>stallation.<br />

40 Track cross<strong>in</strong>g by horizontal bor<strong>in</strong>g method base don the draw<strong>in</strong>g<br />

no. DRM/j/3675 dated 7/8/2003 and as adviced by the eng<strong>in</strong>eer at<br />

site. This <strong>in</strong>cludes supply of all materials like GI pipe nof 50 Mm<br />

dia.<br />

41 Load<strong>in</strong>g unload<strong>in</strong>g and transportation of materials enclud<strong>in</strong>g cable<br />

drums from stores to the site of work. Measurement for the<br />

puppose of payment shall be Ton per Kilometers<br />

42 Provision of earth and it's connection as per technical specs,<br />

earth<strong>in</strong>g shall be carried out as per the draw<strong>in</strong>g given. The work<br />

<strong>in</strong>cludes excavation of a pit at a given location as per draw<strong>in</strong>g<br />

no.SC/N/CN/75 on natural soil.supply and fix<strong>in</strong>g earth pipe<br />

cover<strong>in</strong>g the same with a mixure of 12 KG of charcoal, 12 KG of<br />

comman salt and earth.This <strong>in</strong>cludes brick masanory around th<br />

earth. GI pipe of size 50 mm and 20 mm of 3.5mm with 12 mm dia<br />

holes on the sides at the <strong>in</strong>tervals of 300mm.The equipment to be<br />

earthed shall be connecte dto the earth pipe by means of GI wire 8<br />

SWG by neastly solder<strong>in</strong>g at equipment end earth pipe end. earth<br />

resisitance shall be measured and pa<strong>in</strong>ted on the earth pippe with<br />

date. The earth resistance shall be less than 10 Ohm. All materials<br />

<strong>in</strong>clud<strong>in</strong>g cemet, sand, bricks, GI pipe, GI wire pa<strong>in</strong>t<strong>in</strong>g, Charcoal<br />

and salt etc shall be arranged by the contractor. This also <strong>in</strong>cludes<br />

earth<strong>in</strong>g and solder<strong>in</strong>g of cable armours<br />

Nos 11 3380 37180<br />

set 30 350 10500<br />

no. 750 210 157500<br />

no. 300 200 60000<br />

mts 100 1292.5 129250<br />

PTKM 15000 2.5 37500<br />

Nos 35 1444 50540<br />

Contractor’s signature with stamp Page 12


43 Supply, wir<strong>in</strong>g of way station telecom equipment bay conta<strong>in</strong><strong>in</strong>g ( Nos 5 27000 135000<br />

the bay shall be as per specifications and diagrams A1, A2, A3 given<br />

<strong>in</strong> this tender document )(a) 6 numbers of 32 way 'U' L<strong>in</strong>ks panel<br />

with 'U'l<strong>in</strong>k (b) Spike and transientsuppressor with <strong>in</strong> built LCRFI<br />

&EMI filter conta<strong>in</strong><strong>in</strong>g6 number of 2 p<strong>in</strong>/3p<strong>in</strong> 5 Amps.Socket and<br />

10 meters of 5 Amps connect<strong>in</strong>g cord with 3 p<strong>in</strong> 5 Amps plug and<br />

wired as per diagram at annexure 'B' enclosed, us<strong>in</strong>g the the<br />

follow<strong>in</strong>g: (1) Six numbers of VF Transformers 470:600 to RDSO<br />

spec TC.22-76. (2) Two number of 100 pair krone term<strong>in</strong>als with<br />

back mount<strong>in</strong>g frame . All the materials required for wir<strong>in</strong>g,<br />

solder<strong>in</strong>g shall be provided by the contractor at his own cost. The<br />

wir<strong>in</strong>g diagram of the bay should be pasted <strong>in</strong> side the bay.<br />

44 Supply of 4 wire Head quarters equipment DTMF signall<strong>in</strong>g based Nos 2 13322 26644<br />

complete for control office to RDSO Spec IRS TC 60-93 alongwith<br />

power supply unit to suit RDSO Spec No. IRS TC 72-97 or latest.<br />

45 Installation commiss<strong>in</strong>g of 4 wire way station equipment, power no. 11 2065 22715<br />

supply units at th elocations of Dy.SS /SP/SSP/ TSS etc. The<br />

<strong>in</strong>stallation of way station equipment and power supply unit shall<br />

be mounted on a MS angle rack. All the material for <strong>in</strong>stallation<br />

commission<strong>in</strong>g of 4 wire unit shall be provided by the contractor.<br />

TOTAT 2861849<br />

Contractor’s signature with stamp Page 13


VOLUME - I<br />

PART - III<br />

1. TECHNICAL SPECIFICATIONS (ENCLOSURE- I)<br />

2. LIST OF MATERIALS WITH THEIR SPECIFICATIONS AND DRAWINGS (ENCLOSURE- II)<br />

1. TECHNICAL SPECIFICATIONS<br />

ITEM 1. TRENCHING AND LAYING OF CABLE<br />

(I)<br />

(a)<br />

(b)<br />

(II)<br />

(III)<br />

(IV)<br />

(V)<br />

ENCLOSURE-I<br />

(FOR SOUTH EASTERN, EASTERN & SOUTH CENTRAL RAILWAY)<br />

Excavation & refill<strong>in</strong>g of cable trench 400 mm wide, 1 meter deep <strong>in</strong> all type of soil, rock mixed soil, macadamized and stone paved platform/ road<br />

from Distant Signal to Distant signal. The cable trench should be clear of roots of trees and bushes. Before refill<strong>in</strong>g, the cable <strong>in</strong> the trench should be<br />

covered by sieved/ shifted soil for 50 mm and then cable should be covered by bricks from distant signal to distant signal.<br />

(FOR SOUTHERN, CENTRAL, NORTHERN AND WESTERN RAILWAY)<br />

Excavation and refill<strong>in</strong>g of cable trench 400 mm wide, 1 meter deep <strong>in</strong> all type of soil, rock mixed soil, macadamized and stone paved platform/Road<br />

from distant signal to distant signal on either side of the station, alongside the track and conform<strong>in</strong>g the distance as per approved cable route plan of<br />

all stations. The Cable trench should be clear of roots of trees and bushes. Before refill<strong>in</strong>g, the cable <strong>in</strong> the trench should covered by sieved/shifted<br />

soil for 50 mm and then cable should be covered by bricks from distant signal to distant signal.<br />

Construction of brick masonry channel as per drg. No. RE/S&T/Sig. /Tender /SK /14/85, <strong>in</strong> case rock is encountered after a depth 200 mm-500 mm<br />

& if full depth digg<strong>in</strong>g is not feasible.<br />

Chase cutt<strong>in</strong>g on rocks as per drg. No. CORE/S&T/ALD/SK/373/93 page 6 and plaster<strong>in</strong>g the top surface with 1:3 cement sand mortar.<br />

Excavation and refill<strong>in</strong>g of cable Trench shall be as per drg. no. RE/S&T/SIG/TENDER/SK/29/85.<br />

Supply and fix<strong>in</strong>g of G.I. pipe perforated of required length at culvert as per drg. No. RE/S&T/SIG/TENDER/SK/27/85. Approach brick channels etc.<br />

should be provided with plane cement plaster.<br />

(VI) Supply and lay<strong>in</strong>g of 150 mm dia x 2 meter long RCC pipes with collars and 2 nos. 8 SWG G.I. wire <strong>in</strong>side the pipe below metal road or track or L-<br />

X<strong>in</strong>g as per drg. Nos. RE/S&T/SIG/TENDER/SK/28/85 and CORE/S&T/ALD/SK/ 373/ 93 page 11 and CORE/S&T/ALD/SK/373/93 page 12. The<br />

RCC pipe length shall be sufficient to cover complete the metal road or track or L- X<strong>in</strong>g gate.<br />

(VII)<br />

(VIII)<br />

(IX)<br />

(a)<br />

Supply of G.I. trough as per drg. no. RE/S&T/Sig/Tender/22/85 and fix<strong>in</strong>g of G.I. troughs on girder bridges as per drg. No. RE/S&T/SIG/Tender<br />

/SK/23/85, and refill<strong>in</strong>g of trough with bitumen compound of specification no. IS-7084/73 clause (4) after the cable is laid.<br />

Supply, plac<strong>in</strong>g and position<strong>in</strong>g of breadth wise of second-class country bricks above the screened earth after lay<strong>in</strong>g the cable (plac<strong>in</strong>g of bricks @<br />

n<strong>in</strong>e bricks per meter).<br />

Supply, plac<strong>in</strong>g and position<strong>in</strong>g lengthwise of IInd Class country made bricks at the rate of 4 bricks per meter required for separation of power cable<br />

and signall<strong>in</strong>g cable.<br />

Supply provid<strong>in</strong>g and concret<strong>in</strong>g of cable markers along the cable route at an <strong>in</strong>terval of 30 meter as per drg. No. CORE/S&T/ALD/SK/373/93 page<br />

10 Alt.„A‟ from distant signal to distant signal at all the stations. This practice of provid<strong>in</strong>g cable marker will be followed on all Railways except South<br />

Eastern and Eastern Railways.<br />

The cable markers should be planted <strong>in</strong> such way that the top of the cable marker is on the ground level and shall be concreted with 300 mm x 200<br />

mm x 200 mm.<br />

(b) Supply, provid<strong>in</strong>g and concret<strong>in</strong>g of cable marker along the cable Route at an <strong>in</strong>terval of 30 Mtr. as per Drg. No. CORE/S&T/ALD/SK/373/93 page 10<br />

Alt. „A‟ from up Distant to down Distant signal at all stations on South Eastern & Eastern Railways. Cable markers shall not be provided at theft prone<br />

stations.<br />

Cable markers should be planted <strong>in</strong> such way that the top of the cable marker is on the ground level and shall be concreted with 300 mm x 200 mm<br />

x 200 mm.<br />

Theft prone stations are as under: Nil<br />

(XI)<br />

(a) Lay<strong>in</strong>g of cable should be as per approved cable route plan.<br />

(b) Lay<strong>in</strong>g of signall<strong>in</strong>g cable and Telecom/power cable <strong>in</strong> same trench shall be as per Drg. No. CORE/S&T/ALD/SK/373/93 page 1.<br />

(XII) All cable entry po<strong>in</strong>ts <strong>in</strong> location boxes, location huts, junction boxes, relay room, battery room, SM‟s Room etc. must be closed with suitable<br />

masonry.<br />

works, sand covered and plaster<strong>in</strong>g to prevent entry of rats etc. RCC slab should be provided on the cable pit of cab<strong>in</strong> and relay room/station.<br />

(XIII)<br />

(XIII)<br />

(XIV)<br />

(XVII)<br />

The jo<strong>in</strong>t<strong>in</strong>g of signall<strong>in</strong>g cables shall be undertaken by provid<strong>in</strong>g suitable location boxes/junction boxes on ARA term<strong>in</strong>als.<br />

Megger<strong>in</strong>g & test<strong>in</strong>g of all ma<strong>in</strong> and tail cables before and after lay<strong>in</strong>g of the cable <strong>in</strong> trenches and also after term<strong>in</strong>ation <strong>in</strong> apparatus cases, <strong>in</strong> boxes<br />

and relay room. Test<strong>in</strong>g will be done jo<strong>in</strong>tly with <strong>railway</strong> representative and submission of jo<strong>in</strong>t cable, <strong>in</strong>sulation chart certificate to Eng<strong>in</strong>eer In<br />

charge. The cable shall not be commissioned if the <strong>in</strong>sulation resistance is found less than the standard value.<br />

All the core of the cable (used or spare) should be term<strong>in</strong>ated on ARA term<strong>in</strong>als <strong>in</strong> cab<strong>in</strong>/SM‟s office or apparatus cases. Each core so term<strong>in</strong>ated<br />

will be provided with identification ferrules with letters or/numbers embossed on them as per requirement of circuitry.<br />

Any defect noticed dur<strong>in</strong>g the test<strong>in</strong>g after lay<strong>in</strong>g the cable the same will be replaced by the contractor at his own cost.<br />

Each signall<strong>in</strong>g cable laid must have 20% spare conductor and <strong>in</strong> none of the cable the number of spare conductors should be less than two. All the<br />

materials except underground signall<strong>in</strong>g cable required for the execution of above work shall be supplied by contractor.<br />

(XVIII) Method of unroll<strong>in</strong>g cable should be as per Drg. No. CORE/S&T/ALD/SK /404/94.<br />

ITEM 2. CASTING OF FOUNDATION<br />

(I) Cast<strong>in</strong>g of ma<strong>in</strong> signal foundation as per draw<strong>in</strong>g no. RE/S&T/SIG/ Tender /1/85.<br />

(II) Cast<strong>in</strong>g of shunt signal foundation as per drg. no. RE/S&T/SIG/Tender /SK/2/85.<br />

(III) Cast<strong>in</strong>g of s<strong>in</strong>gle Apparatus cases foundation as per draw<strong>in</strong>g no. RE/S&T/ SIG / Tender/ SK /9/85.<br />

(IV) Cast<strong>in</strong>g of half apparatus case foundation as per draw<strong>in</strong>g no. RE/S&T/Sig/ Tender/SK/8/85.<br />

(V) Cast<strong>in</strong>g of jn. box foundation as per draw<strong>in</strong>g No. RE/S&T/Sig/ Tender/ SK/ 5A/91.<br />

(VI) Cast<strong>in</strong>g of SLB/BSLB/SB foundation as per draw<strong>in</strong>g no. RE/S&T/Sig/ Tender /SK/10/85.<br />

(VII) Cast<strong>in</strong>g of Diesel Generator (7.5 KVA) foundation as per drg. no. RE/S&T/ Sig/Tender/ SK/12/85.<br />

(VIII) Cast<strong>in</strong>g of „Ground Lever Frame‟ foundation as per draw<strong>in</strong>g no. RE/S&T/ Sig / Tender /SK/3/85.<br />

Contractor’s signature with stamp Page 14


All the materials <strong>in</strong>clud<strong>in</strong>g cement for the above works shall be supplied by the contractor.<br />

ITEM 3. APPARATUS CASES AND JUNCTION BOXES:<br />

(I) Term<strong>in</strong>al strip of MS angle size 25mmX25mmX3mm for fix<strong>in</strong>g of ARA term<strong>in</strong>als and fuses, hylem sheet of thickness as 12 mm and width 25 mm as<br />

per drg no. SK/DRG/OL/109 of SE <strong>railway</strong> shall be provided <strong>in</strong> apparatus cases, jn boxes and relay room. Term<strong>in</strong>al and fuses should be fixed as per<br />

drg. No. CORE/S&T/ALD/SK/477/99, 480/99, 481/99, 482/99 484/99 & 485/99 & wired as per approved term<strong>in</strong>ation diagram and circuit diagram.<br />

Shelves <strong>in</strong> Apparatus cases shall be of 25 mm thick salwood.<br />

(II) The location number is to be written/stenciled with letter of bold size of not less than 100 mm <strong>in</strong> block on both the doors. Power locations shall be<br />

<strong>in</strong>dicated as „PCT‟ with legend to read “DANGER 400 V” 230V as the case may be. It shall be stenciled <strong>in</strong> white letters <strong>in</strong> RED background on the<br />

door with 50 mm red band around the PCT.<br />

The location with battery and battery chargers shall be stenciled with legend B.B. and B. C. respectively <strong>in</strong> 100 mm letters. Cable Term<strong>in</strong>ation<br />

arrangement <strong>in</strong> apparatus cases should be as per Drg. No. CORE/S&T/ ALD /SK/400/94 ALT.-A.<br />

(III) The apparatus cases shall generally be on the same side of the track as the cable run and shall be placed just ahead of the signal, it serves so that<br />

aspect of the signal are seen while test<strong>in</strong>g the location equipment.<br />

(IV) TERMINAL BLOCK M-6 (ARA Term<strong>in</strong>al) shall be molded type and fuses non- deteriorat<strong>in</strong>g non - <strong>in</strong>dicat<strong>in</strong>g type 2 Amp/3 Amp.<br />

(V) Each core of every cable <strong>in</strong>clud<strong>in</strong>g spare cable core shall be term<strong>in</strong>ated <strong>in</strong> the location boxes and shall be provided with identification ferrules with<br />

letters to <strong>in</strong>dicate the designation of the circuit, which the particular core carried such as 12 DG or 15 NWKR etc.<br />

(VI) Fix<strong>in</strong>g of equipments such as high voltage signal transformer, MCB switches and all other equipments <strong>in</strong> apparatus cases of Schedule A (I) and (II)<br />

and wir<strong>in</strong>g of equipment as per wir<strong>in</strong>g diagram. This item will be undertaken <strong>in</strong> case where 300 volts signal feed circuit is required.<br />

Fix<strong>in</strong>g of equipments such as relays etc. <strong>in</strong> apparatus cases of Schedule A (I) and (II) and wir<strong>in</strong>g of equipment as per wir<strong>in</strong>g diagram. All materials<br />

except ARA term<strong>in</strong>als and Rly. supply items mentioned <strong>in</strong> para (6) of volume I. for the above work shall be supplied by the contractor <strong>in</strong>clud<strong>in</strong>g but<br />

not limited to the follow<strong>in</strong>g items:<br />

(a) Term<strong>in</strong>al strips, Hylem Strips.<br />

(b) Non - deteriorat<strong>in</strong>g type non <strong>in</strong>dicat<strong>in</strong>g type and fuse base as per wir<strong>in</strong>g diagram.<br />

(c) Wir<strong>in</strong>g, bunch<strong>in</strong>g and dress<strong>in</strong>g materials.<br />

(d) Sal wood 25 mm thick shelves for shelter of equipments and batteries.<br />

(e) Fix<strong>in</strong>g arrangement for shelves, ARA term<strong>in</strong>als, fuses and relays etc.<br />

(f) Fix<strong>in</strong>g arrangement for MCB, High voltage signal transformers, etc. will be undertaken <strong>in</strong> case 300 volts signal feed circuit is required.<br />

ITEM 4. SIGNAL EQUIPMENT:<br />

(I) Fix<strong>in</strong>g of CLS surface base bolt<strong>in</strong>g on the foundation, erection of CLS post with signal unit on to the top or on an offset bracket and fitt<strong>in</strong>g ladder &<br />

guard to the post at the top and concret<strong>in</strong>g ladder base embedded <strong>in</strong>to the ground and with support<strong>in</strong>g brackets <strong>in</strong> the middle, blank<strong>in</strong>g of ladder for<br />

a distance of 1 ft. between the height of the 6‟9” and 7‟9” from the rail level by M.S. angle & M.S. Sheet of 0.6 mm thick wherever required and<br />

term<strong>in</strong>ation of cables. This <strong>in</strong>cludes provision of wooden (Sal) cross arm 1m x 1m for CLS unit prior to commission<strong>in</strong>g.<br />

(II) Fix<strong>in</strong>g of CLS lenses, triple pole lamps and hoods on CLS unit wir<strong>in</strong>g the CLS unit and focus<strong>in</strong>g the signal.<br />

(III) Fix<strong>in</strong>g of shunt signal surface base, bolt<strong>in</strong>g on to the foundation, erection of shunt signal post with signal unit, term<strong>in</strong>ation of cables. This <strong>in</strong>cludes<br />

provision of wooden (Sal) cross Arm 1m x 1m on signal unit prior to commission<strong>in</strong>g.<br />

(IV) Fix<strong>in</strong>g of lenses, lamps, and hoods on shunt signal unit, wir<strong>in</strong>g and focuss<strong>in</strong>g of signals.<br />

(V) Fix<strong>in</strong>g of route <strong>in</strong>dicator on top of the signal post or on an off set bracket <strong>in</strong>clud<strong>in</strong>g fix<strong>in</strong>g of offset bracket.<br />

(VI) Fix<strong>in</strong>g of lenses, lamps and hoods, connect<strong>in</strong>g cable, wir<strong>in</strong>g and focuss<strong>in</strong>g of route <strong>in</strong>dicator.<br />

(VII) Elevation and distance of foundation from track shall be <strong>in</strong> accordance with the “schedule” of dimensions for Indian Railways published by Govt. of<br />

India and approved draw<strong>in</strong>gs.<br />

All items for the above work except Rly. Supply items mentioned <strong>in</strong> para 6 of volume - I shall be supplied by the contractor <strong>in</strong>clud<strong>in</strong>g but not limited to<br />

the follow<strong>in</strong>g items:<br />

(a) “U” bolt for offset brackets.<br />

(b) Wooden cross Arms 1 x 1 mtr.<br />

(c) M S Angle and M S sheet for blank<strong>in</strong>g of ladders.<br />

(d) Triple pole Lamps.<br />

ITEM 5. POINT EQUIPMENT:<br />

(I) Supply & fix<strong>in</strong>g of electric po<strong>in</strong>t detector on sleeper and foundation as per drg. No. RE/S&T/SIG/Tender/SK/35/85 & Drg. No.RE/S&T/Sig/Tender/SK<br />

/34/85 respectively. Mak<strong>in</strong>g rods of 32 mm after weld<strong>in</strong>g 32 mm solid jo<strong>in</strong>t one side and 32 mm threaded end jo<strong>in</strong>t as per Drg. No. RE/S&T/Sig<br />

/Tender/SK/33/85 on other side adjustment and prelim<strong>in</strong>ary test<strong>in</strong>g, Cast<strong>in</strong>g concret<strong>in</strong>g and cur<strong>in</strong>g of „A‟ type foundation shall be as per drg. No.<br />

RE/S&T /Sig/Tender/SK/11/85. Connect<strong>in</strong>g electric po<strong>in</strong>t detector after disconnect<strong>in</strong>g the mechanical detectors, connection and wir<strong>in</strong>g of tail cable of<br />

the detector and adjustment.<br />

(II) Fix<strong>in</strong>g of lock bar complete with fitt<strong>in</strong>g i.e. lock bar clip, lock bar stop, lock bar driv<strong>in</strong>g attachment, crank, compensator etc.<br />

Note: - This item will be undertaken <strong>in</strong> case of Lock Bar/Hold<strong>in</strong>g Bar is required.<br />

(III) Runn<strong>in</strong>g of po<strong>in</strong>t rodd<strong>in</strong>g on trestle placed at 2 mtr <strong>in</strong>terval along with the provision of roller p<strong>in</strong> and split p<strong>in</strong> of lock bar/Hood<strong>in</strong>g Bar/Fac<strong>in</strong>g po<strong>in</strong>t<br />

Lock/Sid<strong>in</strong>g Po<strong>in</strong>t. The trestle should be embedded <strong>in</strong> the earth fully on all side up to the top of the trestle. Cast<strong>in</strong>g, concret<strong>in</strong>g and cur<strong>in</strong>g of foundation<br />

for „A‟ & „B‟ type foundation as per drg. No. RE/S&T/Sig/Tender/SK/11/85. Fix<strong>in</strong>g of cranks, compensator on „A‟ & „B‟ type foundation and rodd<strong>in</strong>g<br />

should be connected with necessary solid jo<strong>in</strong>t wherever required with forged weld<strong>in</strong>g.<br />

(IV) The fac<strong>in</strong>g po<strong>in</strong>t lock with switch extension piece and split stretcher bar shall be fixed <strong>in</strong>side the po<strong>in</strong>ts as per standard draw<strong>in</strong>gs. FPL shall be fixed <strong>in</strong><br />

level on the sleeper with proper size of bolts and nuts duly provid<strong>in</strong>g washers underneath the sleeper.<br />

(V) All the materials except Po<strong>in</strong>t Rodd<strong>in</strong>g (Solid) <strong>in</strong>clud<strong>in</strong>g electric po<strong>in</strong>t detector, required for the above work shall be supplied by contractor <strong>in</strong>clud<strong>in</strong>g but<br />

not limited to the follow<strong>in</strong>g items.<br />

(a) Lock bar complete, Crank, compensator, Solid Jo<strong>in</strong>t „A‟ & „B‟ type foundation, screw jo<strong>in</strong>ts, clips & stops.<br />

(b) Guide roller assembly, trestle 1 way/ 2 way/ 3 way.<br />

(VI) RKT shall be <strong>in</strong>stalled on a wooden board (Sal wood of 25 mm thick) complete with fix<strong>in</strong>g arrangement/accessories as per approved circuit diagram<br />

and term<strong>in</strong>al board of RKT shall rema<strong>in</strong> covered. All wir<strong>in</strong>g materials for this <strong>in</strong>clud<strong>in</strong>g baton, board shall be supplied by contractor.<br />

(VII) Installation of sid<strong>in</strong>g po<strong>in</strong>t with all fitt<strong>in</strong>gs i.e. ground lever frame, FP lock along with hand plunger, po<strong>in</strong>t rodd<strong>in</strong>g, guide roller assembly, solid jo<strong>in</strong>t,<br />

cranks, compensators, cast<strong>in</strong>g, concret<strong>in</strong>g and cur<strong>in</strong>g of foundation for „A‟ & „B‟ type foundation as per drg. no. RE/S&T/Sig/Tender/SK/11/85. Fix<strong>in</strong>g<br />

of cranks and compensators on „A‟ & „B‟ type foundation and rodd<strong>in</strong>g should be connected with necessary solid jo<strong>in</strong>t wherever required with forged<br />

weld<strong>in</strong>g.<br />

All the materials except po<strong>in</strong>t rodd<strong>in</strong>g (solid) required for the execution of above work shall be supplied by contractor <strong>in</strong>clud<strong>in</strong>g but not limited to the<br />

follow<strong>in</strong>g items:<br />

Contractor’s signature with stamp Page 15


(a) Ground lever frames, F.P. lock with hand plunger.<br />

(b) Guide roller assembly, trestles 1 way/2 way/3 way.<br />

(c) Crank compensator, solid jo<strong>in</strong>t A & B type foundation, screw jo<strong>in</strong>ts etc.<br />

(VIII) Remov<strong>in</strong>g of po<strong>in</strong>t rod from transmission, cutt<strong>in</strong>g the rod to proper length after mak<strong>in</strong>g provision for <strong>in</strong>sulation on po<strong>in</strong>t rodd<strong>in</strong>g and connect<strong>in</strong>g <strong>in</strong><br />

transmission ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g its orig<strong>in</strong>al length. This <strong>in</strong>cludes all smithy work and adjustment of po<strong>in</strong>t/lock bar for restor<strong>in</strong>g normal work<strong>in</strong>g. All materials<br />

<strong>in</strong>clud<strong>in</strong>g <strong>in</strong>sulted Rod Jo<strong>in</strong>t required for above work shall be supplied by the contractor.<br />

ITEM 6. TRACK CIRCUIT<br />

(I) Track circuit shall be provided to conform to para 8 of IRS Specification IRS: S- 36/87.<br />

(II) Bond<strong>in</strong>g of rail jo<strong>in</strong>ts which shall be made with 8 SWG G.I. soft solid wire, 7.2 mm holes are to be drilled close to fish plates on the web of rail and<br />

the bond wire are fixed by driv<strong>in</strong>g channel bond p<strong>in</strong> tightly as per Drg. No. CORE/S&T/ALD/SK/361/93. Two bond wires are to be provided for each<br />

jo<strong>in</strong>t <strong>in</strong> parallel. Bond clips are to be provided for each jo<strong>in</strong>t to keep the bond wire <strong>in</strong> tact. In po<strong>in</strong>t track circuit, parallel/polarity jumpers/bond<br />

wires/cables shall be provided as required by the Railway with proper support<strong>in</strong>g arrangements. Transverse bond shall also be provided for all track<br />

circuit as required by Railways.<br />

(III) Two track lead <strong>in</strong> boxes one at track feed end and another at relay end shall be fixed clear of <strong>in</strong>fr<strong>in</strong>gement as <strong>in</strong>dicated by Railway and the<br />

respective track circuit tail cable 2 x 2.5 sq. mm. PVC copper conductor from the apparatus case shall be term<strong>in</strong>ated as per Drg. No.<br />

CORE/S&T/ALD/ SK/367/93.The connection from the TLD boxes to the rail should be through the solid GI soft wire 8 SWG wire which should be<br />

fixed to the rail at both feed and relay ends. The G.I. wire from TLD boxes to sleepers should be covered with suitable PVC sleeves and thereupon<br />

neatly clipped on the sleepers to prevent short<strong>in</strong>g with rails, <strong>in</strong>sulation bush shall be provided on TLD box to prevent G.I. wire earth<strong>in</strong>g.<br />

(IV) Both TLD boxes shall be pa<strong>in</strong>ted and track circuit number shall be neatly written as required by the Railway.<br />

(V) Fix<strong>in</strong>g of Insulated block jo<strong>in</strong>t complete with provision of skimmed fishplate <strong>in</strong> place of exist<strong>in</strong>g fishplate.<br />

(VI) Provision of Insulation for block jo<strong>in</strong>t, gauge tie plate, switch extension bracket and William stretcher bar.<br />

(VII) Provision of 2 chokes „B‟ type as per IRS specification No. IRS - S - 65/83 latest for track circuit and shall be fixed one at feed end and other at Relay<br />

end.<br />

(VIII)<br />

(a)<br />

(b)<br />

(IX)<br />

(X)<br />

(XI)<br />

(XII)<br />

Track circuit shall not be fed directly from AC supply us<strong>in</strong>g Transformer and rectifier. A storage battery 40 AH Capacity (2 or 3 nos.) must be<br />

connected with battery charger as per Drg. No. CORE/S&T/ALD/SK/363 /93 and the connection so made that if battery is disconnected the rectifier<br />

is also disconnected.<br />

Battery arrangement for Track circuit <strong>in</strong> Apparatus cases should be as per Drg. No.CORE/S&T/ALD/SK/481/99.<br />

Feed end and relay end tail cables for track circuit shall be 2 core 2.5 sq. mm for Lead Length less than 90 mtr. and 4sq. mm for lead length more<br />

than 90 mtr.<br />

Non deteriorat<strong>in</strong>g non <strong>in</strong>dicat<strong>in</strong>g type of fuses of 2Amp/3Amp. shall be only used.<br />

Fabrication of fix<strong>in</strong>g arrangements and arrang<strong>in</strong>g for fix<strong>in</strong>g of Surgedischarger as per Drg. No. RE/S&T/SIG/Tender/SK/31/85.<br />

Remov<strong>in</strong>g of exist<strong>in</strong>g block jo<strong>in</strong>ts to manage the s<strong>in</strong>gle rail track circuit. All materials except track feed battery charger, relays, underground cables,<br />

surge discharger, mach<strong>in</strong>e fishplate with longer nuts and bolts required for <strong>in</strong>stallation and commission<strong>in</strong>g of track circuit shall be supplied by<br />

contractor <strong>in</strong>clud<strong>in</strong>g but not limited to the item mentioned below <strong>in</strong> the list.<br />

(a) „Disc‟ Type track feed Resistance as per Drg. No. SA - 20161 - 66M, bond<strong>in</strong>g wire 8SWG bond wire clip, channel p<strong>in</strong> s<strong>in</strong>gle groove.<br />

(b) Non deteriorat<strong>in</strong>g non-<strong>in</strong>dicat<strong>in</strong>g type fuse of 2 AMP.<br />

(c) Insulation for rail jo<strong>in</strong>t, gauge tie plate, stretcher bar and switch extension bracket.<br />

(d) Choke B Type as per IRS Specification No. IRS - S - 65/83 latest.<br />

(e) Track Lead Jn. Boxes.<br />

ITEM 7. CABIN & RELAY/EQUIPMENT/BATTERY ROOM<br />

(I) Supply of prewired composite relay rack similar to SE <strong>railway</strong> sketch no. 83/5/1 alt. B and fix<strong>in</strong>g arrangement for neutral plug <strong>in</strong> relays „Q‟ Type, lamp<br />

prov<strong>in</strong>g Relays and shelf type relays etc. Fix<strong>in</strong>g arrangement for fuses and term<strong>in</strong>al block M6 (ARA Term<strong>in</strong>al) etc. should be <strong>in</strong> conformity with the<br />

SE <strong>railway</strong> sketch no. 83/5/1 alt. B.<br />

(II)<br />

(III)<br />

(IV)<br />

(V)<br />

(VI)<br />

Fix<strong>in</strong>g of relay rack, ARA term<strong>in</strong>als, fuses, relays and relays base and all other accessories <strong>in</strong> the relay rack and term<strong>in</strong>ation of outdoor cable.<br />

Internal wir<strong>in</strong>g of relay room and cab<strong>in</strong> shall be as per item 10(VII) of Technical Specification of Enclosure-I and approved circuit diagram.<br />

Connect<strong>in</strong>g wire to different cables equipments, batteries, fuse board, circuit controller, lever lock, composite relay rack cum high voltage rack and<br />

<strong>in</strong>ter connection wir<strong>in</strong>g. This also <strong>in</strong>cludes term<strong>in</strong>ation of cables/wires of block Instrument of Relay Rack, dress<strong>in</strong>g, bunch<strong>in</strong>g and ladder arrangement<br />

for support<strong>in</strong>g wire runs etc. This also <strong>in</strong>cludes replacement of non immunized relays with immunized relays, <strong>in</strong> case of modification to the exist<strong>in</strong>g<br />

MACLS <strong>in</strong>stallation to suit 25 KV AC Traction.<br />

Note: - High Voltage Rack will not provided <strong>in</strong> case of 110 Volts Signal feed circuit.<br />

Provid<strong>in</strong>g antitilt<strong>in</strong>g wooden arrangement with contractor‟s materials for shelf type relays.( Ref. Drg. No. NBRE/SIG/GEN/050)<br />

All the materials except relays and ARA term<strong>in</strong>als for the above work shall be supplied by the contractor <strong>in</strong>clud<strong>in</strong>g but not limited to the items<br />

mentioned below <strong>in</strong> the list.<br />

(I) fuse with base.<br />

(ii) PVC wire.<br />

(iii) Term<strong>in</strong>al strip and hylem strip.<br />

Supply and <strong>in</strong>stallation of high voltage rack similar to S.E. Rly‟s Sketch No. 83/5/1 ALT.B for over all dimensions. High voltage transformer, MCB<br />

switches & ARA term<strong>in</strong>al should be fixed as per Drg. No. CORE/S&T/SIG /Tender/SK/43/88 and should be wired as wir<strong>in</strong>g diagram. Ma<strong>in</strong> outdoor<br />

cables for 300 volts and signal feed circuits only will be term<strong>in</strong>ated on high voltage rack. Cover<strong>in</strong>g of high voltage term<strong>in</strong>als will also be done by the<br />

contractor.<br />

Note: - This item will be undertaken <strong>in</strong> case 300 volts signal feed circuit is required.<br />

Supply and fix<strong>in</strong>g of ma<strong>in</strong> cable term<strong>in</strong>ation rack as per Drg. No. CORE/S&T/ALD/SK/376/93 along with fuses and fuse bases. Fix<strong>in</strong>g of ARA<br />

term<strong>in</strong>als „I‟ type transformers and all other accessories on the Rack and term<strong>in</strong>ation of outdoor cables. All the materials except relays, high voltage<br />

signal transformer and MCB switches for the above work shall be supplied by contractor <strong>in</strong>clud<strong>in</strong>g but not limited to the items mentioned below <strong>in</strong> the<br />

list.<br />

(a) Fuse with base.<br />

(b) PVC wire.<br />

(c) Hylam strip and term<strong>in</strong>al strip<br />

(d) PVC Cover on ARA Term<strong>in</strong>als hav<strong>in</strong>g High volts feed.<br />

ITEM 8. CABIN EQUIPMENTS/SM‟S OFFICE EQUIPMENT: -<br />

(I) Fix<strong>in</strong>g of shelves salwood 50 mm thick over the lever frame and SM‟s slide <strong>in</strong> cab<strong>in</strong> and SM‟s office/L - X<strong>in</strong>g respectively.<br />

Contractor’s signature with stamp Page 16


(II) Fix<strong>in</strong>g of Signal Slot. Po<strong>in</strong>t <strong>in</strong>dicator and <strong>in</strong>dicator lamps <strong>in</strong> the cab<strong>in</strong> as per approved circuit diagram.<br />

All materials for the above work shall be supplied by the contractor <strong>in</strong>clud<strong>in</strong>g but not limited to the follow<strong>in</strong>g items: -<br />

(a) Lum<strong>in</strong>ous <strong>in</strong>dicator RED, YELLOW, GREEN, WHITE, ON, OFF, etc. as per approved circuit diagram.<br />

(b) Lum<strong>in</strong>ous <strong>in</strong>dicator, Stencil, N, R, as per approved circuit diagram.<br />

(c) Sal wood Shelves (50mm thick).<br />

(d) PVC wire.<br />

(e) Indicator Lamp 12 Volt. 4 Watt.<br />

(III) Fix<strong>in</strong>g of Term<strong>in</strong>al Block M6 (ARA Term<strong>in</strong>al) on 6 mm. thick hylam sheet <strong>in</strong> ASM‟s slide box/ term<strong>in</strong>al Board and wir<strong>in</strong>g as per approved circuit<br />

diagram. This <strong>in</strong>cludes supply of all materials except ARA Term<strong>in</strong>als, which is separate supply item.<br />

(IV) All lock<strong>in</strong>g materials i.e. Dog, Bridle bar etc. shall be supplied by contractor. Overhaul<strong>in</strong>g and test<strong>in</strong>g of Lever frame shall be carried out as per Para<br />

of overhaul<strong>in</strong>g of Signal Eng<strong>in</strong>eer<strong>in</strong>g Manual.<br />

(V) Fabrication of frame for fix<strong>in</strong>g circuit controller and lever lock and down rod of 32 mm dia at one end 20 mm at the other end and connect<strong>in</strong>g to circuit<br />

controller arm and lever tail. Fix<strong>in</strong>g of circuit controller/lever lock and frame work to be done from angle iron as per <strong>in</strong>struction of Eng<strong>in</strong>eer at site.<br />

Angle iron size should be 50 mm x 50 mm x 6 mm.<br />

All the materials except po<strong>in</strong>t rodd<strong>in</strong>g (Solid) 32 mm for this work shall be supplied by the contractor.<br />

ITEM 9. POWER SUPPLY EQUIPMENT:<br />

(I) fix<strong>in</strong>g arrangement for provid<strong>in</strong>g battery charger, transformers, voltage stabilizers, <strong>in</strong>verters etc. and their connection with batteries, relay racks and<br />

block <strong>in</strong>strument.<br />

(II)<br />

(III)<br />

(IV)<br />

(V)<br />

(VI)<br />

Cable runs way to support all cables <strong>in</strong> relay room, power supply room and battery room.<br />

Acid and distilled water separately for charg<strong>in</strong>g of the cells shall be supplied and cells to be <strong>in</strong>stalled by the contractor. These shall be given <strong>in</strong>itial<br />

charg<strong>in</strong>g as per procedure prescribed by the manufacturer and approved by the Rly. This shall <strong>in</strong>clude atleast two cycles of boost charge and<br />

discharge. The charged battery shall be <strong>in</strong>stalled <strong>in</strong> battery room/relay room on sal wood battery rack (Drg. No. SK. DRG/OL/102)/ OR other<br />

draw<strong>in</strong>gs as mentioned <strong>in</strong> Schedule A (I) & A (ii)/RCC slab and <strong>in</strong> apparatus cases on shelves of 25 mm thick sal wood. The contractor shall make<br />

arrangement for <strong>in</strong>itial charg<strong>in</strong>g of secondary cell at a central place. The charg<strong>in</strong>g arrangement shall be <strong>in</strong>spected and approved by Eng<strong>in</strong>eer <strong>in</strong><br />

charge and witness<strong>in</strong>g of actual charg<strong>in</strong>g and necessary shall be done by authorized representative of Eng<strong>in</strong>eer - <strong>in</strong> - charge.<br />

Manufactur<strong>in</strong>g with Contractor‟s timber Sal wood plank of 200 mm x 50 mm size supported by MS angle of size 65 mm x 65 mm x 8 mm grouted<br />

<strong>in</strong>to the wall at every 2 - 3 ft. and fix<strong>in</strong>g of additional equipment <strong>in</strong> connection with RE Modification for one Station/Cab<strong>in</strong>.<br />

Installation of power supply equipment <strong>in</strong> relay room/equipment room as per typical power supply arrangement diagram attached with Tender paper.<br />

Installation of DG set will be on 25 cm high brick platform (above ground level) and plaster<strong>in</strong>g with cement mortar 1:3 of 6 mm thickness to give<br />

smooth surface suitable for <strong>in</strong>stallation of DG Set with cushy foot anti vibrat<strong>in</strong>g mount<strong>in</strong>g, which will be supplied by the contractor. The platform<br />

should be capable to bear the load and vibration shocks so that cranks should not develop.<br />

(VII) Installation of control panel on wall <strong>in</strong> DG Room and subsidiary control panel <strong>in</strong> SM‟s office/cab<strong>in</strong> as specified by Eng<strong>in</strong>eer In charge at site.<br />

(VIII) Supply and fix<strong>in</strong>g of M.S. pipe „B‟ class of suitable diameter covered with layer of Asbestos rope of half <strong>in</strong>ch dia around it for exhaust of fume.<br />

(IX) Supply and ly<strong>in</strong>g of 1 no. PVC <strong>in</strong>sulated and PVC Sheathed 6 sq. mm copper conductor 4 <strong>Core</strong> Power cable of 1.1 KV Grades as per IS<br />

specification No. IS-1554 pt. I <strong>in</strong> between DG set and control panel and subsidiary control panel (<strong>in</strong> SM‟s Office/Cab<strong>in</strong>).<br />

(X) DG Supply is required to be extended to equipment Room and ASM‟s Room <strong>in</strong> consultation with Eng<strong>in</strong>eer at site through power cable.<br />

ITEM 10. MISCELLANEOUS:<br />

(I) Pa<strong>in</strong>t<strong>in</strong>g of all equipment such as signals, shunt signals /call<strong>in</strong>g on signals, electric po<strong>in</strong>t detectors, track circuit equipments, apparatus cases,<br />

junction boxes, track lead <strong>in</strong>. boxes, cable marker, po<strong>in</strong>t rodd<strong>in</strong>g, crank, compensator etc. as per relevant provisions of „Signal Eng<strong>in</strong>eer<strong>in</strong>g Manual‟.<br />

This <strong>in</strong>cludes supply of all pa<strong>in</strong>t<strong>in</strong>g materials.<br />

(II)<br />

(III)<br />

(IV)<br />

(V)<br />

(VI)<br />

(VII)<br />

Mark<strong>in</strong>g of all circuit particular near term<strong>in</strong>als on term<strong>in</strong>al board/rack <strong>in</strong> apparatus cases, <strong>in</strong> boxes / relay room/ SM‟s room and relay nomenclature,<br />

fuse nos. Equipment nomenclatures as per approved term<strong>in</strong>al chart and provision of „Signal Eng<strong>in</strong>eer<strong>in</strong>g Manual‟.<br />

Ink diagram board (size 1 meter x 0.5 meter x 20 mm thick) <strong>in</strong> SM‟s office/cab<strong>in</strong> of sal wood with white sun mica hav<strong>in</strong>g alum<strong>in</strong>um angle (1” x 1” x<br />

1/8”) on all four sides duly pa<strong>in</strong>ted as per approved SWR diagram.<br />

Supply and fix<strong>in</strong>g of each earth electrode as per draw<strong>in</strong>g No. RE/S&T /DRG/Tender/SK/398/94 for apparatus cases, signal post and other equipment<br />

as per <strong>in</strong>struction on earth<strong>in</strong>g of S&T equipment - Annexure 45 of „Technical Supplement‟.<br />

Lay<strong>in</strong>g of earth lead wire and solder<strong>in</strong>g of lead wire to earth electrode and lever frame, signal post & apparatus cases as per Drg. No. CORE/S&T<br />

/ALD/SK/370/93, 371/93 & 372/93 respectively and <strong>in</strong>structions on earth<strong>in</strong>g at S&T equipment (attached at Annexure to the supplement to the<br />

Tender paper) and provid<strong>in</strong>g cement enclosure for earth electrode as per draw<strong>in</strong>g No. RE/S&T/Sig/Tender/SK/13/85 Alt. - „A‟.<br />

Illum<strong>in</strong>ated <strong>in</strong>dication diagram board of size 1.2 mtrs. x 0.6mtrs x 20mm thick shall be provided <strong>in</strong> the SM‟s office/cab<strong>in</strong>s. This shall be made of sal<br />

wood with white sun mica top hav<strong>in</strong>g alum<strong>in</strong>um angle 1”x1”x1/8” on all four sides duly pa<strong>in</strong>ted as per approved station work<strong>in</strong>g rule diagrams. The<br />

<strong>in</strong>dications for signals, po<strong>in</strong>ts, slots, track circuits, etc. shall be provided on this board by means of LEDs of P.G. lamps. The signal and track circuit<br />

<strong>in</strong>dications shall be provided near the signal and track circuits pa<strong>in</strong>ted on the diagram whereas slot <strong>in</strong>dications shall be provided below the pa<strong>in</strong>ted<br />

yard diagram.<br />

INSTRUCTION FOR WIRING:<br />

The wir<strong>in</strong>g of equipment to be carried out with the follow<strong>in</strong>g PVC wires approved by Eng<strong>in</strong>eer - In charge at site.<br />

(A) WIRING INSIDE ONE RACK FOR SHELF TYPE AND PLUG-IN TYPE (METAL TO CARBON) CONTACT RELAYS<br />

1. Relay rack wir<strong>in</strong>g hous<strong>in</strong>g plug-<strong>in</strong> type relays conform<strong>in</strong>g to BRS - 930 & shelf type relays conform<strong>in</strong>g to BS-1659 shall be made with PVC<br />

<strong>in</strong>sulated unsheathed, flame retard<strong>in</strong>g type s<strong>in</strong>gle core flexible wire 1100 V- grade hav<strong>in</strong>g 16/0.2 mm dia annealed copper conductor and<br />

nom<strong>in</strong>al cross sectional area of 0.5 sq. mm of common colour code to the specification no. IS-694. S<strong>in</strong>gle strand and wires shall not be<br />

used for wir<strong>in</strong>g of these relays; the above wires shall be term<strong>in</strong>ated on eyelets/ lugs of standard design.<br />

2. FOR WIRING FROM ONE RELAY RACK TO ANOTHER RELAY RACK (INTER RACK WIRING) USING PLUG-IN TYPE AND SHELF TYPE<br />

RELAYS: Multicore Un - armoured cable of 1.12 mm dia and 1.0 sq mm cross section to the Specification No. IS-694 or IRS: S-63 shall be<br />

used for wir<strong>in</strong>g purpose.<br />

3. The use of <strong>in</strong>termediaries like term<strong>in</strong>al blocks, tag blocks etc. is not recommended <strong>in</strong> normal practice as these are likely to lower down the<br />

<strong>in</strong>sulation resistance of the system. If the use of these is unavoidable the same shall be of standard design and type conform<strong>in</strong>g to standard<br />

specification.<br />

4. The use of <strong>in</strong>termediate rack for wir<strong>in</strong>g shelf type and plug <strong>in</strong> type relays is not recommended unless it is otherwise unavoidable and specially<br />

asked for.<br />

5. Spare contacts of relays need not be wire. If it is considered necessary few spare contacts may be wired and term<strong>in</strong>ated on term<strong>in</strong>al/tag<br />

blocks.<br />

(B).<br />

WIRING OF PROVED TYPE RELAYS (METAL TO METAL CONTACT RELAYS)<br />

The use of Intermediate Distribution Frame (IDF) with these types of relays which is a common practice may cont<strong>in</strong>ue.<br />

Contractor’s signature with stamp Page 17


1. For wir<strong>in</strong>g the above relays the use of s<strong>in</strong>gle strand - t<strong>in</strong>ned copper wire of 0.6mm and 1.0 mm dia 1100V grade PVC <strong>in</strong>sulated flame proof<br />

shall be used. The use of multi core cable of 100 core, 60 core, 40 core and 20 core hav<strong>in</strong>g the above conductor dia and grade is<br />

recommended. Size of conductor shall be chosen based on current to be carried through these conductors.<br />

2. The wire and cable used shall generally conform to IS - 694. (Reference: RDSO‟s Letter No. STS/E/RRI/SCHEME dated 12.01.1987)<br />

ITEM 11(a). Releas<strong>in</strong>g of signals, signall<strong>in</strong>g gears & stack<strong>in</strong>g.<br />

Releas<strong>in</strong>g the fitt<strong>in</strong>g of signal post <strong>in</strong>clud<strong>in</strong>g bracketed or Gantry posts, br<strong>in</strong>g<strong>in</strong>g down the posts <strong>in</strong>clud<strong>in</strong>g bracketed or gantry posts to ground.<br />

Remov<strong>in</strong>g the fitt<strong>in</strong>g and signal posts to the Station and stack<strong>in</strong>g nearly at the location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative. This work <strong>in</strong>cludes<br />

refill<strong>in</strong>g of pits, dug of excavation of the signal and br<strong>in</strong>g<strong>in</strong>g out it to normal soil label i.e. Gantry Bracketed Doll 2/3/4, Signal posts, Shunt Signal<br />

Ground/post Type etc. Releas<strong>in</strong>g complete signal wire transmission <strong>in</strong>clud<strong>in</strong>g pulley, pulley stacks turned out wheels <strong>in</strong>clud<strong>in</strong>g its foundation <strong>in</strong> soil<br />

tak<strong>in</strong>g them to the Station and stack<strong>in</strong>g neatly at one location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative. This work <strong>in</strong>cludes refill<strong>in</strong>g of pits Dug for<br />

excavation of the pulley stakes and Turn out wheels foundations & br<strong>in</strong>g<strong>in</strong>g it to normal soil label.<br />

Releas<strong>in</strong>g the complete, po<strong>in</strong>t fitt<strong>in</strong>g <strong>in</strong>clud<strong>in</strong>g po<strong>in</strong>t locks, Detectors. Po<strong>in</strong>t Mechanism, Lock Bars and its connections Rodd<strong>in</strong>g etc. Tak<strong>in</strong>g them to<br />

the station and stack<strong>in</strong>g neatly at one location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative. Releas<strong>in</strong>g of lever frame complete with all connections &<br />

fitt<strong>in</strong>gs <strong>in</strong>clud<strong>in</strong>g at all connections <strong>in</strong> the cab<strong>in</strong> basement <strong>in</strong>clud<strong>in</strong>g station and stack<strong>in</strong>g neatly at one location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative.<br />

Releas<strong>in</strong>g of double wire levers <strong>in</strong>clud<strong>in</strong>g double wire compensators and its connection and all other connections to lever frame. up to lead out and<br />

stack<strong>in</strong>g neatly at one location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative.<br />

Releas<strong>in</strong>g of double wire lead out complete with all connections <strong>in</strong>clud<strong>in</strong>g turn-out wheel nest and its fix<strong>in</strong>g arrangements and stack<strong>in</strong>g neatly at one<br />

location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative.<br />

Releas<strong>in</strong>g of all exist<strong>in</strong>g electrical connections provided <strong>in</strong> the SM‟s office and cab<strong>in</strong> <strong>in</strong>clud<strong>in</strong>g their connections to Relay Room and Battery Room<br />

and stack<strong>in</strong>g neatly at one location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative.<br />

Releas<strong>in</strong>g of exist<strong>in</strong>g electric equipments/Batteries and its connections <strong>in</strong> the Relay Room, Battery Room & SM‟s office & Stack<strong>in</strong>g neatly at one<br />

location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative. Releas<strong>in</strong>g of „A‟ Type foundation (<strong>in</strong> earth work) and stack<strong>in</strong>g neatly at one location <strong>in</strong>dicated by<br />

Eng<strong>in</strong>eer‟s representative. This work <strong>in</strong>cludes refill<strong>in</strong>g of pit dug for excavation of the „A‟ Type foundations and br<strong>in</strong>g<strong>in</strong>g it to normal soil level.<br />

Releas<strong>in</strong>g the post of overhead alignment, <strong>in</strong>sulations, Cross Arm, Guys and other fitt<strong>in</strong>gs and wires, br<strong>in</strong>g<strong>in</strong>g down the posts to the ground and<br />

tak<strong>in</strong>g them to the station and stack<strong>in</strong>g nearly at one location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative. This work <strong>in</strong>cludes refill<strong>in</strong>g of pit dug for<br />

excavation of the post and br<strong>in</strong>g<strong>in</strong>g it to normal soil level. Releas<strong>in</strong>g Sight<strong>in</strong>g Board, shunt<strong>in</strong>g limit Board and br<strong>in</strong>g<strong>in</strong>g sight<strong>in</strong>g board, to the location<br />

as <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative and refill<strong>in</strong>g pit Dug for excavation of the sight<strong>in</strong>g board and br<strong>in</strong>g<strong>in</strong>g it to normal soil level. Releas<strong>in</strong>g of<br />

exist<strong>in</strong>g Apparatus cases/Jn. Boxes/Battery Boxes/Track lead Boxes with gear fitt<strong>in</strong>gs and stack<strong>in</strong>g neatly at one location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s<br />

representative. This also <strong>in</strong>cludes removal of support<strong>in</strong>g Rail/Angle/Channel Support and refill<strong>in</strong>g of pit, Dug for excavation of these fitt<strong>in</strong>gs boxes<br />

and br<strong>in</strong>g<strong>in</strong>g to normal soil level. Releas<strong>in</strong>g of SM‟s Slide control frame and stack<strong>in</strong>g neatly at one location <strong>in</strong>dicated by Eng<strong>in</strong>eer‟s representative.<br />

Releas<strong>in</strong>g of over ground signall<strong>in</strong>g cable on cable route <strong>in</strong>clud<strong>in</strong>g cable markers, cable support<strong>in</strong>g posts and its fitt<strong>in</strong>g and coil<strong>in</strong>g the released cable<br />

& br<strong>in</strong>g<strong>in</strong>g all released materials and cable to locations as <strong>in</strong>dicated by the Eng<strong>in</strong>eer‟s representative and stack<strong>in</strong>g them neatly. This also <strong>in</strong>cludes<br />

refill<strong>in</strong>g up of excavation trench to normal soil level.<br />

ITEM 11(b). ADDITIONAL CONDITIONS (For releas<strong>in</strong>g of exist<strong>in</strong>g Mechanical Signall<strong>in</strong>g Gears)<br />

(I) All tools and plants required for work shall be contractor‟s own.<br />

(II) Cart and any other vehicles required for transportation to be arranged by the contractor.<br />

(III) While releas<strong>in</strong>g the material, the contractor should take care that material are released <strong>in</strong> tact and <strong>in</strong> sound work<strong>in</strong>g conditions as work<strong>in</strong>g on the<br />

day.<br />

(IV) Breakable items such as roundels, relays, relay cupboards etc. are carefully released without any damage. All materials and electrical equipment<br />

released are fitted with their relevant connection and are <strong>in</strong> sound work<strong>in</strong>g condition, as exist<strong>in</strong>g on the day released.<br />

(V) Released materials are stacked neatly, item wise and at the given location and should be such that it is not <strong>in</strong>terfered with other released<br />

equipments which might cause damage to the materials while shift<strong>in</strong>g.<br />

(VI) Released materials such as relays/electrical equipments should be protected from pilferage and damage. In the event of loss and damage, the<br />

recovery will be made from contractor‟s material and keep accountal of released material till such time they are taken over by an authorized<br />

representative of Eng<strong>in</strong>eer - <strong>in</strong> - charge.<br />

(VII) The material damaged while releas<strong>in</strong>g should be stacked separately and its separate accountal ma<strong>in</strong>ta<strong>in</strong>ed by the contractor. Such material should<br />

be produced before Eng<strong>in</strong>eer - <strong>in</strong> - charge for his <strong>in</strong>spection for accept ion cause and responsibility of damage. Any damage caused due to age<strong>in</strong>g<br />

and any other unavoidable causes may be accepted by Eng<strong>in</strong>eer - <strong>in</strong> - charge, which will be taken over by his representative for arrang<strong>in</strong>g the<br />

disposal of such material. The Eng<strong>in</strong>eer-<strong>in</strong>-charge, if not arrang<strong>in</strong>g the disposal of such material. The Eng<strong>in</strong>eer-<strong>in</strong>-charge, if not satisfied with the<br />

reason, or cause forwarded by the contractor for damage of any equipment/material, the cost of such material will be recovered from the contractor<br />

at book rate or the market - rate. Whichever is a higher plus other charge as applicable. The decision of the Eng<strong>in</strong>eer - <strong>in</strong> - charge will be f<strong>in</strong>al.<br />

(VIII) Eng<strong>in</strong>eer-<strong>in</strong>-charge may reject any work done for releas<strong>in</strong>g given under schedule, if he f<strong>in</strong>ds that any such work is not carried out as per the details<br />

given <strong>in</strong> the schedule & work done by the contractor will not be eligible for any payment for such work which is rejected by the Eng<strong>in</strong>eer-<strong>in</strong>-charge.<br />

(IX) The work of releas<strong>in</strong>g of exist<strong>in</strong>g signall<strong>in</strong>g gears as per enclosed schedule A (ii) Technical Specification are required to be executed by the<br />

Contractor at the station as and when the work of conversion of mechanical signall<strong>in</strong>g to CLS is taken <strong>in</strong> hand. The contractor will be advised 72 hrs.<br />

<strong>in</strong> advance from the date of commencement of such work. The contractor should be present from the first day of the conversion work for<br />

commenc<strong>in</strong>g the work of releas<strong>in</strong>g.<br />

(X) The work of releas<strong>in</strong>g will be carried out successively as per above <strong>in</strong>struction at stations as and when conversion work is taken <strong>in</strong> hand.<br />

(XI) Eng<strong>in</strong>eer - <strong>in</strong> - charge due to local conditions, prevail<strong>in</strong>g may decide to abandon release of complete material at station/L- x<strong>in</strong>g Gate of item<br />

appear<strong>in</strong>g <strong>in</strong> Schedule reduc<strong>in</strong>g or cancel<strong>in</strong>g part or full quantity of schedule for which no compensation will be paid to the contractor.<br />

(XII) After receipt of notice for commencement of work at a particular station as per para as above (IX) of Additional condition of contract, contractor will<br />

depute his authorized representative who will make Jo<strong>in</strong>t Survey with Railway Eng<strong>in</strong>eer - <strong>in</strong> - charge or his representative and jo<strong>in</strong>tly record actual<br />

items and quantities their of to be released materials with Railway, fail<strong>in</strong>g which, cost of short fall Materials will be recovered from him.<br />

ITEM 12(A). Operation and rout<strong>in</strong>e ma<strong>in</strong>tenance of Diesel Generator set.<br />

Operation and rout<strong>in</strong>e ma<strong>in</strong>tenance of Diesel Generator set <strong>in</strong>stalled at stations <strong>in</strong> sections for the purpose of reliable power supply for colour<br />

light signall<strong>in</strong>g <strong>in</strong>stallations.<br />

(I) For provid<strong>in</strong>g power supply to colour Light signall<strong>in</strong>g <strong>in</strong> case of failure of local power supply from State Electricity Board, 2 or 3 DG sets will be<br />

<strong>in</strong>stalled at each station, where colour light signall<strong>in</strong>g is be<strong>in</strong>g commissioned. One of these DG sets will be started as soon as local power<br />

supply fails. Normally the DG set will be started by the station Master on duty by operat<strong>in</strong>g the remote push button provided for these purpose<br />

<strong>in</strong> his office, when even the normal local power supply of state Electricity Board fails. The Station Master will also put the D.G. Set off aga<strong>in</strong> by<br />

operat<strong>in</strong>g the push button provided for these purpose <strong>in</strong> his office as soon as the local supply resumes. However, <strong>in</strong> case it is not possible for<br />

Contractor’s signature with stamp Page 18


(I)<br />

(II)<br />

(III)<br />

(IV)<br />

(V)<br />

(VI)<br />

(II)<br />

the Station Master on duty to operate any DG sets <strong>in</strong> case of failure of local supply by press<strong>in</strong>g the push button concerned due to any reason<br />

the DG set will be operated by the contractor‟s operator. For this purpose the contractor has to depute a D.G. operator round the clock at each<br />

station. The contractor‟s operator available at the station will have to start one of D.G. Set on <strong>in</strong>struction by the station Master Concerned. The<br />

contractor operator will ensure that the DG set work alternatively at 6 hours <strong>in</strong>terval.<br />

The Contractor‟s operator will also be responsible for rout<strong>in</strong>e Ma<strong>in</strong>tenance of D.G. Sets <strong>in</strong>stalled at different stations as well as the controlled<br />

panel and batteries provided for function<strong>in</strong>g of self start<strong>in</strong>g drive of D.G. Set. For this he will be required to check the fuel feed, lubricant,<br />

Temperature, output voltage, output current, electrolyte level of the batteries provided for the self start<strong>in</strong>g mechanism. He will ma<strong>in</strong>ta<strong>in</strong> the<br />

logbook for rout<strong>in</strong>e <strong>in</strong>spection of these items as per the Performa to be given by the Railway representative. The contractor‟s operator will also<br />

ma<strong>in</strong>ta<strong>in</strong> separately for each DG Set with record of consumption of fuel and lubricant <strong>in</strong> the Performa given by the Railway representative. In<br />

case of failure of any DG set at any station, the contractor‟s operator will immediately stop the concerned DG set and start the other D.G. set.<br />

There after the contractor will arrange for immediate rectification of the fault, if it is M<strong>in</strong>or <strong>in</strong> nature i.e. all the faults exclud<strong>in</strong>g seizure of eng<strong>in</strong>e<br />

and burn<strong>in</strong>g of coil of alternator. He will also be the responsible to immediately <strong>in</strong>form the ASM on duty about the failure and nature of failure of<br />

that particular DG set.<br />

NOTE:<br />

Deleted.<br />

At any time the number of stations LC gates where the DG set are to be operated may vary from – NIL.<br />

Diesel oil and lubricant required for operation of DG set will be supplied by the contractor at site. The sufficient amount of diesel oil and lubricant will<br />

be kept stored safely at the site.<br />

At the station/LC Gate - NIL.<br />

Where power supply from state Electricity Board is available but is not reliable, where ever supply from Electricity Board fails and Generator requires<br />

to be operated. The time of start<strong>in</strong>g the DG set and putt<strong>in</strong>g off the DG set should be clearly mentioned <strong>in</strong> the log book and the signature from the<br />

station Master on duty must be taken at the specified space and taken of confirmation of the work<strong>in</strong>g of D.G. Sets.<br />

All the materials required for the operation and rout<strong>in</strong>e ma<strong>in</strong>tenance of DG Sets. control panels and batteries like diesel fuel, lubricant waste cotton,<br />

distilled water, Grease, Sulphuric Acid, Meters, <strong>in</strong>dication bulbs, etc. will be provided by the contractor.<br />

The contractor‟s operator will ensure that the self start<strong>in</strong>g system of DG set functions smoothly, so that the ASM on duty can put on the generator by<br />

the operat<strong>in</strong>g the remote push button when ever supply from State Electricity Board goes off. However, <strong>in</strong>case of failure of self-start<strong>in</strong>g system, the<br />

contractor operator‟s will manually start the D.G. sets and ensure the early rectification of the fault itself start<strong>in</strong>g system.<br />

ITEM 12(B). SPECIAL CONDITIONS OF CONTRACT<br />

(I) ---- NIL -------<br />

Station/Stations/L.C. Gate has been grouped <strong>in</strong> the category of the station where power supply from State Electricity Board is not at all<br />

available. The contractor should note that the DG set are required to be operated around the clock at „NIL‟ Station /Stations/L.C. Gate.<br />

(II)<br />

The Station/L.C. Gate where power supply from the State Electricity Board is available but not reliable, they are as under:<br />

-----NIL----<br />

At the above stations whenever power supply from state Electricity Board fails, the DG set will have to be operated as contractor‟s operator. But the<br />

contractor‟ operator will rema<strong>in</strong> present at the station round the clock so that the DG sets can be started immediately, when supply from State<br />

Electricity Board fails.<br />

(III) Before start<strong>in</strong>g the work, a jo<strong>in</strong>t survey <strong>in</strong> an approved manner will be done by the representative of Railway and contractor‟s Representative to as<br />

certa<strong>in</strong> the average consumption of diesel fuel and the lubricant there of for each and every DG sets <strong>in</strong>stalled and required to be operated.<br />

This result should be noted <strong>in</strong> D.G. History book which will conta<strong>in</strong> all the details, such as date of last repair, date of <strong>in</strong>stallation, detail description of<br />

DG set <strong>in</strong>clud<strong>in</strong>g defects noticed, the date of last jo<strong>in</strong>t <strong>in</strong>spection & date of Jo<strong>in</strong>t Inspection etc.<br />

There after periodic Jo<strong>in</strong>t calibration will be done on monthly basis to ascerta<strong>in</strong> the average consumption of diesel fuel and lubricant of any variation<br />

<strong>in</strong> consumption is noticed s<strong>in</strong>ce <strong>in</strong>spection. This should be noted <strong>in</strong> DG History Book. The total monthly consumption of Diesel fuel and lubricant will<br />

be calculated from the basis of this jo<strong>in</strong>t calibration for particular DG set.<br />

(IV) The contractor should note that the sufficient amount of diesel fuel and lubricant should be stored at site <strong>in</strong> safe manner at least 100 liter diesel and 5<br />

(V)<br />

(VI)<br />

liter lubricant so that there should not be any difficulties for operation of DG set for want of fuel etc.<br />

The contractor should note that <strong>in</strong> case of any tra<strong>in</strong> detention on account of failure of their operator <strong>in</strong> start<strong>in</strong>g DG set due to any reason whatsoever<br />

they shall be liable for a recovery of two times the cost of operation per station day <strong>in</strong> each time.<br />

The contractor should note that the payment of the supply item such as diesel and lubricant may be made to the contractor by the Railway on receipt<br />

of the material at site but the measurement Book will be filed up not <strong>in</strong> a daily basis but <strong>in</strong> an appreciable time i.e. once <strong>in</strong> month or so.<br />

ITEM NO. 13 Fabrication of apparatus cases and Junction boxes.<br />

13.1 Hylam sheet size 960 mm x 450 mm x 6mm, 470 mm x 450 mm x 6 mm and 460 mm x 470mm x 3 mm shall be provided <strong>in</strong> Apparatus case s<strong>in</strong>gle,<br />

Half and junction boxes respectively for fix<strong>in</strong>g of Term<strong>in</strong>al Block M6 (ARA term<strong>in</strong>als) and fuses. Fix<strong>in</strong>g arrangement for term<strong>in</strong>al block M6 (ARA<br />

term<strong>in</strong>als) and fuses etc. should be <strong>in</strong> conformity with the S.E. Railway sketch No. SK/DRG/OL/109 Alt. A. Term<strong>in</strong>al block M6 (ARA term<strong>in</strong>als) and<br />

fuses should be fixed <strong>in</strong> Apparatus cases & Jn. boxes as per Drg. No. CORE/S & T/ALD/SK/478/99, 479/99,480/99, 482/99,484/99 & 485/99 and<br />

wired as per approved term<strong>in</strong>ation diagram and circuit diagram. Shelves <strong>in</strong> apparatus cases and Junction boxes shall be of 25 mm thick Sal wood.<br />

Term<strong>in</strong>al block M6 (ARA term<strong>in</strong>als) should be fixed vertically. The location number is to be written/stenciled with letter if bold size of not less than<br />

100 mm <strong>in</strong> block on both the doors. Power location shall be <strong>in</strong>dicated as “PCT” with legend to read danger “400V” 230 volts as the case may be it<br />

shall be stenciled <strong>in</strong> white letters <strong>in</strong> RED back ground on the door with 50 mm red band around the PCT. The location with battery and battery<br />

charger shall be stenciled with legend B.B. and B.C. respectively <strong>in</strong> 100 mm letters. Cable term<strong>in</strong>ation arrangement <strong>in</strong> apparatus cases should be as<br />

per drg. No. CORE/S&T/ ALD/SK/400/94 Alt. A.<br />

13.2 Fix<strong>in</strong>g of equipment such as high voltage signal transformers, MCB switches and all other equipments <strong>in</strong> apparatus cases of schedule A (I) & A (II)<br />

and wir<strong>in</strong>g of equipment as per wir<strong>in</strong>g diagram. This item will be under taken <strong>in</strong> case where 300 volts signal feed circuit is required.<br />

13.3.1 Fix<strong>in</strong>g of equipment such as relays etc. <strong>in</strong> apparatus cases of schedule A(I) & (II) and wir<strong>in</strong>g of equipment as per wir<strong>in</strong>g diagram. All materials<br />

except ARA term<strong>in</strong>als and Rly. Supply items mentioned <strong>in</strong> Para 6 of volume -I for the above work shall be supplied by the contractor <strong>in</strong>clud<strong>in</strong>g but not<br />

limited to the follow<strong>in</strong>g items.<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

M.S. Angle, Hylam sheet.<br />

Non deteriorat<strong>in</strong>g non-<strong>in</strong>dict<strong>in</strong>g type fuses with bases as per wir<strong>in</strong>g diagram.<br />

Wir<strong>in</strong>g, bunch<strong>in</strong>g and dress<strong>in</strong>g materials.<br />

Sal wood 25 mm thick shelves for shelter of equipments and batteries.<br />

Fix<strong>in</strong>g arrangement for shelves, ARA term<strong>in</strong>als, fuses and relays etc.<br />

Fix<strong>in</strong>g arrangement for MCB, high voltage signal transformers etc. will be under taken <strong>in</strong> -case 300 volts signal feed circuit is required.<br />

Contractor’s signature with stamp Page 19


13.3.2 Apparatus cases should be pa<strong>in</strong>ted completely on all sides, also with bitumen at the out side bottom, before fitt<strong>in</strong>g fixtures, clamps and wooden<br />

boards etc. which also should be pa<strong>in</strong>ted <strong>in</strong>dividually and then the apparatus cases should be fabricated with all fixtures at work shop of the<br />

contractor by the contractor, before provid<strong>in</strong>g at site.<br />

Item 14. Data Loggers.<br />

14.1 Installation & Commission<strong>in</strong>g:<br />

The <strong>in</strong>stallation of Data logger shall conform to IRS specification No. IRS-S-99/2001, with latest amendments, along with additional requirements as<br />

follows:<br />

14.2 All materials & workmanship shall be of good quality.<br />

14.3 Plant & Mach<strong>in</strong>ery<br />

Follow<strong>in</strong>g plants and mach<strong>in</strong>ery required for execution of this work and all test <strong>in</strong>struments as given <strong>in</strong> Cl. 6.2.1 of specification shall be available with<br />

the manufacturer.<br />

(I) Ultrasonic cleaner/Aqueous cleaner for automatic clean<strong>in</strong>g.<br />

(II) Burn <strong>in</strong> chamber.<br />

(III) Anti static assembly.<br />

(IV) EPROM programmer and UV Eraser.<br />

(V) Microprocessor development system.<br />

(VI) Computer aided design system. Documents should be supplied along with the system.<br />

14.4.1 Mechanical draw<strong>in</strong>gs of each sub system /rack.<br />

14.4.2 Trouble Shoot<strong>in</strong>g Chart.<br />

14.4.3 Installation and Ma<strong>in</strong>tenance Manual.<br />

14.4.4 The tenderer should give number of digital <strong>in</strong>puts required by calculat<strong>in</strong>g the <strong>in</strong>puts from the list given below.<br />

14.5<br />

a) All ECR's.<br />

b) All HR's, HHR's, DR's or equivalent.<br />

c) All po<strong>in</strong>t operat<strong>in</strong>g relays NWR's, RWR's or equivalent.<br />

d) All po<strong>in</strong>t <strong>in</strong>dicat<strong>in</strong>g NWKR's RWKR's or equivalent.<br />

e) All buttons and knob relays.<br />

f) All track and axle counter relays.<br />

g) All timer repeater relays.<br />

h) All timer repeater relays.<br />

i) Intermediate <strong>in</strong>terlock<strong>in</strong>g relays which tenderer need to monitor through data logger e.g. UCR, ASR, JSLR etc. or equivalent.<br />

j) All relays related with emergency operation e.g. route cancellation, overlap cancellation, po<strong>in</strong>t operation under emergency, crank handle release,<br />

gate release etc.<br />

k) CH, GF, LX release and <strong>in</strong>dication relays.<br />

l) All relays related with block <strong>in</strong>struments with or without axle counters and SM key.<br />

Or any other relay required to be monitored, and shall obta<strong>in</strong> approval of eng<strong>in</strong>eer. Similarly he will give details of Analogue <strong>in</strong>puts to be monitored<br />

<strong>in</strong> local area by calculat<strong>in</strong>g the <strong>in</strong>puts from the follow<strong>in</strong>g list or any other <strong>in</strong>puts required to be monitored, and shall obta<strong>in</strong> approval of eng<strong>in</strong>eer.<br />

Type of <strong>in</strong>put<br />

No. of channel required.<br />

230 V AC<br />

110V AC<br />

12 V AC<br />

110V AC<br />

60 V DC<br />

24 V DC<br />

18 V DC<br />

12 V DC<br />

Axle counter evaluator <strong>in</strong>put voltages<br />

(RX) (Unit wise)<br />

Any other voltages.<br />

Or<br />

As specified by eng<strong>in</strong>eer at site.<br />

14.6 In case where RTU is required for monitor<strong>in</strong>g of the equipments at distant place, no. of digital and analog <strong>in</strong>puts required <strong>in</strong> RTU, details of analog<br />

<strong>in</strong>puts to be monitored from RTU should be given <strong>in</strong> the format as given below.<br />

Type of <strong>in</strong>put Digital/Analog Number of Approximate distance from data logger<br />

Channels<br />

14.7. The tenderer should give Exception Reports (other than those mentioned <strong>in</strong> para 5.6 of specification) to be generated and the first of function (In<br />

addition those mentioned <strong>in</strong> para 3.10 of specification) to be monitored.<br />

14.8. At the station provided with central panel/end panel/lever frame operated MACLS, data logger shall be provided <strong>in</strong> relay Room /another room near<br />

relay room, at a place specified by the eng<strong>in</strong>eer.<br />

14.9. For purpose of connection of data logger with central monitor<strong>in</strong>g unit, the data transmission shall be through OFC dropp<strong>in</strong>g at such stations.<br />

14.10. Data loggers at one section, if more than one, shall be connected <strong>in</strong> tandem and the last one to be known as ma<strong>in</strong> data logger shall be connected to<br />

central monitor<strong>in</strong>g unit through OFC omnibus channel.<br />

14.11. Ten pair PIJF cable laid between two data loggers at one station /or between ma<strong>in</strong> data logger and the OFC cable hut shall be term<strong>in</strong>ated at 10 pair<br />

CT box provided with Crone connector as per schedule.<br />

14.12. The connectivity of data logger to OFC shall be arranged by Railway.<br />

14.13. The contractor shall connect data logger on the cable so laid up to OFC and after obta<strong>in</strong><strong>in</strong>g connection with OFC and the cable laid between the<br />

data logger and OFC shall ensure function<strong>in</strong>g of system network from each station to central monitor<strong>in</strong>g unit.<br />

14.14. The power supply for the system shall be derived from IPS/Battery Bank provided with a battery charger as available at the station.<br />

14.15. All digital and analog <strong>in</strong>puts shall be derived and term<strong>in</strong>ated at term<strong>in</strong>ation board before be<strong>in</strong>g connected to data logger.<br />

14.16. Connection between all digital and analog <strong>in</strong>puts to data logger, data logger and modem and modem to ten pair CT box shall be made us<strong>in</strong>g same<br />

wire which is used for <strong>in</strong>terconnection between relays <strong>in</strong> the relay room, except where couplers are provided as a part of data logger equipment.<br />

Contractor’s signature with stamp Page 20


14.17. All the necessary equipment/ <strong>in</strong>puts/ resources, considered vital for successful commission<strong>in</strong>g of the work shall be provided by the contractor with<strong>in</strong><br />

the framework of this tender schedule without additional cost.<br />

14.18. The contractor shall supply the follow<strong>in</strong>g document free of cost.<br />

(i) Operation manual of data logger/FEP/FAS.<br />

10 copies<br />

(ii) Technical manual of data logger / FEP giv<strong>in</strong>g<br />

10 copies<br />

Complete circuits details, software details and<br />

flow charts, component details /PCB layout etc.<br />

(iii) Trouble shoot<strong>in</strong>g procedure/debugg<strong>in</strong>g and<br />

10 copies<br />

fault rectification pamphlets for FEP/data logger.<br />

14.19 The contractor shall provide detailed technical tra<strong>in</strong><strong>in</strong>g regard<strong>in</strong>g fault trac<strong>in</strong>g/ card level ma<strong>in</strong>tenance, programm<strong>in</strong>g etc. to six Rly. Supervisors at<br />

his factory premises, at his own cost (Rly. shall provide for lodg<strong>in</strong>g/ board<strong>in</strong>g of its supervisor). Additionally hands on tra<strong>in</strong><strong>in</strong>g <strong>in</strong> operation of<br />

FEP/FAS, debugg<strong>in</strong>g, program edit<strong>in</strong>g/database management and system reconfiguration etc, shall be imparted by the contractor, at site to 30<br />

Railway supervisors/ ma<strong>in</strong>ta<strong>in</strong>ers. Both the tra<strong>in</strong><strong>in</strong>g should be fully supported by full literature on test<strong>in</strong>g and fault procedure and test<strong>in</strong>g po<strong>in</strong>ts.<br />

14.20 The contractor will connect remote term<strong>in</strong>al unit data logger with the ma<strong>in</strong> data logger at end panel station cab<strong>in</strong>s through cable laid for the purpose<br />

<strong>in</strong> between the two and ensure complete data transmission between remote term<strong>in</strong>al unit and ma<strong>in</strong> data logger.<br />

14.21 Central monitor<strong>in</strong>g unit shall be <strong>in</strong>stalled at the place <strong>in</strong> control office /Test room as specified by the eng<strong>in</strong>eer.<br />

14.22 4 quad/ PIJF cable shall be laid as per schedule of quantities between OFC cable hut and CMU. The cable shall be term<strong>in</strong>ated on CT box provided<br />

with Crone connectors. CT box with Crone connectors to be supplied by contractor.<br />

14.23 Connectivity between CT box and OFC <strong>in</strong> the cable hut shall be provided by Railway.<br />

14.24 Power supply for CMU and FEP shall be provided through UPS (to be supplied by Railways).<br />

14.25 The entire system shall be net worked and tested with CMU.<br />

ITEM 15. TRACK DETECTION UNIT AND ELECTRONIC JUNCTION BOX.<br />

1. The track devices should be <strong>in</strong>stalled at the location specified by eng<strong>in</strong>eer <strong>in</strong>chage.<br />

2. The track device should be <strong>in</strong>stalled as per RDSO‟s draw<strong>in</strong>g no. SDO/UAC-320.<br />

(i)<br />

The base clamp should be fixed with the help of bolts, nuts and rail clamp. The nuts and bolts should be fully tightened and locked by<br />

means of lock washers to prevent any movement related to one rails dur<strong>in</strong>g pass<strong>in</strong>g of tra<strong>in</strong>s. To avoid the fitt<strong>in</strong>g gett<strong>in</strong>g loosened due to<br />

passage of tra<strong>in</strong>s proper leverage should be used for tighten<strong>in</strong>g.<br />

(ii) After fix<strong>in</strong>g base clamp transmitter and receiver coil assemblies are to be fixed on base clamp with the help of bolts and nuts. Whenever<br />

required transmitter/receiver coil nylon pack<strong>in</strong>g piece/ pieces should be used. The pack<strong>in</strong>g of suitable size shall be provided as follows:<br />

For 90 lb 3 mm (3 mm x 1 pcs)<br />

For 52 kg 6 mm (3 mm x 2 pcs)<br />

For 60 kg 12 mm (3 mm x 4 pcs)<br />

3. The transmitter & receiver coils, which come with 24/0.2 cables of 10 meter length, this cable should be taken to EJB (location box) directly without<br />

any loops. These cables should be put <strong>in</strong> HDPE pipe of 50 mm dia for safety and laid at a length of 0.8 mm from the bottom rail. Necessary trench<strong>in</strong>g<br />

for lay<strong>in</strong>g HDPE pipe should be done by contractor. HDPE pipe, HDPE “L” jo<strong>in</strong>t, & HDPE “T” jo<strong>in</strong>t shall be supplied by the contractor. HDPE pipe is<br />

separate supply item. Eng<strong>in</strong>eer <strong>in</strong> charge at site and contractor's representatives are to ensure that the apparatus case hous<strong>in</strong>g the EJB is<br />

approximate 3 meters subject to maximum with<strong>in</strong> 10 meters of track devices.<br />

4. Transmitter & receiver cable should be run separately at a m<strong>in</strong>imum separation of 500 mm.<br />

5. Transmitter cables and receiver cables of <strong>in</strong>dividual track device are to be laid <strong>in</strong> different pipes.<br />

6. Rail deflector plates (protectors) should be mounted on both sides of the fitt<strong>in</strong>gs. These should be <strong>in</strong>stalled <strong>in</strong> the sleeper space (approx. 30 cm to 40<br />

cm next to the track fitt<strong>in</strong>gs). These deflector plates are fitted to detector clamp with bolts and nuts on each side. While fix<strong>in</strong>g deflector plates, it<br />

should be ensured that the transmitter deflector plates (smaller width) goes <strong>in</strong> front of transmitter and receiver deflector plates (larger width) goes <strong>in</strong><br />

front of receiver.<br />

7. Installation of EJB <strong>in</strong> half location box and other term<strong>in</strong>ation <strong>in</strong> half location box shall be as per RDSO draw<strong>in</strong>g no. SDO/UAC-325 and SDO/UAC-<br />

326. The EJB is hav<strong>in</strong>g four 7-p<strong>in</strong> couplers. The receptacles of the couplers are to be fixed on EJB and socket is term<strong>in</strong>ated with cable. The other<br />

end of these<br />

cables are term<strong>in</strong>ated on term<strong>in</strong>al board. The connections have to be made as per details on the EJB and colour of wires.<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

The ARA term<strong>in</strong>al as supplied by contractor is separate item. Fuses with base shall be supplied by contractor.<br />

For fix<strong>in</strong>g of ARA term<strong>in</strong>al, fuse block, lighten<strong>in</strong>g arrestor etc. 12 mm thick hylam sheet of approximate size 385 X 70 mm shall be fixed.<br />

ARA term<strong>in</strong>al, fuse block, lighten<strong>in</strong>g arrestor to be supplied by the contractor shall be fixed with stud/screws. The drill<strong>in</strong>g of holes on the<br />

hylam sheet shall be made to br<strong>in</strong>g cable conductor to the term<strong>in</strong>als.<br />

A self of 38 mm thick Sal wood plank duly pa<strong>in</strong>ted and varnished of appropriate size should be provided <strong>in</strong> half location box for fix<strong>in</strong>g EJB.<br />

All wir<strong>in</strong>g and connection <strong>in</strong> the EJB shall be done by contractor by us<strong>in</strong>g cables/wires of approved size as per <strong>in</strong>struction of eng<strong>in</strong>eer <strong>in</strong><br />

charge. While tak<strong>in</strong>g track device cable <strong>in</strong>side the location box, it should be ensured that the extra length of the cable should not be<br />

jumbled up <strong>in</strong>side the location box. These should be kept <strong>in</strong> zigzag manner <strong>in</strong>side the location box.<br />

(v) Capacitor shall be provided across power supply <strong>in</strong> EJB.<br />

(vi) Lighten<strong>in</strong>g protection circuit shall be provided to avoid damage to PCBs due to lighten<strong>in</strong>g.<br />

8. Common track device can be used for evaluators. Necessary wir<strong>in</strong>g for this purpose shall be done at site.<br />

9. In case of two wire system (for advanced starter EJB) a 4W/2W converter card shall be <strong>in</strong>stalled <strong>in</strong> the EJB; however supply of this card is beyond<br />

the scope of this specification.<br />

10. Initial adjustment test<strong>in</strong>g and commission<strong>in</strong>g of outdoor equipments viz. Electronic Junction Box, Transmitter and Receiver Coils, Trolley<br />

Suppression Track Circuit and Deflector Plate Assembly. This should be as per “Installation Practice for Universal Axle Counter” issued by RDSO <strong>in</strong><br />

March 1994 with latest modifications and to the satisfaction of eng<strong>in</strong>eer <strong>in</strong> charge.<br />

ITEM-16. Rack for Axle Counter.<br />

1. (a) The term<strong>in</strong>ation and wir<strong>in</strong>g at composite relay rack shall generally be done as per draw<strong>in</strong>g No.CORE/S&T/ALD/SK/531/2003. This<br />

term<strong>in</strong>ation arrangement is for 12 axle counters <strong>in</strong>stallation, however the term<strong>in</strong>ation arrangement shall be made for 5/10 nos. of axle<br />

counters only, as per schedule. For wir<strong>in</strong>g from composite relay rack to evaluator 1/2/5 pairs shielded cable wire ATC wire shield<strong>in</strong>g<br />

hav<strong>in</strong>g 90% coverage as per IRS specifications IRS: S 24-91 shall be used.<br />

(b)<br />

(c)<br />

(d)<br />

Whenever track device channel are common to two evaluators, the requisite loop<strong>in</strong>g of channel shall be done.<br />

The +10 V feed from evaluator for trolley suppression circuit of the evaluator is taken through the pick up contact of these relays when<br />

track device is fixed <strong>in</strong> track circuited area. However, if it is not possible to provide track circuit where track device is <strong>in</strong>stalled, the circuit as<br />

shown <strong>in</strong> RDSO‟s draw<strong>in</strong>g no. SDO/UAC-330 shall be followed.<br />

The position of this rack should be such that it is as near as possible to evaluator.<br />

Contractor’s signature with stamp Page 21


(e) The power supply from Integrated Power Supply/Battery Bank (whose supply and <strong>in</strong>stallation is beyond the scope of this work) to axle<br />

counter system through composite relay rack shall be taken by tw<strong>in</strong> core 7/1.4mm(10 sq mm) copper conductor (to be supplied by<br />

contractor) on cable runway of 75 mm dia PVC pipe, tee, elbow etc.<br />

(f) Installation of Axle Counter:<br />

1. PVC <strong>in</strong>sulated <strong>in</strong>door cables with conductor of 7/0.85 (3.5 Sq. mm) as per IRS-S: 76/89 to be used for batteries and battery chargers wir<strong>in</strong>g <strong>in</strong><br />

location box used for track circuit.<br />

2. PVC <strong>in</strong>sulated <strong>in</strong>door multi strand, s<strong>in</strong>gle core, copper conductor of size 16/0.2 mm (0.5 Sq. mm) as per IRS-S: 76/89 to be used for relay wir<strong>in</strong>g<br />

<strong>in</strong> location box axle counter room.<br />

3. Tw<strong>in</strong> core 7/1.4 mm (10 sq.mm) copper conductor as per IRS-S: 76/89 to be used from battery chargers to batteries and dc-dc converters.<br />

4. 5 pairs shielded cables with ATC wire shield<strong>in</strong>g hav<strong>in</strong>g 90% coverage as per specification no. T.C-24-91 to be used for wir<strong>in</strong>g from CT rack to<br />

evaluator.<br />

5. 1/2/5/ pairs shield<strong>in</strong>g cables with ATC wire shield<strong>in</strong>g hav<strong>in</strong>g 90% coverage as per specification no. T.C-24-91 to be used for trolley suppression<br />

wir<strong>in</strong>g from CT rack to evaluator.<br />

6. 5 pairs twisted t<strong>in</strong>ned copper conductor <strong>in</strong>door cables (0.51 mm) with ATC wire as per specification no. T.C-24-91 to be used for reset box<br />

wir<strong>in</strong>g from S.M room to CT rack.<br />

7. PVC <strong>in</strong>sulated <strong>in</strong>door cables with conductor diameter 1/0.6 mm (0.28 Sq. mm) as per IRS-S: 76/89 to be used for wir<strong>in</strong>g of EV & SUP relays<br />

contacts.<br />

2. EVALUATOR SYSTEM: The follow<strong>in</strong>g constitutes evaluator system.<br />

a) Base channel<br />

b) Axle Counter Cab<strong>in</strong>et<br />

c) DC-DC Converter<br />

d) Evaluator<br />

e) EV & SUP relays<br />

f) T.B. Plates<br />

g) Display unit<br />

h) „CLR‟ and „Occupied‟ Indication<br />

i) F<strong>in</strong>al track clear prov<strong>in</strong>g relay<br />

(a) The base channel assembly as per RDSO draw<strong>in</strong>g no. RDSO/S/5668 shall be fixed on RCC platforms (as per RDSO drg.no.SDO/UAC-336). The<br />

platform shall be made with mixture of cement sand and stone chip size: 20mm <strong>in</strong> the ratio of 1:3:6 and subsequently outer surface shall be<br />

plastered with cement sand <strong>in</strong> the ratio of 1:4 (All material to be supplied by contractor). Duct for cable shall also be made by contractor. The base<br />

channel assembly should be fixed on RCC platform by grout<strong>in</strong>g M.S. bolts.<br />

(b) Axle counter cab<strong>in</strong>et 20U/30U rack (as the case may be) shall be <strong>in</strong>stalled on base channel as per RDSO draw<strong>in</strong>g no. SDO/UAC-336. Base channel<br />

is also hav<strong>in</strong>g antivibration pads on the top surface, which takes care of any damage to evaluator due to vibration.<br />

(i) 20 U Rack: (Drg.No. RDSO/S-15661)<br />

It can house one set of evaluator, dc-dc converter and EV & SUP relays. In this, the relays are kept on top shelf of the rack. Below relays,<br />

the evaluator and then dc-dc converter are to be fixed. The bottom space is left for keep<strong>in</strong>g tools, manuals etc. The above arrangements<br />

are shown <strong>in</strong> RDSO draw<strong>in</strong>g no. RDSO/S-15660.<br />

(ii) 30 U Rack: (Drg.No. RDSO/S-15663)<br />

It can house two set of evaluator, dc-dc converter and EV & SUP relays. In this, the first evaluator is kept at top and then its dc-dc<br />

converter and second evaluator. Between second evaluator and first dc-dc converter, 2 sets of EV & SUP relays are kept. The above<br />

arrangements are shown <strong>in</strong> RDSO draw<strong>in</strong>g no. RDSO/S-15662.<br />

(c) (i) The dc-dc converter should be fixed <strong>in</strong>side the Cab<strong>in</strong>et with nuts and bolts.<br />

(ii)<br />

(d)<br />

(e)<br />

The connection to evaluator should be made through a cable hav<strong>in</strong>g 7-p<strong>in</strong> coupler at both ends. The two ends of the cable are<br />

<strong>in</strong>terchangeable.<br />

(iii) Power supply to dc- dc converter should be fed by means of 2 core-shielded cables. The other end of this cable is to be connected to 0, +<br />

24V <strong>in</strong>put banana term<strong>in</strong>als of dc-dc converter. Capacitor shall be provided across power supply <strong>in</strong> dc-dc converter.<br />

The evaluator chassis should be fixed <strong>in</strong>side the rack with nuts and bolts. The external connection to term<strong>in</strong>ation plate should be made<br />

through 1 no. of 10 p<strong>in</strong> M.S. Coupler and 1 no. of 14 p<strong>in</strong> coupler, <strong>in</strong> case of 20 system and 2 nos. of 10 p<strong>in</strong> M.S.coupler and 1 no. of 14 p<strong>in</strong><br />

coupler <strong>in</strong> case of 3D & 4D system. Also the dc-dc converter should be connected through a 7-p<strong>in</strong> coupler.<br />

All the modules are fitted with Euro connectors (32 p<strong>in</strong>s) and these modules should be plugged <strong>in</strong> the 32 p<strong>in</strong> receptacles fixed on<br />

motherboard. These modules should be fixed <strong>in</strong> position by front end tighten<strong>in</strong>g screws.<br />

The three couplers cater for the follow<strong>in</strong>g connections:<br />

a) Evaluator Input:<br />

i) Eight <strong>in</strong>put wires for 4 channels <strong>in</strong> case of 2D system and 16 <strong>in</strong>put wires for 8 channels <strong>in</strong> case of 4D system com<strong>in</strong>g from the<br />

cable term<strong>in</strong>ation rack are connected through MS couplers. The first 4 channels are connected through 10 p<strong>in</strong> coupler and other<br />

four channels through another 10 p<strong>in</strong> coupler.<br />

ii)<br />

iii)<br />

The 14-p<strong>in</strong> coupler is used for:<br />

a) EV & SUP Relays output.<br />

b) Trolley suppression circuits.<br />

c) Reset circuit.<br />

A cable hav<strong>in</strong>g 7 p<strong>in</strong> M.S.coupler at both ends is used for direct connection of dc-dc converter to evaluator, for + 5V + 10V<br />

isolated supply.<br />

b) Evaluator output:<br />

For connect<strong>in</strong>g evaluator output to EV and SUP relays, two pairs of shielded cable, one pair for each relay with one end term<strong>in</strong>ated on T.B.<br />

plate and other end to relay. A 4.7 mf (250 V) non-electrolytic capacitor (to be supplied by contractor) has to be connected across relay<br />

coils for suppress<strong>in</strong>g the transient voltage.<br />

EVR and SUPR shall be <strong>in</strong>stalled <strong>in</strong> the cab<strong>in</strong>et. The EV & SUP relays are of 12V/1000 Ohm DC neutral l<strong>in</strong>es relays (non- immunized)<br />

with 4F/B metal to carbon contacts. These relays (to be supplied by <strong>railway</strong>) can either plug <strong>in</strong> type(QS3) or shelf type.<br />

i) Plug-<strong>in</strong> type (QS3) relays should be fixed on M.S. Square bar (anodized) whereas shelf type relays should be mounted on alum<strong>in</strong>um tray<br />

provided <strong>in</strong> the rack.<br />

ii) Alum<strong>in</strong>ium tray for fix<strong>in</strong>g EV & SUP relays has got provision for anti tilt<strong>in</strong>g arrangements.<br />

iii) Relays should be provided with 4.7 mf (250V) capacitor (to be supplied by contractor) to suppress the transient voltage (more than 800V)<br />

generated when the relays drop and can affect the fast act<strong>in</strong>g sensitive TTL ICs used <strong>in</strong> the evaluator.<br />

Contractor’s signature with stamp Page 22


(f)<br />

iv) Relay wir<strong>in</strong>g shall be done with PVC <strong>in</strong>sulated multi strand s<strong>in</strong>gle core copper conductor of size 16/0.2 mm (0.5 sq mm) as per IRS<br />

specification no. IRS: S 63:89.<br />

v) Lighten<strong>in</strong>g protection shall be provided <strong>in</strong> A, B, C & D channels to avoid dropp<strong>in</strong>g of SUP relay without any tra<strong>in</strong>.<br />

TERMINATION BACK PLATE :(Drg. No. SDO/AC 337 & 338): All outgo<strong>in</strong>g and <strong>in</strong>com<strong>in</strong>g connections should be term<strong>in</strong>ated on this plate as per<br />

RDSO‟s draw<strong>in</strong>g no. SDO/AC 337 & 338. This plate is fixed on back bottom side of the rack. Other end of the cables hav<strong>in</strong>g M.S. Coupler at one<br />

end is term<strong>in</strong>ated on term<strong>in</strong>ation plats no. 2, 3 and 4. T.B 5 is for 3D and 4D system and T.B 1 is for EV & SUP relays contacts, which are used for<br />

reset box. The wires from evaluator should be term<strong>in</strong>ated on left hand side of term<strong>in</strong>als and wires from cable term<strong>in</strong>ation rack should be term<strong>in</strong>ated<br />

on right hand side of term<strong>in</strong>als.<br />

(g) DISPLAY UNIT: The display card is hav<strong>in</strong>g seven segment counts display and is connected to counter comparator, card through flat cable<br />

connectors (16 p<strong>in</strong>). The „IN‟ and „OUT‟ count <strong>in</strong>formation is available for ma<strong>in</strong>ta<strong>in</strong>er. Whenever the cable is removed and reconnected, the random<br />

counts are to be resetted.<br />

(h)<br />

„CLR‟ & OCC INDICATIONS: Separate <strong>in</strong>dications for axle counter „CLR‟ and „OCC‟ conditions should be provided on alum<strong>in</strong>um tray for keep<strong>in</strong>g EV<br />

and SUP relays. (Drg. No. SDO/AC/339). These <strong>in</strong>dications are helpful for ma<strong>in</strong>ta<strong>in</strong>er and it is just the replica of the <strong>in</strong>dications available <strong>in</strong> SM reset<br />

box. F<strong>in</strong>al Track Clear Prov<strong>in</strong>g Relay AZTPR: This relay <strong>in</strong>dicates the position of axle counter and trolley suppression track circuit. The pick up<br />

contacts of EV, SUP and trolley suppression track circuit (TPRs) should be proved as shown <strong>in</strong> drg. No. SDO/AC-340.<br />

In case, trolley suppression track circuit is not provided for crossover track device, f<strong>in</strong>al track clear prov<strong>in</strong>g relay picks up with EV & SUP relay<br />

contacts only.<br />

To avoid dropp<strong>in</strong>g of HR relay (when f<strong>in</strong>al track clear prov<strong>in</strong>g relay has been used <strong>in</strong> HR circuit) due to push trolley movement over track device,<br />

AZTPR front contact should be by passed with „HR‟ front contact (SDO/AC/360).<br />

3. RESET BOX (Drg. SDO/UAC/341):<br />

(i) This unit should be placed on a hylam sheet shelf supported by M.S. angle <strong>in</strong> SM room and is used to reset axle counter system <strong>in</strong> case of failure or<br />

dur<strong>in</strong>g test<strong>in</strong>g and ma<strong>in</strong>tenance of axle counter system. The wir<strong>in</strong>g details are available on the back of the door.<br />

(ii) The connection between SM reset box and relay/cable term<strong>in</strong>ation rack of axle counter should be made by 5 pair switch board telecom cable taken<br />

<strong>in</strong> PVC conduit pipe(to be supplied and <strong>in</strong>stalled by contractor) and connected directly on SM reset box term<strong>in</strong>al strips as given <strong>in</strong> drg. No.<br />

SDO/AC-342.<br />

(iii)<br />

(iv)<br />

(v)<br />

Reset switch also operates a counter. Counter read<strong>in</strong>gs should be recorded <strong>in</strong> the register ma<strong>in</strong>ta<strong>in</strong>ed for this purpose, <strong>in</strong>dicat<strong>in</strong>g the reasons for<br />

each resett<strong>in</strong>g. Counter will move to next number only when actual resett<strong>in</strong>g has taken place.<br />

Resett<strong>in</strong>g should be done only when the section is occupied or when the tra<strong>in</strong> is likely to be received <strong>in</strong> the axle counter controlled section.<br />

Resett<strong>in</strong>g should be done only when it is ensured that the controlled track section is free from any obstruction and same is communicated through a<br />

l<strong>in</strong>e verification box actuation. Wir<strong>in</strong>g of axle counter when used <strong>in</strong> station yard (No. SDO/RRI/137-H).<br />

Circuit description:<br />

i) In case EV or SUP drop, „RED‟ LED shall glow <strong>in</strong>dicat<strong>in</strong>g section is occupied.<br />

ii) When both EV & SUP picks up „GREEN‟ LED shall glow.<br />

iii) When axle counter fails, and resett<strong>in</strong>g procedure has been any obstruction and l<strong>in</strong>e verification key is actuated, SM will actuate his key for<br />

resett<strong>in</strong>g and if the system gets reset, GREEN LED shall glow.<br />

iv) Resett<strong>in</strong>g is possible only when trolley suppression track relays are up.<br />

vi) Resett<strong>in</strong>g is possible only when SM reset keys and l<strong>in</strong>e verification key are „IN‟.<br />

. LINE VERIFICATION BOX: The l<strong>in</strong>e verification box is as per drg. No. RDSO/S-15671. It has to be fixed outside SM‟s office (when axle counter is<br />

used <strong>in</strong> station yard)<br />

For fix<strong>in</strong>g of l<strong>in</strong>e verification box, two bolts are to be fixed on the wall and a through hole <strong>in</strong> the wall is required to carry the wires. In cases, number<br />

of l<strong>in</strong>e verification box are more, common base plate can be used for fix<strong>in</strong>g the same. The wir<strong>in</strong>g has to be done with 16/0.2 wire on the term<strong>in</strong>als<br />

provided <strong>in</strong> the l<strong>in</strong>e verification box. Care has to be taken that all the l<strong>in</strong>e verification box keys are of separate wards.<br />

For easier identification, axle counter number should be pa<strong>in</strong>ted on l<strong>in</strong>e term<strong>in</strong>ation box so that <strong>in</strong> case of failure of axle counter, particular axle<br />

counter only be resetted.<br />

5. Test<strong>in</strong>g and commission<strong>in</strong>g of entire axle counter system for track circuit<strong>in</strong>g as per “Installation Practice for Universal Axle Counter” issued by RDSO<br />

<strong>in</strong> March 1994 with latest modifications.<br />

The contractor shall see to it that after the system is <strong>in</strong>stalled it should function as per standard laid down and <strong>in</strong> the spirit of the services called for <strong>in</strong><br />

a turnkey project.<br />

The contractor shall use his own test<strong>in</strong>g <strong>in</strong>struments at his cost for the <strong>in</strong>stallation and commission<strong>in</strong>g of axle counter system.<br />

ITEM 16(A).<br />

The 4W/2W converter card shall reta<strong>in</strong> „A‟ channel frequency as 5 kHz but shall converts „B‟ channel frequency <strong>in</strong>to 3.5 kHz and send it to the next<br />

station over the block cable through comb<strong>in</strong>er-converter.<br />

ITEM 16 (B)<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

ITEM 16(C).<br />

(i)<br />

The station master‟s panel of axle counter block system shall be a table top model and consists of all the controls for double l<strong>in</strong>e block work<strong>in</strong>g. It<br />

shall be supplied with 25 meter suitable s<strong>in</strong>gle length multicore cables (for 24 p<strong>in</strong> and 19 p<strong>in</strong> couplers) wired with couplers at one end for connection<br />

between SM‟s panel and relay rack. Push buttons and keys used <strong>in</strong> SM‟s panel should have only m<strong>in</strong>imum contact resistance.<br />

SM‟s panel is to be <strong>in</strong>stalled at a distance not greater than 25 mtrs. from the relay rack of axle counter block system.<br />

The size of SM‟s panel shall be 600mm(width) X 384mm(height) X 340mm(depth) and shall be provided with MS angle base with slots for fix<strong>in</strong>g the<br />

SM‟s panel firmly to the table.<br />

The SM‟s panel is to be mounted firmly on to any table (to be supplied by Railways) top by means of 4 nos. of M 10 X 50 mm bolts. A hole on the<br />

table shall be made at the cable outlet of SM‟s panel bottom for tak<strong>in</strong>g out cables from SM‟s panel to relay room.<br />

The cables between SM‟s panel and relay room shall be laid on baton/ladder for wire support. The one end of cable (coupler end) shall be tightened<br />

<strong>in</strong> the respective coupler receptacles and other end be term<strong>in</strong>ated on the relay rack as per RDSO‟s draw<strong>in</strong>g No. S 32001.<br />

The SM‟s panel shall have a telephonic circuit for communication between stations and a block buzzer circuit for exchang<strong>in</strong>g code for block<br />

operation.<br />

The Relay/Multiplexer Rack shall be Central Electronics Limited, Sahib bad make DBS-245A (19” rack). This rack shall be 19” standard type and<br />

shall be of 1425 mm (height) X 592mm (width) X 632mm (depth). The rack shall be supplied with four wheels for movement up to the <strong>in</strong>stallation<br />

place and it is to be <strong>in</strong>stalled and anchored on four studs by unscrew<strong>in</strong>g the studs from the rack. The rack along with axle counter shall be <strong>in</strong>stalled<br />

on RCC plate form RCC plate form (as per RDSO drg.no.SDO/UAC-336). The plate form shall be made with mixture of cement sand and stone chip<br />

size: 20mm <strong>in</strong> the ratio of 1:3:6 and subsequently outer surface shall be plastered with cement sand <strong>in</strong> the ratio of 1:4 (All material to be supplied by<br />

contractor. Duct for cable shall also be made by contractor).<br />

Contractor’s signature with stamp Page 23


(ii) The relay logic circuit is housed <strong>in</strong> the relay rack. At the rear side of the relay rack 8 nos. of Pair-term<strong>in</strong>al strips and 16 nos. of 8 way disconnect<strong>in</strong>g<br />

type PBT term<strong>in</strong>al shall be provided for both <strong>in</strong>ternal and external <strong>in</strong>terconnections.<br />

(iii) Transmitter Mux, Receiver Mux and Comb<strong>in</strong>er-Converter shall be <strong>in</strong>stalled <strong>in</strong> the relay rack as per <strong>in</strong>struction of eng<strong>in</strong>e <strong>in</strong>-charge. These equipments<br />

shall be connected to term<strong>in</strong>al strip by coupler cables, for this MS coupler receptacles have been provided at the rear plates.<br />

(iv) Four bulbs of 110 V AC shall be provided and fixed <strong>in</strong> the holders provided for the purpose for lighten<strong>in</strong>g the <strong>in</strong>terior of relay rack.<br />

(v) In the front upper half of the relay racks 22 nos. QNA1/8F-8B (to be supplied by <strong>railway</strong>) and 2 nos. QNN1/4F-4B (to be supplied by <strong>railway</strong>) shall be<br />

clamped with relay clamp as per RDSO‟s draw<strong>in</strong>g No. S 32001.<br />

(vi) A filter circuit card for noise filter<strong>in</strong>g <strong>in</strong> 24V supply l<strong>in</strong>e shall be part of relay rack and provided at rear h<strong>in</strong>ge plate. Also a tim<strong>in</strong>g control card shall be<br />

provided on the same plate.<br />

(vii) Four fuse holders for circuit protection are part of relay rack and shall be provided at rear h<strong>in</strong>ge plate.<br />

(viii) The relay rack shall be prewired as per RDSO‟s draw<strong>in</strong>g No. S 32001.<br />

(ix) The coupler cables (provided with coupler at other ends) for Transmitter Mux, Receiver Mux and Comb<strong>in</strong>er-Converter shall be connected to relay<br />

rack term<strong>in</strong>al strips.<br />

ITEM 16(D)<br />

(i) Transmitter Multiplexer and Receiver Multiplexer shall be of 12 channels for transmitt<strong>in</strong>g and receiv<strong>in</strong>g coded message relat<strong>in</strong>g to block <strong>in</strong>formation<br />

relays, axle counter reset co-operation <strong>in</strong>formation etc by means of coded FSK signal.<br />

(ii) Comb<strong>in</strong>er-Converter subsystem shall be for send<strong>in</strong>g and receiv<strong>in</strong>g composite block signals.<br />

(iii) Transmitter Multiplexer reads ON-OFF status of block <strong>in</strong>formation relays/switches and conveys this <strong>in</strong>formation to the other station Receiver<br />

Multiplexer through the Comb<strong>in</strong>er-Converter. It shall have total eight nos. cards. These are<br />

Error-1 Card<br />

Error-2 Card<br />

Decoder Card (1500-1700hz/1100-1300hz)<br />

Sync. Card.<br />

Input 2 Card.<br />

Xtal Card<br />

Input FSK Card (1500-1700hz/1100-<br />

1300hz)<br />

Reg. Card<br />

(iv) Receiver Multiplexer receives FSK coded message from the Transmitter Multiplexer located at other stations through comb<strong>in</strong>er-converter relat<strong>in</strong>g to<br />

ON-OFF status of block <strong>in</strong>formation relays at other station. Receiver Multiplexer shall keep the local block <strong>in</strong>formation repeater relays energized<br />

exactly as per ON-OFF status of block <strong>in</strong>formation relays at other station. It shall have total ten nos. cards. These are<br />

Relay driver card<br />

Relay driver card<br />

Relay driver card<br />

Relay driver card<br />

Error-1 Card<br />

Sync. Card<br />

Decoder Card (1500-1700hz/1100-1300hz)<br />

Xtal card<br />

Error-2 Card<br />

Regulator card.<br />

(v) The comb<strong>in</strong>er-converter from the transmitt<strong>in</strong>g end as a comb<strong>in</strong>er shall launches composite out signal from one station to other station over the block<br />

cable. The composite out signal shall be mixed of coded FSK signal output of Transmitter Multiplexer and output of 4W/2W EJB <strong>in</strong>stalled near the<br />

advance starter signal. It shall have total five nos. cards. These are<br />

FSK filter (1500-1700 or 1100-1300z)<br />

2W/4W card<br />

3.5 kHz filter card<br />

5.0 kHz filter card-1<br />

5.0 kHz filter card-2<br />

In addition <strong>in</strong> the right hand side of front plate five pairs of banana socket shall be provided for monitor<strong>in</strong>g different signals of comb<strong>in</strong>er-converter.<br />

(vi) The subsystems comb<strong>in</strong>er-converter, Rx-Mux, TX-Mux shall be <strong>in</strong>stalled one by one from bottom to top <strong>in</strong> the space provided <strong>in</strong> the rack for each<br />

subsystems. Each sub systems has to be slider <strong>in</strong>side on slotted angle from front to back with MS coupler receptacles go<strong>in</strong>g towards the rear <strong>in</strong>side<br />

the rack. Install comb<strong>in</strong>er/converter at the bottom most space of the rack by slid<strong>in</strong>g it <strong>in</strong>wards. Tighten the two 10-p<strong>in</strong> M.S coupler (plug) to the<br />

respective receptacles of comb<strong>in</strong>er/converter sub system from the backside of the rack from the space available at the backside of the rack.<br />

The Rx-MUX is to be <strong>in</strong>serted <strong>in</strong> the middle space of the rack. Install & tighten the two 14 p<strong>in</strong> M.S couplers and one 10 p<strong>in</strong> M.S coupler <strong>in</strong>to their<br />

respective receptacles.<br />

The Tx-MUX system is to be <strong>in</strong>stalled above the Rx-MUX at the top slot. The Rx-MUX M.S couplers are of 14 p<strong>in</strong> and 7 p<strong>in</strong> type and have to be<br />

tighten to their respective receptacles.<br />

(If it is found difficult to tighten MS couplers on to the sub racks from back side the M.S couplers may be tightened by open<strong>in</strong>g the side door. To open<br />

the side door from the relay rack unscrew the two screws provided on the side door and lift the side door and open. The side door has to be put back<br />

<strong>in</strong>to its orig<strong>in</strong>al place after complet<strong>in</strong>g the job).<br />

The cables com<strong>in</strong>g from S.M.‟s panel, axle counter rack, battery banks, advance and home lever circuit breaker connections have to be term<strong>in</strong>ated<br />

as per draw<strong>in</strong>g no. W006783A4 (3 sheets) aga<strong>in</strong>st each way of term<strong>in</strong>al block. The wires have to be taken from the open<strong>in</strong>gs at the backside bottom<br />

plate of rack and to be run <strong>in</strong> the left & right vertical channels of rack and term<strong>in</strong>ated at the respective ways of term<strong>in</strong>al block.<br />

The sub systems Tx-MUX, Rx-MUX, comb<strong>in</strong>er/converter must be fitted to the front of rack with four screws for each sub system.<br />

ITEM 16(E)<br />

(a) The term<strong>in</strong>ation and wir<strong>in</strong>g at relay rack shall generally be <strong>in</strong> consultation with eng<strong>in</strong>eer <strong>in</strong> charge. For wir<strong>in</strong>g from relay rack to evaluator<br />

1/2/5 pairs shielded cable wire ATC wire shield<strong>in</strong>g hav<strong>in</strong>g 90% coverage as per IRS specifications IRS: S 24-91 shall be used.<br />

(b) The +10 V feed from evaluator for trolley suppression circuit of the evaluator is taken through the pick up contact of these relays when<br />

track device is fixed <strong>in</strong> track circuited area. However, if it is not possible to provide track circuit where track device is <strong>in</strong>stalled, the circuit as<br />

shown <strong>in</strong> RDSO‟s draw<strong>in</strong>g no. SDO/UAC-330 shall be followed.<br />

Contractor’s signature with stamp Page 24


(c) The power supply from Integrated Power Supply/ Battery Bank (whose supply and <strong>in</strong>stallation is beyond the scope of this work) to axle<br />

counter system shall be taken by tw<strong>in</strong> core 7/1.4mm(10 sq mm) copper conductor (to be supplied by contractor) on cable runway of 75 mm<br />

dia PVC pipe, tee, elbow etc.<br />

2. EVALUATOR SYSTEM: The follow<strong>in</strong>g constitutes evaluator system.<br />

a) Base channel<br />

b) Axle Counter Cab<strong>in</strong>et<br />

c) DC-DC Converter<br />

d) Evaluator<br />

e) EV & SUP relays<br />

f) T.B. Plates<br />

g) Display unit<br />

h) „CLR‟ and „Occupied‟ Indication<br />

i) F<strong>in</strong>al track clear prov<strong>in</strong>g relay<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

The base channel assembly as per RDSO draw<strong>in</strong>g no. RDSO/S /15668 shall be fixed on RCC plate form (as per RDSO drg.no.SDO<br />

/UAC-336). The plate form shall be made with mixture of cement sand and stone chip size: 20mm <strong>in</strong> the ratio of 1:3:6 and subsequently<br />

outer surface shall be plastered with cement sand <strong>in</strong> the ratio of 1:4 (All material to be supplied by contractor. Duct for cable shall also be<br />

made by contractor. The base channel assembly should be fixed on RCC plate form by grout<strong>in</strong>g M.S. bolts.<br />

Axle counter cab<strong>in</strong>et 20U (Drg. No. RDSO/S-15661) shall be <strong>in</strong>stalled on base channel as per RDSO draw<strong>in</strong>g no. SDO/UAC-336. Base<br />

channel is also hav<strong>in</strong>g antivibration pads on the top surface, which takes care of any damage to evaluator due to vibration. It can house<br />

one set of evaluator, dc-dc converter and EV & SUP relays. In this, the relays are kept on top shelf of the rack. Below relays, the evaluator<br />

and then dc-dc converter are to be fixed. The bottom space is left for keep<strong>in</strong>g tools, manuals etc. The above arrangements are shown <strong>in</strong><br />

RDSO draw<strong>in</strong>g no. RDSO/S-15660.<br />

(i) The dc-dc converter should be fixed <strong>in</strong>side the Cab<strong>in</strong>et with nuts and bolts.<br />

(ii) The connection to evaluator should be made through a cable hav<strong>in</strong>g 7-p<strong>in</strong> coupler at both ends. The two ends of the cable are<br />

<strong>in</strong>terchangeable.<br />

(iii) Power supply to dc- dc converter should be fed by means of 2 core-shielded cable. The other end of this cable is to be connected to 0,<br />

+ 24V <strong>in</strong>put banana term<strong>in</strong>als of dc-dc converter. Capacitor shall be provided across power supply <strong>in</strong> dc-dc converter.<br />

The evaluator chassis should be fixed <strong>in</strong>side the rack with nuts and bolts. The external connection to term<strong>in</strong>ation plate should be made<br />

through 1 no. of 10 p<strong>in</strong> M.S. Coupler and 1 no. of 14 p<strong>in</strong> coupler. Also the dc-dc converter should be connected through a 7-p<strong>in</strong> coupler.<br />

All the modules are fitted with Euro connectors (32 p<strong>in</strong>s) and these modules should be plugged <strong>in</strong> the 32 p<strong>in</strong> receptacles fixed on<br />

motherboard. These modules should be fixed <strong>in</strong> position by front end tighten<strong>in</strong>g screws.<br />

The three couplers cater for the follow<strong>in</strong>g connections:<br />

a) Evaluator Input:<br />

i) Eight <strong>in</strong>put wires for 4 channels com<strong>in</strong>g from the cable term<strong>in</strong>ation rack, are connected through MS couplers. The 4 channels are<br />

connected through a 10 p<strong>in</strong> coupler.<br />

ii)<br />

iii)<br />

The 14 p<strong>in</strong> coupler is used for:<br />

a) EV & SUP Relays output.<br />

b) Trolley suppression circuits.<br />

c) Reset circuit.<br />

A cable hav<strong>in</strong>g 7 p<strong>in</strong> M.S.coupler at both ends is used for direct connection of dc-dc convector to evaluator, for + 5V, + 10V<br />

isolated supply.<br />

b) Evaluator output:<br />

For connect<strong>in</strong>g evaluator output to EV and SUP relays, two pairs of shielded cable, one pair for each relay with one end<br />

term<strong>in</strong>ated on T.B. plate and other end to relay. A<br />

4.7 mf (250 V) non-electrolytic capacitor (to be supplied by contractor) has to be connected across relay coils for suppress<strong>in</strong>g<br />

the transient voltage.<br />

(e)<br />

EVR and SUP relays shall be <strong>in</strong>stalled <strong>in</strong> the cab<strong>in</strong>et. The EV & SUP relays are of 12V/1000 Ohm DC neutral l<strong>in</strong>es relays (nonimmunized)<br />

with 4F/B metal to carbon contacts. These relays (to be supplied by <strong>railway</strong>) can either plug <strong>in</strong> type (QS3) or shelf<br />

type.<br />

i) Plug-<strong>in</strong> type (QS3) relays should be fixed on M.S. Square bar (anodized) whereas shelf type relays should be mounted on<br />

ii)<br />

iii)<br />

iv)<br />

alum<strong>in</strong>um tray provided <strong>in</strong> the rack.<br />

Alum<strong>in</strong>ium tray for fix<strong>in</strong>g EV & SUP relays has got provision for anti tilt<strong>in</strong>g arrangements.<br />

Relays should be provided with 4.7 mf (250V) capacitor (to be supplied by contractor) to suppress the transient voltage (more<br />

than 800V) generated when the relays drop and can affect the fast act<strong>in</strong>g sensitive TTL ICs used <strong>in</strong> the evaluator.<br />

Relay wir<strong>in</strong>g shall be done with PVC <strong>in</strong>sulated multi strand s<strong>in</strong>gle core copper conductor of size 16/0.2 mm (0.5 sq mm) as per<br />

IRS specification no. IRS: S 63:89.<br />

v) Lighten<strong>in</strong>g protection shall be provided <strong>in</strong> A, B, C & D channels to avoid dropp<strong>in</strong>g of SUP relay without any tra<strong>in</strong>.<br />

(f) TERMINATION BACK PLATE:(Drg. No. SDO/AC 337 & 338):<br />

All outgo<strong>in</strong>g and <strong>in</strong>com<strong>in</strong>g connections should be term<strong>in</strong>ated on this plate as per RDSO‟s draw<strong>in</strong>g no. SDO/AC 337 & 338. This<br />

plate is fixed on back bottom side of the rack. Other ends of the cables hav<strong>in</strong>g M.S. Coupler at one end are term<strong>in</strong>ated on<br />

term<strong>in</strong>ation plate no. 2, 3 and 4. T.B 1 is for EV & SUP relays contacts, which are used for reset box. The wires from evaluator<br />

should be term<strong>in</strong>ated on left hand side of term<strong>in</strong>als and wires from cable term<strong>in</strong>ation rack should be term<strong>in</strong>ated on right hand<br />

side of term<strong>in</strong>als.<br />

(g) DISPLAY UNIT: The display card is hav<strong>in</strong>g seven segment counts display and is connected to counter comparator card<br />

through flat cable connectors (16 p<strong>in</strong>). The „IN‟ and „OUT‟ count <strong>in</strong>formation is available for ma<strong>in</strong>ta<strong>in</strong>er. Whenever the cable is<br />

removed and reconnected, the random counts are to be resetted.<br />

(h)<br />

„CLR‟ & OCC INDICATIONS: Separate <strong>in</strong>dications for axle counter „CLR‟ and „OCC‟ conditions should be provided on<br />

alum<strong>in</strong>um tray for keep<strong>in</strong>g EV and SUP relays. (Drg. No. SDO/AC/339). These <strong>in</strong>dications are helpful for ma<strong>in</strong>ta<strong>in</strong>er and it is just<br />

the replica of the <strong>in</strong>dications available <strong>in</strong> SM reset box.<br />

F<strong>in</strong>al Track Clear Prov<strong>in</strong>g Relay (AZTPR): This relay <strong>in</strong>dicates the position of axle counter and trolley suppression track circuit.<br />

The pick up contacts of EV, SUP and trolley suppression track circuit (TPRs) should be proved as shown <strong>in</strong> Drg. No. SDO/AC-<br />

340.<br />

Contractor’s signature with stamp Page 25


In case, trolley suppression track circuit is not provided for crossover track device, f<strong>in</strong>al track clear prov<strong>in</strong>g relay picks up with EV<br />

& SUP relay contacts only.<br />

To avoid dropp<strong>in</strong>g of HR relay (when f<strong>in</strong>al track clear prov<strong>in</strong>g relay has been used <strong>in</strong> HR circuit) due to push trolley movement<br />

over track device, AZTPR front contact should be by passed with „HR‟ front contact (SDO/AC/360).<br />

3. RESET BOX (Drg. SDO/UAC/341):<br />

(i) This unit should be placed on hylem sheet shelf supported by M.S. angle <strong>in</strong> SM room and is used to reset axle counter system <strong>in</strong> case of failure or<br />

dur<strong>in</strong>g test<strong>in</strong>g and ma<strong>in</strong>tenance of axle counter system. The wir<strong>in</strong>g details are available on the back of the door.<br />

(ii) The connection between SM reset box and relay/cable term<strong>in</strong>ation rack of axle counter should be made by 5 pair switch board telecom cable taken<br />

<strong>in</strong> PVC conduit pipe (to be supplied and <strong>in</strong>stalled by contractor) and connected directly on SM reset box term<strong>in</strong>al strips as given <strong>in</strong> Drg. No. SDO/AC-<br />

342.<br />

(iii) Reset switch also operators a counter. Counter read<strong>in</strong>gs should be recorded <strong>in</strong> the register should be recorded <strong>in</strong> the register ma<strong>in</strong>ta<strong>in</strong>ed for this<br />

purpose, <strong>in</strong>dicat<strong>in</strong>g the reasons for each resett<strong>in</strong>g. Counter will move to next number only when actual resett<strong>in</strong>g has taken place.<br />

(iv) Resett<strong>in</strong>g should be done only when it is ensured that no resett<strong>in</strong>g is done when the section is occupied or when the tra<strong>in</strong> is likely to be received <strong>in</strong><br />

(v)<br />

the axle counter controlled section.<br />

Resett<strong>in</strong>g should be done only when it is ensured that the controlled track section is free from any obstruction and same is communicated through a<br />

l<strong>in</strong>e verification box actuation. Wir<strong>in</strong>g of axle counter when used <strong>in</strong> IBS and axle counter block (No. SDO.RRI/139-B).<br />

Circuit description:<br />

i) In case EV or SUP drop, „RED‟ LED shall glow <strong>in</strong>dicat<strong>in</strong>g section is occupied.<br />

ii) When both EV & SUP picks up „GREEN‟ LED shall glow.<br />

iii) When axle counter fails, and resett<strong>in</strong>g procedure has been <strong>in</strong>itiated i.e. controlled track section is free from any obstruction and l<strong>in</strong>e verification<br />

key is actuated, SM will actuate his key for resett<strong>in</strong>g and if the system gets reset, GREEN LED shall glow.<br />

iv) Resett<strong>in</strong>g is possible only when trolley suppression track relays are up.<br />

v) In case of IBS or axle counter block, the l<strong>in</strong>e verification key can be kept with other station.<br />

vi) Resett<strong>in</strong>g is possible only when SM reset keys and l<strong>in</strong>e verification key are „IN‟.<br />

4. LINE VERIFICATION BOX: The l<strong>in</strong>e verification box is as per drg. No. RDSO/S-15671. It has to be fixed outside SM‟s office.<br />

For fix<strong>in</strong>g of l<strong>in</strong>e verification box, two bolts are to be fixed on the wall and a through hole <strong>in</strong> the wall is required to carry the wires. In case, numbers<br />

of l<strong>in</strong>e verification box are more, common base plate can be used for fix<strong>in</strong>g the same. The wir<strong>in</strong>g has to be done with 16/0.2 wire on the term<strong>in</strong>als<br />

provided <strong>in</strong> the l<strong>in</strong>e verification box. Care has to be taken that all the l<strong>in</strong>e verification box keys are of separate wards.<br />

For easier identification, axle counter number should be pa<strong>in</strong>ted on l<strong>in</strong>e term<strong>in</strong>ation box so that <strong>in</strong> case of failure of axle counter, particular axle<br />

counter only be resetted.<br />

5. Test<strong>in</strong>g and commission<strong>in</strong>g of entire axle counter system shall be as per “Installation Practice (to the extent applicable for block work<strong>in</strong>g) for<br />

Universal Axle Counter” issued by RDSO <strong>in</strong> March 1994 with latest modifications.<br />

The contractor shall see to it that after the system is <strong>in</strong>stalled it should function as per standard laid down and <strong>in</strong> the spirit of the services called for <strong>in</strong><br />

a turnkey project.<br />

The contractor shall use his own test<strong>in</strong>g <strong>in</strong>struments at his cost for the <strong>in</strong>stallation and commission<strong>in</strong>g of axle counter system.<br />

Item 17. Signal equipment.<br />

(i)<br />

Fix<strong>in</strong>g of CLS surface base bolt<strong>in</strong>g on the foundation, erection of CLS post with signal unit on to the top or on an offset bracket and fitt<strong>in</strong>g ladder &<br />

guard to the post at the top and concret<strong>in</strong>g ladder base embedded <strong>in</strong>to the ground and with support<strong>in</strong>g brackets <strong>in</strong> the middle, blank<strong>in</strong>g of ladder for<br />

distance of one ft. between the height of the 6' 9" and 7' 9" from the rail level by M.S angle and M.S.Sheet of 0.6 mm thick wherever required and<br />

term<strong>in</strong>ation of cables. This <strong>in</strong>cludes provisions of wooden (Sal) cross arm 1 m X 1 m for CLS unit prior to commission<strong>in</strong>g.<br />

(ii) Fix<strong>in</strong>g of LED lamp unit, current regulator and preventive alarm <strong>in</strong>dication unit and hoods on CLS unit, wir<strong>in</strong>g and focuss<strong>in</strong>g the CLS unit.<br />

(iii) Fix<strong>in</strong>g of shunt signal surface base, bolt<strong>in</strong>g on to the foundation, erection of shunt signal post with signal unit, term<strong>in</strong>ation of cables. This <strong>in</strong>cludes<br />

provision of wooden (Sal) cross arm 1 m x 1m on signal unit prior to commission<strong>in</strong>g.<br />

(iv) Fix<strong>in</strong>g of LED lamp unit, current regulator and preventive alarm <strong>in</strong>dication unit and hoods on shunt signal unit, wir<strong>in</strong>g the shunt signal unit.<br />

(v) Fix<strong>in</strong>g of root <strong>in</strong>dicator on top of the signal post or an offset bracket <strong>in</strong>clud<strong>in</strong>g fix<strong>in</strong>g of offset bracket.<br />

(vi) Fix<strong>in</strong>g of LED lamp unit current regulator and preventive alarm unit and hoods, connect<strong>in</strong>g cable, wir<strong>in</strong>g and focuss<strong>in</strong>g route <strong>in</strong>dicator.<br />

(vii) Elevation and distance of foundation from track shall be <strong>in</strong> accordance with the 'schedule of dimensions' for Indian Railways published by Govt. of<br />

India and approved draw<strong>in</strong>gs.<br />

All items for the above work, except Rly. supply items mentioned <strong>in</strong> para 6 of Vol -I shall be supplied by the contractor <strong>in</strong>clud<strong>in</strong>g but not limited to the<br />

follow<strong>in</strong>g items: -<br />

(a) "U" bolt for offset brackets.<br />

(b) Wooden cross Arms 1 m x 1m.<br />

(c) M S angle and M.S. sheet for blank<strong>in</strong>g of ladders.<br />

ITEM NO.18:<br />

The draw<strong>in</strong>g shall be prepared with CAD system and shall be supplied on good quality of paper on the follow<strong>in</strong>g sizes:<br />

(I) A3 size - 297 mm X 420 mm: - For <strong>in</strong>terlock<strong>in</strong>g table, selection table and circuit diagram and other field draw<strong>in</strong>gs except cable route plan and cable<br />

coreage chart which will be <strong>in</strong> same size as <strong>in</strong>terlock<strong>in</strong>g plan.<br />

(II)<br />

The contractor shall furnish three copies of pr<strong>in</strong>t out of complete wir<strong>in</strong>g diagram and all other draw<strong>in</strong>gs prepared/ modified by them for each station to<br />

Railway for approval. After approval contractor shall supply compact disk(CD) <strong>in</strong> two sets bear<strong>in</strong>g all approved wir<strong>in</strong>g diagram & all other draw<strong>in</strong>gs<br />

prepared / modified. The contractor shall also supply completion draw<strong>in</strong>gs on polyester trac<strong>in</strong>g film double matte, 75 microns thick Garware brand or<br />

similar along with 6 sets of pr<strong>in</strong>t out. The draw<strong>in</strong>gs shall be kept <strong>in</strong> folders with spiral coil b<strong>in</strong>d<strong>in</strong>g hav<strong>in</strong>g transparent plastic cover. The draw<strong>in</strong>g shall be<br />

prepared as per Railway practice, SEM, RE Manual, General and Subsidiary Rules and as per latest rules prescribed by Railway.<br />

The draw<strong>in</strong>gs / diagrams to be supplied are listed as follows:<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

(vii)<br />

(viii)<br />

(ix)<br />

(x)<br />

Wir<strong>in</strong>g diagram.<br />

Relay rack chart.<br />

Term<strong>in</strong>al and contact analysis.<br />

Cable route plan.<br />

Cable courage plan / chart.<br />

Track b<strong>in</strong>d<strong>in</strong>g diagram.<br />

Power supply arrangement.<br />

Location wir<strong>in</strong>g plan.<br />

Cable <strong>in</strong>sulation test report.<br />

Track circuit test card.<br />

Contractor’s signature with stamp Page 26


(xi) Lamp register.<br />

(xii) Battery history card.<br />

(xiii) Equipment disposition plan.<br />

(xiv) Circuit route term<strong>in</strong>ation chart.<br />

(xv) Fuse analysis.<br />

(xvi) Square sheet.<br />

(xvii) Cable term<strong>in</strong>ation chart.<br />

In addition to above follow<strong>in</strong>g draw<strong>in</strong>g shall also be given by the contractor:<br />

A Specific to MACLS station with lever frame. B. Specific to MACLS station with panel <strong>in</strong>terlock<strong>in</strong>g.<br />

1. Interlock<strong>in</strong>g table 1. Selection table.<br />

2. Dog charts 2. Control Panel Diagram.<br />

3. Route section plan<br />

(iii) Track bond<strong>in</strong>g diagram should be got approved by contractor from S&T project <strong>in</strong> charge before physical execution at site.<br />

(iv) In case where SSI system is be<strong>in</strong>g provided Boolean version of wir<strong>in</strong>g diagram shall also be prepared along with conventional wir<strong>in</strong>g diagram.<br />

ITEM NO.19: Technical details for <strong>in</strong>stallation and commission<strong>in</strong>g of IPS:<br />

1. Installation:<br />

a. Panels and batteries shall be placed <strong>in</strong> suitable configuration to suit the site.<br />

b. There shall be a m<strong>in</strong>imum clearance of 700 mm on rear side of panels and m<strong>in</strong>imum 1000 mm from front side of panels.<br />

c. The m<strong>in</strong>imum rear clearance for batteries should be approximately 500 mm.<br />

d. The battery shall be kept as near as possible to SMR panel, less than 20 meters. It also should be ensured that all the other external<br />

cable lengths are also as m<strong>in</strong>imum as possible to reduce cable drops. This cable, along with ladder and other sub ord<strong>in</strong>ate arrangements<br />

etc. shall be laid by the contractor /Railways execut<strong>in</strong>g MACLS work at the station.<br />

2. Test<strong>in</strong>g and commission<strong>in</strong>g (General):<br />

a. The <strong>in</strong>put voltage and frequency for their limit of 160 – 270 volts and 50 Hz +/- 2 Hz shall be tested.<br />

b. Each module viz. SMR, AC distribution panel, DC distribution panel, ASM‟s <strong>in</strong>dication panel and <strong>in</strong>verter etc. shall be commissioned and<br />

tested.<br />

c. The total system shall not be switched on for its operation and the batteries shall not be connected until sub modules of whole IPS system<br />

are <strong>in</strong>stalled and commissioned.<br />

d. All switches and circuit breakers shall be kept <strong>in</strong> OFF position and all cables shall be connect to the system.<br />

e. It shall be ensured that all the earth<strong>in</strong>g term<strong>in</strong>als of all panels/modules are connected to proper earth<strong>in</strong>g.<br />

f. All cable connections as laid by the MACLS contractors/Railways from relay room of equipment/battery room shall be connected to the IPS<br />

keep<strong>in</strong>g circuit barkers off.<br />

3. F<strong>in</strong>al test<strong>in</strong>g & commission<strong>in</strong>g of IPS:<br />

a. Connect battery to SMR panel while keep<strong>in</strong>g off switches <strong>in</strong> all conditions.<br />

b. Switch on ma<strong>in</strong>s. Switch on SMR module/Inverter/DC-DC converters/ magnetic sequentially.<br />

c. Connect all loads to the system sequentially.<br />

d. Check for full state of change of battery.<br />

e. Allow the system to rema<strong>in</strong> on AC ma<strong>in</strong>s till booster <strong>in</strong>dication disappears.<br />

f. Switch off AC ma<strong>in</strong>s and allow battery to discharge to desired level, observe for alarms test for load bear<strong>in</strong>g time.<br />

g. Switch on ma<strong>in</strong>s allow battery to reach full state of charge.<br />

4. Record:<br />

The contractor shall prepare a record of all tests conducted and hand over the same to Railways <strong>in</strong> form of a register neatly pr<strong>in</strong>ted.<br />

Item No. 20 Commission<strong>in</strong>g of SSI and associated equipment/system.<br />

(Details not given as this be<strong>in</strong>g not applicable <strong>in</strong> this tender)<br />

Item No. 21 Prewired Relay Racks and Cable Term<strong>in</strong>ation Board.<br />

21.1 Composite Relay Rack shall be fabricated & supplied as per Drg. No. CORE/S&T/ ALD/SK/ 504/2001 and fix<strong>in</strong>g arrangement for neutral plug <strong>in</strong><br />

relays „Q‟ Type, lamp-prov<strong>in</strong>g relays etc. Fix<strong>in</strong>g arrangement for fuses and Term<strong>in</strong>al block M6 (ARA Term<strong>in</strong>al) etc. should be <strong>in</strong> conformity with the<br />

Drg. No. CORE /S&T/ ALD /SK/504/2001 and SK/DRD./OL/109. Alt. A Hylam sheet size 1100 mm x 900 mm x12 mm shall be provided <strong>in</strong> Relay<br />

Rack for fix<strong>in</strong>g of Term<strong>in</strong>al block M6 (ARA term<strong>in</strong>als).<br />

21.2 The complete relay rack shall be wired <strong>in</strong> conformity to the approved wir<strong>in</strong>g diagram, tested and <strong>in</strong>stalled <strong>in</strong> the relay room. The same shall be<br />

offered for test<strong>in</strong>g to the Eng<strong>in</strong>eer & any corrections <strong>in</strong> the wir<strong>in</strong>g carried out or and any changes that may be brought out by the Eng<strong>in</strong>eer shall be<br />

carried out by the contractor at no extra cost. The wires connected to the term<strong>in</strong>als shall be soldered. It shall be ensured that there is no dry<br />

solder<strong>in</strong>g.<br />

Composite relay rack large shall be fabricated & supplied as per Drg.No. CORE/S&T/ALD/SK/503/2001 and fix<strong>in</strong>g arrangement for neutral plug <strong>in</strong><br />

Relays „Q‟ Type, lamp prov<strong>in</strong>g relays etc. Fix<strong>in</strong>g arrangement for fuses and term<strong>in</strong>al block M6 (ARA term<strong>in</strong>al) etc. should be <strong>in</strong> conformity with the<br />

Drg.No.CORE/S&T/ALD/SK/503/2001 and SK/DRD/OL/109. Alt. A Hylam sheet size 1100 mm x 1280 mm x 12 mm shall be provided <strong>in</strong> Relay Rack<br />

for fix<strong>in</strong>g of Term<strong>in</strong>al block M6 (ARA term<strong>in</strong>als).<br />

21.3 The complete relay rack shall be wired <strong>in</strong> conformity to the approved wir<strong>in</strong>g diagram, tested and <strong>in</strong>stalled <strong>in</strong> the relay room. The same shall be<br />

offered for test<strong>in</strong>g to the Eng<strong>in</strong>eer & any corrections <strong>in</strong> the wir<strong>in</strong>g carried out or and any changes that may be brought out by the Eng<strong>in</strong>eer shall be<br />

carried out by the contractor at no extra cost. The wires connected to the term<strong>in</strong>als shall be soldered. It shall be ensured that there is no dry<br />

solder<strong>in</strong>g.<br />

21.4 Supply and fix<strong>in</strong>g of Ma<strong>in</strong> Cable Term<strong>in</strong>ation Board as per Drg No. CORE/S&T/ALD/SK/505/2001 along with fuses and fuse bases. Fix<strong>in</strong>g of ARA<br />

term<strong>in</strong>als/‟I‟ type transformer and term<strong>in</strong>ation of outdoor cables. Hylam sheet size 1296 mm x 900 mm x 12 mm shall be provided on Ma<strong>in</strong> Cable<br />

Term<strong>in</strong>ation Board for fix<strong>in</strong>g Term<strong>in</strong>al Block M6 (ARA Term<strong>in</strong>als). ARA term<strong>in</strong>als supplied through other schedule shall be used here.<br />

21.6 Relay rack shall be fabricated & supplied as per Drg. No. CORE/S&T/ALD/ SK / 20/85 and fix<strong>in</strong>g arrangement for neutral plug <strong>in</strong> relays Q‟ type, lamp<br />

provid<strong>in</strong>g relays, po<strong>in</strong>t groups, tag blocks etc.<br />

21.7 Contractor‟s shall provide antitl<strong>in</strong>g arrangement for shelf type relays. (Ref. Drg no. NBRE/SIG/GEN/050).<br />

Item No. 22 Wir<strong>in</strong>g of SM's Slide Control Frame.<br />

Fix<strong>in</strong>g of term<strong>in</strong>al block M6 (ARA term<strong>in</strong>als) on 6 mm thick Hylam sheet <strong>in</strong> SM‟s slide box/ term<strong>in</strong>al board and wir<strong>in</strong>g as per approved circuit diagram.<br />

This <strong>in</strong>cludes supply of all materials except ARA term<strong>in</strong>als which is separate supply item.<br />

Item No.23 Installation of ground lever frame and boom lock<strong>in</strong>g.<br />

Contractor’s signature with stamp Page 27


23.1 Installation of all fitt<strong>in</strong>gs i.e. ground lever frame, po<strong>in</strong>t rodd<strong>in</strong>g, guide roller assembly, solid jo<strong>in</strong>t, crank, compensators, cast<strong>in</strong>g, concret<strong>in</strong>g & cur<strong>in</strong>g of<br />

foundation for A & B type foundation shall be done <strong>in</strong> conformity to Drg.No. RE/S&T/Sig/ Tender/SK/11/85. Fix<strong>in</strong>g of cranks & compensators on A &<br />

B type foundation and rodd<strong>in</strong>g should be connected with necessary solid jo<strong>in</strong>ts wherever required with forge weld<strong>in</strong>g.<br />

23.2 Boom lock<strong>in</strong>g shall be <strong>in</strong>stalled <strong>in</strong> conformity to RDSO Drg. No. A 7998/M. Po<strong>in</strong>t rodd<strong>in</strong>g shall be used for boom lock<strong>in</strong>g <strong>in</strong>stead of flexible wire<br />

shown <strong>in</strong> the draw<strong>in</strong>g.<br />

23.3 Runn<strong>in</strong>g of po<strong>in</strong>t rodd<strong>in</strong>g required for boom lock<strong>in</strong>g shall be on trestle placed at 2 mtrs. Interval along with the provision of roller p<strong>in</strong> and split p<strong>in</strong>,<br />

ma<strong>in</strong>ta<strong>in</strong><strong>in</strong>g a m<strong>in</strong>imum of 30 cm. distance between nearest rod jo<strong>in</strong>t from the trestles. Trestle should be embedded <strong>in</strong> the earth fully on all side up to<br />

the top of trestle.<br />

23.4 Foundation for ground lever frame shall be casted <strong>in</strong> conformity to drg. No.RE/S&T/Sig/Tender/3/85.<br />

23.5 It shall be ensured that boom lock<strong>in</strong>g is effective and it is not possible to lift the boom by more than 10 degree from closed position.<br />

23.6 Wherever, it is required for the rod run to cross the level cross<strong>in</strong>g gate, arrangement shall be made as per Drg. No. CORE/S&T/ALD/SK/553 /2003.<br />

A trench shall be made across level cross<strong>in</strong>g gate of width just enough to accommodate trestles. Trestles shall be provided <strong>in</strong> the trench along with<br />

standard roller guides, top & bottom rollers such that rod is run at m<strong>in</strong>imum clearance of 25 mm from bottom of the plate. Two 'H' channels shall be<br />

placed across the road on both sides of the trench such that the top of channel is flushed to the surface of the road. The work shall be carried out<br />

caus<strong>in</strong>g lest <strong>in</strong>terruption to road traffic.<br />

Item No.24 Lock<strong>in</strong>g of SM's slide control frame.<br />

24.1 A lock<strong>in</strong>g table & dog chart for slide frame specific for the station shall be prepared & approval shall be obta<strong>in</strong>ed from the Eng<strong>in</strong>eer.<br />

24.2 Tappets shall be fabricated & notches <strong>in</strong> slides be cut <strong>in</strong> conformity to the dog chart so approved.<br />

24.3 The lock<strong>in</strong>g shall be provided by rivet<strong>in</strong>g the tappets to M.S. bridle bar, such that slide does not move more than 1 mm. when locked.<br />

24.4 One channel of the S.M's slide frame shall be used for lock<strong>in</strong>g all slides by S.M's lock.<br />

Item No. 25 Installation of lift<strong>in</strong>g barrier.<br />

25.1 Lift<strong>in</strong>g barrier shall be <strong>in</strong>stalled <strong>in</strong> conformity to RDSO Drg No. SA/7986/M (R.H.) & SA 7994/M (L.H.) suitable for 6 mtrs. Long gate.<br />

25.2 Foundation for pedestal shall be casted as per draw<strong>in</strong>g No. CORE/S&T /ALD /SK/552/2003.<br />

25.3 The boom rest (stop post) shall be <strong>in</strong> alignment with the boom.<br />

25.4 The boom shall be provided with 300 mm bands alternate black & yellow colour of approved type of retro reflective strips. The stop board shall be<br />

pa<strong>in</strong>ted with fluorescent red pa<strong>in</strong>t with word 'stop' pa<strong>in</strong>ted white <strong>in</strong> the center. The fr<strong>in</strong>ges, if provided, shall also be pa<strong>in</strong>ted with fluorescent yellow<br />

pa<strong>in</strong>t.<br />

25.5 It shall be ensured that while clos<strong>in</strong>g the gate, warn<strong>in</strong>g bell r<strong>in</strong>gs and lamp brackets also get turned to give red <strong>in</strong>dication to road users when closed<br />

& white, when gate opened.<br />

25.6 The wire rope shall not overlap at the w<strong>in</strong>ch and rope drums. The guy rod shall be given sufficient tension for smooth operation of the boom &<br />

pa<strong>in</strong>ted with black enameled pa<strong>in</strong>t.<br />

25.7 Oil holes, grease nipples etc. provided with spr<strong>in</strong>g-loaded covers shall be filled with grease.<br />

25.8 It shall be possible to extract the key from the w<strong>in</strong>ch only when the gate is fully closed.<br />

Item No.26 Installation of Road Signal & audible warn<strong>in</strong>g bell.<br />

26.1 Foundation for Road signal shall be as per Drg.No.RE/S&T/Sig/Tender/ SK/1/85 and as per technical specification No. 2 of enclosure-I.<br />

26.2 Signal on both side of the L.C.Gate shall be provided as per technical specification No. 17 of enclosure-I.(covered under other item of schedule).<br />

26.3 A standardized audio dual tone warn<strong>in</strong>g bell with 20 W horn and 15 W amplifier shall be provided for warn<strong>in</strong>g to approach<strong>in</strong>g traffic while clos<strong>in</strong>g the<br />

gate. Power Supply to be provided by Railways.<br />

Item No. 27: Installation & commission<strong>in</strong>g of Axle detectors, field units of Multi Section Digital Axle Counter.<br />

Item No. 28: Installation of Multi Section Digital Axle Counter central evaluator along with resett<strong>in</strong>g arrangement.<br />

Item No. 29: Installation of Block Prov<strong>in</strong>g by Axle Counter us<strong>in</strong>g S<strong>in</strong>gle Section Digital Axle Counter & MUX for s<strong>in</strong>gle/double L<strong>in</strong>e Section.<br />

Item No. 30: Ma<strong>in</strong>tenance of SSI.<br />

(Details of Item Nos. 27 to 30 are not given as these be<strong>in</strong>g not applicable <strong>in</strong> this tender).<br />

ITEM No 31. TRACK CIRCUIT<br />

(I) Provision of Insulation for gauge tie plate, switch extension bracket and William stretcher bar shall be made by the contractor.<br />

(II) All materials except Glued Jo<strong>in</strong>ts, track feed battery chargers, relays, underground cables, surge dischargers, required for <strong>in</strong>stallation and<br />

commission<strong>in</strong>g of track circuit shall be supplied by contractor <strong>in</strong>clud<strong>in</strong>g but not limited to the item mentioned below <strong>in</strong> the list.<br />

(a) „Disc‟ Type track feed Resistance as per Drg. No. SA - 20161 - 66M, bond<strong>in</strong>g wire 8SWG bond wire clip, channel p<strong>in</strong> s<strong>in</strong>gle groove.<br />

(b) Non deteriorat<strong>in</strong>g non-<strong>in</strong>dicat<strong>in</strong>g type fuse of 2 AMP.<br />

(c) Insulation for gauge tie plate, stretcher bar and switch extension bracket.<br />

(d) Choke B Type as per IRS Specification No. IRS - 65/83 latest.<br />

(e) Track Lead Jn. Boxes.<br />

ENCLOSURE-II<br />

2. LIST OF SIGNALLING MATERIALS WITH THEIR SPECIFICATION/ DRAWINGS (ONLY THOSE ITEMS WILL APPLY TO CONTRACTOR,<br />

WHICH ARE TO BE SUPPLIED BY THEM.)<br />

1. PVC Insulated armoured Signall<strong>in</strong>g Cable 8/12/20 core 1.5 sq. mm. as per specification No. IRS-S-63/89 with latest amendments. The core of the<br />

cable shall be identified as para 3.2.6.<br />

2. Jelly filled cables as per specification IRS-TC-41-97 with latest amendment for axle Counter.<br />

3. PVC <strong>in</strong>sulated, PVC sheathed armoured <strong>railway</strong> signall<strong>in</strong>g power cable, 1100V grade 2 core of size 25 sq.mm H2 grade Alum<strong>in</strong>ium conductor<br />

confirm<strong>in</strong>g to requirement of IRS: S-63/89 with latest amendments except for the Alum<strong>in</strong>ium conductor which shall be as per IS-1554 (Part-I) with<br />

latest amendments.<br />

4. Four quad hav<strong>in</strong>g 0.51 mm dia or 0.9 mm dia conductors underground cable for Axle counter for use <strong>in</strong> Railway Electrified Areas as per IRS: TC-<br />

30/96 with latest amendments.<br />

5. 3/0.75 mm & 7/0.75 mm S<strong>in</strong>gle core cable conductor comprised of annealed bare copper wire PVC <strong>in</strong>sulated (11 mm wall thickness) flame resist<strong>in</strong>g<br />

<strong>in</strong> red and black colour <strong>in</strong>sulation conform<strong>in</strong>g to IRS Specification No. IRS-S-76/89 with latest amendments.<br />

6. 0.6 mm and 1 mm s<strong>in</strong>gle or multi core <strong>in</strong>door wir<strong>in</strong>g cable and 16/0.2 mm s<strong>in</strong>gle core flexible cable as per IRS specification No. IRS-S-76/89 with<br />

latest amendments.<br />

7. Apparatus case steel s<strong>in</strong>gle as per Sketch No. RE/S&T/ALD/SK/219/82 with alteration „A‟ and 221/82 with Alteration „B‟. The key and handle should<br />

be @ one each per 4 apparatus cases.<br />

8. Apparatus case steel half as per sketch No. RE/S&T/ALD/SK/220/82 with Alteration „A‟ and 221/82 with alteration „B‟. The key and handle should be<br />

@ one each per 4 apparatus cases.<br />

9. Junction box steel as per Sketch No. RE/S&T/ALD/SK/227/82 Corrected up to 30.6.86 and 228/82 corrected up to 18.1.83. The key and handle<br />

should be @ one each per 4 Junction boxes.<br />

Contractor’s signature with stamp Page 28


10. Track lead Jn. Box as per RDSO Drg. No. SA-20101/M Complete with 450 mm long 25 mm dia pipe.<br />

11. Signal Colour Light Multi Unit type 4 aspect without sidelight, signal transformers, lamps and lenses as per RDSO Drg. No. SA-23001 A/M (Adv.)<br />

with latest amendment.<br />

12. Signal colour light Multi Unit type 3 aspect without side light, lenses, lamps and signal transformers as per RDSO Drg. No. SA-23002 A/M (Adv) with<br />

latest amendment.<br />

13. Signal Colour Light Multi Unit type 2 Aspect without sidelight, lenses, lamps and signal transformers as per RDSO Drg. No. SA-23003 A/M (Adv) with<br />

latest amendment. The mount<strong>in</strong>g socket should be provided for 140 mm dia to RDSO Drg. No. S-23005 M (Adv) with latest amendments.<br />

14. Colour Light Signall<strong>in</strong>g Tubular post 5.6 metres long, conform<strong>in</strong>g to IRS spec. No. IRS: S-6-81 with latest amendments.<br />

15. Colour Light Signall<strong>in</strong>g Tubular post 4.6 metres long, conform<strong>in</strong>g to IRS spec No. IRS: S-6-81 with latest amendments.<br />

16. Colour Light Signall<strong>in</strong>g Tubular post 3.6 metres long, conform<strong>in</strong>g to IRS spec. No. IRS: S-6-81 with latest amendments.<br />

17. Route Indicator Direction type 5 Unit Arm 1 way as per RDSO Drg. No. SA 23401(Adv.) latest, complete with fitt<strong>in</strong>gs but without lamps, lenses and<br />

signal transformer along with mount<strong>in</strong>g sockets 140 mm dia to RDSO Drg. No. S-23005/M (Adv.) latest.<br />

18. Route Indicator Direction type 5 Unit Arm 2 way as per RDSO Drg. No. SA 23402 (Adv.) latest, complete with fitt<strong>in</strong>gs but without lamps, lenses and<br />

signal transformer along with mount<strong>in</strong>g socket 140 mm dia to RDSO Drg. No. S-23005/M (Adv.) latest (Suitable arrangement should be provided to<br />

fix the Arm as per Unit Comb<strong>in</strong>ation „a‟ and „b‟ <strong>in</strong>dicated on the Drg.)<br />

19. Route Indicator Direction type 5 Unit arm 3 way as per RDSO Drg. No. SA 23403 (Adv.) latest, complete with fitt<strong>in</strong>gs but without lamps, lenses and<br />

signal transformer along with mount<strong>in</strong>g socket 140 mm dia. to RDSO Drg No. S - 23005/M (Adv.) latest (Suitable arrangement should be provided to<br />

fix the arms as per Unit comb<strong>in</strong>ation „a‟ and „b‟ <strong>in</strong>dicated on the drg.)<br />

20 Ladder for colour light Signal Multi Unit Type 5.5 Meters as per RDSO Drg. No. SA 23156 (Adv.) Alt. 1 Latest.<br />

21. Ladder for Colour Light Signal Multi Unit type 4.5 meters as per RDSO Drg. No. SA 23153 (Adv) latest.<br />

22. Ladder for Colour Light Signal Multi Unit type 3.5 meters as per RDSO Drg. No. SA 23150 (Adv.) latest.<br />

23. Signal Base for 140 mm dia post as IRS (S) Drg. No. S-2011/M latest.<br />

24. Signal Bracket Colour Position Light for 140 mm out side dia post as per RDSO Drg. No. SA 23080 (Adv.) latest.<br />

25. Offset bracket for CLS for 140 mm outside dia post procured through Signal Workshop. RDSO Drg. is not available.<br />

26. „P‟ Marker (Non - illum<strong>in</strong>ated) as per Drg. No. RE/S&T/SIG/Tender/SK /36/ 85 dated 20. 4. 85.<br />

27. Signal cable Marker as per Drg. No. CORE/S&T/ALD/SK/373/93. Pg.10, ALT.- A.<br />

28. Block Section/Shunt<strong>in</strong>g Limit Board as per RDSO Drg. No. SA 2373 (Adv.) latest.<br />

29. Cable Trough (GI) For girder Bridges as per Drg. No. RE/S&T//SIG/TENDER/ SK/22/85 dated 20.04.85.<br />

30. Earth Electrode as per Drg. No. RE/S&T/SIG/Tender/SK/398/94.<br />

31. RCC Pipe 150 mm dia 2 meter long with collars to IS Spec. No. 458/1971.<br />

32. Signal Shunt Position Light 2 Positions as per RDSO Drg. No. SA 23840. (Adv.) latest.<br />

33. Repeater Lum<strong>in</strong>ous Signal Green as per IRS Drg. No. SA 23271 C/M.<br />

34. Repeater Lum<strong>in</strong>ous Signal Red as per IRS Drg. No. SA 23271 A/M.<br />

35. Repeater Lum<strong>in</strong>ous Signal Yellow as per IRS Drg. No. SA 23271 B/M.<br />

36. Indicator Lum<strong>in</strong>ous Stencil Type „F‟ as per IRS Drg. No. SA 23296/M.<br />

37. do „L‟ as per IRS Drg. No. SA 23295/M.<br />

38. do „N‟ as per IRS DRG. No.SA 23291/M.<br />

39. do „OFF‟ as per IRS Drg. No. SA 23293/M.<br />

40. Indicator Lum<strong>in</strong>ous Stencil type „ON‟ as per IRS Drg. No.SA 23294/M.<br />

41. Indicator Lum<strong>in</strong>ous Stencil Type „R‟ as per IRS Drg. No. SA 23292/M.<br />

42. -do- -do- Case complete as per IRS Drg. No. SA 23297/M.<br />

43. Circuit Controller 2 Way (modified design) lever type as per RDSO Drg. No. SA 20245 (Advance).<br />

44. Circuit Controller 4 Way (modified design) lever type as per RDSO Drg. No. SA 20266 (Advance).<br />

45. Circuit Controller 6 Way (modified design) lever type as per RDSO Drg. No. SA 20276(Advance).<br />

46. Circuit Controller 6 Way (modified design) lever type as per RDSO Drg. No. SA 20286 (Advance).<br />

47. Double wire circuit controller (Rotary Type) 4 way as per Drg. No. SA 22420 (Advance).<br />

48. -do- 6 way as per Drg. No. SA 22430 (Advance.)<br />

49. -do- 8 way as per Drg. No SA 22440 (Advance.)<br />

50. Electric lever lock and circuit controller comb<strong>in</strong>ed 200 mm stroke as per Drg. No. SA 22701 (Adv) latest.<br />

51. Earth Leakage detector s<strong>in</strong>gle channel/Multi channel suitable to work on 110 Voltage 50 Hz s<strong>in</strong>gle phase AC as per RDSO Specification No. 256 -<br />

1971 (Revised 1977) complete with electromagnetic counter.<br />

52. Term<strong>in</strong>al Block (M6 Term<strong>in</strong>als) as per IRS Specification No. IRS: S-75/91 with latest amendment and IRS Drg. No. SA 23741/A (Alt. 4).<br />

53. Fuse L<strong>in</strong>k cartridge cyl<strong>in</strong>drical head (2A, 4A and so on) non-deteriorat<strong>in</strong>g type, non-<strong>in</strong>dication type as per IRS Specification No. IRS: S-78/92 with<br />

latest amendment.<br />

54. Indication type of low voltage (0.4A, 0.6A and 1.6 Amp.) Non-deteriorat<strong>in</strong>g Fuse l<strong>in</strong>ks for signall<strong>in</strong>g circuit as per RDSO Specification No. IRS: S-<br />

80/92 with latest amendment.<br />

55. Fuse Block as per IRS(S) Drg. No. SA 23748 (Alt. 4)<br />

56. Block <strong>in</strong>strument s<strong>in</strong>gle l<strong>in</strong>e Neal's Ball Token type „A‟ as per RDSO Drg. No. SA 20701 (Adv) latest.<br />

57. Block <strong>in</strong>strument SGE type token less double l<strong>in</strong>e without 3 position polarized relay, rated voltage of <strong>in</strong>strument 12 V DC, hand micro telephone<br />

without dial for us<strong>in</strong>g the <strong>in</strong>strument <strong>in</strong> AC electrified traction area as per specification no. IRS: S-22/91.<br />

58 Handle type Token less Block <strong>in</strong>strument suitable for RE areas as per specifications no. IRS: S-98/2001 with latest amendments.<br />

59. Signal colour light transformer 110/12V AC as per IRS specification No. IRS: S-59/77 with latest amendments & RDSO draw<strong>in</strong>g SA-23014/M with<br />

latest amendments.<br />

60. High Voltage Signal Transformer as per IRS Specification No. IRS: S-92/9388 with latest amendments.<br />

61. Transformer 230 V AC/110V AC as per IRS Specification No. IRS: S-72/88 with latest amendments.<br />

62. Indication supply transformer 230 V AC/24 V AC with tapp<strong>in</strong>g at 12 V AC as per IRS Specification No. IRS: S-83-92 with latest amendments.<br />

63. Current Transformer „I‟ type for lamp prov<strong>in</strong>g as per IRS Specification No. IRS: S-62/92 with latest amendments.<br />

64. Lock key „E‟ type as per IRS Drg. No. SA 3376/M latest amendments.<br />

65. Interlock<strong>in</strong>g Frame Ground Type S<strong>in</strong>gle Lever as per IRS Drg. No. SA 922/M (adv.) latest.<br />

66. Po<strong>in</strong>t rodd<strong>in</strong>g (solid) 32 mm dia, 18‟ long as per No. IRS-S-5-62 with latest amendment & Drg.No. SA-3635A latest.<br />

67. Roller Trestle 2 way as per RDSO Drg. No. S-3534/M (Adv) latest.<br />

68. Roller Trestle 4 way as per RDSO Drg. No. S-3535/M (Adv) latest.<br />

69. Roller stands as per RDSO Drg. No. S-3538/M (Adv.) latest.<br />

Contractor’s signature with stamp Page 29


70 Bottom Roller as per RDSO Drg. No. S-3539/M (Adv.) latest.<br />

71. Top Roller as per RDSO Drg. No. S-3540/M (Adv.) ALT-1 latest.<br />

72. Top Roller p<strong>in</strong> as per RDSO Drg. No. S-68/M (Adv.) latest.<br />

73. Horizontal crank 300 mm x 300 mm as per RDSO Drg. No. SA 3414/M (Adv.)<br />

74. --do-- 300 mm x 400 mm as per RDSO Drg. No. SA 3415/M (Adv.)<br />

75. Vertical crank as per RDSO Drg. No. SA 3412/M (Adv.)<br />

76. Adjustable crank as per RDSO Drg. No. SA 3416/M (Adv.)<br />

77. Adjustable straight crank as per RDSO Drg. No. SA 3417/M (Adv.)<br />

78. Compensator 253 mm x 406 mm as per RDSO Drg. No. SA 3504/M (Adv.) latest.<br />

79. Accommodat<strong>in</strong>g crank „Low‟ 103 mm center as per RDSO Drg. No. SA 5852/M (Adv.)<br />

80. Deleted<br />

81. Accommodat<strong>in</strong>g Crank „Medium‟ 103 mm Center as per RDSO Drg. No. SA 5853/M (Adv.)<br />

82. Accommodat<strong>in</strong>g Crank „High‟ 103 mm Center as per RDSO Drg. No. SA 5854/M (Adv.)<br />

83. Accommodat<strong>in</strong>g Crank „Low‟ 125 mm Center as per RDSO Drg. No. SA 5856/M (Adv.)<br />

84. Accommodat<strong>in</strong>g Crank „Medium‟ 125 mm center as per RDSO Drg. No. SA 5857/M (Adv.)<br />

85. Accommodat<strong>in</strong>g Crank „High‟ 125 mm center as per RDSO Drg. No. SA 5858/M (Adv.)<br />

86. Foundation Type „A‟ as per IRS Drg. No. S-3529/M latest.<br />

87. Foundation Type „B‟/Plate as per IRS Drg. No. S-3536 latest<br />

88. Foundation Type „B‟ as per IRS Drg. No. S-3533 latest.<br />

89. Shoe 1 or 2 way as per RDSO Drg. No. S-5814/M (Adv.) latest.<br />

90. Shoe Jo<strong>in</strong>t (Butt end) and as per RDSO Drg. No. S-5817/M (Adv.) latest.<br />

91. Flange connect<strong>in</strong>g rod (Butt end) as per RDSO Drg. No. S-3600/M (Adv.) latest.<br />

92. Angle Slide 1 or 2 way as per RDSO Drg. No. S-5818/M (Adv.) latest.<br />

93. Switch Extension piece (BG) LH as per RDSO Drg. No. S-6063/M (Adv) ALT-3 latest.<br />

94. Switch Extension piece (BG) RH as per RDSO Drg. No. S-6062A (Adv.) latest.<br />

95. Lug Eye (Butt end) as per RDSO Drg. No. S-3631/M (Adv) latest.<br />

96. Flush jo<strong>in</strong>t 32 mm (Butt end) as per RDSO Drg. No. SA 6051/M (Adv.) latest.<br />

97. Solid Jo<strong>in</strong>t 32 mm (Butt end) as per RDSO Drg. NO. SA 6050/M (Adv.) latest<br />

98. Jo<strong>in</strong>t solid 20 mm as per IRS Drg. No. SA 2160/M.<br />

99. Jo<strong>in</strong>t Screw 20 mm as per IRS Drg. No. SA 2162/M.<br />

100. Radial Guide standard tension Bracket as per RDSO Drg. No. S-3831 (Adv.)<br />

101. Radial Guide Extension Bracket as per RDSO Drg. No. S-3832 (Adv.) latest.<br />

102. Radial guide Lock Driv<strong>in</strong>g rod 33 mm as per RDSO Drg. No. SA 3833 (Adv.) latest.<br />

103. Radial Guide connection rod 33 mm as per RDSO Drg. No. SA 3834 (Adv.) latest.<br />

104. 3 Section Lock Bar <strong>in</strong>cl<strong>in</strong>ed as per RDSO Drg. No. SA 3275/M (Adv.) latest.<br />

105. Lock Bar Driv<strong>in</strong>g attachment as per RDSO Drg. No. S-3243/M (Adv).<br />

106. Clip Lock Bar <strong>in</strong>side 60 kg. (UIC Rail clamp Type as per RDSO Drg. No. SA 8675 (Adv.)<br />

107. Clip Lock Bar <strong>in</strong>side 52 kg. Rail Clamp Type as per RDSO Drg. No. SA 3560 (Adv.) latest.<br />

108. Lock bar stop <strong>in</strong>side 60 kg. (UIC Rail clamp Type as per RDSO Drg. No. SA 8678 (Adv.)<br />

109. Lock Bar Stop 52 kg. Rail clamp type as per RDSO Drg. No. SA 3591 (Adv).<br />

110. Clip Lock Bar <strong>in</strong>side 90 R Rail Clamp Type (vertical) as per RDSO Drg. No. SA 3569 (Adv.) latest.<br />

111. Lock Bar Stop 90 R Rail clamp Type as per RDSO Drg. No. SA 3592 (Adv.)<br />

112. Roller path 52 kg. Rail as per RDSO Drg. No. SA 3578 (Adv.).<br />

113. Roller path 90 R Rail as per RDSO Drg. No. SA 3579 (Adv.)<br />

114. Lock fac<strong>in</strong>g po<strong>in</strong>t as per IRS Drg. No. SA - 5984. latest.<br />

115. Lock fac<strong>in</strong>g po<strong>in</strong>t split stretcher bar (BG) as per IRS Drg. No. SA 5988 late<br />

116. Lock fac<strong>in</strong>g po<strong>in</strong>t (HP Type) with key locks base as per IRS Drg. No. S - 3152/M latest.<br />

117. Lock fac<strong>in</strong>g po<strong>in</strong>t (HP Type.) split stretcher bar (BG) 52 kg. Rail as per IRS Drg. No. SA 3162 B/M latest.<br />

118. Lock fac<strong>in</strong>g po<strong>in</strong>t (HP Type) Split stretcher bar 90 R Rail as per IRS Drg. No. SA 3163/M latest.<br />

119. Screw Jo<strong>in</strong>t adjust<strong>in</strong>g (Butt end) as per RDSO Drg. No. S-3628/M (Adv.) latest.<br />

120. Indicator po<strong>in</strong>t on Trestle with short lamp base as per RDSO Drg. NO. S-5777/2/M (Adv.).<br />

121. Po<strong>in</strong>t Rodd<strong>in</strong>g connections for Siemens Electric Po<strong>in</strong>t mach<strong>in</strong>e as per RDSO Drg. No. SA 8800-01(Adv.) latest.<br />

122. Po<strong>in</strong>t connection for GRS 5E po<strong>in</strong>t mach<strong>in</strong>e complete as per RDSO Drg. No. SA 9001-02 latest.<br />

123. Electric Po<strong>in</strong>t & lock Detector with cross protection contacts as per RDSO Drg. No. SA 23331 (Adv.) latest with Detector slide slug to RDSO Drg. No.<br />

S-23385 (Adv) latest.<br />

124. Po<strong>in</strong>t Rodd<strong>in</strong>g connection for Ericson Electric Po<strong>in</strong>t mach<strong>in</strong>e as per RDSO Drg. No. RDSO/S/3191-92 alt. 5 latest.<br />

125. Lens Optical, Inside step without Hot Strip for long range colour light signal, 213 mm dia, 102 mm focal length „clear‟ as per IRS specn. No. IRS-S-<br />

7/92 & IRS-S-10 latest and RDSO Drg.No. RDSO-S-23069 (Adv.) latest.<br />

126. Lens Optical <strong>in</strong>side step Hot strip for long-range colour light signal, 213 mm dia. 102 mm focal length clear as per specn. No. IRS-S-7/92 & IRS-S-10<br />

with latest amendments & RDSO Drg. No. RDSO-S-23061/M (Adv.) latest.<br />

127. Lenses clear <strong>in</strong>side stepped spread light 213 mm dia x 102 mm focal length as per IRS Spec. No. IRS: S-7/92 & IRS - S - 10 with latest<br />

amendments and RDSO Drg. No. S-23062/M (Adv.) latest.<br />

128. Lens optical outside stepped for long range colour light signal, 140 mm dia. 13 mm focal length “RED” as per spec. No. IRS: S-7 /92 & IRS: S-10<br />

with latest amendments and RDSO Drg. No. S-23063/M (Adv.) latest.<br />

129. Lens Optical outside stepped for long range colour light signal, 140 mm dia 13 mm focal length „Yellow‟ as per IRS-S-10 10 with latest amendments<br />

and RDSO Drg. No. S-23064/M (Adv.) latest.<br />

130. Lens Optical outside step for long range colour light signal 140 mm dia 13 mm focal length „Green‟ as per spec. No. IRS: S-7/92 & IRS: S-10 10 with<br />

latest amendments and RDSO Drg. No. S-23065/M (Adv.) latest.<br />

131. Lens optical outside step 92 mm dia, 16 mm focal length „Lunar white‟ as per spec. No. IRS: S-7 /92 & IRS: S-10 with latest amendments and RDSO<br />

Drg. No. S-23422 (Adv.) latest.<br />

132. Lens optical <strong>in</strong>side step with molded prism for close up <strong>in</strong>dication 127 mm dia and 70 mm focal length „Clear‟ as per spec. No. IRS: S-7 /92 & IRS:<br />

S-10 with latest amendments and RDSO Drg. No. S-23421 (Adv.) latest.<br />

Contractor’s signature with stamp Page 30


133. Lens optical <strong>in</strong>side stepped „Clear‟ 101 mm dia as per specification No. IRS: S-7 /92 & IRS: S-10 with latest amendments and RDSO Drg. No. S-<br />

2743/M latest.<br />

134. Lamp Electric for Rly. Signall<strong>in</strong>g „Clear‟ 12 Volts. 33 watts. 3 p<strong>in</strong> double filament, double pole SL21 of Spec. No. IRS: S-57/93 with the latest<br />

amendments.<br />

135. Lamp Electric for Rly. Signall<strong>in</strong>g „Clear‟ 12 Volts. 25 watts, 3 p<strong>in</strong> double filament double pole SL17 of spec. No. IRS: S-57/93 with the latest<br />

amendments.<br />

136. Lamp Electric for Rly. Signall<strong>in</strong>g „Clear‟ 110 volts 25 watts 3 p<strong>in</strong> s<strong>in</strong>gle filament SL33 of Spec. No. IRS: S-57/93 with the latest amendments.<br />

137. Lamp Electric Triple pole for Railway Signall<strong>in</strong>g clear 12 V, 33 watt 3 P<strong>in</strong> Double filament SL35 or SL35-A or SL35-B of Specification No IRS: S-<br />

57/93 with the latest amendments.<br />

138. Lamp Electric for Rly. Signal<strong>in</strong>g „Clear‟ 12 V, 4 watt. S<strong>in</strong>gle filament SL 5 of spec. No. IRS: S-57/93 & IS 1901 with latest amendments.<br />

139. Deleted.<br />

140. Lamp Electric 110 V, 25 watt as per IS spec. No. IS-418.<br />

141. Lamp Electric 12 V, 1.2 watt as per IS Spec. No. IS-1901.<br />

142. Lamp Electric 12V, 2.4 watt as per IS Spec. No. IS-1901.<br />

143. Choke Type „B‟ hav<strong>in</strong>g annealed enameled copper wire, as per IRS Spec. No. IRS: S-65/83 with latest amendments.<br />

144. “Disc” Type Track Feed Resistance as per Drg. No. SA-20161/M (Adv.) to SA - 20166/M (Adv.).<br />

145. Surge Discharger Type „A‟ Non Rest orat<strong>in</strong>g type as per IRS: S-52/76 with latest amendments but without hard ware materials i.e. Bolts, Nuts,<br />

washer etc. and with connection cables and Alum<strong>in</strong>ium term<strong>in</strong>al lugs.<br />

146. Track feed battery charger to work on 110V AC for charg<strong>in</strong>g 1 or 2 or 3 or 4 lead acid cell of 40/80 AH used <strong>in</strong> track circuits as per IRS specification<br />

No. IRS-S-89-93 with latest amendments.<br />

147. Deleted.<br />

148. Battery chargers as per IRS Spec. No. IRS - S - 86/2000 with latest amendments.<br />

149. Voltage Stabilizer Ferro Resonant Type as per spec. No. IRS: S-74/89 with latest amendments.<br />

150. Inverter (Ferro resonant version) for Railway Signall<strong>in</strong>g Installations for „On L<strong>in</strong>e‟ applications as per IRS Specification No. IRS: S-82/92 with latest<br />

amendments.<br />

.151. DG sets 7.5 KVA s<strong>in</strong>gle phase with wall mount<strong>in</strong>g type controlled panel, subsidiary control panel for remote operation and battery charg<strong>in</strong>g dynamos<br />

arrangement as per IRS- specification No. IRS-S-69/86 with latest amendments. The BHP rat<strong>in</strong>g of eng<strong>in</strong>e should not be less than 15 BHP. The DG<br />

sets are to be supplied <strong>in</strong>corporat<strong>in</strong>g the diesel eng<strong>in</strong>e hav<strong>in</strong>g requisite type test approved from DRDE / DIGHI / PUNE or from National test houses.<br />

152. Deleted.<br />

153. Relay Group 3 Aspect Ma<strong>in</strong> signal plug <strong>in</strong> type with 100 term<strong>in</strong>al base plate (Complete with term<strong>in</strong>al connections and fix<strong>in</strong>g screws) consist<strong>in</strong>g of 13<br />

Nos. of DC neutral m<strong>in</strong>iaturized Relays conform<strong>in</strong>g to IRS: S-46 and complete with suitable visual <strong>in</strong>dication of similar to Siemens relay group NO.<br />

RS-SK-3525/46.<br />

154 Relay Group 2 Aspect Ma<strong>in</strong> Signal plug - <strong>in</strong> type with 100 term<strong>in</strong>al base plate (complete with term<strong>in</strong>al connections and fix<strong>in</strong>g screws) and Consist<strong>in</strong>g<br />

of 10 numbers of DC neutral m<strong>in</strong>iaturized relays conform<strong>in</strong>g to IRS Specification IRS: S-46 and complete with a Suitable visual <strong>in</strong>dications or similar<br />

to Siemens relay group No. RS-SK-3525/2.<br />

155. Relay group shunt signal plug <strong>in</strong> type with 100 term<strong>in</strong>al base plate (complete with term<strong>in</strong>al connections and fix<strong>in</strong>g screws) and consist<strong>in</strong>g of 13 Nos.<br />

of DG neutral M<strong>in</strong>iaturized relays conform<strong>in</strong>g to IRS Specification IRS:S-46 and complete with suitable visual <strong>in</strong>dications or similar to Siemens relay<br />

Group No. RE/SE/3525/67.<br />

156. Relay Route group plug <strong>in</strong> type with 100 term<strong>in</strong>al base plate complete with term<strong>in</strong>al connection and fix<strong>in</strong>g screws and consist<strong>in</strong>g of 5 Nos. of DC<br />

neutral m<strong>in</strong>iaturized relays. Nos. of m<strong>in</strong>iaturized <strong>in</strong>terlocked relay conform<strong>in</strong>g to IRS: S-46 and complete with suitable visual <strong>in</strong>dication or similar to<br />

Siemens Relay Group No. RS-SK-31/0002.<br />

157. Po<strong>in</strong>t group for panel, Siemens make ACI 24V relay.<br />

158. Relay, Fail safe Electronics Time Delay mounted on „Q‟ series relay base & covered with fixed tim<strong>in</strong>g of 120 seconds, confirm<strong>in</strong>g to IRS: S-61/81,<br />

IRS: S-34 & IRS: S-23. The <strong>in</strong>terlock<strong>in</strong>g code for this unit shall be AFGKY.<br />

159. Flasher Relay Siemens make as per draw<strong>in</strong>g no. RS SK 30/0098 for 110 V AC operations.<br />

160. Insulated Rod Jo<strong>in</strong>t 32 mm butt end as per RDSO‟S Drg. No. SA.3637/M (Adv.) latest.<br />

161. Insulation for Gauge tie plate (BG) complete with Insulat<strong>in</strong>g bush and washer each set compris<strong>in</strong>g of<br />

(a) Insulat<strong>in</strong>g Plate for <strong>in</strong>sulated Tie plate BG as per RDSO Drg. No. T-10372, 1 No.<br />

(b) Insulat<strong>in</strong>g bush<strong>in</strong>g for <strong>in</strong>sulated stretcher bar BG as per RDSO Drg. No. T-10368, 3 Nos.<br />

(c) Insulat<strong>in</strong>g washer for <strong>in</strong>sulated stretcher, bar BG as per RDSO Drg. No. T-10371, 6 Nos.<br />

162. Insulation for alter<strong>in</strong>g stretcher - bars (BG), each set compris<strong>in</strong>g of.<br />

(a) Insulat<strong>in</strong>g plate for alter<strong>in</strong>g <strong>in</strong>sulated stretcher bars BG as per RDSO Drg. No. T-10384, 2Nos.<br />

(b) Insulat<strong>in</strong>g bush<strong>in</strong>g for alter<strong>in</strong>g <strong>in</strong>sulated stretcher bars for BG as per RDSO Drg. No. T-10535, 4 Nos.<br />

163. Insulation for stretcher bars BG. Each set Compris<strong>in</strong>g of:<br />

(a) Insulat<strong>in</strong>g side plate for <strong>in</strong>sulated stretcher bars BG as per RDSO Drg. No. T-10367, 1 No.<br />

(b) Insulat<strong>in</strong>g bush<strong>in</strong>g for <strong>in</strong>sulated stretcher bars BG as per RDSO Drg. NO. T - 10368, 2 Nos.<br />

(c) Insulat<strong>in</strong>g washer for <strong>in</strong>sulated Stretcher bars BG as per RDSO Drg. No. T - 10371, 4 Nos.<br />

164. Insulated Rail Jo<strong>in</strong>t Nylon (Four channel Type) 60 kg. UIC complete as per RDSO Drg. No. SA 22181 (Adv.) latest.<br />

165. Insulated Rail Jo<strong>in</strong>t Nylon (Four channel Type) 52 kg. Complete as per RDSO Drg. No. SA 22101 (Adv.) latest without iron & steel parts.<br />

166. Insulated Rail Jo<strong>in</strong>t Nylon (Four Channel Type) 90 R complete as per RDSO Drg. No. SA-22111 (Adv.) latest without Iron and Steel parts.<br />

167. Insulated Rail Jo<strong>in</strong>t Nylon (Four Channel Type) 75 R complete as per RDSO Drg. No. SA - 22121 (Adv.) latest without iron & steel parts.<br />

168. Insulated Rail Jo<strong>in</strong>t Nylon (Four Channel Type) 60 R complete as per RDSO Drg. No. SA-22131 (Adv.) latest without iron & steel part.<br />

169. Insulated Rail jo<strong>in</strong>t fishplate for 52 kg as per RDSO Drg. No. S-22102 (Adv.) ALT-2 and for 90 R as per RDSO Drg. No. S-22112 (Adv.) ALT- 2.<br />

170. Rail Jo<strong>in</strong>t Insulated back<strong>in</strong>g plate (52 kg.) as per RDSO Drg. No. S-2107 (Adv.) latest.<br />

171. Rail jo<strong>in</strong>t Insulated Back<strong>in</strong>g plate „90 R‟ as per RDSO Drg. No. S-22117 (Adv.) latest.<br />

172. Rail jo<strong>in</strong>t Insulated ferrule as per RDSO Drg. No.22108 (adv.) latest.<br />

173. Channel P<strong>in</strong> s<strong>in</strong>gle Groove 7 mm dia (for 4 mm dia Bond wire) as per Drg. No. S-69/M.<br />

174. Bond wire clip (52 kg. - 90R Rails) as per RDSO Drg. No. S-22167 (Adv.) latest.<br />

175. Wire GI soft. 4 mm (8 SWG) as per IS spec. No.IS-280.<br />

176. Magneto Telephone Desk Type to IRS TC 36 - 85 with latest amendments.<br />

177. Multiway isolat<strong>in</strong>g term<strong>in</strong>al Blocks (Barrier type) as per IRS Specification No. IRS: S-70/82 with latest amendments.<br />

178. Wire Insulator as per IRS Specification No. IRS: S-47/74 with latest amendments.<br />

179. Light Unit CLS Lamp holder Unit (for Triple pole Lamp as per Drg. No. SA 2483 (Adv.) ALT.-1 Latest.<br />

Contractor’s signature with stamp Page 31


180. PVC <strong>in</strong>sulated armoured signall<strong>in</strong>g cable 2 core 2.5 sq. mm as per specification No. IRS-S-63/89 with latest amendments.<br />

181 Electric lever lock and circuit controller comb<strong>in</strong>e (DW) 40 mm stoke as per drg. No. SA 21201/M (adv.) latest.<br />

182. Electric po<strong>in</strong>t operat<strong>in</strong>g mach<strong>in</strong>e type Bsg to operate on 110V DC, haul<strong>in</strong>g <strong>in</strong>ternal lock<strong>in</strong>g non-trail able design (Siemens Type). As per Siemens<br />

specification and Drg. A.C immunity level & throw<strong>in</strong>g force as per IRS-S-24-90 with latest amendments.<br />

182 Key lock relay with different ward comb<strong>in</strong>ations (one extra set of ward plate for po<strong>in</strong>t mach<strong>in</strong>e to supplied with each relay) as per specification No.<br />

IRS-S-46.<br />

183. Relay, Non-AC Immune, plug -<strong>in</strong> type, Style „QN1‟, Neutral l<strong>in</strong>e, 24VDC 8F.8B contacts, front & back contacts metal to carbon with plug board,<br />

reta<strong>in</strong><strong>in</strong>g clip & connectors conform<strong>in</strong>g to BRS: 930A, IRS: S 34 & IRS: S 23. The <strong>in</strong>terlock<strong>in</strong>g code for this unit shall be ABCDF.<br />

184. Relay, Non-AC Immune, plug -<strong>in</strong> type, Style „QN1‟, Neutral l<strong>in</strong>e, 24VDC 12F.4B contacts, front & back contacts metal to carbon with plug board,<br />

reta<strong>in</strong><strong>in</strong>g clip & connectors conform<strong>in</strong>g to BRS: 930A, IRS: S 34 & IRS:S 23. The <strong>in</strong>terlock<strong>in</strong>g code for this unit shall be ABCDE.<br />

185. Relay, AC Immune, plug -<strong>in</strong> type, Style „QNA1‟, Neutral l<strong>in</strong>e, 24V DC, 8F.8B contacts, front & back contacts metal to carbon with plug board,<br />

reta<strong>in</strong><strong>in</strong>g clip & connectors conform<strong>in</strong>g to BRS: 931A, IRS: S 60, IRS: S 34 & IRS: S 23. The <strong>in</strong>terlock<strong>in</strong>g code for this unit shall be ABDGH.<br />

186. Relay AC Immune, plug -<strong>in</strong> type, Style „QNA1‟, Neutral l<strong>in</strong>e, 24V DC, 12F.4B contacts, front & back contacts metal to carbon with plug board,<br />

reta<strong>in</strong><strong>in</strong>g clip & connectors conform<strong>in</strong>g to BRS: 931A, IRS: S 60, IRS: S 34 & IRS: S 23. The <strong>in</strong>terlock<strong>in</strong>g code for this unit shall be ABDFH.<br />

187. Electric lamp filament switch<strong>in</strong>g unit for colour light signals, to specification No. RDSO / SPN / 158 / 2000.<br />

188. Relay, AC Immunized, DC shelf type, Neutral l<strong>in</strong>e tractate armature 1000 ohms, 6F/B contacts (non prov<strong>in</strong>g type), front contacts metal to carbon and<br />

back contacts metal to metal as per specification No. BS-1659 class „A‟, IRS: S 34 & IRS: S 23. (As applicable) along with AC immunity requirement<br />

as per Annexure “I”.<br />

189. Relay, AC Immunized, DC shelf type, Neutral l<strong>in</strong>e tractive armature 1000 ohms, 4F/B contacts (non proved type front contacts metal to carbon and<br />

back contacts metal to metal as per specification No. BS-1659 class „A‟, IRS: S 34 & IRS:S 23. (As applicable) along with AC immunity requirement<br />

as per Annexure “I”.<br />

190. Relay, AC Immunized, D.C shelf type, Neutral track tractive armature 9 ohms, 4F/B contacts (non proved type). Front contacts metal to carbon and<br />

back contacts metal to metal confirm<strong>in</strong>g to specification No. BS-1659 -1950 (upto amendment No. 3) RE specification No. RE/S&T/187/11 dt.<br />

14.8.68 IRS: S 34 & IRS: S 23. (as applicable).<br />

191. Relay, plug-<strong>in</strong> type, Style „ON‟ aspect. A.C lamp prov<strong>in</strong>g relay unit, slow release neutral l<strong>in</strong>e relay, metal to metal, 3F.3B contacts mounted <strong>in</strong> a m<strong>in</strong>i<br />

relay group hous<strong>in</strong>g or <strong>in</strong>dividual relay, complete with plug-board and connectors shall be suitable for work<strong>in</strong>g <strong>in</strong> series with the primary w<strong>in</strong>d<strong>in</strong>g of<br />

colour light signal transformer conform<strong>in</strong>g to IRS: S59 (110V AC / 12V AC) feed<strong>in</strong>g 25/33 watt signal lamps conform<strong>in</strong>g to IRS: S46, IRS: S34 & IRS:<br />

S23. The special <strong>in</strong>terlock<strong>in</strong>g code for this unit shall be CFKMY.<br />

192. Relay, plug-<strong>in</strong> type, Style „OFF‟ aspect. A.C lamp prov<strong>in</strong>g relay unit, slow release neutral l<strong>in</strong>e relay, metal to metal, 3F.3B contacts mounted <strong>in</strong> a m<strong>in</strong>i<br />

relay group hous<strong>in</strong>g or <strong>in</strong>dividual relay, complete with plug-board and connectors shall be suitable for work<strong>in</strong>g <strong>in</strong> series with the primary w<strong>in</strong>d<strong>in</strong>g of<br />

colour light signal transformer conform<strong>in</strong>g to IRS: S59 (110V AC / 12V AC) feed<strong>in</strong>g 25/33 watt signal lamps conform<strong>in</strong>g to IRS: S46, IRS: S34 & IRS:<br />

S23. The special <strong>in</strong>terlock<strong>in</strong>g code for this unit shall be CFJKN.<br />

193. Relay, plug-<strong>in</strong> type, Style „ROUTE‟ aspect. A.C lamp prov<strong>in</strong>g relay unit, slow release neutral l<strong>in</strong>e relay, metal to metal, 3F.3B contacts mounted <strong>in</strong> a<br />

m<strong>in</strong>i relay group hous<strong>in</strong>g or <strong>in</strong>dividual relay, complete with plug-board and connectors shall be suitable for work<strong>in</strong>g <strong>in</strong> series with the light<strong>in</strong>g circuit of<br />

the junction type route <strong>in</strong>dicator (5 lamps, 110V / 25 Watt, double pole, connected <strong>in</strong> parallel). Conform<strong>in</strong>g to IRS: S46, IRS: S34 & IRS: S23. The<br />

special <strong>in</strong>terlock<strong>in</strong>g code for this unit shall be CFKLY.<br />

194. Relay, DC polarized, 3 position, 77 ohms, 1N/1R contact metal to metal, center biased armature confirm<strong>in</strong>g to IRS-S-31-80, IRS-S-34 & IRS-S-23.<br />

195. Tag Block 200 way conform<strong>in</strong>g to specification No. IRS-S-77/91. With Drg. No. SA-24751.<br />

196. Tag Block 160 way conform<strong>in</strong>g to specification No. IRS-S-77/91. with Drg. No. SA-24752.<br />

197. Low ma<strong>in</strong>tenance lead acid stationary secondary cell as per IRS specification No. IRS-S-88/93, Nom<strong>in</strong>al voltage 2V, each of 80/40 AH with<br />

transparent conta<strong>in</strong>er for use of Railway signall<strong>in</strong>g and telecommunication applications.<br />

198. Dual bank battery charger 12V to 36V DC 1 Amp capacity complete with two banks of 9 Nos. each of tw<strong>in</strong> cells of 4V 12 AH capacity of 100 hrs. rate<br />

low ma<strong>in</strong>tenance lead acid batteries as per IRS- specification No. IRS-S-85/92 with latest amendments.<br />

199. Transformer 230V AC / 110V AC 1KVA as per IRS- specification No. IRS-S-72/88 with latest amendments.<br />

200. Po<strong>in</strong>t group for panel, Siemens make ACI 24V relay. Po<strong>in</strong>t group for panel, Siemens make ACI 24V relay.<br />

201. Transmitter & Receiver for handle type token less Daido block <strong>in</strong>strument suitable for RE area as per specification no. IRS: S-98/2001.<br />

202. SMPS based <strong>in</strong>tegrated power supply system (IPS) as per RDSO specifications No. RDSO/SPN/165/2000.<br />

203. Specifications for LED signal light<strong>in</strong>g unit as per RDSO specifications No. RDSO/SPN/153/2002.<br />

204. Specifications for Data logger as per RDSO specifications No. IRS: S-99/2001.<br />

Form - I<br />

TENDERER‟S SCHEME OF WORK AND TIME SCHEDULE IN TERMS OF PARA 7 OF INSTRUCTION TO TENDERER IN VOLUME I<br />

Sl.<br />

No.<br />

Particulars<br />

1 Trench<strong>in</strong>g and lay<strong>in</strong>g of cables.<br />

2 Cast<strong>in</strong>g of foundation for apparatus cases and erection of apparatus<br />

cases.<br />

3 Fix<strong>in</strong>g of term<strong>in</strong>al board, strips and shelves, fix<strong>in</strong>g of term<strong>in</strong>als etc.<br />

and term<strong>in</strong>ation of cables.<br />

4 Fix<strong>in</strong>g of equipment <strong>in</strong> apparatus cases and their wir<strong>in</strong>g.<br />

5 Fix<strong>in</strong>g of relay rack, C.T.Board<br />

6 Fix<strong>in</strong>g relays, fuses etc. and complete <strong>in</strong>ternal wir<strong>in</strong>g.<br />

7 Installation & commission<strong>in</strong>g of Power supply equipments.<br />

8 Earth<strong>in</strong>g of equipment.<br />

9 Pa<strong>in</strong>t<strong>in</strong>g and letter<strong>in</strong>g.<br />

10 Track circuit<strong>in</strong>g work.<br />

11 Other Misc. works.<br />

12 Preparation & submission of draw<strong>in</strong>gs.<br />

13 Test<strong>in</strong>g of station.<br />

14 Commission<strong>in</strong>g of station.<br />

Time <strong>in</strong> months from the date of<br />

issue of Letter of acceptance of<br />

tender.<br />

1 2 3 - -<br />

Contractor’s signature with stamp Page 32


DECLARATION<br />

We hereby declare that <strong>in</strong> quot<strong>in</strong>g the above price, we have taken <strong>in</strong>to account the entire credit <strong>in</strong>puts available under the MODVAT Scheme <strong>in</strong>troduced w.e.f.<br />

1.3.1986.<br />

We further agree to pass on such additional duties as set offs as may become available <strong>in</strong> future <strong>in</strong> respect of all the <strong>in</strong>puts used <strong>in</strong> the manufacture on the<br />

f<strong>in</strong>al product on the date of supply under the MODVAT Scheme by the way of reduction of prices and advice the purchase accord<strong>in</strong>gly.<br />

VOLUME – II<br />

CHAPTER –I<br />

INSTRUCTIONS TO TENDERERS AND CONDITIONS OF TENDERING<br />

PARA NO.<br />

SUBJECT<br />

Annexure-1<br />

Check List for submission of Tender Document<br />

1.0 General Instructions<br />

2.0 Def<strong>in</strong>itions and Interpretations<br />

3.0 Submission of Offers/ Bids<br />

3.11 System of Tender<strong>in</strong>g<br />

3.11.1 S<strong>in</strong>gle Packet System<br />

3.11.1 (a) Submission of S<strong>in</strong>gle Packet Tender<br />

3.11.1 (b) Open<strong>in</strong>g of S<strong>in</strong>gle Packet Tender<br />

3.11.2 Two Packet System<br />

3.11.2 (a) Submission of Two Packet Tender<br />

3.11.2 (b) Open<strong>in</strong>g of Two Packet Tender<br />

3.11.3 Validity of Offer<br />

3.12 Attestation of alterations<br />

3.13 Scribbl<strong>in</strong>g and stipulation of special conditions by tenderers<br />

3.14 Non-transferability and non-refundability<br />

3.15 Rates to be quoted <strong>in</strong> figures and words<br />

3.16 Schedule of Rates (SOR) items<br />

3.17 Non – Schedule of Rates (NS) items<br />

3 .18 SOR items- not <strong>in</strong>cluded <strong>in</strong> contract/ discrepancies there <strong>in</strong><br />

4.0 Inclusiveness of taxes & royalty etc.<br />

4.2 Prices to take <strong>in</strong>to account MODVAT scheme<br />

5.0 Earnest Money<br />

5.4 Mode of deposit of Earnest Money<br />

6.0 Need of tenderer‟s careful study of tender & site conditions<br />

7.0 Period of completion<br />

8.0 Submission of constitution and power of attorney<br />

9.0 Fluctuation of market rates<br />

10.0 Authority for acceptance<br />

11.0 Modification <strong>in</strong> quantity <strong>in</strong> scope of work<br />

12.0 Purchase of other documents<br />

13.0 Wrong <strong>in</strong>formation by tenderer<br />

14.0 Cancellation of tender <strong>in</strong> special circumstances<br />

15.0 Testimonial of Experience & other Credentials<br />

16.0 Eligibility criteria<br />

16.1 Solvency Certificate<br />

16.2 Total contract amount received<br />

16.3 Work Experience<br />

16.4 Mean<strong>in</strong>g of Similar Work<br />

17.0 Execution of work of new technology like IPS, Axle Counter, BPAC & Data Logger etc.<br />

18.0 Eng<strong>in</strong>eer<strong>in</strong>g Organization<br />

19.0 Construction Mach<strong>in</strong>ery<br />

20.0 Credentials<br />

21.0 Rates dur<strong>in</strong>g negotiation<br />

22.0 Advice of cancellation of documents by contractor<br />

23.0 Agreement<br />

24.0 Other conditions of rejection<br />

25.0 Labour license<br />

26.0 Arrangements for permits or licenses<br />

27.0 Errors, omissions and discrepancies<br />

28.0 Preference to Public sector undertak<strong>in</strong>g<br />

29.0 Negotiation<br />

30.0 Tenderer‟s Address<br />

31.0 Procurement of specifications etc.<br />

32.0 Enclosures<br />

PARA NO.<br />

1.0 Tender documents<br />

CHAPTER – II<br />

SPECIAL CONDITIONS OF CONTRACT<br />

SUBJECT<br />

Contractor’s signature with stamp Page 33


1.1 The follow<strong>in</strong>g documents will form part of the contract<br />

1.2 Stipulations, which prevail<br />

2.0 Railway offices & addresses for correspondence<br />

3.0 Force ampere<br />

4.0 Agreement<br />

5.0 Security Deposit<br />

5.3 Refund of Security Deposit<br />

6.0 Performance Guarantee<br />

7.0 Programme of work<br />

7.8 Determ<strong>in</strong>ation of Contract ow<strong>in</strong>g to default of contractor<br />

7.9 Contractor‟s liabilities for costs and damages withhold<strong>in</strong>g and lien <strong>in</strong> respect of sums claimed<br />

7.9.2 Lien <strong>in</strong> respect of other contracts<br />

7.9.3 Contractor‟s liabilities for cost and damages<br />

7.10 Penalty for delay <strong>in</strong> completion<br />

7.11 Extension of time<br />

8.0 Stores to be supplied by Railway<br />

8.2 Recovery of cost <strong>in</strong> respect of excess unused Railway materials not returned by the contractor<br />

8.3 No extra charges towards carriage etc.<br />

8.4 Disposal of empty cable drums<br />

8.5 Indemnity bond and stand<strong>in</strong>g bank guarantee aga<strong>in</strong>st materials supplied to contractor<br />

9.0 Stores to be supplied by contractor<br />

9.2 Instruments and forms to be arranged by the contractor<br />

9.3 Inspection of materials<br />

9.4 Inspection Charges<br />

9.5 Test<br />

10.0 Other Railway stores and mode of recovery from bill<br />

11.0 Figures dimensions etc.<br />

12.0 Use of <strong>railway</strong> land<br />

12.2 Use of electricity<br />

13.0 Water charges<br />

14.0 Cess charges<br />

15.0 Deduction for <strong>in</strong>come tax<br />

16.0 Care of staff<br />

17.0 Damage by accident or floods or tides<br />

18.0 Inspection<br />

18.4 Inspection of foundation<br />

18.5 Inspection of trenches, chases and fill<strong>in</strong>g<br />

19.0 Storage of materials<br />

20.0 Variation <strong>in</strong> Schedule Quantity<br />

21.0 Right of <strong>railway</strong> to keep back from the contract any portion of work<br />

22.0 Mean<strong>in</strong>g and <strong>in</strong>terpretation by <strong>railway</strong> to be f<strong>in</strong>al<br />

23.0 Insurance<br />

24.0 Safety measures<br />

24.4 Indemnification <strong>in</strong> event of accident out of failure of contractor<br />

24.5 Blast<strong>in</strong>g of rocks<br />

24.6 Safety for passenger while work<strong>in</strong>g by contractor <strong>in</strong> station limit<br />

24.7 Avoid<strong>in</strong>g <strong>in</strong>fr<strong>in</strong>gement of Indian Railway Act<br />

24.8 Recovery of cost of safety of track affected<br />

24.9 Presence of supervisors while <strong>in</strong>terfer<strong>in</strong>g with work<strong>in</strong>g gears<br />

24.10 Programm<strong>in</strong>g of work to avoid <strong>in</strong>terference with tra<strong>in</strong> movements<br />

25.0 Site clearance<br />

26.0 Measurement<br />

27.0 Unit price to be firm and <strong>in</strong>clusive of all taxes<br />

27.2 Prices to <strong>in</strong>clude element such as<br />

27.3 Schedule `B‟ if required<br />

27.4 Negotiation of rates for items not <strong>in</strong>cluded <strong>in</strong> schedule-A-I and schedule - A-II<br />

28.0 On account payment<br />

28.2 Separate bill for item/ sub item<br />

28.3 On account payment for supply of items<br />

28.4 On account payment for <strong>in</strong>stallation portion of works <strong>in</strong>clud<strong>in</strong>g supply items not covered <strong>in</strong> Para 28.3 above<br />

28.5 Not to exceed 95% of total payment<br />

29.0 F<strong>in</strong>al payment<br />

30.0 Submission of bills<br />

31.0 Guarantee/ Ma<strong>in</strong>tenance<br />

31.4 Indemnify<strong>in</strong>g Railway aga<strong>in</strong>st losses <strong>in</strong>curred<br />

32.0 Amendments/ changes <strong>in</strong> I.P. or delay <strong>in</strong> supply of materials by Railways.<br />

33.0 Settlement of disputes - Indian Railway Arbitration Rules (ref. GCC para 63 & 64) Latest - Matters f<strong>in</strong>ally<br />

determ<strong>in</strong>ed by the Railway.<br />

33.1 Demand for arbitration<br />

Contractor’s signature with stamp Page 34


33.2 Obligations dur<strong>in</strong>g pendency of arbitration<br />

33.3 Appo<strong>in</strong>tment of arbitral tribunal & arbitral award<br />

33.3.1 Appo<strong>in</strong>tment of arbitral tribunal<br />

33.3.2 Arbitral award<br />

34.0 Def<strong>in</strong>ition of supervisors / workmen<br />

35.0 Tenderers to advice strength of staff<br />

36.0 Mobilisation advance<br />

37.0 Price variation clause<br />

VOLUME-II<br />

CHAPTER - I<br />

Check List for submission of Tender Document<br />

SN. Description Reference Complied<br />

Yes<br />

1 Offer Letter, Complete. Volume-I<br />

No<br />

ANNEXURE- 1<br />

2 Earnest Money: In prescribed form. Para 5.0 of Vol-II, Chap-I<br />

3 All Documents are submitted with Orig<strong>in</strong>al/ Attested<br />

copies.<br />

Para 3.6 of Vol-II, Chap-I<br />

4 Tender Offer is valid for a period as stipulated <strong>in</strong><br />

Tender Notice.<br />

Para 3.11.3 of Vol-II,<br />

Chap-I<br />

5 Corrections, erasures and alterations made have been<br />

attested.<br />

Para 3.12 of Vol-II, Chap-I<br />

6 Scribbl<strong>in</strong>g, stipulations of conditions & List of Para 3.13, 6.0 of Vol-II,<br />

deviations, if any <strong>in</strong> separate letter.<br />

Chap-I<br />

7 Rates & Costs are Quoted <strong>in</strong> Figure & Words as below:<br />

Para 3.15, 3.16 & 3.17 Vol-<br />

(a) For SOR Items (Schedule A-I): Percentage Rates &<br />

Costs are Quoted Chapter wise <strong>in</strong> „Abstract Sheet”. II, Chapter-I<br />

(b) For Non-SOR Items (Schedule A-II): Unit Rates &<br />

Costs are Quoted item wise aga<strong>in</strong>st respective NS<br />

items & <strong>in</strong> “Abstract Sheet”.<br />

8 Tender is be<strong>in</strong>g submitted with<strong>in</strong> specified date and<br />

time as per Tender Notice.<br />

Para 3.2 of Vol-II, Chap-I<br />

9 Tender is submitted <strong>in</strong> TWO copies & each page of<br />

Tender Document has been duly signed.<br />

Para 3.8 of Vol-II, Chap-I<br />

10 Rates quoted are <strong>in</strong>clusive of all Taxes, Levies,<br />

Royalties etc.<br />

Para 4.0 of Vol-II, Chap-I<br />

11 Careful Study of Tender paper & Site Conditions. Para 6.0 of Vol-II, Chap-I<br />

12 Tenderer‟s scheme of work and Time Schedule <strong>in</strong><br />

Form-1 of Vol (I)<br />

Para 7.3 of Vol-II, Chap-I<br />

13 Constitution of firm and Power of attorney & submission Para 8.0, 20 (a) of Vol-II,<br />

of Partnership deed/affidavit of proprietorship.<br />

Chap-I<br />

14 All the <strong>in</strong>formation & support<strong>in</strong>g documents/certificates Para 13.0 of Vol-II, Chap-I<br />

submitted with Tender Offer are verified & correct<br />

15 Solvency certificate: Para 16.1 Vol-II, Chap-I<br />

16 Total Contract Amount received: Para 16.2(a), 16.2(b)(i) &<br />

16.2(b)(ii) of Vol-II, Chap-I<br />

(a) An Attested certificate from the Employer/Client.<br />

(b) Audited balance sheet duly certified by Chartered<br />

Accountant.<br />

17 Certificate of Similar works executed.<br />

Para 16.3 of Vol-II, Chap-I<br />

18 Commitment <strong>in</strong> respect of execution of work of new<br />

technology by Orig<strong>in</strong>al manufacturer.<br />

Para 17.0 of Vol-II, Chap-I<br />

19 Details of Eng<strong>in</strong>eer<strong>in</strong>g Organisation.<br />

Para 18.0 of Vol-II, Chap-I<br />

20 Details of Construction Mach<strong>in</strong>ery.<br />

Para 19.0 of Vol-II, Chap-I<br />

21 Tenderer's credentials. Para 20.0 of Vol-II, Chap-I<br />

22 Details of Works <strong>in</strong> hand.<br />

Para 20.0(e) of Vol-II,<br />

Chap-I<br />

23 Para-wise compliance to Tender Conditions. Para 6.0 & 24.0 of Vol-II,<br />

Chap-I<br />

24 Any other <strong>in</strong>formation desired to be submitted by the<br />

tenderer.<br />

Contractor’s signature with stamp Page 35


Note: - The details given <strong>in</strong> the above Check List for submission of Tender Offer/ Bid is only for the purpose of provid<strong>in</strong>g guidance to the Tenderer and is not<br />

exhaustive. The Tenderer shall check thoroughly List of the documents etc. required to be submitted along with Tender Offer/ Bid and shall submit<br />

the same as per Tender Document.<br />

VOLUME - II<br />

CHAPTER - I<br />

INSTRUCTIONS TO TENDERERS & CONDITIONS OF TENDERING<br />

1.0 GENERAL INSTRUCTIONS<br />

1.1 The Chief Project Manager, Railway Electrification, Near Hyderabad Bhavan Secunderabad-500 071 , <strong>in</strong>vites sealed tenders on behalf of<br />

President of India, for the Signall<strong>in</strong>g work as mentioned <strong>in</strong> Volume -I.<br />

1.2 The General Conditions of Contract of Zonal Railway applicable to the section of work, Special Conditions of Contract, Instructions to<br />

Tenderers and conditions of Tender, Technical Supplement & Specifications, Schedules of Work <strong>in</strong>clud<strong>in</strong>g all Annexures & Forms etc.<br />

shall, hereafter, be collectively referred to as the "Tender Documents".<br />

1.3 Any clarifications required by the Tenderer may be obta<strong>in</strong>ed from the Dy Chief Signal & Telecommunication Eng<strong>in</strong>eer, Railway<br />

1.4 Electrification, Near Hyderabad Bhavan, Secunderabad-500 071 ,or his successor/ nom<strong>in</strong>ee.<br />

1.4 The Tenderer shall submit the Tender offer along with the Check List duly filled as given <strong>in</strong> Annexure-1 at the beg<strong>in</strong>n<strong>in</strong>g of Chapter-I<br />

ofVolume-II, to ensure that all required support<strong>in</strong>g documents have been <strong>in</strong>cluded <strong>in</strong> the Tender Offer.<br />

2.0 DEFINITIONS AND INTERPRETATIONS<br />

The follow<strong>in</strong>g terms wherever occurr<strong>in</strong>g <strong>in</strong> the tender Documents and wherever used throughout the execution of the work, by Central<br />

Organisation, Railway Electrification, shall, unless excluded by or repugnant to the context, have the mean<strong>in</strong>g attributed thereto as<br />

follows:-<br />

"CONTRACT"‚ shall mean the Contract result<strong>in</strong>g from the acceptance by the Purchaser of this Tender whether <strong>in</strong> whole or <strong>in</strong> part.<br />

"CONTRACTOR"‚ shall mean the <strong>in</strong>dividual, sole proprietor or partnership firm consist<strong>in</strong>g of several named partners or are <strong>in</strong> any<br />

company <strong>in</strong>corporated under Indian Company Act, who enters <strong>in</strong>to the contract with the Railway and shall <strong>in</strong>clude their authorised<br />

executors, adm<strong>in</strong>istrators, successors and permitted assigns.<br />

"CONTRACTOR‟S REPRESENTATIVE"‚ shall mean a person <strong>in</strong> supervisory capacity who shall be so declared by the Contractor and who<br />

shall be authorized under a duly executed power of attorney to receive materials issued by the Purchaser to the Contractor for the works.<br />

He shall be responsible for proper execution of works at each or all places and shall take orders from Purchaser's Eng<strong>in</strong>eers and carry out<br />

the same.<br />

"ENGINEER"‚ shall mean the Divisional Signal & Telecom. Eng<strong>in</strong>eer or the Assistant Executive Signal & Telecom. Eng<strong>in</strong>eer <strong>in</strong> executive<br />

charge of the Railway Electrification works and shall <strong>in</strong>clude the superior officers of the Railway Electrification Project. He is responsible<br />

for ensur<strong>in</strong>g that all field works covered by the contract are carried out <strong>in</strong> accordance with approved designs, draw<strong>in</strong>gs and specifications<br />

and conditions of contract as agreed to. He is also responsible for prices and terms of payment.<br />

"ENGINEER'S REPRESENTATIVE"‚ shall mean the Sr. Section/ Section/ Jr. Eng<strong>in</strong>eer <strong>in</strong> direct charge of the works of Signal & Telecom.<br />

department of Railway Electrification Project.<br />

"EQUIPMENT"‚ shall mean all or any equipment considered necessary by the Purchaser's Eng<strong>in</strong>eers for the satisfactory operation, as a<br />

whole, of the <strong>in</strong>stallations.<br />

"GENERAL MANAGER"‚ shall mean the officer <strong>in</strong> Adm<strong>in</strong>istrative charge of Railway Electrification and shall mean and <strong>in</strong>clude the officers<br />

to whom the functions are delegated.<br />

CHIEF ENGINEER” shall mean the Dy Chief Signal & Telecom Eng<strong>in</strong>eer, Railway Electrification, Secunderabad and shall mean & <strong>in</strong>clude<br />

officers to whom the functions are delegated.<br />

“DIVISIONAL RAILWAY MANAGER” shall mean head of the project i.e. Chief Project Manager and shall mean & <strong>in</strong>clude officers to whom<br />

the functions are delegated.<br />

"MATERIALS"‚ shall mean all equipments, components, fitt<strong>in</strong>gs and other materials <strong>in</strong>clud<strong>in</strong>g raw materials required to complete the work.<br />

"PURCHASER"‚ shall mean the President of India act<strong>in</strong>g through his accredited officers or any one of them. The Chief Project Manager of<br />

the works of Signal & Telecom. department of Railway Electrification shall be deemed to be one of such accredited officers.<br />

"PURCHASER`S ENGINEERS"‚ shall mean the Chief Project Manager / Dy. Chief Signal & Telecom. Eng<strong>in</strong>eer of Railway Electrification<br />

Project will decide all matters relat<strong>in</strong>g to design, manufacture, and <strong>in</strong>stallation and commission<strong>in</strong>g of the plants and equipments at site.<br />

"RAILWAY"‚ shall mean the President of the Republic of India or the Adm<strong>in</strong>istrative Officers of the Railway Electrification or of the<br />

successor Railway authorized to deal with any matters which these presents are concerned, on his behalf.<br />

"SITE"‚ shall mean the areas to be taken up by the permanent works, together with any other area or areas as shall be determ<strong>in</strong>ed by the<br />

Purchaser's Eng<strong>in</strong>eers, which may be placed at the disposal of the Contractor for the purpose of the contract and also such area or areas<br />

used for store yards, works yards or workshop <strong>in</strong> proximity of the works as the Purchaser's Eng<strong>in</strong>eers may have authorized as an<br />

extension of the site, irrespective of the terms and conditions under which they are occupied by the Contractor.<br />

"TENDERER"‚ shall mean <strong>in</strong>dividual, sole proprietor or partnership firm consist<strong>in</strong>g of several named partners or any company <strong>in</strong>corporated<br />

under Indian Company Act, who tenders for the works with a view to execute the works on contract with the Railway and shall <strong>in</strong>clude their<br />

personal representatives, successors and permitted assigns.<br />

"WORK OR WORKS"‚ shall mean the works to be executed <strong>in</strong> accordance with the Contract, which shall <strong>in</strong>clude all or any of the items of<br />

the work for which the Tenderer/ Contractor has Tendered/contracted accord<strong>in</strong>g to the Specifications, Draw<strong>in</strong>gs and Annexures hereto<br />

annexed and Schedules or to be implied there from, or <strong>in</strong>cidental thereto or to be hereafter specified or required <strong>in</strong> such explanatory<br />

<strong>in</strong>structions and draw<strong>in</strong>gs, be<strong>in</strong>g <strong>in</strong> conformity with the orig<strong>in</strong>al Specifications, Draw<strong>in</strong>gs, Annexures and Schedules and also such<br />

<strong>in</strong>structions and draw<strong>in</strong>gs additional to the aforementioned as may from time to time be issued by the Purchaser's Eng<strong>in</strong>eer dur<strong>in</strong>g the<br />

progress of the contracted work.<br />

"WRITING"‚ <strong>in</strong>cludes all matters written, type written or pr<strong>in</strong>ted either <strong>in</strong> whole or <strong>in</strong> part.<br />

3.0 SUBMISSION OF OFFERS/ BIDS<br />

3.1.1 Tender enclosed <strong>in</strong> sealed cover should be super scribed as “Tender Bid for work “------------------------------------------------<br />

-------------” and bear<strong>in</strong>g the “Tender Number” and “Date of clos<strong>in</strong>g/open<strong>in</strong>g” must be sent through registered post to the<br />

address of Dy Chief Signal & Telecomm. Eng<strong>in</strong>eer, Railway Electrification, Near Hyderabad Bhavan, Secunderabad, -<br />

Contractor’s signature with stamp Page 36


500071, so as to reach his office not later than the date and the time as mentioned <strong>in</strong> the tender notice or deposited <strong>in</strong><br />

Hyderabad bhavan, Secunderabad, -500071.<br />

3.1 The box will be sealed at specified hours on the date mentioned <strong>in</strong> the Tender Notice.<br />

3.2 Tender Offers received after the stipulated time and date as specified <strong>in</strong> Tender Notice shall not be considered and will be summarily rejected.<br />

3.3 Any Tender delivered or sent otherwise will be at the risk of Tenderer.<br />

3.4 The Tender Box will be sealed at specified hours on the date Mentioned <strong>in</strong> the Tender Notice.<br />

3.5 In case the date of open<strong>in</strong>g happens to be a holiday, the Tenders will be received and opened at the same time on the next work<strong>in</strong>g day.<br />

3.6 All offers shall be either type written or written neatly <strong>in</strong> <strong>in</strong>delible <strong>in</strong>k. Each page of the offer must be numbered consecutively. A reference<br />

to total number of pages compris<strong>in</strong>g the offer must be made at the top right hand corner of the top page. All the support<strong>in</strong>g documents<br />

should be submitted either <strong>in</strong> orig<strong>in</strong>al or duly attested by Gazetted Officer of Govt. of India or Notary unless stated otherwise <strong>in</strong> these<br />

documents. The orig<strong>in</strong>al documents shall be produced for verification whenever called for.<br />

3.7 The tenderer shall submit his tender <strong>in</strong> TWO copies. Each copy of the tender shall be complete <strong>in</strong> all respect. The copies should be<br />

marked “ORIGINAL”, and “DUPLICATE”. The DUPLICATE copy of the tender shall be replica of the ORIGINAL copy <strong>in</strong> all respects<br />

except as specified <strong>in</strong> the paragraph below. The tenderer may submit his tender on his own paper, but he shall strictly adhere to the Forms<br />

for Tender mentioned <strong>in</strong> this Tender Document.<br />

3.8 The “ORIGINAL” and “DUPLICATE” copies of the tender papers duly signed <strong>in</strong> <strong>in</strong>k by the tenderer, on each page <strong>in</strong>clud<strong>in</strong>g clos<strong>in</strong>g page,<br />

<strong>in</strong> token of his hav<strong>in</strong>g studied the tender papers carefully, shall be attached with the tenders.<br />

3.9 The Orig<strong>in</strong>al copy of the Cash Receipt or Demand Draft or Deposit Receipt for Earnest Money shall be attached <strong>in</strong> the ORIGINAL copy of<br />

the Tender. True copy of the Cash Receipt or Demand Draft or Deposit Receipt shall be enclosed <strong>in</strong> the DUPLICATE copy of the Tender<br />

Document.<br />

3.10 The Tender may be either S<strong>in</strong>gle Packet system or Two Packet system. The mode and packet system of tender<strong>in</strong>g is as specified <strong>in</strong><br />

Tender Notice.<br />

3.11 SYSTEM OF TENDERING<br />

3.11.1 S<strong>in</strong>gle Packet system<br />

(a) Submission of S<strong>in</strong>gle Packet Tender:<br />

The Tender shall be submitted <strong>in</strong> ONE PART (both Credential Bid and Price Bid comb<strong>in</strong>ed as S<strong>in</strong>gle Bid, hereby called as Tender Bid) <strong>in</strong><br />

sealed S<strong>in</strong>gle envelope. This envelope should be super scribed as “Tender Bid for work “-----------------------------------------------------------” and<br />

bear<strong>in</strong>g the “tender number” and “date of clos<strong>in</strong>g/ open<strong>in</strong>g” <strong>in</strong> bold letters. The “Tender Bid” should conta<strong>in</strong> Earnest Money and other<br />

details duly supported by copies of certificates attested by a Notary or Gazetted Officer work<strong>in</strong>g under Government of India as mentioned<br />

below :-<br />

i) Offer Letter, duly completed. (Volume-I)<br />

ii) Rate and Price of each item Quoted exactly accord<strong>in</strong>g to the Proforma and Schedule of Quantities. (Para- 3.15, 3.16 & 3.17 of<br />

Chap-I)<br />

iii) Earnest Money: In prescribed form. (Para 5.0 of Chap-I)<br />

iv)<br />

Solvency Certificate: Duly attested by Notary or Gazetted Officer of Government of India. (Para of 16.1 Chap-I)<br />

v) Total Contract Amount received: (Para 16.2 of Chap-I)<br />

(a) An Attested certificate from the Employer/ Client. (Para 16.2(b) (i) of Chap-I)<br />

(b) Audited balance sheet duly certified by Chartered Accountant. (Para 16.2(b) (ii) of Chap-I)<br />

vi)<br />

vii)<br />

Constitution of Firm and Power of Attorney (Para 8.0 of Chap-I)<br />

Careful Study of Tender Paper & Site Condition & List of deviations, if any. (Para 6.0, 3.13 of Chap-I)<br />

viii) Tenderer's Credentials. (Para 20.0 of Chap-I).<br />

ix)<br />

Commitment <strong>in</strong> respect of execution of work of new technology by Orig<strong>in</strong>al Manufacturer. (Para 17.0 of Chap-I).<br />

x) Similar Works executed. (Para 16.3 of Chap-I)<br />

xi) Works <strong>in</strong> hand. (Para 20.0 (e) of Chap-I)<br />

xii) Eng<strong>in</strong>eer<strong>in</strong>g Organisation. (Para 18.0 of Chap-I)<br />

Contractor’s signature with stamp Page 37


xiii) Construction Mach<strong>in</strong>ery. (Para 19.0 of Chap-I)<br />

xiv)<br />

xv)<br />

xvi)<br />

Tenderer‟s Scheme of Work and Time Schedule (Para 7.3 of Chap-I)<br />

Any other <strong>in</strong>formation required as per Tender Document.<br />

Any other <strong>in</strong>formation as desired to be submitted by the tenderer.<br />

(b)<br />

Open<strong>in</strong>g of S<strong>in</strong>gle Packet Tender:<br />

The Tenderer‟s Bid will be opened at the time & date of open<strong>in</strong>g of the tender given <strong>in</strong> the Tender Notice <strong>in</strong> presence of such Tenderers/<br />

Representatives who choose to be present.<br />

3.11.2 Two Packet System<br />

(a) Submission of Two Packet Tender:<br />

The Tender shall be submitted <strong>in</strong> TWO PARTS, the “Credential Bid” (Techno -commercial Bid) as Part-I and the “Price Bid” as Part-II. Both<br />

Bids shall be sealed <strong>in</strong> separate envelops marked as part-I and part-II respectively, and both envelopes put and sealed <strong>in</strong> one envelope.<br />

Both the envelopes should bear the tender number, its description and date of clos<strong>in</strong>g/ open<strong>in</strong>g.<br />

(1) The Credential Bid (Part-I) under no circumstances should conta<strong>in</strong> the rates offered, otherwise the tender shall be summarily<br />

rejected. This envelope should be marked as “Credential Bid” along with tender number and its description <strong>in</strong> bold letters and sealed.<br />

The “Credential Bid” (Part-I) should conta<strong>in</strong> Earnest Money and other details duly supported by copies of certificates attested by a Notary<br />

or an Gazetted Officer work<strong>in</strong>g under Government of India, as mentioned below :-<br />

i) Offer Letter duly completed. (Volume-I)<br />

(ii) For Credential Bid <strong>in</strong> Two Packet System Rate and Price of each item aga<strong>in</strong>st schedule of Quantities shall be kept<br />

“BLANK”.<br />

iii)<br />

Earnest Money: In prescribed form. (Para 5.0 of Chap-I)<br />

iv)<br />

Solvency Certificate: Duly attested by Notary or Gazetted Officer of Government of India. (Para of 16.1 Chap-I)<br />

v) Total Contract Amount received: (Para 16.2 of Chap-I)<br />

(a) An Attested certificate from the Employer/ Client. (Para 16.2(b) (i) of Chap-I)<br />

(b) Audited balance sheet duly certified by Chartered Accountant. (Para 16.2(b) (ii) of Chap-I)<br />

vi)<br />

vii)<br />

Constitution of Firm and Power of Attorney. (Para 8.0 of Chap-I)<br />

Careful Study of Tender Paper & Site Condition & List of deviations, if any (Para 6.0, 3.13 of Chap-I)<br />

viii) Tenderer's Credentials.<br />

(Para 20.0 of Chap-I).<br />

ix)<br />

Commitment <strong>in</strong> respect of execution of work of new technology by Orig<strong>in</strong>al Manufacturer. (Para 17.0 of Chap-I).<br />

x) Similar Works executed. (Para 16.3 of Chap-I)<br />

xi) Works <strong>in</strong> hand. (Para 20.0 (e) of Chap-I)<br />

xii) Eng<strong>in</strong>eer<strong>in</strong>g Organisation.<br />

(Para 18.0 of Chap-I)<br />

xiii) Construction Mach<strong>in</strong>ery. (Para 19.0 of Chap-I)<br />

xiv) Tenderer‟s Scheme of Work and Time Schedule. (Para 7.3 of Chap-I)<br />

xv) Any other <strong>in</strong>formation required as per Tender Document.<br />

xvi) Any other <strong>in</strong>formation desired to be submitted by the tenderer.<br />

(2) The "Price Bid (Part–II)” should conta<strong>in</strong> only the Rate and Price of each item quoted exactly accord<strong>in</strong>g to the Proforma and Schedule of<br />

Quantities.<br />

(Para- 3.15, 3.16 & 3.17 of Chap-I)<br />

(b)<br />

(i)<br />

Open<strong>in</strong>g of Two Packet Tender<br />

The Tenderer‟s Credential Bid (Part-I) will be opened at the time & date of open<strong>in</strong>g of the tender given <strong>in</strong> the Tender Notice <strong>in</strong> presence of<br />

such Tenderers/ Representatives who choose to be present.<br />

(ii)<br />

After scrut<strong>in</strong>iz<strong>in</strong>g Credential Bid, Price Bid (Part­ II) will be opened on a subsequent date only for those Tenderers who qualify <strong>in</strong><br />

“Credential Bid (Part-I)”.<br />

(iii)<br />

The date of open<strong>in</strong>g of Price Bid (part-II) will be advised <strong>in</strong> due course.<br />

(iv)<br />

Price Bid (part-II) envelops of those Tenderers who are not found to be eligible, will not be opened and will be destroyed.<br />

Contractor’s signature with stamp Page 38


3.11.3 Validity of Offer<br />

The tenderer shall keep the offer open for a m<strong>in</strong>imum period as specified <strong>in</strong> Tender Notice from the date of open<strong>in</strong>g of tender. With<strong>in</strong> this<br />

period, the tenderer can not withdraw his offer subject to the period be<strong>in</strong>g extended further if required by mutual agreement from time to<br />

time. Any contravention of this condition will make the tenderer liable for forfeiture of his Earnest Money.<br />

3.12 Attestation of alterations<br />

Tender conta<strong>in</strong><strong>in</strong>g erasures and alteration on the tender documents are liable to be rejected. Any correction made by the Tenderer/<br />

Tenderers <strong>in</strong> his/ their entries must be attested by him/ them. Use of eraser <strong>in</strong>k (white fluid) for corrections made <strong>in</strong> rates and/ or any other<br />

<strong>in</strong>formation is not acceptable.<br />

3.13 Scribbl<strong>in</strong>g and stipulation of special conditions by tenderers<br />

No scribbl<strong>in</strong>g is permissible <strong>in</strong> the tender documents and no special conditions are to be stipulated by the tenderer <strong>in</strong> the tender. He may<br />

do so <strong>in</strong> a separate cover<strong>in</strong>g letter.<br />

3.14 Non transferability & non refundability:<br />

Tender documents are not transferable. The cost of tender paper is not refundable.<br />

3.15 Rates to be quoted <strong>in</strong> figures & words:<br />

3.15.1 The rates shall be quoted both <strong>in</strong> figures and words for each item <strong>in</strong> the manner as required <strong>in</strong> Schedule –A (II) of Vol.-I.<br />

3.15.2 If there is variation between the rates quoted <strong>in</strong> figures and <strong>in</strong> words, the rate quoted <strong>in</strong> words shall be taken as correct. If more than one<br />

or improper rates are tendered for the same item the tender is liable to be rejected.<br />

3.16 Schedule of rates (SOR) items<br />

3.16.1 The Tenderer/s is/are required to quote uniform percentage below/ at par/ above aga<strong>in</strong>st the SOR cost chapter wise, both <strong>in</strong> figures and<br />

<strong>in</strong> words on “Abstract Sheet” of Schedule A (I) of Vol.-I. The total cost chapter wise should also be quoted.<br />

3.16.2 The percentage rate quoted aga<strong>in</strong>st SOR cost chapter wise on “Abstract Sheet” shall be applicable to all items of that chapter of Schedule<br />

A (I) of Vol.-I.<br />

3.16.3 The percentage quoted for items covered under Schedule Of Rates (SOR) items of Schedule A (I) of Vol.-I, shall not be applicable for Non<br />

Schedule of Rates (NS) items of Schedule A (II) of Vol.-I.<br />

3.17 Non – Schedule of Rates (NS items)<br />

3.17.1 The Non-Schedule of Rate items are covered under Schedule A (II) of Vol.-I and the Tender/s is/are required to quote unit rates and cost<br />

item wise both <strong>in</strong> figures and words aga<strong>in</strong>st the respective non-schedule items.<br />

3.17.2 The Grand Total of the cost of entire work both for SOR item of Schedule A (I) and Non-SOR items of Schedule A (II) of Vol.-I should be<br />

quoted on „Abstract Sheet‟ of Schedule A (I) of Vol.-I as per Proforma.<br />

3.18 SOR items- not <strong>in</strong>cluded <strong>in</strong> contract/ discrepancies there <strong>in</strong><br />

3.18.1 If any other item of work <strong>in</strong>cluded <strong>in</strong> the RE SOR-1994 for Signall<strong>in</strong>g are required to be carried out, they shall also be carried out at the<br />

rates at par / below /above as the case may be as accepted for that chapter of SOR as quoted on Abstract Sheet of Schedule A (I) of Vol.-<br />

I.<br />

3.18.2 The SOR item nos. description and rates given <strong>in</strong> Schedule of Quantities are based on the RE Schedule of Rates 1994, for Signall<strong>in</strong>g. Any<br />

discrepancy noticed dur<strong>in</strong>g the execution of work, <strong>in</strong> work<strong>in</strong>g rate, quantity of materials etc. should be rectified by the reference to the RE<br />

Schedule of rates 1994, for Signall<strong>in</strong>g which shall be treated as authoritative and b<strong>in</strong>d<strong>in</strong>g on the contractor. The relevant notes applicable<br />

to the respective sub-chapter will apply to the items of the Tender Schedule and should be considered as hav<strong>in</strong>g been <strong>in</strong>corporated <strong>in</strong> the<br />

contract agreement and b<strong>in</strong>d<strong>in</strong>g on contractor.<br />

3.18.3 If any contractor wants the copy of RE Schedule of rates 1994 for Signall<strong>in</strong>g, he can purchase the same from the office of<br />

CSTE/CORE/ALD at the prescribed cost.<br />

4.0 INCLUSIVENESS OF TAXES & ROYALTY ETC.<br />

4.1 The price quoted by the Tenderer shall <strong>in</strong>clude the price of materials <strong>in</strong>clud<strong>in</strong>g all <strong>in</strong>cidental charges for transport, load<strong>in</strong>g/ Unload<strong>in</strong>g and<br />

handl<strong>in</strong>g of materials, for arrang<strong>in</strong>g dispatch by rail direct from manufacturer‟s factory and complet<strong>in</strong>g all necessary formalities <strong>in</strong> this<br />

respect, such as submission of forward<strong>in</strong>g notes, arrang<strong>in</strong>g placement of wagon, collection of Banker‟s charges for Bank Guarantee,<br />

Indemnity Bonds, <strong>in</strong>clusive of cost of stamp etc. as also sid<strong>in</strong>g or shunt<strong>in</strong>g charges, if any, levied by the Railway. The prices shall <strong>in</strong>clude<br />

all taxes, duties, royalty and levies (<strong>in</strong>clud<strong>in</strong>g Octroi etc.) applicable on this works contract. Therefore, they should quote their prices tak<strong>in</strong>g<br />

<strong>in</strong>to account the rates of sales tax as leviable <strong>in</strong> the event of sale to the Central Government Organization etc. It is clarified that required<br />

forms applicable for this purpose will be supplied to the contractor, as applicable <strong>in</strong> the state where the contract is be<strong>in</strong>g executed. While<br />

quot<strong>in</strong>g the rate, they should also keep <strong>in</strong> view the provisions <strong>in</strong> section 15 of C.S.T. Rules 1956 as amended from time to time. The prices<br />

shall also <strong>in</strong>clude provision for losses and wastage <strong>in</strong> transit and <strong>in</strong>stallation and commission<strong>in</strong>g.<br />

The prices quoted by Tenderer shall <strong>in</strong>clude cost of execution & test<strong>in</strong>g and all costs of Adm<strong>in</strong>istration of Contract, Insurance premium,<br />

Bankers charges for guarantees, cost of storage, load<strong>in</strong>g and unload<strong>in</strong>g and handl<strong>in</strong>g of materials, and for any road transport which the<br />

contractor may use, for carriage of materials to his depot and the site of work. The prices shall <strong>in</strong>clude cost of works and adjustments<br />

necessary to be done by the contractor dur<strong>in</strong>g or after tests carried out by the purchaser.<br />

4.2 Prices to take <strong>in</strong>to account MODVAT scheme<br />

4.2.1 The price to be quoted by the tenderers should take <strong>in</strong>to account the credit availed on <strong>in</strong>puts under the MODVAT Scheme <strong>in</strong>troduced<br />

w.e.f. 1 st March 1986. The tenderers should give a declaration that any set offs <strong>in</strong> respect of duties on <strong>in</strong>puts as admissible under law is<br />

be<strong>in</strong>g totally and unconditionally passed on due to the purchaser <strong>in</strong> the price quoted by him.<br />

4.2.2 Tenderer shall submit analysis of rates if called upon to do so.<br />

4.3 While the prices quoted <strong>in</strong> the contract are <strong>in</strong>clusive of all Taxes i.e. Excise Duty, Octroi, Local Levies, Sales Tax levied by any statutory<br />

authority, the purchaser shall make any deduction towards Sales Tax on works contract if statutorily required to do so. The deducted Sales<br />

Tax on works contract shall be remitted to the concerned Sales Tax Authority and the purchaser shall <strong>in</strong> no way be responsible for any<br />

dispute between the Sales Tax authorities and the contractor <strong>in</strong> this regard.<br />

4.4 All taxes, duties and levies (<strong>in</strong>clud<strong>in</strong>g octroi etc.) aris<strong>in</strong>g out of the transaction between the contractor and his sub-contractors, suppliers for<br />

this work will be <strong>in</strong>cluded <strong>in</strong> the rates quoted by the contractor <strong>in</strong> the relevant Schedule.<br />

5.0 Earnest Money ,<br />

5.1 The Tenderer shall be required to deposit Earnest Money with the tender for the due performance with the stipulation to keep the offer<br />

open till such date as specified <strong>in</strong> the Tender Notice, under the conditions of tender. The Earnest Money shall be 2% of the estimated<br />

Contractor’s signature with stamp Page 39


tender value as <strong>in</strong>dicated <strong>in</strong> the Tender Notice. The Earnest Money shall be rounded to the nearest Rs. 10/-. This Earnest Money shall be<br />

applicable for all modes of tender<strong>in</strong>g.<br />

5.2 It is understood that the tender document have been sold/ issued to the tenderer and the tenderer is be<strong>in</strong>g permitted to tender <strong>in</strong><br />

consideration of the stipulation on his part, that after submitt<strong>in</strong>g his tender he will not resile from his offer or modify the terms and<br />

conditions thereof <strong>in</strong> a manner not acceptable to the Chief Project Manager, Railway Electrification, Near Hyderabad Bhavan<br />

Secunderabad - 500071. Should the tenderer fail to observe or comply with the forego<strong>in</strong>g stipulation, the amount deposited, as Earnest<br />

Money for the due performance for the above stipulation shall be forfeited to the Railway. FDR submitted towards EMD should<br />

be with auto renewal facility only.<br />

5.3 If his tender is accepted, this Earnest Money mentioned <strong>in</strong> sub-clause 5.1 above will be reta<strong>in</strong>ed, as part of Security Deposit for the due<br />

and faithful fulfillment of the contract <strong>in</strong> terms of clause 16 of General Conditions of Contract.<br />

The Earnest Money of the unsuccessful tenderers will, save as here<strong>in</strong> before provided, be returned to the unsuccessful tenderer but the<br />

Railway shall not be responsible for any loss or depreciation that may happen to the security for the due performance of the above<br />

stipulation to keep the offer open for the period specified <strong>in</strong> the Tender Documents or to the Earnest Money while <strong>in</strong> their possession, nor<br />

be liable to pay <strong>in</strong>terest thereon.<br />

5.4 Mode of deposit of Earnest Money<br />

5.4.1 Earnest Money should be furnished <strong>in</strong> any of the follow<strong>in</strong>g forms: -<br />

(a)<br />

Deposit Receipts, Pay Orders, Demand Drafts. These forms of Earnest Money could be either of the State Bank of India or of any of the<br />

Nationalised Banks. No conformity advice from the reserve Bank of India will be necessary.<br />

(b)<br />

Deposit Receipts executed by the Scheduled Banks (other than the State Bank of India and the Nationalised Banks) approved by the<br />

Reserve Bank of India for this purpose. The Railways will not, however, accept Deposit Receipt without gett<strong>in</strong>g <strong>in</strong> writ<strong>in</strong>g the concurrence<br />

of the Reserve Bank of India.<br />

NOTE: - (1)<br />

Earnest Money <strong>in</strong> cash should be deposited with the Divisional Cashier, Railway Electrification Secunderabad-500071, and cash receipt<br />

obta<strong>in</strong>ed from him should be furnished along with the Tender.<br />

(2) Deposit Receipts, Pay orders and Demand Drafts should be drawn <strong>in</strong> favour of the Dy FA&CAO/Railway<br />

Electrification/Secunderabad -500071, and endorsed “ACCOUNT PAYEE”. These <strong>in</strong>struments should be valid at<br />

east for the period cover<strong>in</strong>g two months beyond the validity of the pff offer.<br />

5.5 No reference to the previous deposit of Earnest Money & Security deposit for adjustment aga<strong>in</strong>st the present tender will be accepted and<br />

any request for recovery from any Security deposit aga<strong>in</strong>st present tender will not be enterta<strong>in</strong>ed.<br />

5.6 Any Tender not accompanied by Earnest Money <strong>in</strong> one of the approved forms will be summarily rejected.<br />

5.7 The Earnest Money shall be forfeited for breach of any of the Tender conditions or Tender Agreement or Contract or if the contractor/<br />

contractors fail to execute the Agreement (to be determ<strong>in</strong>ed by the Eng<strong>in</strong>eer <strong>in</strong>-charge) after notification of the Acceptance of his/ their<br />

Tender.<br />

6.0 NEED OF TENDERER‟S CAREFUL STUDY OF TENDER & SITE CONDITIONS<br />

The <strong>in</strong>tend<strong>in</strong>g tenderer is advised to study tender papers, concerned specifications and other <strong>in</strong>structions carefully. The tenderer/ s shall<br />

<strong>in</strong>spect the proposed site of work and acqua<strong>in</strong>t himself/ themselves with the site conditions, work<strong>in</strong>g hours, layout of land, trees and shrubs<br />

that he/ they will have to cut, type of strata likely to be met with<strong>in</strong> the borrow pits, stack<strong>in</strong>g space for materials, approach roads, pathways<br />

available etc. and all relevant items connected with execution of the work. No claim shall be enterta<strong>in</strong>ed for the contractors mak<strong>in</strong>g his/<br />

their own arrangements for approaches/ approach road from outside Railway land and contractors will bear entire expenses such as road<br />

taxes, payment for right of way etc. to outsiders and for constructions of approaches/ approach road etc. The submission of tender shall be<br />

deemed to have been done after careful study and exam<strong>in</strong>ation of the tender papers with full understand<strong>in</strong>g of the implications thereof.<br />

Tenderer should note that no deviations to conditions stipulated <strong>in</strong> tender paper shall be acceptable to Railways. They should submit their<br />

offer only if the Tender conditions are acceptable to them <strong>in</strong>-toto fail<strong>in</strong>g which the <strong>railway</strong> shall have right to reject the tender summarily.<br />

7.0 PERIOD OF COMPLETION<br />

7.1 The work/ works should be completed with<strong>in</strong> the period mentioned <strong>in</strong> the Tender Notice from the date of issue of Letter of Acceptance of<br />

the Tender. However execution of the work shall be <strong>in</strong> proportion to the period allowed as per date of completion.<br />

7.2 The tenderer shall <strong>in</strong>dicate the period <strong>in</strong> months with<strong>in</strong> which he would complete the work <strong>in</strong> the Offer Letter of tender assum<strong>in</strong>g that the<br />

letter of Acceptance of the Tender is issued to him <strong>in</strong> month zero.<br />

7.3 The Tenderer shall enclose with his offer the scheme of work and time schedule show<strong>in</strong>g the period of time that he will take for the various<br />

items of work, <strong>in</strong> the format as given <strong>in</strong> FORM No.1 of Volume-I. The Tenderer shall <strong>in</strong>dicate <strong>in</strong> the form notes to the schedule the<br />

assumptions and the basis adopted for the preparation of the time schedule.<br />

7.4 The Tenderer shall, however, submit their f<strong>in</strong>al programme <strong>in</strong> consultation with CPM (S&T) of the project <strong>in</strong> terms of clause 7.0 of Special<br />

Conditions of Contract.<br />

8.0 SUBMISSION OF CONSTITUTION AND POWER OF ATTORNEY<br />

8.1 Tenderers should submit the constitution of their firms and the power of attorney, if any. They are also required to disclose whether they<br />

are carry<strong>in</strong>g on bus<strong>in</strong>ess as <strong>in</strong>dividual, as sole proprietors or are <strong>in</strong> partnership firm consist<strong>in</strong>g of several named partners or are <strong>in</strong> any<br />

company <strong>in</strong>corporated under Companies act.<br />

8.2 Railway will not be bound by power of Attorney granted by the tenderer or by the changes <strong>in</strong> the Composition of the firm made subsequent<br />

to the execution of the contract. It may however recognize such Power of Attorney and changes after obta<strong>in</strong><strong>in</strong>g proper legal advice, the<br />

cost of which will be chargeable to the tenderer. These charges have been fixed at Rs.100/- (Rs. One Hundred) only, payable by the<br />

tenderer at the time of submission of the Power of Attorney for scrut<strong>in</strong>y and legal advice.<br />

8.3 In case where the Power of Attorney/ Partnership Deed has not been executed <strong>in</strong> English, true and authenticated copies of the translation<br />

of the same by an advocate, authorized translators of Court and Licensed petition writers should be supplied by the tenderer while<br />

tender<strong>in</strong>g for the work.<br />

9.0 FLUCTUATION OF MARKET RATES<br />

Possible fluctuation of market rates must be taken <strong>in</strong>to consideration before quot<strong>in</strong>g the rates and no claim on this<br />

account shall be enterta<strong>in</strong>ed afterwards.<br />

10.0 AUTHORITY FOR ACCEPTANCE<br />

10.1 The authority for the acceptance of the tender will rest with the Chief Project Manager, Railway Electrification, Near Hyderabad Bhavan,<br />

Secunderabad-500071or his accredited officer who reserves the right to divide the tender amongst more than one tenderer, if deemed<br />

necessary and also to reject any or all tenders received without assign<strong>in</strong>g any reason and does not b<strong>in</strong>d himself to accept the lowest or<br />

any other tender, nor does he undertake to assign reasons decl<strong>in</strong><strong>in</strong>g to consider any particulars tender or tenders.<br />

10.2 The adm<strong>in</strong>istration reserves the right to split up the work without reference to tenderer and may accept the tender <strong>in</strong> respect of any such<br />

portion of the work.<br />

Contractor’s signature with stamp Page 40


11.0 MODIFICATION IN QUANTITY IN SCOPE OF WORK<br />

The Railway Adm<strong>in</strong>istration reserves the right to modify the quantity from time to time whether it is an <strong>in</strong>crease or decrease <strong>in</strong> the scope of<br />

the work. The Tenderer shall not be entitled to any compensation but will be paid for as per contract for the actual work done.<br />

The above Para should be read <strong>in</strong> conjunction with Para 20.0 of Special Conditions of Contract.<br />

12.0 PURCHASE OF OTHER DOCUMENTS<br />

The Railway General Conditions of Contract regulations and <strong>in</strong>structions to tenderers and standard forms of contract of the Eng<strong>in</strong>eer<strong>in</strong>g<br />

Department of the Zonal Railway on whose jurisdiction the work falls may be purchased from Divisional Railway Manager‟s office of that<br />

Railway on payment of prescribed cost.<br />

13.0 WRONG INFORMATION BY TENDERER<br />

If the tenderer deliberately gives wrong <strong>in</strong>formation <strong>in</strong> his tender or creates circumstances for the acceptance of his tender, the Railway<br />

reserves the right to reject such tender at any stage.<br />

14.0 CANCELLATION OF TENDER IN SPECIAL CIRCUMSTANCES<br />

14.1 If a tenderer expires after the submission of his tender or after the acceptance of his tender the Railway shall deem such tender cancelled.<br />

If a partner of firm expires after the submission of their tender or after the acceptance of their tender, the Railway shall deem such tender<br />

as cancelled, unless the firm reta<strong>in</strong>s its character.<br />

14.2 If the Contractor‟s firm is dissolved on account of death or retirement of any partner or any reason whatsoever before fully complet<strong>in</strong>g the<br />

whole work or any part of it, undertaken by the pr<strong>in</strong>cipal agreement, the partners shall rema<strong>in</strong>, jo<strong>in</strong>tly severally and personally liable to<br />

complete the whole work to the satisfaction of the Railway and pay compensation shall be decided by the General Manager or his<br />

accredited officer and his decision <strong>in</strong> the matter shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the Contractor.<br />

15.0 TESTIMONIAL OF EXPERIENCE & OTHER CREDENTIALS<br />

All Tenderers irrespective of their be<strong>in</strong>g known to this organization or not, must submit related/ support<strong>in</strong>g documents <strong>in</strong> respect of their<br />

Experience & other Credentials as mentioned <strong>in</strong> Para 16, 17, 18, 19 & 20 below.<br />

16.0 ELIGIBILITY CRITERIA<br />

16.1 Solvency Certificate<br />

The Tenderer shall produce Revenue/ Banker's solvency certificate <strong>in</strong>dicat<strong>in</strong>g the amount, from a nationalized scheduled Bank, which<br />

should be m<strong>in</strong>imum 40% of advertised tender value, for the works cost<strong>in</strong>g more than Rs. 1.00 (One) Crore.<br />

16.2 Total Contract Amount received<br />

(a) The Tenderer should have received total contract amount, <strong>in</strong> the last three f<strong>in</strong>ancial years i.e. three previous f<strong>in</strong>ancial years and current<br />

f<strong>in</strong>ancial year (with reference to the date of open<strong>in</strong>g of tender) m<strong>in</strong>imum of 150% of advertised tender value of the work.<br />

(b) The Tenderer(s) should produce follow<strong>in</strong>g certificates for assessment of total contract amount received <strong>in</strong> conformity to Para 16.2 (a)<br />

above.<br />

(i) An attested certificate copy from the employer i.e. issued by central <strong>gov</strong>ernment or state <strong>gov</strong>ernment /PSU.<br />

(ii) Audited balance sheet duly certified by the Chartered Accountant.<br />

16.3 Work Experience<br />

The Tenderer should have completed, <strong>in</strong> the last three f<strong>in</strong>ancial years i.e. three previous f<strong>in</strong>ancial years and current year (with reference to the date<br />

of open<strong>in</strong>g of tender) at least one similar work (as expla<strong>in</strong>ed <strong>in</strong> follow<strong>in</strong>g para-16.4), for a m<strong>in</strong>imum value of 35%, of advertised tender value of work.<br />

All the documents <strong>in</strong> support of the eligilability criteria shall be submitted duly attested by a gazetted officer. Offers received with out relevant<br />

document support<strong>in</strong>g eligilabilty criteria will not be considered. No post tender correspondence will be enterta<strong>in</strong>ed from the tenderers.<br />

16.4 Mean<strong>in</strong>g of Similar Work<br />

16.5 In case of Tender <strong>in</strong> which work <strong>in</strong>volves <strong>in</strong>stallation/ modification of Multiple Aspect Colour Light Signall<strong>in</strong>g (MACLS)/ Colour Light<br />

Signall<strong>in</strong>g (CLS), “Tenderer must have executed & commissioned satisfactorily work of <strong>in</strong>stallation/ modification of MACLS/ CLS or Panel<br />

Interlock<strong>in</strong>g at <strong>in</strong>terlocked block station hav<strong>in</strong>g 3 L<strong>in</strong>es or more”.<br />

In case of Tender <strong>in</strong> which work <strong>in</strong>volves <strong>in</strong>stallation/ modification of Panel Interlock<strong>in</strong>g, “Tenderer must have executed & commissioned<br />

satisfactorily work of <strong>in</strong>stallation/ modification of Panel Interlock<strong>in</strong>g at <strong>in</strong>terlocked block stations hav<strong>in</strong>g 3 L<strong>in</strong>es or more”.<br />

17.0 EXECUTION OF WORK OF NEW TECHNOLOGY LIKE IPS, AXLE COUNTER, BPAC & DATA LOGGER ETC.<br />

The execution of work (Installation & Commission<strong>in</strong>g) of Integrated Power Supply (IPS), Axle Counter, Block Prov<strong>in</strong>g by Axle Counter<br />

(BPAC) and Data Logger (<strong>in</strong>clud<strong>in</strong>g network<strong>in</strong>g of Data Loggers) shall be done only by those manufacturers, who are borne on current<br />

approved list of suppliers issued by RDSO or the personnel certified by the manufacturer as tra<strong>in</strong>ed for <strong>in</strong>stallation & commission<strong>in</strong>g.<br />

Commitment <strong>in</strong> this respect shall be made by the Tenderer at the time of submitt<strong>in</strong>g of offer. Payment <strong>in</strong> that respect will be made only on<br />

production of completion certificate from their approved manufacturers or personnel certified by the manufacturer.<br />

18.0 ENGINEERING ORGANIZATION<br />

(a) The Tenderer shall make an assessment of the requirement of personnel for execution of this project & shall give details as to how he<br />

proposes to mobilize all technical manpower required for the project. Details of the qualifications & experience of the personnel identified<br />

for project execution shall be <strong>in</strong>cluded <strong>in</strong> the Tender. The Tenderer shall submit, the list of personnel (Eng<strong>in</strong>eers, Supervisors, Artisans<br />

etc.) employed by him with their names, qualifications, biodata & experience <strong>in</strong> this particular trade of work under consideration,<br />

organization available on hand and proposed to be engaged for subject work along with the Tender positively. Irrevocable letters of<br />

commitment of the said supervisors & key technicians/ artisans for do<strong>in</strong>g the work shall be furnished along with tender papers if they are<br />

(b)<br />

not already <strong>in</strong> employment of the Tenderer.<br />

The Tenderer shall have at least one Graduate Eng<strong>in</strong>eer and two experienced Supervisors (Diploma holders) hav<strong>in</strong>g m<strong>in</strong>imum 5 years<br />

experience <strong>in</strong> the relevant field supported by at least 5 Nos. of Artisan staff like signal fitter, wiremen, etc. The staff mentioned above <strong>in</strong> the<br />

Eng<strong>in</strong>eer<strong>in</strong>g Organization should be available on regular basis for the entire duration of the work. Additional staff shall be deputed as per<br />

requirement & progress of the work.<br />

19.0 CONSTRUCTION MACHINERY<br />

The firm should have m<strong>in</strong>imum complement of construction mach<strong>in</strong>ery, Tools & plants, test & measur<strong>in</strong>g <strong>in</strong>struments, vehicles etc. List of<br />

construction mach<strong>in</strong>ery, Tools & plants, test & measur<strong>in</strong>g <strong>in</strong>struments, vehicles etc. available on hand (own) and proposed to be <strong>in</strong>ducted<br />

(own and hired to be given separately) for the subject work, should be furnished along with the tender bid positively.<br />

20.0 CREDENTIALS<br />

(a) A copy of partnership deed and affidavit for proprietorship should be submitted along with the documents.<br />

(b) Detailed particulars of consultants to assist the company <strong>in</strong> the works, if any.<br />

(c ) The Tenderer must submit list of all the works completed <strong>in</strong> the last three f<strong>in</strong>ancial years i.e. three previous f<strong>in</strong>ancial years & current<br />

f<strong>in</strong>ancial year, giv<strong>in</strong>g description of work, organization for whom executed, approximate value of contract at the time of award, date of<br />

award and date of scheduled completion of work, on the L<strong>in</strong>e of work <strong>in</strong> question. Date of actual start, actual completion and f<strong>in</strong>al value of<br />

Contractor’s signature with stamp Page 41


contract should also be given with reasons for delay, if any. Supportive documents/ certificates from the organizations with whom they<br />

worked/ are work<strong>in</strong>g should be enclosed.<br />

(d) Whether LD was imposed with respect to above.<br />

(e) The Tenderer must also submit list of all the works on hand <strong>in</strong>dicat<strong>in</strong>g description of work, contract value, and approximate value of<br />

balance work yet to be done and date of award. Supportive documents/ certificates from the organizations with whom they are work<strong>in</strong>g<br />

should be enclosed.<br />

(f) All documents should be submitted with orig<strong>in</strong>al/ attested copies, fail<strong>in</strong>g which tender is liable to be rejected.<br />

(g) Certificates from private <strong>in</strong>dividuals for whom such works are executed/ be<strong>in</strong>g executed shall not be accepted.<br />

21.0 RATES DURING NEGOTIATION<br />

The Tenderer/ s shall not <strong>in</strong>crease his/ their quoted rates <strong>in</strong> case the Railway Adm<strong>in</strong>istration negotiates for reduction of rates. Such<br />

negotiations shall not amount to cancellation or withdrawal of the orig<strong>in</strong>al offer and the rates orig<strong>in</strong>ally quoted will be b<strong>in</strong>d<strong>in</strong>g on the<br />

tenderers.<br />

22.0 ADVICE OF CANCELLATION OF DOCUMENTS BY CONTRACTOR<br />

The cancellation of any document such as power of Attorney partnership deed etc. should be forthwith communicated by the contractor to<br />

the Railway Adm<strong>in</strong>istration <strong>in</strong> writ<strong>in</strong>g, fail<strong>in</strong>g which the Railway Adm<strong>in</strong>istration shall have no responsibility or liability for an action taken on<br />

the strength of the said documents.<br />

23.0 AGREEMENT<br />

The successful tenderer/ s shall be required to execute an agreement with the President of India act<strong>in</strong>g through the Dy.Chief<br />

Telecommunication Eng<strong>in</strong>eer, Railway Electrification, Secunderabad-500071 or his accredited officer for carry<strong>in</strong>g out the work accord<strong>in</strong>g to<br />

the Instructions to Tenderers and Conditions of Tender together with the Special Conditions Contract and Technical Specifications.<br />

24.0 OTHER CONDITIONS OF REJECTION<br />

Tenderer/ s who do not comply with any one or more of the conditions set for here<strong>in</strong> above is liable to result <strong>in</strong> the tender be<strong>in</strong>g rejected.<br />

25.0 LABOUR LICENSE<br />

The contractors are required to produce license as enjo<strong>in</strong>ed <strong>in</strong> the Government of India contractor labour (Regulation and Abolition) Act,<br />

1978. They shall not be allowed to undertake or execute any work through contract labour except under and <strong>in</strong> accordance with a license<br />

issued under the said act <strong>in</strong> that behalf by the authorized Licens<strong>in</strong>g Officer.<br />

26.0 ARRANGEMENTS FOR PERMITS OR LICENSES<br />

Arrangement for permits or license for materials will not be made by the Railway or any assistance given. The contractor will have to make<br />

his own arrangements. Also no import license shall be arranged by the Railway for this work.<br />

27.0 ERRORS, OMISSIONS AND DISCREPANCIES<br />

The contractor shall not take any advantage of any mis-<strong>in</strong>terpretation of the conditions due to typ<strong>in</strong>g or any other error and if <strong>in</strong> doubt shall<br />

br<strong>in</strong>g it to the notice of the Eng<strong>in</strong>eer without delay. In case of any contradiction only the pr<strong>in</strong>ted rules and books should be followed and no<br />

claim for the mis –<strong>in</strong>terpretation shall be enterta<strong>in</strong>ed.<br />

28 PREFERENCE TO PUBLIC SECTOR UNDERTAKING<br />

28.1 In case the overall value of the tender by Central Public Sector undertak<strong>in</strong>g is up to 10% higher than the lowest acceptable tender of<br />

private sector tenderer, subject to cost of tender be<strong>in</strong>g 5 (five) crore or above but not exceed<strong>in</strong>g Rs. 100 (one hundred) crore, the Railway<br />

reserves right to give purchase preference to the tender of such central public sector undertak<strong>in</strong>g/ Navratna Central Public Sector<br />

Enterprises with m<strong>in</strong>imum value addition of 20% by way of manufacture and /or services, ignor<strong>in</strong>g the lowest. However such public<br />

enterprises which avail benefit of the purchase preference would be subjected to adequate penalties for cost over-runs etc.<br />

28.2 In tenders, provid<strong>in</strong>g for “Purchase Preference” <strong>in</strong> favour of PSUs, if the quoted rates of L-1 are considered high and negotiations are<br />

resorted to, such negotiations may be held with orig<strong>in</strong>al L-1 as also with the Lowest PSU whose orig<strong>in</strong>al offer is not higher by more than<br />

10% of the orig<strong>in</strong>al L-1. Further, if after such negotiations the revised offer of the PSU is higher by more than 10% of the negotiated offer<br />

of the orig<strong>in</strong>al L-1, offer of PSU may not be considered for award of contract. If it is less than 10%, the exist<strong>in</strong>g procedure for award<strong>in</strong>g the<br />

contract to the PSU shall be followed.<br />

29.0 NEGOTIATION<br />

Negotiations, if contemplated to f<strong>in</strong>alize the tender, will be held with lowest eligible bidder only.<br />

30.0 TENDERER‟S ADDRESS<br />

Tenderer shall state <strong>in</strong> the tender their Postal Address fully and clearly. Any communication sent to the Tenderers by post at their said address, shall<br />

be deemed to have reached the tenderer duly & timely, not withstand<strong>in</strong>g the fact that the communication could not reach the tenderer at all or <strong>in</strong> time<br />

for whatever reason. Important documents shall be sent by Registered post.<br />

31.0 PROCUREMENT OF SPECIFICATIONS ETC.<br />

The copy of specifications can be purchased which are available at the follow<strong>in</strong>g sources:<br />

31.1 IRS/BRS specification: (i) Manager of Publications,<br />

Government of India,<br />

Civil L<strong>in</strong>es, New Delhi – 110054<br />

(ii) Government of India Book Depot,<br />

8-K.S.Roy Road, Calcutta – 700001<br />

31.2 RDSO specifications and RDSO Draw<strong>in</strong>gs : RDSO, Manak Nagar, Lucknow.<br />

31.3 B.I.S. specification: i) Directorate General,<br />

Indian Standard Institution,<br />

9 – Bahadur Shah Zafar Marg, New Delhi.<br />

(ii) F – Block, Unity Build<strong>in</strong>g,<br />

Narsimharaja Square, Bangalore – 560002.<br />

(iii) 534 – Sardar Vallabh Bhai Patel Road, Bombay.<br />

(iv) 5 – Chower<strong>in</strong>ghee Approach, PO-Pr<strong>in</strong>cep Street, Calcutta – 700072.<br />

(v) Ah<strong>in</strong>sa Build<strong>in</strong>g (I st Floor), SCO<br />

Contractor’s signature with stamp Page 42


82 –83, Sector 27 – C,<br />

Chandigarh – 160017.<br />

(vi) 5 – 8 –56/57, L.N.Gupta Marg, Hyderabad – 500001.<br />

(vii) 117/418 – B, Sarvodaya Nagar, Kanpur – 208005.<br />

(viii) C.I.T. Campus, Adyar<br />

Madras-600020.<br />

32.0 Enclosures<br />

32.1 Special Conditions of Contract.<br />

32.2 Technical Specifications, Draw<strong>in</strong>gs and Technical Instructions for Signall<strong>in</strong>g Works (separate as supplement).<br />

32.3 Volume-I conta<strong>in</strong><strong>in</strong>g Schedule A (I), Schedule A (II) and other <strong>in</strong>formation.<br />

VOLUME - II<br />

CHAPTER – II<br />

SPECIAL CONDITIONS OF CONTRACT<br />

1.0 TENDER DOCUMENTS<br />

1.1 The follow<strong>in</strong>g Documents will form part of the Contract<br />

(A). Volume- I consist<strong>in</strong>g of: -<br />

(a) Offer Letter.<br />

(b) Latest modifications to Chapter-I of Volume-II, Instructions to Tenderer and Conditions of Tender.<br />

(c) Latest modifications to Chapter-II of Volume-II, Special Conditions of Contract.<br />

(d) Draw<strong>in</strong>gs/Tentative M<strong>in</strong>i Plan to be supplied with tender paper as per Annexure „A‟.<br />

(e) Information about Volume-II <strong>in</strong>clud<strong>in</strong>g Additions/ Alterations.<br />

(f) Information about Modification/ Addition <strong>in</strong> para 5.18 & 5.19 of Technical Specifications, Draw<strong>in</strong>gs and Technical Instructions for<br />

Signall<strong>in</strong>g works (2002 Edition).<br />

(g) Schedule of Quantities (approximate) PART-II.<br />

(h) Technical Specifications Enclosure-I & II.<br />

(i) Form of Tenderer‟s Scheme of Work and Time Schedule.<br />

(j) Schedule of Rate for supply and erection portion as per Enclosure-III, PART-IV.<br />

(B). Volume-II (May -2006) consist<strong>in</strong>g of<br />

(a) Chapter-I, Instructions to Tenderers and Conditions of Tender.<br />

(b) Chapter-II, Special Conditions of Contract.<br />

(C)<br />

(D)<br />

Technical specifications along with technical <strong>in</strong>structions and draw<strong>in</strong>gs for signall<strong>in</strong>g works supplied as supplement to this tender.<br />

General Conditions of Contract of concerned Railways as amended with advance correction slips issued up to date. This may be procured by the<br />

contractor on payment from any Divisional Railway Manager‟s office of concerned Railways.<br />

(E) Schedule of Rate for Signal<strong>in</strong>g works- 1994.<br />

(F) Schedule of Rate for Telecommunication works- 1994.<br />

1.2 Stipulations, which prevail<br />

These “Special Conditions”, The clause of Tender conditions and the Instructions to Tenderers and Technical Specifications, the<br />

stipulations made <strong>in</strong> the Schedule of Rates and Quantities, shall <strong>gov</strong>ern the work to be done under this contract <strong>in</strong> addition to and / or <strong>in</strong><br />

part supersession of the General Conditions of Contract and Regulation and Instructions to Tenderers and standard form of contract of<br />

Eng<strong>in</strong>eer<strong>in</strong>g Department (latest) embody<strong>in</strong>g corrections up to date. Where there is any conflict between the Tender conditions and<br />

Instructions to Tenderers, Special Conditions of Contract, Technical Specifications and Stipulations conta<strong>in</strong>ed <strong>in</strong> Schedule of Rates and<br />

Quantities on the one hand and General Conditions of Contract and Regulation and Instructions to Tenderers and standard form of<br />

Contract, the former shall prevail. Any Special Conditions stated by the tenderer <strong>in</strong> the cover<strong>in</strong>g letter submitted along with the Tender<br />

shall be deemed to be a part of contract to such extent only, as have been explicitly accepted by the Railway.<br />

NOTE: - Designations mentioned <strong>in</strong> the contract conditions may be read as per designations prevalent <strong>in</strong> CORE.<br />

2.0 RAILWAY OFFICES & ADDRESSES FOR CORRESPONDENCE<br />

The list of Addresses to which correspondence and documents relat<strong>in</strong>g to the contract should be sent is given <strong>in</strong> Volume – I (Annexure)<br />

3.0 FORCE MAJEURE<br />

If at any time, dur<strong>in</strong>g the cont<strong>in</strong>uance of this contract, the performance, <strong>in</strong> whole or <strong>in</strong> part, by either party, of any obligation under this<br />

contract shall be prevented or delayed by reason of any war, hostility, acts of the public enemy, Civil commotion, sabotage, fires, floods,<br />

earth quakes, explosions, epidemics, quarant<strong>in</strong>e restrictions, strikes, lockouts, any statute, statutory rules regulations orders or requisitions<br />

issued by any Government Department or competent authority or acts of God (here-<strong>in</strong>-after referred to as “EVENT”) then provided notice<br />

of the happen<strong>in</strong>g of any such event is given by either party to the other with<strong>in</strong> twenty one days from the date of occurrence thereof neither<br />

party shall be reason of such event be entitled to term<strong>in</strong>ate this contract nor shall either party have any claim for damage aga<strong>in</strong>st the other<br />

<strong>in</strong> respect of such non-performance or delay <strong>in</strong> performance, and the obligations under the contract shall be resumed as soon as<br />

practicable after such event has come to an end or ceased to exist, provided further that if the performance <strong>in</strong> whole or part of any<br />

obligation under this contract is prevented or delayed by reason of any such event beyond a period as mutually agreed to by the Railway<br />

and the contractor after any event or 60 days <strong>in</strong> the absence of such an agreement whichever is more, either party may, at its option<br />

term<strong>in</strong>ate the contract, provided also that if the contract is so term<strong>in</strong>ated under this clause the Railway may at the time of such term<strong>in</strong>ation<br />

take over from the Contractor all works executed or, works under execution.<br />

4.0 AGREEMENT<br />

The Agreement with the successful tenderer/s should normally be signed with<strong>in</strong> 15 (fifteen) days after the issue of LOA, on accepted rates<br />

and conditions, <strong>in</strong> such form as the Railways may prescribe and lodge the same with the Railway together with the conditions of contract,<br />

specifications and schedule of prices referred to there <strong>in</strong> duly completed. The form for agreement is enclosed as FORM No. 2.<br />

5.0 SECURITY DEPOSIT<br />

5.1 The Earnest Money deposited by the contractor with his tender, as mentioned <strong>in</strong> para-5 of Chapter-I, Volume-II, will be reta<strong>in</strong>ed by the<br />

Railways as part of security for the due and faithful fulfillment of the contract by the contractor. The balance to make up the Security<br />

Deposit, the rate for which are given below, may be deposited by the contractor <strong>in</strong> cash or may be recovered by percentage deduction<br />

from the contractor‟s “on account” bills. Provided also that <strong>in</strong> case of default<strong>in</strong>g contractor the Railway may reta<strong>in</strong> any amount due for<br />

Contractor’s signature with stamp Page 43


payment to the contractor on the pend<strong>in</strong>g “on account bill” so that the amounts so reta<strong>in</strong>ed may not exceed 10% of the total value<br />

of the contract.<br />

5.2 Unless otherwise specified <strong>in</strong> the special conditions, if any, the Security Deposit/ rate of recovery/mode of recovery shall be as under:<br />

5.2.1 Security Deposit for each work should be 5% of the contract value.<br />

5.2.2 The rate of recovery should be at the rate of 10% of the bill amount till the full Security Deposit is recovered.<br />

5.2.3 Security Deposits will be recovered only from the runn<strong>in</strong>g bills of the contract and no other mode of collect<strong>in</strong>g SD such as SD <strong>in</strong> the form of<br />

<strong>in</strong>struments like BG, FD etc. shall be accepted towards Security Deposit.<br />

5.3 Refund of Security Deposit<br />

Security Deposit shall be released to the contractor by competent authority only after the expiry of the ma<strong>in</strong>tenance period and after<br />

pass<strong>in</strong>g the f<strong>in</strong>al bill based on "No Claim Certificate". The Competent Authority shall normally be the authority who is competent to sign the<br />

contract. If this Competent Authority is of the rank lower than JA Grade, then a JA Grade officer (concerned with the work) shall act as<br />

competent authority.<br />

5.4 No <strong>in</strong>terest will be payable upon the Earnest Money & Security Deposit or amounts payable to the contractor under the contract.<br />

6.0 PERFORMANCE GUARANTEE (PG) –CLAUSE 1616(4) OF GCC:<br />

6.1 The procedure for obta<strong>in</strong><strong>in</strong>g performance guarantee is out l<strong>in</strong>ed below:<br />

(a) The successful bidder shall have to submit a performance guarantee (PG) with<strong>in</strong> 30 days (Thirty) from the date of issue of letter of<br />

acceptance (LOA). Extension of time for submission of PG beyond 30 (Thirty) days and uoti 60 days from the date of issue of LOA may be<br />

given by the authority who is competent to sign the contract agreement. However, a penel <strong>in</strong>terest of 15% per annum shall be charged for<br />

the delay beyond 30 days. That is from 31 ST day after the date of issue of LOA. In case the contractor fails to Submit the requisite PG<br />

even after 60 days from the date of issue of LOA, the contract shall be term<strong>in</strong>ated duly forfeit<strong>in</strong>g EMD and other dues, is any payable<br />

aga<strong>in</strong>st the contract. The failed contractor shall be debarred from participat<strong>in</strong>g <strong>in</strong> re tender for the work.<br />

The successful bidder shall submit the performance guarantee (PG) <strong>in</strong> any of the follow<strong>in</strong>g forms amount<strong>in</strong>g to 5% of the contract value<br />

(i)<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

(vii)<br />

(viii)<br />

(ix)<br />

(x)<br />

(xi)<br />

a deposit of cash,<br />

irrevocable bank guarantee<br />

Government Securities <strong>in</strong>clud<strong>in</strong>g state Loan Bonds at 5 percent below the market value,<br />

Deposit receipts, pay orders, Demand Drafts and Guarantee Bonds. These forms of Performance Guarantee could be either of the<br />

State bank of India or of any of the Nationalised Banks,<br />

Guarantee Bonds executed or Deposit Reciepts tendered by all Schedule Banks,<br />

A Deposit <strong>in</strong> the Post Office Sav<strong>in</strong>g Banks,<br />

A Deposit <strong>in</strong> the National Sav<strong>in</strong>gs Certificates,<br />

Twelve years National Defence Certificates,<br />

Ten years Defence Deposits<br />

National Defence Bonds,<br />

Unit Trust Certificates at 5 percent below market value or at the face value whichever is less, Also FDR <strong>in</strong> favour of<br />

Dy.FA&CAO/RE/SC (free from any encumbrance) may be accepted.<br />

6.2 The Performance Guarantee shall be submitted by the successful bidder after the Letter of Acceptance (LOA) has been issued, but before<br />

sign<strong>in</strong>g of the contract Agreement. The P.G. shall be <strong>in</strong>itially valid up to the stipulated of completion plus 60 days beyond that. In case,<br />

the time for completion of work gets extended, the contractor shall get validity of P.G. extended time for completion of work plus 60 days.<br />

The value of PG to be submitted by the contractor will not change for variation upto 25% (either <strong>in</strong>crease or decerease). Incase dur<strong>in</strong>g the<br />

course of execution value of the contract <strong>in</strong>creases by more than 25 % of the orig<strong>in</strong>al contract value, an additional performance guarantee<br />

amount<strong>in</strong>g to 5% ( Five percent) for the excess value over the orig<strong>in</strong>al contract value shall be deposited by the contractor.<br />

6.3 The Performance Guarantee (PG) shall be released after the physical completion of the work based on the "Completion Certificate" issued<br />

by the Competent Authority stat<strong>in</strong>g that the contractor has completed the work <strong>in</strong> all respects satisfactorily. The security deposit shall<br />

however , be released only after expiry of the ma<strong>in</strong>tenance period and after pass<strong>in</strong>g the f<strong>in</strong>al bill based on no claim certificate from the<br />

contractor. The Competent Authority shall normally be the authority who is competent to sign the contract. If this Competent Authority is of<br />

the rank lower than JA Grade, then a JA Grade officer (concerned with the work) should issue the above certificate.<br />

6.4 Wherever the contract is resc<strong>in</strong>ded, the Security Deposit shall be forfeited and the Performance Guarantee shall be encashed and the<br />

balance work shall be got done <strong>in</strong>dependently without risk & cost of the failed contractor. The failed contractor shall be debarred from<br />

participat<strong>in</strong>g <strong>in</strong> the tender for execut<strong>in</strong>g the balance work. If the failed contractor is a Jo<strong>in</strong>t Venture (JV) or a partnership firm, then the<br />

every member/ partner of such a firm shall be debarred from participat<strong>in</strong>g <strong>in</strong> the tender for the balance work either <strong>in</strong> his/ her <strong>in</strong>dividual<br />

capacity or as a partner of any other JV/ partnership firm.<br />

6.5 The Eng<strong>in</strong>eer shall not make a claim under the Performance Guarantee except for amounts to which the President of India is entitled<br />

under the contract (not withstand<strong>in</strong>g and/or without prejudice to any other provisions <strong>in</strong> the contract agreement) <strong>in</strong> the event of:<br />

(i)<br />

Failure by the contractor to extend the validity of the performance Guarantee as described here<strong>in</strong> above, <strong>in</strong> which event the eng<strong>in</strong>eer may<br />

claim the full amount of the Performance Guarantee.<br />

(ii)<br />

Failure by the contractor to pay President of India any amount due, either as agreed by the contractor or determ<strong>in</strong>ed under any of the<br />

(iii)<br />

clauses/ conditions of the agreement, with<strong>in</strong> 30 days of the service of notice to this effect by eng<strong>in</strong>eer.<br />

The contract be<strong>in</strong>g determ<strong>in</strong>ed or resc<strong>in</strong>ded under provision of the GCC the Performance Guarantee shall be forfeited <strong>in</strong> full and shall be<br />

absolutely at the disposal of the President of India.<br />

7.0 Programme of work<br />

7.1 The Contractor shall have necessary resources to execute the work so that the entire work is completed with <strong>in</strong> a period as mentioned <strong>in</strong><br />

Tender Notice from the date of issue of Letter of Acceptance of Tender. He shall also have necessary resources to take up the works at<br />

least two stations simultaneously with<strong>in</strong> a period of 15 days beg<strong>in</strong>n<strong>in</strong>g from the date of issue of priority of each station for tak<strong>in</strong>g up the<br />

work. Priority shall be as decided by the Railway and the contractor shall take up the work at the stations only as per the order of priorities<br />

assigned to the stations by the Railways for the purpose.<br />

7.2 The contractor shall be held responsible for the execution of the works accord<strong>in</strong>g to the time schedule given above for the execution of the<br />

work <strong>in</strong> full compliance of the specifications and the various clauses of the supplement “Technical specifications, <strong>in</strong>structions and draw<strong>in</strong>g<br />

“. Failure to comply with any of these will be dealt with as per provision laid down <strong>in</strong> the General Conditions of the contract of the<br />

Eng<strong>in</strong>eer<strong>in</strong>g Department of the Zonal Railways on whose jurisdiction the work falls and <strong>in</strong>structions for tenderers.<br />

Contractor’s signature with stamp Page 44


7.3 The contractor on his part will have to employ labour <strong>in</strong> full strength commensurate with work<strong>in</strong>g area available. He will also arrange<br />

match<strong>in</strong>g materials and equipments to complete the job most expeditiously so as to ensure that the work is completed <strong>in</strong> phases with<strong>in</strong><br />

stipulated period.<br />

7.4 The contractor should nom<strong>in</strong>ate a competent Supervisor/ Eng<strong>in</strong>eer <strong>in</strong> accordance with the provision conta<strong>in</strong>ed <strong>in</strong> Clause 35.0 of Special<br />

conditions of contract, as his representative, on the works who will be authorized to receive and acknowledge materials issued by the<br />

Railway and take all orders issued by the Inspect<strong>in</strong>g Officer of the Railway.<br />

7.5 Inspection Register shall be ma<strong>in</strong>ta<strong>in</strong>ed at the site of work by the Railway where <strong>in</strong> <strong>in</strong>structions regard<strong>in</strong>g the work<strong>in</strong>g etc. shall be<br />

recorded by the Eng<strong>in</strong>eer or his executive subord<strong>in</strong>ates. It is expected of the contractor or his representative at the site to note such<br />

<strong>in</strong>structions whenever asked upon to do so and take action accord<strong>in</strong>gly.<br />

7.6 No facility whatsoever e.g. provision of approach road and provision of temporary level cross<strong>in</strong>g etc. will be provided by Railway for cart<strong>in</strong>g<br />

materials. Approach roads with<strong>in</strong> the <strong>railway</strong> limits can be used for cart<strong>in</strong>g materials.<br />

7.7 Technically it is considered that the work of cable lay<strong>in</strong>g should not be tackled under moist conditions. Hence the work of cable lay<strong>in</strong>g<br />

should be stopped before the on set of monsoon and the contractor shall have this <strong>in</strong> his m<strong>in</strong>d while submitt<strong>in</strong>g his detailed time schedule.<br />

7.8 Determ<strong>in</strong>ation of Contract ow<strong>in</strong>g to default of contractor-<br />

(1) If the contractor should …..<br />

(i)<br />

(ii)<br />

Becomes bankrupt or <strong>in</strong>solvent, or<br />

Make an arrangement with of assignment <strong>in</strong> favour of his creditors, or agree to carry out the contract under a Committee of Inspection of<br />

his creditors, or<br />

(iii) Be<strong>in</strong>g a Company or Corporation, go <strong>in</strong>to liquidation (other than a voluntary liquidation for the purpose of amalgamation or reconstruction),<br />

or<br />

(iv) Have an execution levied on his goods or property on the works, or<br />

(v) Assign the contract or any part thereof otherwise than as provided <strong>in</strong> Clause- 7 of General Conditions of Contract, or<br />

(vi) Abandon the contract, or<br />

(vii) Persistently disregard the <strong>in</strong>struction of the Eng<strong>in</strong>eer, or contravene any provision of the contract, or<br />

(viii) Fail to adhere to the agreed programme of work by a marg<strong>in</strong> of 10% of the stipulated period, or<br />

(ix) Fail to remove the materials from the site or to pull down and replace work after receiv<strong>in</strong>g from the Eng<strong>in</strong>eer notice to the effect that the<br />

said materials or works have been condemned or rejected under Clause- 25 and 27 of General Conditions of Contract, or<br />

(x) Fail to take steps to employ competent or additional staff and labour as required under Clause- 26 of General Conditions of Contract, or<br />

(xi) Fail to afford the Eng<strong>in</strong>eer or Eng<strong>in</strong>eers representative proper facilities for <strong>in</strong>spect<strong>in</strong>g the works or any part thereof as required under<br />

Clause (28) of General Conditions of Contract, or<br />

(xii) Promise, offer or give any bribe, commission, gift or advantage either himself or through his partner, agent or servant to any officer or<br />

employee of the Railway or to any person on his or on their behalf <strong>in</strong> relation to the execution of this or any other contract with this<br />

Railway,<br />

(xiii) (A) At any time after the tender relat<strong>in</strong>g to the contract has been signed and submitted by the contractor, be<strong>in</strong>g a partnership firm admit<br />

as one of its partners employ under it or be<strong>in</strong>g an <strong>in</strong>corporated company elect or nom<strong>in</strong>ate allow to act as one of its directors or employ<br />

under it <strong>in</strong> any capacity what so ever any retired eng<strong>in</strong>eer of the gazetted rank or any other retired gazetted officer work<strong>in</strong>g before his<br />

retirement, whether <strong>in</strong> the executive or adm<strong>in</strong>istrative capacity, or whether hold<strong>in</strong>g any pensionable post or not, <strong>in</strong> the Eng<strong>in</strong>eer<strong>in</strong>g<br />

Department of the Railways for the time be<strong>in</strong>g owned and adm<strong>in</strong>istered by the President of India before the expiry of two years from the<br />

date of retirement from the said service of such Eng<strong>in</strong>eer or officer unless such Eng<strong>in</strong>eer or officer has obta<strong>in</strong>ed permission from the<br />

President of India or any officer duly authorized by him <strong>in</strong> this behalf to become a partner or a director or to take employment under the<br />

contractor, as the case may be, or<br />

(B)<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

Fail to give the time of submitt<strong>in</strong>g the said tender:-<br />

The correct <strong>in</strong>formation as to the date of retirement of such retired eng<strong>in</strong>eer or retired officer from the said service, or as to<br />

whether any such retired eng<strong>in</strong>eer or retired officer was under the employment of the contractor at the time of submitt<strong>in</strong>g the<br />

said tender, or<br />

The correct <strong>in</strong>formation as to such eng<strong>in</strong>eers or officers obta<strong>in</strong><strong>in</strong>g permission to take employment under the contractor, or<br />

Be<strong>in</strong>g a partnership firm, the correct <strong>in</strong>formation as to, whether any of its partners was such a retired eng<strong>in</strong>eer or a retired<br />

officer, or<br />

Be<strong>in</strong>g an <strong>in</strong>corporated company, correct <strong>in</strong>formation as to whether any of its directors was such retired eng<strong>in</strong>eer or a retired<br />

officer, or<br />

Be<strong>in</strong>g such a retired eng<strong>in</strong>eer or retired officer suppress and not disclose at the time of submitt<strong>in</strong>g the said tender the fact of his<br />

be<strong>in</strong>g such a retired eng<strong>in</strong>eer or a retired officer or make at the time of submitt<strong>in</strong>g the said tender a wrong statement <strong>in</strong> relation<br />

to his obta<strong>in</strong><strong>in</strong>g permission to take the contract or if the contractor be a partnership firm or an <strong>in</strong>corporated company to be a<br />

partner or director of such firm or company as the case may be or to seek employment under the contractor.<br />

Then and <strong>in</strong> any of said clause, the Eng<strong>in</strong>eer on behalf of the Railway may serve the Contractor with a notice (Proforma at Annexure- III of<br />

GCC) <strong>in</strong> writ<strong>in</strong>g to that effect and if the Contractor does not with<strong>in</strong> seven days after the delivery to him of such notice proceed to make<br />

good his default <strong>in</strong> so far as the same is capable of be<strong>in</strong>g made good and carry on the work or comply with such directions as aforesaid to<br />

the entire satisfaction of the Eng<strong>in</strong>eer, the Railway shall be entitled after giv<strong>in</strong>g 48 hours notice (Proforma at Annexure IV of GCC) <strong>in</strong><br />

writ<strong>in</strong>g under the hand of the Eng<strong>in</strong>eer to resc<strong>in</strong>d the contract as a whole or <strong>in</strong> part or parts (as may be specified <strong>in</strong> such notice) and after<br />

expiry of 48 hours notice, a f<strong>in</strong>al term<strong>in</strong>ation notice (Proforma at Annexure-V of GCC) should be issued.<br />

(2) Right of Railway after rescission of contract ow<strong>in</strong>g to default of Contractor - In the event of any or several of the courses, referred to <strong>in</strong><br />

sub- clause (1) of this clause, be<strong>in</strong>g adopted:-<br />

(a)<br />

(b)<br />

(c)<br />

The Contractor shall have no claim to compensation for any loss susta<strong>in</strong>ed by him by reason of his hav<strong>in</strong>g purchased or procured any<br />

materials or entered <strong>in</strong>to any commitment or made any advances on account of or with a view to the execution of the works or the<br />

performance of the contract and Contractor shall not be entitled to recover or be paid any sum for any work there to for actually performed<br />

under the contract unless and until the Eng<strong>in</strong>eer shall have certified the performance of such work and the value payable <strong>in</strong> respect<br />

thereof and the Contractor shall only be entitled to be paid the value so certified,<br />

The Eng<strong>in</strong>eer or Eng<strong>in</strong>eer's Representative shall be entitled to take possession of any materials, tools, implements, mach<strong>in</strong>ery and<br />

build<strong>in</strong>gs on the works or on the property on which these are be<strong>in</strong>g or out to have been executed, and to reta<strong>in</strong> and employ the same <strong>in</strong><br />

the further execution of the works of any part thereof until the completion of the works without the Contractor be<strong>in</strong>g entitled to any<br />

compensation for the use and employment thereof or for wear and tear pr destruction thereof,<br />

The Eng<strong>in</strong>eer shall as soon as may be practicable after removable of the Contractor fix and determ<strong>in</strong>ed ex-parte or by or after reference to<br />

the parties or after such <strong>in</strong>vestigation or enquiries as he may consider fit to make or <strong>in</strong>stitute and shall certify what amount (if any) had at<br />

Contractor’s signature with stamp Page 45


the time of rescission of the contract been reasonably earned by or would reasonably accrue to the contractor <strong>in</strong> respect of the work then<br />

actually done by him under the contract and what was the value of any unused, or partially used materials, any constructional plant and<br />

any temporary works upon the site. The legitimate amount due to the contractor after mak<strong>in</strong>g necessary deductions and certified by the<br />

Eng<strong>in</strong>eer should be released expeditiously.<br />

7.9 Contractor‟s liabilities for costs and damages withhold<strong>in</strong>g and lien <strong>in</strong> respect of sums claimed<br />

7.9.1 Whenever any claim or claims for payment of a sum of money arises out of or under the contractor aga<strong>in</strong>st the contractor, the purchaser<br />

shall be entitled to with<strong>in</strong> and also have lien to reta<strong>in</strong> such sum or sums <strong>in</strong> whole or <strong>in</strong> part from the security, if any, deposited by the<br />

contractor and for the purpose aforesaid the purchaser shall be entitled to withhold the cash security deposit or the security, if any<br />

furnished as the case may be and also have lien over the sum pend<strong>in</strong>g f<strong>in</strong>alization or adjudication of any such claim. In the event of the<br />

security be<strong>in</strong>g <strong>in</strong>sufficient to cover the claimed amount or amounts or if no security has been taken from the contractor, the purchaser shall<br />

be entitled to withhold and have lien to reta<strong>in</strong> to the event of such claim amount or amounts referred to supra from any sum or sums found<br />

payable or which at any time thereafter may become payable to the contractor under the same contract or any other Department of the<br />

Central Govt. pend<strong>in</strong>g f<strong>in</strong>alization or adjudication of any such claims. It is an agreed terms of the contract that the sum or sums of money<br />

so withheld or reta<strong>in</strong>ed under the lien referred to by the purchaser till the claim aris<strong>in</strong>g out of or under the contract is determ<strong>in</strong>ed by the<br />

Arbitrator (if the contract is <strong>gov</strong>erned by the Arbitration clause) or by the competent court as the case may be and that the contractor will<br />

have no claim for <strong>in</strong>terest or damages whatsoever on any account <strong>in</strong> respect of such withhold<strong>in</strong>g or retention under the lien referred to<br />

supra duly notified as such to the contractor. For the purpose of this clause, where contractor is a partnership firm or a limited company,<br />

the purchaser shall be entitled to withhold and also have a lien to reta<strong>in</strong> towards such claimed amount or amounts <strong>in</strong> whole or <strong>in</strong> part from<br />

any sum found payable to any partner/ limited company, as the case may be, whether <strong>in</strong> his <strong>in</strong>dividual company or otherwise.<br />

7.9.2 Lien <strong>in</strong> respect of other contracts<br />

Any sum or sum of money due and payable to the Contractor (<strong>in</strong>clud<strong>in</strong>g the Security Deposit returnable to him) under the contract may be<br />

withheld or reta<strong>in</strong>ed by way of lien by the purchaser aga<strong>in</strong>st any claim of this or any other Railways or any other departments of the<br />

Central Government <strong>in</strong> respect of payment of a sum of money aris<strong>in</strong>g out of or under this or any other Railway or any other department of<br />

the Central Govt.<br />

7.9.3 Contractor‟s liabilities for cost and damages.<br />

It is an agreed terms of the contract that sum of money so withheld or reta<strong>in</strong>ed under this clause by the purchaser will be kept withheld or<br />

reta<strong>in</strong>ed as such by the purchaser till the claim aris<strong>in</strong>g out of on under any other contract is either mutually settled or determ<strong>in</strong>ed by the<br />

Arbitrator, if the other contract is <strong>gov</strong>erned by the Arbitration clause or by the competent court as the case may be, and that the contractor<br />

shall have no claim for <strong>in</strong>terest or damages whatsoever on this account or any other grounds <strong>in</strong> respect of any sum of money withheld or<br />

reta<strong>in</strong>ed under this clause and duly notified to the contractor.<br />

7.10 Penalty for delay <strong>in</strong> completion<br />

7.10.1 If the contractor fails to execute and complete the work with<strong>in</strong> the time specified <strong>in</strong> the contract agreement or with<strong>in</strong> the period of extension<br />

granted under Para 7.11 except <strong>in</strong> so far as the delay is on the purchaser‟s account, the contractor shall accept reduction <strong>in</strong> the total<br />

amount payable to him by the purchaser, a sum equivalent to one half of one percent (1/2 of 1%) of the contract value of the works<br />

for each week or part thereof of the week the contractor is <strong>in</strong> default beyond stipulated time by which the work shall have been completed<br />

under the contract.<br />

7.10.2 For the purpose of above clause, the contract value of the works shall be taken as value of work as per contract agreement <strong>in</strong>clud<strong>in</strong>g any<br />

supplementary work order/contract agreement issued. Provided also, that the total amount of the liquidated damages under this condition,<br />

shall not exceed the under noted percentage value or of the total value of the item or groups of the items of work for which a separate<br />

dist<strong>in</strong>ct completion period is specified <strong>in</strong> the contract.<br />

(i) For contract value up 10% of the total value of<br />

to Rs. 2 Lakhs<br />

the contract.<br />

(ii) For contracts valued 10% of first Rs. 2 Lakhs<br />

above Rs. 2 Lakhs<br />

and the 5% of the balance<br />

7.10.3 The purchaser <strong>in</strong> full satisfaction of the contractor's liability aris<strong>in</strong>g from delay only shall accept such reduction. This penalty for delay <strong>in</strong><br />

completion will be applicable separately for each stage of completion of work when two or more stage of completion is specified <strong>in</strong> the<br />

contract. The General Manger or his successor shall, at his sole discretion specify a time limit with<strong>in</strong> which the unf<strong>in</strong>ished portion of the<br />

work, shall be completed after serv<strong>in</strong>g on the contractor a notice of Purchaser's <strong>in</strong>tention to recover the said penalty <strong>in</strong> FORM No. 9. In the<br />

event of failure of the contractor, the purchaser shall be at liberty to take action <strong>in</strong> accordance with provisions <strong>in</strong> para 7.8.<br />

NOTE: -<br />

For purpose of this para the value of work shall be calculated on the basis of unit prices <strong>in</strong>cluded <strong>in</strong> schedule of works.<br />

7.11 Extension of time<br />

If such a failure as aforesaid shall have arisen from any cause which the purchaser may admit as be<strong>in</strong>g a reasonable ground for extension<br />

of time, the General Manager/ Chief Signal & Telecomm. Eng<strong>in</strong>eer or his successor (s) shall allow such additional time as he may <strong>in</strong> his<br />

absolute discretion consider to be reasonably justified by the circumstances of the case. Such extensions shall be granted by the<br />

purchaser <strong>in</strong> the FORM No.10. The contractor will apply for extension at least two months before the expiry of the period of completion.<br />

NOTE: -<br />

Form No.10 will be applicable <strong>in</strong> case extension is on purchaser‟s account and also <strong>in</strong> case extension is on Contractor‟s account but the<br />

purchaser is reasonably satisfied that contractor cannot be penalized for such delay.<br />

8.0 STORES TO BE SUPPLIED BY RAILWAY<br />

8.1 All materials as shown <strong>in</strong> list enclosed <strong>in</strong> Volume –I (Annexure) will be supplied by Railway at RE/ Stores Depot as mentioned <strong>in</strong> Volume-I.<br />

The quantity required would be determ<strong>in</strong>ed by the Railway accord<strong>in</strong>g to the quantum of work to be done. The contractor shall be<br />

responsible for check<strong>in</strong>g before tak<strong>in</strong>g delivery that all the materials given to him are <strong>in</strong> good conditions. The receipt of materials shall be<br />

acknowledged by the contractor or his representative, mention<strong>in</strong>g details of materials and their quantities on a prescribed Performa <strong>in</strong><br />

FORM No.7 enclosed. The left out/ unused materials if any shall be returned to Railway Depot (as mentioned <strong>in</strong> Volume-I) by the<br />

contractor for which no extra charges shall be paid by the Railway.<br />

8.2 Recovery of cost <strong>in</strong> respect of excess unused Railway materials not returned by the contractor<br />

In case where it is found after check<strong>in</strong>g that excess quantity of Railway materials has been drawn by the contractor but the contractor fails<br />

to return any excess unused materials or there are any shortages dur<strong>in</strong>g f<strong>in</strong>al reconciliation, their cost will be recovered by the Railway<br />

Adm<strong>in</strong>istration from the contractor at the book rate or last purchase rate or the prevail<strong>in</strong>g market rate whichever is higher plus 5% on<br />

account of <strong>in</strong>itial freight, 2% on account of <strong>in</strong>cidental charges together with supervision charges at 12 ½% on the total cost <strong>in</strong>clusive of<br />

materials, freight and <strong>in</strong>cidental charges. Freight between the Railway sources of supply and the site of work shall be to the contractor‟s<br />

account.<br />

8.3 No extra charges towards carriage etc.<br />

Contractor’s signature with stamp Page 46


8.3.1 No extra charges shall be paid to the contractor towards carriage, load<strong>in</strong>g unload<strong>in</strong>g and handl<strong>in</strong>g etc. of the above materials <strong>in</strong>dicated at<br />

para 8.1 required for execution of work and the rates quoted by the contractor aga<strong>in</strong>st items <strong>in</strong>cluded <strong>in</strong> schedule A-I & A-II of Volume-I<br />

under which these materials are to be used shall be <strong>in</strong>clusive of all such charges.<br />

8.3.2 The contractor shall be responsible for undertak<strong>in</strong>g repair if any, to crates, cable drums, pack<strong>in</strong>g cases etc. for safe transport of materials<br />

from Railway‟s specified depot to the site of work. The contractor should also undertake necessary repairs to crates, drums etc. <strong>in</strong> respect<br />

of unused materials required to be returned to the purchaser. No extra payment will be made on this account.<br />

8.4 Disposal of empty cable drums<br />

Empty cable drums, wooden crates and other pack<strong>in</strong>g materials used for supply of Railway‟s materials to the contractor shall be the<br />

property of the contractor except<strong>in</strong>g the cable drums which are to be returned by him along with unused cable exceed<strong>in</strong>g 50 Mt. length as<br />

per “NOTE” given below the clause 27.2.3 of Special Conditions of Contract. The Tenderer should take note of this while quot<strong>in</strong>g rates.<br />

8.5 Indemnity bond and stand<strong>in</strong>g bank guarantee aga<strong>in</strong>st materials supplied to contractor<br />

The contractor shall furnish a Stand<strong>in</strong>g Indemnity Bond <strong>in</strong> FORM No. 4 for materials supplied to him by Railways under clause 8.0 of<br />

Special Conditions of Contract. The Contractor shall also furnish a stand<strong>in</strong>g Bank Guarantee as per FORM No. 5 for a sum of Rs. 25,000/-<br />

(Rupees Twenty Five Thousand) only for materials supplied by Railways direct from the time he commences tak<strong>in</strong>g delivery of the<br />

materials to the time the materials are used <strong>in</strong> execution of work and quantities f<strong>in</strong>ally reconciled.<br />

9.0 STORES TO BE SUPPLIED BY CONTRACTOR<br />

All materials other than those specifically mentioned to be supplied by Railway under Para 8.1 of Special conditions of contract, shall be<br />

supplied by contractor at site. The supply of materials by the contractor will be accord<strong>in</strong>g to what have been mentioned <strong>in</strong> each item of<br />

Schedule A (I) and Schedule A (II) of Vol.-I read along with Enclosure-I and also other than those mentioned <strong>in</strong> the list of the materials to<br />

be supplied by Railway for complete execution and commission<strong>in</strong>g of work.<br />

9.2 Instruments and forms to be arranged by the contractor<br />

All <strong>in</strong>struments required, for test<strong>in</strong>g, like magneto phone, Megger, Avometer, wheat stone bridge etc. shall be arranged by the Contractor<br />

and shall rema<strong>in</strong> his property.<br />

The forms for tabulat<strong>in</strong>g test result for cable and earth resistance shall be supplied by the contractor.<br />

9.3 Inspection of materials<br />

9.3.1 Materials to be supplied by Contractor shall be best quality and shall conform to the relevant specification, designs and draw<strong>in</strong>gs. The<br />

materials shall be procured by the Contractor/s from the manufacturers of repute or their authorized dealers as approved by the Eng<strong>in</strong>eer<br />

– <strong>in</strong> – charge.<br />

The Contractor/ s may be required to produce test certificate from the Manufacturer, wherever called for by the Eng<strong>in</strong>eer-<strong>in</strong> –charge.<br />

The <strong>in</strong>spection of items which are <strong>in</strong>cluded <strong>in</strong> the list of RDSO approved suppliers shall be <strong>in</strong>spected by RDSO and other items shall be<br />

<strong>in</strong>spected by RITES except petty items which shall be <strong>in</strong>spected by representative of the Eng<strong>in</strong>eer-<strong>in</strong>-charge.<br />

All materials that are not covered under specification, design and draw<strong>in</strong>gs of RDSO, Railway Board, etc. shall be procured by the<br />

contractor from the manufactures of repute/ their authorized dealers, such materials to be approved by the Eng<strong>in</strong>eer- <strong>in</strong>-charge.<br />

9.3.2 Materials to be supplied by the contractor shall be put up for <strong>in</strong>spection of Eng<strong>in</strong>eer or his representative for check<strong>in</strong>g its quality/ suitability<br />

before they are f<strong>in</strong>ally used/ <strong>in</strong>stalled by the contractor and necessary <strong>in</strong>spection certificate to be obta<strong>in</strong>ed. The Contractor shall therefore<br />

arrange to get the material <strong>in</strong>spected <strong>in</strong> advance, preferably <strong>in</strong> bulk and not <strong>in</strong> piece-meal. The contractor shall give the Railway 10 (Ten)<br />

days notice, when the materials are ready for <strong>in</strong>spection.<br />

9.3.3 Materials shall be <strong>in</strong> accordance with Standard Specifications and Draw<strong>in</strong>gs and approved by the Railway.<br />

9.3.4 Railway may <strong>in</strong>spect the material at all stages of manufacture <strong>in</strong>clud<strong>in</strong>g the completed product to determ<strong>in</strong>e the requirements of the<br />

specification and standard draw<strong>in</strong>gs have been met.<br />

9.3.5 Contractor shall give the Railway or the <strong>in</strong>spect<strong>in</strong>g authorities‟ nom<strong>in</strong>ated by the Railway 10 days notice when the materials or product are<br />

ready for test.<br />

9.3.6 All materials to be supplied by contractor should be offered by him/ them for RDSO‟s/ RITES <strong>in</strong>spection, well <strong>in</strong> time, so as not to delay the<br />

progress of work at any stage at any of the stations <strong>in</strong> any way on this account.<br />

9.3.7 Contractor shall provide at po<strong>in</strong>t of production, apparatus and labour for mak<strong>in</strong>g required tests under the supervision of the Railway.<br />

9.3.8 Tests may be made at po<strong>in</strong>t of production or on samples submitted, and may also be made at dest<strong>in</strong>ation.<br />

9.4 Inspection Charges<br />

9.4.1 Inspection charges for materials to be supplied by contractor for execution of work shall be borne by Railway.<br />

9.4.2 All the expenses of the Purchaser‟s representative shall be borne by the Purchaser whether the <strong>in</strong>spected material utilized <strong>in</strong> the work or<br />

not.<br />

9.5 Test<br />

9.5.1 The Contractor shall make such tests as may be necessary to demonstrate to the satisfaction of the Railway that the apparatus and the<br />

system as <strong>in</strong>stalled are <strong>in</strong> accordance with the specifications and contract. The contractor shall provide such <strong>in</strong>struments and apparatus as<br />

may be necessary for conduct<strong>in</strong>g such tests.<br />

9.5.2 The follow<strong>in</strong>g tests of equipment and <strong>in</strong>stallation shall be made (<strong>in</strong> addition to tests enumerated <strong>in</strong> draft Indian Railway Standard<br />

Specification No. RDSO/SPN-13 for “Electrical Signall<strong>in</strong>g and <strong>in</strong>terlock<strong>in</strong>g Fitt<strong>in</strong>gs” and tests specified <strong>in</strong> Clause 27 (i) of the General<br />

Conditions: -<br />

9.5.2.1 Service test to determ<strong>in</strong>e that protective devices function as <strong>in</strong>tended.<br />

9.5.2.2 Service test to determ<strong>in</strong>e that control system functions as <strong>in</strong>tended.<br />

9.5.2.3 Tests to determ<strong>in</strong>e that all circuits conform to approved circuit plan by <strong>in</strong>dividually electrically check<strong>in</strong>g each contact selection.<br />

9.5.2.4 Test to all electrically operated devices to determ<strong>in</strong>e that electrical operat<strong>in</strong>g characteristics are <strong>in</strong> accordance with specifications designed<br />

by the Railway.<br />

9.5.2. 5 Test of <strong>in</strong>sulation resistance of each complete circuit <strong>in</strong> accordance with Eng<strong>in</strong>eer‟s <strong>in</strong>structions.<br />

9.5.2.6 The <strong>in</strong>sulation resistance shall be not less than as specified <strong>in</strong> the signal Eng<strong>in</strong>eer<strong>in</strong>g Manual.<br />

9.5.2.7 The responsibility of fault localization of the defective or <strong>in</strong>operative <strong>in</strong>stallation dur<strong>in</strong>g the execution and test<strong>in</strong>g and restoration thereof<br />

shall be that of the contractor.<br />

9.5.2.8 The contractor shall co-operate <strong>in</strong> conduct<strong>in</strong>g tests and trials and wherever defects/ deficiencies are required to be attended to or made<br />

good, will be complied with promptly.<br />

10.0 OTHER RAILWAY STORES AND MODE OF RECOVERY FROM BILL<br />

Contractor’s signature with stamp Page 47


If any materials specified <strong>in</strong> Para-9.0 is supplied by the Railway either at the Contractor‟s request or suomoto <strong>in</strong> order to prevent any<br />

possible delay <strong>in</strong> the execution of the works likely to occur due to the Contractor‟s <strong>in</strong>ability to make adequate arrangements for supply<br />

there of or otherwise, recovery will be made from contractor‟s bill at the book rate or market rate prevail<strong>in</strong>g at the time of supply whichever<br />

is higher plus 5% (Five percent) on account of <strong>in</strong>itial freight and 2% (Two percent) on account of <strong>in</strong>cidental charges together with<br />

supervision charges at 12.5% of the total cost <strong>in</strong>clusive of material. Freight and <strong>in</strong>cidental charges or the rate given <strong>in</strong> Schedule A-(I) and<br />

A-(II) of Vol.-I whichever is higher. Freight between the Railway Sources of supply and the site of work shall be to the Contractor‟s<br />

account. If however, the material required by the contractor is not available <strong>in</strong> Railway‟s stock or the Railway decides not to supply the<br />

same, be that for whatsoever reason, the Railway shall not be bound to arrange for the supply at the cost quoted above or at any other<br />

cost nor will this fact be accepted as an excuse for delay <strong>in</strong> execution of works.<br />

11.0 FIGURES DIMENSIONS ETC.<br />

Figures, dimensions and draw<strong>in</strong>gs shall supercede measurement by scale and draw<strong>in</strong>g to large scale shall take precedence over these to<br />

a smaller scale. Special Dimensions or directions <strong>in</strong> the specification shall supercede all else.<br />

12.0 USE OF RAILWAY LAND<br />

12.1 Use of Railway land required by Contractor for construction temporary office, quarters, hutments etc. for the staff and for stor<strong>in</strong>g materials<br />

etc. will be permitted to him / them free by Railway if available. The location of these office hutments, stores etc. will be subject to the<br />

approval of the Eng<strong>in</strong>eer or his representative. The land will be restored to Railway by the Contractor <strong>in</strong> the same condition as when taken<br />

over or <strong>in</strong> vacant condition as desired by the Eng<strong>in</strong>eer, after completion of the work or at any earlier day as specified by the Eng<strong>in</strong>eer. The<br />

failure to do so will make the contractor (s) liable to pay the cost <strong>in</strong>curred by the Railway for gett<strong>in</strong>g possession of land.<br />

12.2 USE OF ELECTRICITY<br />

The electricity will be supplied to the contractor on their request on usual charges under the rules of Zonal Railway. However, the<br />

contractor shall have to make his own distribution system for the work.<br />

13.0 WATER CHARGES<br />

The Contractor (s) shall make his/ their own arrangement for potable and other water supply required for the execution of the work as well<br />

as his labour. However, if water is supplied by the Railway, contractor(s) will have to pay water charges as laid down <strong>in</strong> the General<br />

Conditions of Contract and <strong>in</strong> addition the Contractor(s) will have to pay charges as levied by the corporation/ municipality.<br />

14.0 CESS CHARGES<br />

14.1 For contractor labour employed/ resid<strong>in</strong>g at stations and <strong>in</strong> colonies where sanitary facilities exist, contractor will be required to pay cess<br />

charges as per rules <strong>in</strong> force on the Railway from time to time.<br />

14.2 For labour work<strong>in</strong>g between stations or at isolated places where Railway facilities do not exist, the contractor shall be required to provide<br />

necessary sanitary facilities for their labour <strong>in</strong> terms of Clause 59 (4) of the General Conditions of Contract. In case of any failure on his/<br />

their part the necessary facilities shall be provided by the Railway Adm<strong>in</strong>istration at the cost of contractor and expenditure thus <strong>in</strong>curred<br />

will be recovered from his/ their bills.<br />

15.0 DEDUCTION FOR INCOME TAX<br />

15.1 The contractor and all personnel employed by him shall pay such taxes like Income Tax as are payable under statutory Law of India and<br />

the purchaser will not accept any liability for the same.<br />

15.2 Deduction of Income Tax at source as per provision of F<strong>in</strong>ance Act & Income Tax <strong>in</strong> force may be made from the contractor/ sub–<br />

contractor and the amount so deducted may be credited to the Central Govt.<br />

16.0 CARE OF STAFF<br />

No quarters will be provided by the Railway for the accommodation of the Contractor or any of his staff employed on the work. The<br />

Contractor may be allowed to erect any labour camps for hous<strong>in</strong>g the labours at or near the site of works on available Railway land subject<br />

to payment of cess and water charges. The contractor shall at his own cost make all necessary and adequate arrangement for the<br />

importation, feed<strong>in</strong>g and preservation of the hygiene of his staff. The contractor shall permit <strong>in</strong>spection at all times of all sanitary<br />

arrangements made by him, by the Eng<strong>in</strong>eer or his Assistant or the medical staff of the Railway. If the Contractor fails to make adequate<br />

medical, sanitary arrangements, these will be provided by the Railway, the cost thereof be<strong>in</strong>g recovered from the Contractor.<br />

17.0 DAMAGE BY ACCIDENT OR FLOODS OR TIDES<br />

17.1 The Contractor shall take all precautions aga<strong>in</strong>st damage from accident, floods or tides. No compensation will be allowed to the contractor<br />

for his plant or materials lost or damaged by any cause whatsoever. The contractor shall be liable to make good the damages to any<br />

structure or part of structure, plant or materials of every description belong<strong>in</strong>g to the Adm<strong>in</strong>istration lost or damaged by any cause dur<strong>in</strong>g<br />

the course of the contractor‟s work.<br />

17.2 The adm<strong>in</strong>istration will not be liable to pay to the contractor any charges for rectification or repair to any damage which may have occurred<br />

from any cause whatsoever, to any part of the new/ exist<strong>in</strong>g structure dur<strong>in</strong>g construction.<br />

18.0 INSPECTION<br />

18.1 The Eng<strong>in</strong>eer or his representative may <strong>in</strong>spect and test the various portions of the work at all stages and shall have full power to reject all<br />

or any portion of the work that he may consider to be defective or <strong>in</strong>ferior <strong>in</strong> quality or material, workmanship or design <strong>in</strong> comparison to<br />

what is called for <strong>in</strong> the specification. In the event of rejection of any work already executed which is not <strong>in</strong> accordance with specifications,<br />

as <strong>in</strong> this tender papers and/ or as determ<strong>in</strong>ed by the Eng<strong>in</strong>eer of which the Contractor has been apprised, the contractor shall carry out<br />

alterations/ replacements to such works to the satisfaction of the Eng<strong>in</strong>eer for which no additional expenses will be borne by the Railway.<br />

18.2 The contractor shall carry out such tests at his own expenses as are necessary to determ<strong>in</strong>e that the contract is be<strong>in</strong>g complied with and<br />

that the contractor is entitled to payment <strong>in</strong> respect thereof.<br />

18.3 Even if the Eng<strong>in</strong>eer‟s Representative rema<strong>in</strong>ed associated/ supervised <strong>in</strong> course of the progress of works at various stages, a<br />

jo<strong>in</strong>t <strong>in</strong>spection, for each item of work, by Eng<strong>in</strong>eer‟s Representative and Contractor‟s representative will be carried out to check that the<br />

work has been done as per specification and measurement taken.<br />

18.4 Inspection of foundation<br />

Before cast<strong>in</strong>g of foundation, the contractor‟s representative and the Eng<strong>in</strong>eer‟s representative shall jo<strong>in</strong>tly <strong>in</strong>spect the quality and depth of<br />

pits, quality of bricks, concrete mixture etc. and ensure compliance with the Draw<strong>in</strong>gs and specifications.<br />

18.5 Inspection of trenches, chases and fill<strong>in</strong>g<br />

Before the cables are actually laid, the contractor‟s representative and the Eng<strong>in</strong>eer‟s representative shall jo<strong>in</strong>tly <strong>in</strong>spect the quality and<br />

depth of trenches, chases, before attempt<strong>in</strong>g fill<strong>in</strong>g. The measurements for all these items will be suitably recorded, by the Eng<strong>in</strong>eer‟s<br />

representative who will permit the lay<strong>in</strong>g of cables after issu<strong>in</strong>g the certificate <strong>in</strong> FORM No.8 that the above works have been done as<br />

required by the specifications.<br />

19.0 STORAGE OF MATERIALS<br />

Contractor’s signature with stamp Page 48


The storage of materials, tools and mach<strong>in</strong>ery used by the Contractor shall be done <strong>in</strong> an orderly manner and any th<strong>in</strong>g used by the<br />

contractor for the execution of the work should <strong>in</strong> no way cause a danger or h<strong>in</strong>drance to the work<strong>in</strong>g of the Railway or to the movement of<br />

its staff or passengers.<br />

19.0 VARIATION IN SCHEDULE QUANTITY<br />

“ Variation <strong>in</strong> quantities of items of contracts under clause 42(4) to the General Condition of Contract is detailed as below:<br />

(3).<br />

(a)<br />

(b)<br />

(1) Individual NS items <strong>in</strong> contracts shall be operated with variation of Plus(+) or M<strong>in</strong>us (-) 25 % and payment would be made as per the<br />

agreement rate .for this no f<strong>in</strong>ance concurrence would be required.<br />

(2) In case an <strong>in</strong>crease <strong>in</strong> quantity of an <strong>in</strong>dividual item by more than 25% of the agreement quantity considered unavoidable , the same shall<br />

be got executed by float<strong>in</strong>g a fresh tender. If float<strong>in</strong>g a fresh tender for operat<strong>in</strong>g that item is considered not practicable, quantity of that<br />

item may be operated <strong>in</strong> access of 125% of the agreement quantity subject to the follow<strong>in</strong>g condition :<br />

(a) Operation of an item by more than 125% of the agreement quantity needs the approval of an officer of the rank not less than SA grade.<br />

(i) Quantities operated <strong>in</strong> access of 125% but upto 140% of the agreement quantity of the concerened item, shall.be paid at 98% of the rate<br />

awarded for that item <strong>in</strong> that particular tender.<br />

(ii) Quantities operated <strong>in</strong> access of 140% but upto 150% of the agreement quantity of the concerned item, shall be paid at 96% of the rate<br />

awarded for that item that particular tender.<br />

(iii) Variation <strong>in</strong> quantities of <strong>in</strong>dividual items beyond 150% will be prohibited and would be permitted only <strong>in</strong> exceptional, unavoidable<br />

circumstances with the concurrence of Associate f<strong>in</strong>ance and shall be paid at 96% of the rate award for that item <strong>in</strong> that particular tender.<br />

(b)<br />

(c)<br />

The variation <strong>in</strong> quantities as per the above formula will apply only to the <strong>in</strong>dividual items of the contract and not on the overall contract<br />

value.<br />

Execution of quantites beyond 150% of the overall agreemental value should not be permitted and , if found necessary, should be only<br />

through fresh tenders or by negotiat<strong>in</strong>g with exist<strong>in</strong>g contractor with prior personal concurrence of FA&CAO and approval of General<br />

Manager.<br />

In case where decrease is <strong>in</strong>volved dur<strong>in</strong>g execution of contract<br />

The contract sign<strong>in</strong>g authority can decrease the items upto 25% of <strong>in</strong>dividual item with out f<strong>in</strong>ance concurrence.<br />

For decrease beyond 25% for the <strong>in</strong>dividual items or 25% of the contract agreement value, the approval of an officer not less than the rank of<br />

SA grade may be taken. After obta<strong>in</strong><strong>in</strong>g “No Claim certificate” from the contractor and with f<strong>in</strong>ance concurrence, giv<strong>in</strong>g detailed reasons for<br />

each such decrease <strong>in</strong> the quantities.<br />

It should be certified that the work proposed to be reduced will not be required <strong>in</strong> the same work.<br />

(c)<br />

4)<br />

The limit for vary<strong>in</strong>g quantities for m<strong>in</strong>or value items shall be 100% ( As aga<strong>in</strong>st 25% prescribed for other items). A m<strong>in</strong>or valve item for this<br />

purpose is def<strong>in</strong>ed as on item orig<strong>in</strong>al agreement value is less than 1 % of the total orig<strong>in</strong>al agreement value.<br />

5) No such quantity variation limit shall apply for foundation items.<br />

6) As for as SOR items are concerned the limit of 25% would apply to the value of SOR schedule as a whole and not on <strong>in</strong>dividual SOR<br />

items. However, In case of NS items, the limit of the 25% would apply on the <strong>in</strong>dividual items irrespective of the manner of quot<strong>in</strong>g the rates.<br />

(S<strong>in</strong>gle percentage rates or <strong>in</strong>dividual item rate).<br />

7) For the tenders accepted at zonal <strong>railway</strong>s level, variations <strong>in</strong> the quantities will be approved by the authority <strong>in</strong> whose powers revised value of the<br />

agreement lies.<br />

8) For the tenders accepted by the General Manager, Variation upto 125% of the orig<strong>in</strong>al agreement value may be accepted by the General Manager.<br />

9) For tenders accepted by Board members and <strong>railway</strong> m<strong>in</strong>isters, Variation upto 110% of the orig<strong>in</strong>al agreement value may be accepted by General<br />

Manager.<br />

10) The aspect of vitiation of tender with respect to variation <strong>in</strong> quantities should be checked and avoided. In case of Vitiation of the tender( Both for<br />

<strong>in</strong>crease as well as decrease of value of contract agreement), sanction of the competent authority as per s<strong>in</strong>gle tender should be obta<strong>in</strong>ed.<br />

21.0 RIGHT OF RAILWAY TO KEEP BACK FROM THE CONTRACT ANY PORTION OF WORK<br />

The successful Tenderer/ s will however, have no claim/ right <strong>in</strong> the execution of any work which <strong>in</strong> op<strong>in</strong>ion of the Eng<strong>in</strong>eer should be<br />

carried out departmentally or otherwise and the Railway reserves the right any time the acceptance of the tender to keep back from the<br />

contract and carry out the work or any portion of work through any other agent it may th<strong>in</strong>k without assign<strong>in</strong>g any reason. No claim for<br />

compensation/ loss or whatsoever on this account will be enterta<strong>in</strong>ed by the Railway.<br />

22.0 MEANING AND INTERPRETATION BY RAILWAY TO BE FINAL<br />

All measurement, method of measurement, mean<strong>in</strong>g and <strong>in</strong>tent of specifications and <strong>in</strong>terpretation of special conditions of contract, given<br />

and made by the Railway or by the Eng<strong>in</strong>eer shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g and shall be considered excepted matters <strong>in</strong> terms of conditions no.<br />

62 i.e. “Matters f<strong>in</strong>ally determ<strong>in</strong>ed by the Railway”, of the General Conditions of Contract.<br />

23.0 INSURANCE<br />

23.1 The Contractor shall take out and keep <strong>in</strong> force a policy or policies of <strong>in</strong>surance aga<strong>in</strong>st all liabilities of the contractor or the Railway at<br />

common law or under any statute <strong>in</strong> respect of accidents to persons who shall be employed by the contractor <strong>in</strong> or about the site or the<br />

contractor‟s office for the purpose of carry<strong>in</strong>g out the works on the site. The contractor shall also take out and keep <strong>in</strong> force a policy or<br />

policies of <strong>in</strong>surance aga<strong>in</strong>st all recognized risks to their offices and depots. Such <strong>in</strong>surance shall <strong>in</strong> all respect be to the approval of the<br />

Railway Adm<strong>in</strong>istration and if he so requires <strong>in</strong> his name.<br />

23.2 The Contractor shall take out and keep <strong>in</strong> force a policy or policies of <strong>in</strong>surance for all materials handed over to him irrespective of<br />

whether used up <strong>in</strong> the portion of work already done or kept for the balance portion of the work until such works are handed over to the<br />

Railway. For this purpose, the works are deemed to have been handed over when F<strong>in</strong>al Acceptance Certificate is issued by the<br />

Competent Authority after the completion of the entire acceptance test to be conducted on the works.<br />

The contractor shall not be liable for losses/ damages to the materials either used up <strong>in</strong> the portion of work done or the materials kept for<br />

use at site, <strong>in</strong> consequence of mut<strong>in</strong>y or other similar causes over which the contractor has no control and which cannot be <strong>in</strong>sured. Such<br />

losses or damages shall be the liability of the Railway.<br />

23.3 The contractor should, however, <strong>in</strong>sure the stores brought to site, aga<strong>in</strong>st risks <strong>in</strong> consequence of war and <strong>in</strong>vasion, as required under the<br />

Emergency Risk (Good) Insurance Act <strong>in</strong> force.<br />

23.4 The contractor shall take out all <strong>in</strong>surance covers <strong>in</strong> connection with this contract with Government recognized Insurance Companies.<br />

Contractor’s signature with stamp Page 49


23.5 The Insurance policy taken as above should make Railway a beneficiary of the policy or the policy should be hypothecated <strong>in</strong> favour of<br />

Railway. In case contractor fails by delay<strong>in</strong>g the timely payment of premium, <strong>in</strong> such case Railway will have the right to get the policy<br />

renewed at contractor‟s cost plus 20% of the premium amount per annum.<br />

24.0 SAFETY MEASURES<br />

24.1 The contractor shall take all possible precautions to ensure that none of his workers know<strong>in</strong>gly or other wise cause <strong>in</strong>terference to the<br />

circuit or equipments <strong>in</strong> use and give risk to unsafe conditions or dislocation of traffic.<br />

24.2 No work shall be begun above or under or adjacent to any l<strong>in</strong>e of the Railway <strong>in</strong> consequence of which it may become necessary to foul<br />

any such l<strong>in</strong>e or it <strong>in</strong> any way prejudice the same for safe passage of traffic until look out men and hand signal men as required by the<br />

Eng<strong>in</strong>eer or his representative, shall have taken their duties.<br />

24.3 The contractor shall take all precautionary measures <strong>in</strong> order to ensure the protection of their own personnel mov<strong>in</strong>g about or work<strong>in</strong>g on<br />

the Railway premises, but shall then conform to the rules and regulations of the Railway. If and when <strong>in</strong> the course of the work there is<br />

likely to be any danger to persons <strong>in</strong> the employment of the contractor due to runn<strong>in</strong>g traffic while work<strong>in</strong>g <strong>in</strong> the Railway sid<strong>in</strong>g and<br />

premises, the contractor shall apply <strong>in</strong> writ<strong>in</strong>g to the Railway to provide flagmen or look out men for protection of such persons. The<br />

Railway will, however, decide as to whether it is necessary to post such flagmen for various types of work and also the number of such<br />

men required to protect the gang or gangs of contractor‟s staff work<strong>in</strong>g at site.<br />

24.4 Indemnification <strong>in</strong> event of accident out of failure of contractor<br />

The Railway shall rema<strong>in</strong> <strong>in</strong>demnified by the contractor, <strong>in</strong> the event of any accident occurr<strong>in</strong>g <strong>in</strong> the normal course of work, aris<strong>in</strong>g out of<br />

the failure of contractor or his men to exercise reasonable precaution at all places or work whether or not the Railway has posted flagmen<br />

at any particular site of work. The flagmen will be appo<strong>in</strong>ted by the Railway and no expenses on this account will be charged to the<br />

Contractor.<br />

24.5 Blast<strong>in</strong>g of rocks<br />

Blast<strong>in</strong>g of rocks for foundation work shall be done only after due notice is given to the Railway‟s, time/s and dates for blast<strong>in</strong>g operations<br />

agreed to by the Railway. Blast<strong>in</strong>g, if required to be done <strong>in</strong> vic<strong>in</strong>ity of the track shall not be undertaken until the Railway flagmen on duty,<br />

takes necessary steps to protect tra<strong>in</strong>s and the track, to be protected by the contractor aga<strong>in</strong>st damage by blasted rocks. The contractor<br />

shall follow detailed <strong>in</strong>structions, which will be issued to him regard<strong>in</strong>g blast<strong>in</strong>g operations <strong>in</strong> the vic<strong>in</strong>ity of tracks.<br />

24.6 Safety for passenger while work<strong>in</strong>g by contractor <strong>in</strong> station limit<br />

While work<strong>in</strong>g with <strong>in</strong> station limits especially on passenger platforms, the contractor shall ensure that at all time sufficient space is left for<br />

free movement of passenger traffic. He must cover and or barricade the excavations carried out <strong>in</strong> such areas and cont<strong>in</strong>ue to ma<strong>in</strong>ta<strong>in</strong><br />

these, till the work is completed with a view to avoid any accident of public or to a Railway Staff<br />

24.7 Avoid<strong>in</strong>g <strong>in</strong>fr<strong>in</strong>gement of Indian <strong>railway</strong> act<br />

The works must be carried out most carefully without any <strong>in</strong>fr<strong>in</strong>gement of the Indian Railway Act or the General and Subsidiary Rules <strong>in</strong><br />

force on the Railway, <strong>in</strong> such a way that they do not h<strong>in</strong>der Railway operation nor affect the proper function<strong>in</strong>g of or damage any Railway<br />

equipment, structure or roll<strong>in</strong>g stock except as agreed to by the Railway, provided that all damage and disfiguration caused by the<br />

contractor to any Railway or public property must be made good by the contractor at his own expenses fail<strong>in</strong>g which cost of such repairs<br />

shall be recovered from the Contractor.<br />

24.8 Recovery of cost of safety of track affected<br />

If safety of track etc is affected as a consequence of works under taken by the contractor, the contractor shall take immediate steps to<br />

restore normal conditions. In case of delay, the Railway shall, after giv<strong>in</strong>g due notice to the contractor, <strong>in</strong> writ<strong>in</strong>g, take necessary steps and<br />

recover the cost from the Contractor.<br />

24.9 Presence of supervisors while <strong>in</strong>terfer<strong>in</strong>g with work<strong>in</strong>g gears<br />

No work on the po<strong>in</strong>ts, track circuits, equipments <strong>in</strong>volv<strong>in</strong>g work<strong>in</strong>g signall<strong>in</strong>g gears, <strong>in</strong>ternal wir<strong>in</strong>g, cable term<strong>in</strong>ation etc., should be done<br />

unless and until contractor' s technical supervisors are present at site.<br />

24.10 Programm<strong>in</strong>g of work to avoid <strong>in</strong>terference with tra<strong>in</strong> movements<br />

The contractor will programme his work <strong>in</strong> such a manner so as not to <strong>in</strong>terfere <strong>in</strong> the work<strong>in</strong>g and movement of tra<strong>in</strong>s. No extra payment<br />

shall be allowed on this account and for tak<strong>in</strong>g any precautions or wastage of contractor‟s labour, time, etc. due to tra<strong>in</strong>s work<strong>in</strong>g.<br />

25.0 SITE CLEARANCE<br />

At the end of the work <strong>in</strong> each section the contractor shall, as a part of his contractual obligation, leave the area completely cleared of<br />

rubbish and obstructions of all k<strong>in</strong>ds accord<strong>in</strong>g to the <strong>in</strong>structions of the Railway‟s representative. Besides he shall take all necessary steps<br />

<strong>in</strong> the course of the execution of work to avoid the presence of loose earth and ballast on platforms, <strong>in</strong> dra<strong>in</strong>s, on the track formation and<br />

pathways <strong>in</strong> the vic<strong>in</strong>ity. If with<strong>in</strong> a fortnight of completion of the particular item of site work, the refuge is not cleared, the Railway will<br />

arrange to get them removed at the cost of the Contractor. However, before the Railway actually gets the site cleared, <strong>in</strong>timation <strong>in</strong> writ<strong>in</strong>g<br />

shall be sent to the contractor.<br />

26.0 MEASUREMENT<br />

26.1 The measurement of quantities for the purpose of payment to the contractor shall be under-taken station wise jo<strong>in</strong>tly by the representative<br />

of the Eng<strong>in</strong>eer and the contractor <strong>in</strong> course of and on completion of works item wise as <strong>in</strong>cluded <strong>in</strong> Schedule A (I) of Vol.-I and Schedule<br />

A (II) of Vol.-I attached hereto.<br />

26.2 The measurement of quantities shall be made only after ensur<strong>in</strong>g conformity with the specifications and various clauses of the supplement<br />

“Technical Specifications, Instructions and Draw<strong>in</strong>gs“.<br />

27.0 UNIT PRICE TO BE FIRM AND INCLUSIVE OF ALL TAXES<br />

27.1 The unit prices should be quoted by the contractor after tak<strong>in</strong>g all the relevant factors <strong>in</strong>to consideration and these should be firm and<br />

<strong>in</strong>clusive of all taxes as mentioned <strong>in</strong> clause 4.1 of Instructions to Tenderers and Conditions of Tender, without any variation clauses. The<br />

prices shall be quoted <strong>in</strong> rupees for the units under metric system.<br />

27.2 Prices to <strong>in</strong>clude element such as<br />

The unit prices offered aga<strong>in</strong>st the various items <strong>in</strong> Schedule A (I) and Schedule A (II) of Vol.-I will <strong>in</strong>clude besides labour the follow<strong>in</strong>g<br />

elements of cost.<br />

27.2.1 Cost of all materials required for prepar<strong>in</strong>g the cable route, lay<strong>in</strong>g the cables, cast<strong>in</strong>g of foundations, erection of signals, apparatus cases,<br />

Junction Boxes, <strong>in</strong>stallation of track circuits and po<strong>in</strong>t mach<strong>in</strong>es, work<strong>in</strong>g their transport to site and all other <strong>in</strong>cidentals connected<br />

therewith exclud<strong>in</strong>g the materials supplied by the Railway.<br />

27.2.2 Cost of transportation of materials supplied by the Railway from place of delivery to the site work <strong>in</strong> execution part of SOR/NS items of<br />

schedule A (I) & A (II) of Volume-I.<br />

27.2.3 Collection of balance cables, materials left over after the work, if any, and materials released and hand<strong>in</strong>g over to the Railway Eng<strong>in</strong>eers at<br />

specified location.<br />

Contractor’s signature with stamp Page 50


NOTE:<br />

If the balance cable length exceeds 50 Meters <strong>in</strong> length they will be rolled back <strong>in</strong> the same cable drum and handed over to the <strong>railway</strong><br />

Eng<strong>in</strong>eers, if otherwise the cable can be handed over loose.<br />

27.2.4 All other miscellaneous expenses necessary for the execution of the work and fulfillment of the contractual obligations.<br />

27.3 Schedule `B‟ if required<br />

If it is considered necessary that items of works <strong>in</strong>cluded <strong>in</strong> Schedule A (I) and Schedule A (II) of Vol.-I would not cover all works <strong>in</strong>volved<br />

to complete trench<strong>in</strong>g, lay<strong>in</strong>g of underground signall<strong>in</strong>g cables, cast<strong>in</strong>g of foundations, for signals, apparatus cases etc. and <strong>in</strong>stallation of<br />

various equipments and their wir<strong>in</strong>g test<strong>in</strong>g and commission<strong>in</strong>g of colour light signall<strong>in</strong>g, releas<strong>in</strong>g of materials etc. and all other works<br />

required <strong>in</strong> connection with a panel <strong>in</strong>terlocked <strong>in</strong>stallation, additional items of work which are considered necessary and unit prices of<br />

such items shall be given separately as Schedule „B‟ along with explanatory Notes.<br />

27.4 Negotiation of rates for items not <strong>in</strong>cluded <strong>in</strong> schedule A (I) and schedule A (II) of Volume-I.<br />

If dur<strong>in</strong>g the execution of the work the Contractor is called upon to carry out any new item of work not <strong>in</strong>cluded <strong>in</strong> accepted schedule A (I)<br />

and A (II) of Vol.-I and “Schedule-B”, if any, it should not be executed before a rate has been agreed to by the Railways <strong>in</strong> the manner as<br />

<strong>in</strong>dicated <strong>in</strong> General Conditions of contract and Instructions for tenderers of the Eng<strong>in</strong>eer<strong>in</strong>g, Department of Railway.<br />

28.0 ON ACCOUNT PAYMENT<br />

28.1 Subject to any deductions or recovery which the Railway may be entitled to make under contract, the contractor will be entitled to be paid<br />

from time to time by way of “ON ACCOUNT“ payment only for such works as <strong>in</strong> the op<strong>in</strong>ion of the Eng<strong>in</strong>eer he has executed <strong>in</strong> terms of<br />

contract.<br />

28.2 Separate bill for item/ sub item<br />

”ON ACCOUNT” payment shall be made separately for each item/ Sub item of work given <strong>in</strong> the schedule A(I) & A(II) of Vol.-I. The bill<br />

shall be submitted by the contractor for each station.<br />

28.3 On account payment for supply of items<br />

28.3.1 85% cost of supply items as given <strong>in</strong> Vol.- I (Annexure) shall be made on receipt of materials at contractor‟s depot at the rates quoted <strong>in</strong><br />

schedule A (I) of Vol.-I for respective items. The contractor should furnish a Bank guarantee for 15% of the amount claimed and <strong>in</strong>surance<br />

policy equal to the amount claimed for the material as per accepted rates <strong>in</strong> schedule A (I) of Vol.-I along with Invoices. The Bank<br />

Guarantee shall be <strong>in</strong> the prescribed form of State Bank of India or from any Scheduled Bank/ Nationalized Bank and valid for two month<br />

beyond the date of commission<strong>in</strong>g of work at the station item wise for which materials has been supplied.<br />

In the event of extension to the time of completion, the contractor shall extend the validity of the Bank guarantee and Insurance Policy. In<br />

the case the contractor is unable to furnish the Bank Guarantee, equivalent cash would be held by the purchaser from the payment due to<br />

the contractor. All Invoices shall be accompanied by the follow<strong>in</strong>g:<br />

28.3.1.1 Supplier‟s challans.<br />

28.3.1.2 Inspection certificate granted by the RDSO/RITES.<br />

28.3.1.3 Certificate of receipt of materials at contractor‟s depot duly accepted by purchaser‟s <strong>in</strong> charge of works.<br />

28.3.2 In case completion of works (Supply & erection) is held-up on Railway‟s account and date of completion is extended on Railway‟s account<br />

exclusively, ON ACCOUNT payment can be made to the extent of 85% of the cost of materials (supply portion <strong>in</strong> Schedule of rates) for the<br />

items as given <strong>in</strong> Vol-.I (Annexure) on production of 15% B.G. of amount claimed and production of Insurance policy of equal amount<br />

claimed on this account on the same terms & conditions as of Para 28.3.1.<br />

28.3.3 95% payment for items supplied under schedule A (I) and A(II) of Vol.-I shall be made on execution, erection, and <strong>in</strong>stallation of associate<br />

items of works <strong>in</strong>cluded <strong>in</strong> schedule A-I and A-II of Vol.-I based on measurement of executed quantity, less payment already made under<br />

clause 28.3.1, <strong>in</strong> on account payment.<br />

28.4 On account payment for <strong>in</strong>stallation portion of works <strong>in</strong>clud<strong>in</strong>g supply items not covered <strong>in</strong> para - 28.3 above<br />

On completion of each item of work <strong>in</strong> schedule A (I) and A (II) of Vol.-I at each station the contractor shall be paid to the extent of 95%<br />

price for supply & erection as <strong>in</strong>cluded <strong>in</strong> Schedule A (I) and schedule A (II) of Vol.-I less recovery of on account payment made under<br />

clause, except items No. 0203, 0204. For item No.0203 and 0204, only 60% on account payment shall be made after lay<strong>in</strong>g of the cables<br />

and 35% on account payment shall be made on completion of term<strong>in</strong>ation and test<strong>in</strong>g of cables jo<strong>in</strong>tly with the Railway representative. For<br />

item 401 & NS items perta<strong>in</strong><strong>in</strong>g to supply and <strong>in</strong>stallation of relay rack & term<strong>in</strong>ation board, only 60% on account payment shall be made<br />

after supply and <strong>in</strong>stallation of composite relay rack & term<strong>in</strong>ation board, with fuse bases, fuses etc. & term<strong>in</strong>ation of cables on completion<br />

of item <strong>in</strong> all respects and 35% on account payment shall be made after supply of completion draw<strong>in</strong>gs and accepted by Eng<strong>in</strong>eer <strong>in</strong>charge<br />

as mentioned <strong>in</strong> SOR items 0101 to 0105 of Schedule A (I) of Vol-I & item no. NS-1 to NS-5. (Draw<strong>in</strong>g and design items) of<br />

Schedule A (II) of Vol.-I. The payment made for supply items under para 28.3 shall be progressively adjusted.<br />

28.5 Not to exceed 95%of total payment<br />

28.5.1 The “ON ACCOUNT” payment shall not exceed 95% of the total on account payment due to the contractor on the rates <strong>in</strong>dicated <strong>in</strong> the<br />

Schedule A (I) and Schedule A (II) of Vol.-I. For this purpose, the payment to the contractor at each on account stage shall be restricted to<br />

95% of the amount calculated on the basis of rates <strong>in</strong>dicated <strong>in</strong> the Schedule A (I) & Schedule A (II) of Vol.-I.<br />

28.5.2 On Account payment for supply of materials shall be covered by stand<strong>in</strong>g Indemnity Bond <strong>in</strong> approved form attached with this volume as<br />

FORM No. 11.<br />

29.0 FINAL PAYMENT<br />

On the basis of completion certificate issued by the Competent Authority for all the works <strong>in</strong> all the sections covered <strong>in</strong> this contract, the<br />

f<strong>in</strong>al bill for the balance payment for each item/sub item of work shall be submitted by the contractor along with a clear “No Claim<br />

Certificate”. The completion certificate shall be issued by the Competent Authority only when he has accepted the work wholly after<br />

conduct<strong>in</strong>g the acceptance tests on each item of work and the f<strong>in</strong>al payment shall be released after ensur<strong>in</strong>g that, the validity of Bank<br />

Guarantee aga<strong>in</strong>st Performance Guarantee covers guarantee/ ma<strong>in</strong>tenance period as prescribed <strong>in</strong> Para-6.0 of these Special<br />

Conditions of Contract. The Competent Authority shall normally be the authority who is competent to sign the contract. If this Competent<br />

Authority is of the rank lower than JA Grade, then a JA Grade officer (concerned with the work) shall be the Competent Authority.<br />

30.0 SUBMISSION OF BILLS<br />

30.1 All bills shall be submitted to the authority mentioned <strong>in</strong> Volume-I (Annexure).<br />

30.2 The supplier /Contractor should <strong>in</strong>sert the follow<strong>in</strong>g clause <strong>in</strong> the bills: -<br />

“We certify that no additional duty set offs on the goods supplied by us have accrued under the MODVAT scheme <strong>in</strong> force on the date of<br />

supply, after we submitted our quotations and submitted the present bills”.<br />

In the event of MODVAT credit be<strong>in</strong>g extended by the Govt. of India to more items than already covered, the firm should advise the<br />

purchaser about the additional benefits accrued, through a letter conta<strong>in</strong><strong>in</strong>g the follow<strong>in</strong>g certificate or any variation thereof as may be<br />

considered necessary by <strong>in</strong>dividual Railway adm<strong>in</strong>istration.<br />

Contractor’s signature with stamp Page 51


“We hereby declare that we can avail additional duty set offs as per latest MODVAT scheme <strong>in</strong> force now and we hereby give a reduction<br />

of (------------------) per unit and agree to revise the prices <strong>in</strong>dicated <strong>in</strong> the order. The current E.D. of -------------------- is payable on this<br />

reduced price. Therefore, we request you to amend the order accord<strong>in</strong>gly.<br />

31.0 GUARANTEE/ MAINTENANCE<br />

31.1 The contractor shall guarantee satisfactory work<strong>in</strong>g of the equipment supplied (and not required to be <strong>in</strong>stalled) by him <strong>in</strong> respect of each<br />

station for a period of 18 months beg<strong>in</strong>n<strong>in</strong>g from the date of receipt of last supply. Similarly, the contractor shall guarantee satisfactory<br />

work<strong>in</strong>g of the equipment supplied and <strong>in</strong>stalled by him for a period of 12 calendar months beg<strong>in</strong>n<strong>in</strong>g from the date of issue of completion<br />

certificate.<br />

31.2 Dur<strong>in</strong>g this period, the Contractor shall keep all the equipment, materials and tools readily available and shall carry out at his own expense<br />

all modifications, additions or substitutions that may be considered necessary for the satisfactory work<strong>in</strong>g of the equipment supplied of<br />

work executed. F<strong>in</strong>al decision <strong>in</strong> respect of unsatisfactory work<strong>in</strong>g of the equipment/ work executed or faulty use of designs workmanship<br />

etc. shall rest with the Eng<strong>in</strong>eer- <strong>in</strong> charge, and the same shall be b<strong>in</strong>d<strong>in</strong>g on the contractor.<br />

31.3 Dur<strong>in</strong>g the aforesaid period of guarantee, the contractor shall be liable at his own cost for all repairs or replacement of any parts that may<br />

be found defective <strong>in</strong> the contract or equipment, irrespective of whether any defect arose as a result of faulty design, materials,<br />

workmanship, <strong>in</strong>stallation or otherwise provided that such defective parts which are not repairable at site, are promptly removed to the<br />

contractors works for repairs if required by him, and such defective parts should be replaced by him , by new ones <strong>in</strong> order to remove the<br />

defects at his own expenses. In case m<strong>in</strong>or repairs are carried out by the <strong>railway</strong> at site, the cost of such repairs plus departmental<br />

charges shall be borne by the Contractor.<br />

31.4 Indemnify<strong>in</strong>g Railway aga<strong>in</strong>st losses <strong>in</strong>curred<br />

In support of this Guarantee, the contractor shall Indemnify Railway aga<strong>in</strong>st all losses <strong>in</strong>curred by the Railway dur<strong>in</strong>g this Guarantee/<br />

Ma<strong>in</strong>tenance period aga<strong>in</strong>st the Bank Guarantee submitted <strong>in</strong> compliance of para –6.0 of these Special Conditions of Contract.<br />

32.0 AMENDMENTS/ CHANGES IN I.P. OR DELAY IN SUPPLY OF MATERIALS BY RAILWAYS.<br />

The Railway Adm<strong>in</strong>istration reserves the right to change or amend the draw<strong>in</strong>g as and when necessary at any stage of the work. No claim<br />

of any k<strong>in</strong>d whatsoever will be enterta<strong>in</strong>ed by the Railway on this account. In case the execution of any item of the work is held up for want<br />

of approved design, or late supply of such materials as are to be arranged by the Railway then such failure or delay shall <strong>in</strong> no way affect<br />

or vitiate the contract or alter the character thereof or entitle the contractor for damages or compensation therefore but <strong>in</strong> any such case,<br />

the Railway may grant such extension of the completion date as may be considered reasonable.<br />

33.0 SETTLEMENT OF DISPUTES - INDIAN RAILWAY ARBITRATION RULES (REF. GCC PARA 63 & 64) LATEST<br />

Matters f<strong>in</strong>ally determ<strong>in</strong>ed by the Railway -<br />

All disputes and differences of any k<strong>in</strong>d whatsoever aris<strong>in</strong>g out of or <strong>in</strong> connection with the contract, whether dur<strong>in</strong>g the progress of the<br />

work or after its completion and whether before or after the determ<strong>in</strong>ation of the contract, shall be referred by the contractor to the GM and<br />

the GM shall with<strong>in</strong> 120 days, after receipt of the contractor‟s representation make and notify decisions on all matters referred to by the<br />

contractor <strong>in</strong> writ<strong>in</strong>g provided that matters for which provision has been made <strong>in</strong> clauses 8, 18, 22(5), 39, 43(2), 45(a), 55, 55-A(5), 57, 57<br />

A, 61(1), 61(2) and 62(1) to (xiii)(B) of General Conditions of Contract or <strong>in</strong> any clause of the special conditions of the contract shall be<br />

deemed as 'excepted matters‟ (matters not arbitrable) and decisions of the Railway authority, thereon shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the<br />

contractor, provided further that 'excepted matters‟ shall stand specifically excluded from the purview of the arbitration clause.<br />

33.1 Demand for arbitration<br />

33.1.1 In the event of any dispute or difference between the parties hereto as to the construction or operation of this contract, or the respective<br />

rights and liabilities of the parties on any matter <strong>in</strong> question, dispute or difference on any account, or as to the withhold<strong>in</strong>g by the Railway<br />

of any certificate to which the contractor may claim to be entitled to, or if the Railway fails to make a decision with<strong>in</strong> 120 days, then and <strong>in</strong><br />

any such case, but except <strong>in</strong> any of the “excepted matters” referred to <strong>in</strong> clause 33.0 of these conditions, the contractor, after 120 days<br />

but with<strong>in</strong> 180 days of his present<strong>in</strong>g his f<strong>in</strong>al claim on disputed matters, shall demand <strong>in</strong> writ<strong>in</strong>g that the dispute or difference be referred<br />

to Arbitration.<br />

33.1.2 The demand for arbitration shall specify the matters which are <strong>in</strong> question, or subject of the dispute or difference as also the amount of<br />

claim item wise. Only such dispute(s) or difference(s) <strong>in</strong> respect of which the demand has been made, together with counter claims or set<br />

off, given by the Railway, shall be referred to arbitration and other matters shall not be <strong>in</strong>cluded <strong>in</strong> the reference.<br />

33.1.2.1 The arbitration proceed<strong>in</strong>gs shall be assumed to have commenced from the day, a written and valid demand for arbitration is received by<br />

the Railway.<br />

33.1.2.2 The claimant shall submit his claim stat<strong>in</strong>g the facts support<strong>in</strong>g the claims along with all relevant documents and the relief or remedy<br />

sought aga<strong>in</strong>st each claim with<strong>in</strong> a period of 30 days from the date of appo<strong>in</strong>tment of the Arbitral Tribunal.<br />

33.1.2.3 The Railway shall submit its deference statement and counter claim (s), if any, with<strong>in</strong> a period of 60 days of receipt of copy of claims from<br />

Tribunal thereafter, unless otherwise extension has been granted by tribunal.<br />

33.1.2.4 Place of arbitration: The place of arbitration would be with<strong>in</strong> the geographical limits of the Division of the Railway where the cause of<br />

action arose or the Headquarters of the concerned Railway or any other place with the written consent of both the parties.<br />

33.1.3 No new claim shall be added dur<strong>in</strong>g proceed<strong>in</strong>gs by either party, However, a party may amend or supplement the orig<strong>in</strong>al claim or<br />

difference thereof dur<strong>in</strong>g the course, of arbitration proceed<strong>in</strong>gs subject to acceptance by Tribunal, hav<strong>in</strong>g due regard to the delay <strong>in</strong><br />

mak<strong>in</strong>g it.<br />

33.1.4 If the Contractor (s) does/ do not prefer his/ their specific and f<strong>in</strong>al claims <strong>in</strong> writ<strong>in</strong>g, with<strong>in</strong> a period of 90 days of receiv<strong>in</strong>g the <strong>in</strong>timation<br />

from the Railways that the f<strong>in</strong>al bill is ready for payment, he/ they will be deemed to have waived his/ their claim (s) and the Railway shall<br />

be discharged and released of all liabilities under the contract <strong>in</strong> respect of these claims.<br />

33.2 Obligations dur<strong>in</strong>g pendency of arbitration<br />

Work under the contract shall, unless other wise directed by the Eng<strong>in</strong>eer, cont<strong>in</strong>ue dur<strong>in</strong>g the arbitration proceed<strong>in</strong>gs, and no payment<br />

due or payable by the Railway shall be withheld on account of such proceed<strong>in</strong>gs, provided, however it shall be open for the Arbitrator or<br />

Arbitrators to consider and decide whether or not such work should cont<strong>in</strong>ue dur<strong>in</strong>g arbitration proceed<strong>in</strong>gs.<br />

33.3 Appo<strong>in</strong>tment of arbitral tribunal & arbitral award.<br />

33.3.1 Appo<strong>in</strong>tment of arbitral tribunal<br />

33.3.1.1 In cases where the total value of all claims <strong>in</strong> question added together does not exceed Rs. 10,00,000 (Rupees Ten Lacs only), the Arbitral<br />

tribunal shall consist of a sole arbitrator who shall be a Gazetted Officer of Railway not below JA grade, nom<strong>in</strong>ated by the General<br />

Manager. The sole arbitrator shall be appo<strong>in</strong>ted with<strong>in</strong> 60 days from the day when a written and valid demand for arbitration is received by<br />

GM.<br />

33.3.1.2 In cases not covered by clause 33.3.1.1, the Arbitral Tribunal shall consist of a panel of three Gazetted Railway officers not below JA<br />

grade or 2 Railway Gazetted Officers not below JA Grade and a retired Railway Officer, retired not below the rank of SAG Officer, as the<br />

arbitrators. For this purpose, the Railway will send a panel of more than 3 names of Gazetted Railway Officers of one or more<br />

Contractor’s signature with stamp Page 52


Departments of the Railway, Which may also <strong>in</strong>clude the name(s) of retired Railway Officer(s) empanelled to work as Railway Arbitrator to<br />

the Contractor with<strong>in</strong> 60 days from the day when a written and valid demand for arbitration is received by the GM. Contractor will be asked<br />

to suggest to General Manager atleast 2 names out of the panel for appo<strong>in</strong>tment as contractor‟s nom<strong>in</strong>ee with<strong>in</strong> 30 days from the date of<br />

dispatch of the request by Railway. The General Manager shall appo<strong>in</strong>t at least one out of them as the contractor‟s nom<strong>in</strong>ee and will, also<br />

simultaneously appo<strong>in</strong>t the balance number of arbitrators either from the panel or from outside the panel, duly <strong>in</strong>dicat<strong>in</strong>g the 'presid<strong>in</strong>g<br />

arbitrator' from amongst the 3 arbitrators so appo<strong>in</strong>ted. GM shall complete this exercise of appo<strong>in</strong>t<strong>in</strong>g the Arbitral Tribunal with<strong>in</strong> 30 days<br />

from the receipt of the names of contractor's nom<strong>in</strong>ees. While nom<strong>in</strong>at<strong>in</strong>g the arbitrators it will be necessary to ensure that one of them is<br />

from the Accounts department. An Officer of Selection Grade of the Accounts department shall be considered of equal status to the<br />

officers <strong>in</strong> SA grade of other departments of the Railway for the purpose of appo<strong>in</strong>tment of arbitrators.<br />

33.3.1.3 If one or more of the Arbitrators appo<strong>in</strong>ted as above refuses to act as arbitrator, withdraws from his office as arbitrator or vacates his / their<br />

office / offices or is / are unable or unwill<strong>in</strong>g to perform his function as arbitrator for any reason whatsoever or dies or <strong>in</strong> the op<strong>in</strong>ion of the<br />

General Manager fails to act without undue delay, the General Manager shall appo<strong>in</strong>t a new arbitrator / arbitrators to act <strong>in</strong> his / their place<br />

<strong>in</strong> the same manner <strong>in</strong> which the earlier arbitrator / arbitrators had been appo<strong>in</strong>ted . Such re- constituted Tribunal, may at its discretion,<br />

proceed with the reference from the stage at which it was left by the previous arbitrator (s).<br />

33.3.1.4 The Arbitral Tribunal shall have power to call for such evidence by way of affidavits or otherwise, as the Arbitral Tribunal shall th<strong>in</strong>k proper,<br />

and it shall be the duty of parties hereto to do or cause to be done all such th<strong>in</strong>gs as may be necessary to enable the Arbitral Tribunal to<br />

make the award without any delay. The Arbitral Tribunal should record day-to-day proceed<strong>in</strong>gs. The proceed<strong>in</strong>gs shall normally be<br />

conducted on the basis of documents and written statements.<br />

33.3.1.5 While appo<strong>in</strong>t<strong>in</strong>g Arbitrator (s) under sub –clause 33.3.1.1, 33.3.1.2 and 33.3.1.3 above due care shall be taken that he / they is / are not<br />

the one / those who had an opportunity to deal with the matter to which the contract relates or who <strong>in</strong> the course of his / their duties as<br />

Railway servant (s) has / have expressed views on all or any of the matters under dispute or difference. The proceed<strong>in</strong>gs of the Arbitral<br />

Tribunal or the award made by such Tribunal will, however, not be <strong>in</strong>valid merely for the reason that one or more arbitrators had, <strong>in</strong> the<br />

course of his service, opportunity to deal with the maters to which the contract relates or who <strong>in</strong> the course of his/ their duties expressed<br />

views on all or any of the mattes under dispute.<br />

33.3.2 Arbitral award<br />

33.3.2.1 The arbitral award shall state Item wise, the sum and reasons upon which it is based. The analysis and reasons shall be detailed enough<br />

so that the award could be <strong>in</strong>ferred there from.<br />

33.3.2.2 A party may apply for corrections of any computational errors, any typographical or clerical errors or any other error of similar nature<br />

occurr<strong>in</strong>g <strong>in</strong> the award of tribunal with<strong>in</strong> 60 days of the receipt of the award.<br />

33.3.2.3 A party may apply to tribunal with<strong>in</strong> 60 days of the receipt of award to make an additional award as to claims presented <strong>in</strong> the arbitral<br />

proceed<strong>in</strong>gs but omitted from the arbitral award.<br />

33.4 In case of the Tribunal, compris<strong>in</strong>g of 3 members, any rul<strong>in</strong>g or award shall be made by a majority of members of Tribunal. In the absence<br />

of such a majority, the views of the presid<strong>in</strong>g arbitrator shall prevail.<br />

33.5 Where the arbitrator award is for the payment of money, no <strong>in</strong>terest shall be payable on whole or any part of the money for any period till<br />

the date on which the award is made.<br />

33.6 The cost of arbitration shall be borne by the respective parties. The cost shall <strong>in</strong>ter-alia <strong>in</strong>clude fee of the arbitrator(s) as per the rates fixed<br />

by the Railway Board from time to time and the fee shall be borne equally by both the parties. Further, the fee payable to the arbitrator(s)<br />

would be <strong>gov</strong>erned by the <strong>in</strong>structions issued on the subject by Railway Board from time to time irrespective of the fact whether the<br />

arbitrator(s) is/are appo<strong>in</strong>ted by the Railway Adm<strong>in</strong>istration or by the court of law unless specifically directed by Hon' ble court otherwise<br />

on the matter.<br />

33.7 Subject to the provisions of the aforesaid arbitration and conciliation Act 1996 and the rules there under any statutory modification thereof<br />

shall apply to the arbitration proceed<strong>in</strong>gs under this clause.<br />

34.0 DEFINITION OF SUPERVISORS / WORKMEN<br />

For Signall<strong>in</strong>g Works, a supervisor mentioned <strong>in</strong> General Conditions of contract of the Zonal Railways <strong>in</strong> whose jurisdiction this work falls,<br />

shall be an experienced person/ Eng<strong>in</strong>eer/ Ex-Signal Inspector of the Railway with 5 to 6 years experience <strong>in</strong> Railway Signall<strong>in</strong>g<br />

<strong>in</strong>stallation and about 2 years experience <strong>in</strong> supervision of works for <strong>in</strong>stallation of color light signall<strong>in</strong>g on Railways.<br />

In respect of workman, they shall be technicians/ artisans of the required trade and call<strong>in</strong>g or ex-Mechanical signal Fitters, Electrical Signal<br />

Fitters, Black smiths, Wiremen of Railways hav<strong>in</strong>g an experience of about 2 years <strong>in</strong> works similar to those required to be executed.<br />

35.0 TENDERERS TO ADVICE STRENGTH OF STAFF<br />

Tenderer/ Contractor should advise the number of Eng<strong>in</strong>eer Supervisors and Cable Jo<strong>in</strong>ters/ Artisans employed by him/ them or go<strong>in</strong>g to<br />

be employed with their names, qualifications, bio-datas and experience <strong>in</strong> this particular trade under consideration along with the Tender<br />

positively. Irrevocable letters of commitment of the said supervisors and key technicians/ artisans for do<strong>in</strong>g the works shall be furnished<br />

along with tender papers, if they are not already <strong>in</strong> employment of the tenderer.<br />

36.0 MOBILISATION ADVANCE<br />

36.1 If required by the contractor mobilisation advance limited to 10% of contract value, if contract value exceeds Rs. 1.0 crore (one crore),<br />

shall be payable on submission of irrevocable Bank Guarantee from a Nationalised Bank <strong>in</strong> India or the State Bank of India <strong>in</strong> a form<br />

acceptable to the Railway (FORM No. 6). Bank Guarantee should clearly cover pr<strong>in</strong>cipal plus <strong>in</strong>terest 18%. This advance shall be payable<br />

<strong>in</strong> two stages as under: -<br />

Stage 1: 5% of the contract value on sign<strong>in</strong>g the contract.<br />

Stage 2: 5% of the contract value on mobilisation of establishment etc. i.e. sett<strong>in</strong>g up of project office and actual commencement of work.<br />

Interest: The mobilisation advance shall carry an <strong>in</strong>terest at the rate of 18% (Eighteen percent) per annum for the period commenc<strong>in</strong>g<br />

from the date of payment of advance bill. The advance plus <strong>in</strong>terest is fully adjusted and recovery of the mobilisation advance along with<br />

its <strong>in</strong>terest shall be made from on account bills <strong>in</strong>clud<strong>in</strong>g design & f<strong>in</strong>al payment on prorata basis. The <strong>in</strong>terest will be charged on balance<br />

outstand<strong>in</strong>g on the first day of each month.<br />

The recovery of the advance shall commence when the work to an extent of 15% of the provisional value of the contract is completed.<br />

The recovery of pr<strong>in</strong>cipal and <strong>in</strong>terest shall be made at the rate of 15% of on Account payments such that the entire amount is recovered<br />

before total payment reaches 85% of the value of the contract.<br />

36.2 In case pr<strong>in</strong>cipal and <strong>in</strong>terest could not be deducted progressively from progress/ on account bills dur<strong>in</strong>g the course of the year, the<br />

<strong>in</strong>terest on moblisation advance as accrued <strong>in</strong> the end of an year will be recovered with<strong>in</strong> the first 30 days of the next year from the first<br />

progress / on account bill or any other bills which may be made by the Railways to the contractor. If, for the reason whatsoever, no<br />

progress/on account bill of any other amount is paid to the contractor, he will still pay to the Railways the accrued <strong>in</strong>terest <strong>in</strong> full with<strong>in</strong> the<br />

said 30 days of the next year, otherwise, the unpaid <strong>in</strong>terest will be added on to the pr<strong>in</strong>cipal and <strong>in</strong>terest for the next year will be charged<br />

on the balance compris<strong>in</strong>g pr<strong>in</strong>cipal as well as unpaid <strong>in</strong>terest.<br />

Contractor’s signature with stamp Page 53


36.3 In case of extension of the date of completion due to any reason whatsoever the <strong>in</strong>terest on the mobilisation advance outstand<strong>in</strong>g, would<br />

cont<strong>in</strong>ue to accrue as specified earlier and the contractor/firm would make the payment aga<strong>in</strong>st the advance <strong>in</strong> the same manner as<br />

specified <strong>in</strong> Para 36.2 above.<br />

36.4 No advance / extra payment other than stated above shall be payable aga<strong>in</strong>st the works.<br />

36.5 The tenderer shall specially <strong>in</strong>dicate <strong>in</strong> their offer whether mobilisation advance is required by them. In case no specific demand has been<br />

made <strong>in</strong> the offer, grant of mobilisation advance shall not be considered subsequently.<br />

36.6 No mobilisation advance would be considered for contracts with the value less than Rs.1.0 (one) crore.<br />

37.0 PRICE VARIATION CLAUSE (NOT APPLICABLE UPTO 50 LAKHS)<br />

The rates quoted by tenderer and accepted by Railway Adm<strong>in</strong>istration shall hold good till the completion of the work and no additional<br />

<strong>in</strong>dividual claim will be admissible on account of fluctuation <strong>in</strong> market rates, <strong>in</strong>crease <strong>in</strong> taxes/ any other levies/ tolls etc. except that<br />

payment/ recovery for overall market situation shall be made as per price variation clause given <strong>in</strong> Para below:<br />

Price variation on erection / <strong>in</strong>stallation shall be applicable only beyond orig<strong>in</strong>al DOC. If DOC is extended exclusively on Railway account<br />

and if orig<strong>in</strong>al DOC is up to 12 months or more but it is extended on Railways account and extended completion period becomes more<br />

than 12 months. Price variation shall be allowed on the basis of consumer price <strong>in</strong>dex (LO) for the month one month prior to orig<strong>in</strong>al DOC<br />

or 12 months which ever is later.<br />

Price variation shall be payable only on erection prices given <strong>in</strong> erection column of schedule of rate (LO) <strong>in</strong> PV format as per Enclosure–III<br />

of volume –I.<br />

The price <strong>in</strong>dex for <strong>in</strong>dustrial workers (base year 1982=100) published by Reserve Bank of India/ Indian Labour Journal will be the<br />

relevant <strong>in</strong>dex on the basis of which price variation given below is to be calculated. The base <strong>in</strong>dex would be the price <strong>in</strong>dex for the month<br />

of the orig<strong>in</strong>al completion period as per LOA. The price variation applicable would be as per the follow<strong>in</strong>g formula:<br />

Percentage <strong>in</strong>crease on amount Payable for erection for work done beyond orig<strong>in</strong>al DOC (L-LO) x 100 / LO<br />

as per rate <strong>in</strong> erection of<br />

Schedule of rate.<br />

Where L = All India consumer Price Index for <strong>in</strong>dustrial workers for the month of actual work done beyond orig<strong>in</strong>al DOC for which price<br />

variation is applicable.<br />

LO = All India consumer price <strong>in</strong>dex for <strong>in</strong>dustrial workers for the month which is one month prior to the date of orig<strong>in</strong>al DOC or 12 months<br />

whichever is later.<br />

It may be noted that no Price Variation shall by payable on material.<br />

LIST OF FORMS<br />

FORM No. 1<br />

FORM No.2<br />

FORM No. 3<br />

FORM No.4<br />

FORM No.5<br />

FORM No.6<br />

FORM No.7<br />

FORM No.8<br />

FORM No.9<br />

FORM No.10<br />

FORM No.11<br />

Spare<br />

Agreement<br />

Guarantee Bond for Performance Guarantee<br />

Stand<strong>in</strong>g Indemnity Bond for materials supplied to Contractor by Railway<br />

Bank Guarantee for Stores supplied by Railway<br />

Bank Guarantee for Advance<br />

Acknowledgement for receipt of materials/ cables<br />

Certificate for jo<strong>in</strong>t <strong>in</strong>spection of cable trench/ chase <strong>in</strong>clud<strong>in</strong>g ducts, pipes etc.<br />

Extension of period of completion of work on contractor‟s account<br />

Extension of period of completion of work<br />

Stand<strong>in</strong>g Indemnity Bond for `On Account‟ payments towards supply of<br />

materials<br />

FORM No. 2<br />

AGREEMENT<br />

Para-4<br />

Chapter-II, Volume-II<br />

AN AGREEMENT made this ________ day of _________ two thousand ______ between the President of India, act<strong>in</strong>g <strong>in</strong> the premises through the<br />

General Manager, Railway Electrification or his successor ___________ of the M<strong>in</strong>istry of Railway, Railway Board (here<strong>in</strong>after referred to as “ The<br />

Railways” of the one part) and M/s. __________ (here<strong>in</strong>after referred to as “Contractor” of the other part).<br />

Whereas <strong>in</strong> response to a call for tenders for the work of_____<br />

_________________________________________________________________________ on section ______________ of the<br />

__________________ Railway.<br />

As per Tender No._________ dated _______ opened on ________ credential bid & price bid on _________ hereto the contractor has submitted<br />

orig<strong>in</strong>al offer No. ________ dated __________ hereto and whereas the said tender of the contractor has been accepted for the said work as per<br />

copy of Letter of Acceptance No. ___________ dated ________ at the accepted amount and agreed deviations from the tender papers as per<br />

annexure -'A' and volume -I <strong>in</strong>clud<strong>in</strong>g schedule of quantities & rates of Schedule A (I) & A (II) at the accepted rates as per Annexure- 'B' hereto and<br />

an estimated contract value of Rs. _________ (<strong>in</strong> words) only and Volume –II i.e. Instructions to Tenderers and Special Conditions of Contract for<br />

Signall<strong>in</strong>g Works as per Annexure-„C‟.<br />

Contractor’s signature with stamp Page 54


Now this agreement witnesseth that <strong>in</strong> consideration of the premises and the payment to be made by the Railway to the contractor provided for<br />

here<strong>in</strong> below, the contractor shall supply all equipments and materials and execute and perform all works for which the said tender of the contractor<br />

has been accepted strictly accord<strong>in</strong>g to the various provisions <strong>in</strong> Annexure-„A‟, 'B' and Annexure-„C‟ hereto and upon such supply, execution and<br />

performance to the satisfaction of the Railway, the Railway shall pay to the contractor at the several rates accepted as per the said Annexure-'A'<br />

and „B‟ and <strong>in</strong> terms of provisions there<strong>in</strong>.<br />

In the witness whereof the parties have hereto set and subscribed their respective hands and /or seal the day and year respectively mentioned<br />

aga<strong>in</strong>st their respective signature.<br />

Signed and delivered at _______ by Shri ______________ for and on behalf of M/s___________ The contractor with<strong>in</strong> named <strong>in</strong> presence of:<br />

WITNESS:<br />

1. Signature:<br />

Date:<br />

Name <strong>in</strong> Block Capitals:<br />

Address:<br />

2. Signature:<br />

Date:<br />

Name <strong>in</strong> Block Capitals:<br />

Address:<br />

Signature of contractor & seal<br />

Signed and delivered at ___________ for and on behalf of the President of India by Shri ____________________________<strong>in</strong> the presence of: -<br />

WITNESS:<br />

1. Signature:<br />

Date:<br />

Name <strong>in</strong> Block Capitals:<br />

Address:<br />

Signature of Rly. Officer & seal<br />

2. Signature:<br />

Date:<br />

Name <strong>in</strong> Block Capitals:<br />

Address:<br />

Enclosures: -<br />

Annexure„A‟ Letter of Acceptance of tender bear<strong>in</strong>g No.____dated ______<br />

Annexure „B‟: Volume-I <strong>in</strong>clud<strong>in</strong>g schedule of quantities & rates of Schedule A (I) & A (II)<br />

Annexure‟C‟: Volume –II i.e. Instructions to tenderers and Special Conditions of Contract for Signall<strong>in</strong>g Works.<br />

FORM No. 3<br />

(On stamp paper of requisite value)<br />

Para-6.1<br />

Chapter-II, Volume-II<br />

GUARANTEE BOND FOR PERFORMANCE GUARANTEE<br />

(To be used by approved Scheduled Banks)<br />

In consideration of the President of India (here<strong>in</strong> after called “The Government”) hav<strong>in</strong>g agreed to exempt ________________________<br />

_______________________________________________(here<strong>in</strong>after<br />

(Name of Contractor)<br />

called“ the said contractor (s)”, from the demand, under the terms and conditions of an Agreement No. ___________________Dated_______<br />

made between____________________________________________ for (name of work) _________________________________________<br />

________________________________________________________<br />

(here-<strong>in</strong>-after called “The said Agreement”), of Performance Guarantee Bond for the due fulfillment by the said Contractor (s) of the terms and<br />

conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement, on production of a Bank Guarantee for Rs._____________________(Rupees <strong>in</strong><br />

words)___________________________________________________only.<br />

1. We _____________________________________________________<br />

(Indicate name of the Bank)(here-<strong>in</strong>-after referred to as “The Bank”) at the request of M/s. _________________________________________<br />

________________________________________________________<br />

(Name of contractor) do hereby undertake to pay to the Government an amount not exceed<strong>in</strong>g Rs. __________aga<strong>in</strong>st any loss or damage<br />

caused to or suffered or would be caused to or suffered by the Government by reason of any breach by the said Contractor (s) of any of the<br />

terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said, Agreement.<br />

2. We ______________________________________________Bank do (Indicate the name of Bank),<br />

hereby undertake to pay the amounts due and payable under this guarantee without any demur, merely on a demand from the Government<br />

stat<strong>in</strong>g that the amount claimed is due by way of loss or damage caused to or would be caused to or suffered by the Government by reason of<br />

breach by the said contractor (s) of any of the terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement or by reason of the Contractor„s failure to<br />

perform the said agreement. Any such demand made on the bank shall be conclusive as regards the amount due and payable by the Bank<br />

under this guarantee. However, our liability under this guarantee shall be restricted to an amount not exceed<strong>in</strong>g<br />

Rs._________________________<br />

3. We _________________________________________ Bank undertake (Indicate the name of Bank)<br />

Contractor’s signature with stamp Page 55


to pay the Government any money so demanded not withstand<strong>in</strong>g any dispute or disputes raised by the Contractor (s) / Supplier (s) <strong>in</strong> any suit or<br />

proceed<strong>in</strong>g thereof pend<strong>in</strong>g before any court or Tribunal relat<strong>in</strong>g there to our liability under this present contract be<strong>in</strong>g absolute and unequivocal. The<br />

payment so made by us under this bond shall be a valid discharge of our liability for payment there under and the contractor (s) supplier (s) shall<br />

have no claim aga<strong>in</strong>st us for mak<strong>in</strong>g such payment.<br />

4. We ______________________________________________Bank further (Indicate the name of Bank)<br />

agree that the guarantee here<strong>in</strong> conta<strong>in</strong>ed shall rema<strong>in</strong> <strong>in</strong> full force and effect dur<strong>in</strong>g the period that would be taken for the performance of the said<br />

agreement and that it shall cont<strong>in</strong>ue to be enforceable till all the dues of the Government under or by virtue of the said Agreement have been fully<br />

paid and its claims satisfied or discharged or till (name of office) M<strong>in</strong>istry of Railway certifies that the terms and conditions of the said Agreement<br />

have been fully and properly carried out by the said Contractor (s) and accord<strong>in</strong>gly discharges this guarantee unless a demand or claim under this<br />

guarantee is made on us <strong>in</strong> writ<strong>in</strong>g on or before the ________________ we shall be discharged from all liability under this guarantee<br />

thereafter.<br />

5. We _____________________________________________Bank further (Indicate the name of Bank)<br />

agree with the Government that the Government shall have the fullest liberty without our consent and without affect<strong>in</strong>g <strong>in</strong> any manner our obligations<br />

hereunder to vary any of the terms and conditions of the said Agreement or to extend time of performance by the said agreement or to extend time<br />

of performance by the said Contractor (s) from time to time or to postpone for any time or from time to time any of the power exercisable by the<br />

Government aga<strong>in</strong>st the said contractor (s) and to forbear or enforce any of the terms and conditions relat<strong>in</strong>g to the said agreement and we shall not<br />

be relieved from our liability by reason of any such variation, or extension be<strong>in</strong>g granted to the said contractor (s) of for any forbearance, act or<br />

omission on the part of the Government of any <strong>in</strong>dulgence by the Government to the said contractor (s) or by any such matter or th<strong>in</strong>g whatsoever<br />

which under the law relat<strong>in</strong>g to sureties would, but for this provision, have effect of so reliev<strong>in</strong>g us.<br />

6 This guarantee will not be discharged due to change <strong>in</strong> the constitution of the Bank or the Contractor (s)/ supplier (s).<br />

7 We _______________________________________________Bank lastly<br />

(Indicate the name of Bank)<br />

Undertake not to revoke this guarantee dur<strong>in</strong>g its currency except with the previous consent of the Government <strong>in</strong> writ<strong>in</strong>g.<br />

Dated the ________________________________________________<br />

Day of __________________________________________________<br />

For _____________________________________________________<br />

(Name of Bank)<br />

WITNESSES: -<br />

1. SIGNATURE<br />

NAME<br />

Signature of Bank Official Designation & seal<br />

DATE<br />

ADDRESS<br />

2. SIGNATURE<br />

NAME<br />

DATE<br />

ADDRESS<br />

NOTE: Where necessary Bond should be signed by two Bank Officials.<br />

FORM No. 4<br />

Para-8.5<br />

Chapter-II, Volume-II<br />

STANDING INDEMNITY BOND FOR MATERIALS SUPPLIED TO CONTRACTOR BY RAILWAY<br />

(On stamp paper of requisite value)<br />

We, M/s_____________________________________________<br />

(here<strong>in</strong> after called the Contractor ) do hereby undertake that we shall hold <strong>in</strong> our custody for and on behalf of the President of India act<strong>in</strong>g <strong>in</strong><br />

the premises through the General Manager, Railway Electrification or his successor ( here –<strong>in</strong> –after referred to as “Railway” ) and as his<br />

property <strong>in</strong> trust for him all imported and <strong>in</strong>digenous materials which have been handed over to us except under Clause 8.2 and 8.3 of Special<br />

conditions of contract aga<strong>in</strong>st the contract for___________<br />

________________________________________________________<br />

(Name of work)<br />

____________________________________________on the sections<br />

________________________________as per “Letter of Acceptance “ of Tender No._____________________________________________<br />

dated ____________and materials/ such as ________________ ________________________________________________________<br />

handed over to us by the Railway for the purpose of execution of the said contract, until such time the materials are duly <strong>in</strong>stalled and/ or<br />

erected or otherwise handed over to the Railway.<br />

We shall be entirely responsible for the safe custody and protection of the said materials aga<strong>in</strong>st all risk till they are duly delivered as <strong>in</strong>stalled<br />

and/ or erected equipment to the Railway or as directed other wise and shall <strong>in</strong>demnity the Railway aga<strong>in</strong>st any loss, damages or deterioration<br />

whatsoever <strong>in</strong> respect of the said materials while <strong>in</strong> our possession and aga<strong>in</strong>st disposal of surplus materials. The said materials shall at all time<br />

be open to <strong>in</strong>spection by any officer authorized by the General Manager, Railway Electrification or his successor.<br />

Should any loss, damage or deterioration of materials occur or surplus materials disposed off and a refund becomes due, the Railway shall be<br />

entitled to recover from us the full cost and compensation determ<strong>in</strong>ed <strong>in</strong> terms of the contract for such loss or damage if any, along with the<br />

amount to be refunded without prejudice to any other remedies available to him by deductions from any sum due or any sum which at any time<br />

hereafter becomes due to us under the said or any other Contract.<br />

In the event of any loss or damage as aforesaid the assessment of such loss or damage and the assessment of the compensation therefore<br />

would be made by the President of India act<strong>in</strong>g through the General Manager / Railway Electrification or his authorized nom<strong>in</strong>ee shall be f<strong>in</strong>al<br />

and b<strong>in</strong>d<strong>in</strong>g upon us.<br />

Signed at ________________________________________________<br />

On the day of ____________________________________________<br />

Signature of witness________________________________________<br />

For and on behalf of _______________________________________<br />

Contractor’s signature with stamp Page 56


M/s._____________________________________________________<br />

(Contractor)<br />

Name of witness:<br />

In block letters<br />

ADDRESS:<br />

FORM No. 5<br />

Para-8.5<br />

Chapter-II, Volume-II<br />

BANK GUARANTEE FOR STORES SUPPLIED BY RAILWAY<br />

(To be used by approved scheduled Bank)<br />

(On stamp paper or requisite value)<br />

In consideration of the President of India act<strong>in</strong>g through the F<strong>in</strong>ancial Advisor and Chief Accounts Officer, Railway Electrification, Allahabad or his<br />

successor/ nom<strong>in</strong>ee (here- <strong>in</strong>- after called “the Government”) hav<strong>in</strong>g agreed to exempt M/s._________________________________________<br />

(Here<strong>in</strong>after called “the said Contractor (s)”)<br />

from the demand, under terms and conditions of Agreement No.______ _________________________________dated__________made between<br />

the President of India act<strong>in</strong>g through the Chief Signal & Telecomm. Eng<strong>in</strong>eer, Railway Electrification, Allahabad and M/s._________________<br />

for the work of ______________________________________ <strong>in</strong> the said Agreement of Security Deposit for the due fulfillment by the said<br />

Contractor (s) of the terms and conditions conta<strong>in</strong>ed <strong>in</strong> Para _______of the said Agreement , on production of bank guarantee for<br />

Rs.________(Rupees_________________) We______________ Bank.<br />

(here<strong>in</strong>after referred to as Bank)<br />

do hereby undertake to pay to the Government to the extent of Rs.______________(Rupees_______________________) not exceed<strong>in</strong>g Rs.<br />

_____________aga<strong>in</strong>st any loss or damage caused to or suffered or would be caused to or suffered by the Government by reason of any breach by<br />

the said contractor (s) of any of the terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said Agreement .<br />

We ________________________________________________Bank do hereby undertake to pay the amount due and payable under this guarantee<br />

without any demur, merely on a demand from the Government stat<strong>in</strong>g that the amount claimed is due by way of loss of damage caused to or would<br />

be caused to or suffered by the Government by reason of breach by the said contractor (s) of any of the terms or conditions conta<strong>in</strong>ed <strong>in</strong> the said<br />

Agreement or by reason of the Contractor„s failure to perform the said agreement. Any such demand made on the bank shall be conclusive as<br />

regards the amount due and payable by the Bank under this guarantee shall be restricted to extend of Rs.____________ (Rupees_____________<br />

_______________only).<br />

We ______________________Bank further agree that the guarantee here<strong>in</strong> conta<strong>in</strong>ed shall rema<strong>in</strong> <strong>in</strong> full force and effect dur<strong>in</strong>g the<br />

period that would be taken for the performance of the said Agreement and that it shall cont<strong>in</strong>ue to be enforceable till all the dues of the Government<br />

under or by virtue of the said Agreement have been fully paid and its claims satisfied or discharged or till the Chief Signal and Telecommunication<br />

Eng<strong>in</strong>eer, Railway Electrification, Allahabad or his successor / nom<strong>in</strong>ee, M<strong>in</strong>istry of Railway, certifies that the terms and conditions of the said<br />

agreement have been fully and properly carried out by the said contractor (s) and accord<strong>in</strong>gly discharge the Guarantee, unless a demand or claim<br />

under this guarantee is made on us <strong>in</strong> writ<strong>in</strong>g on or before the_______________ We shall be discharged from all liability under this guarantee<br />

thereafter.<br />

We ___________________________________________Bank agree with the Government that the Government shall have the fullest liberty<br />

without our consent and without affect<strong>in</strong>g <strong>in</strong> any manner our obligations hereunder to vary any of the terms and conditions of the said Agreement or<br />

to extend time of performance by the said contractors from time to time or to postpone for any time or from time to time any of the powers<br />

exercisable by the Government aga<strong>in</strong>st the said contractors and to forbear or enforce any of the terms and conditions relat<strong>in</strong>g to the said<br />

Agreement and we shall not be relieved from our liability by reason of any such variation or extension be<strong>in</strong>g granted to the said contractors or for<br />

any forbearance, act or omission on the part of the Government or any <strong>in</strong>dulgence by the <strong>gov</strong>ernment to the said contractors or by any such matter<br />

or th<strong>in</strong>g whatsoever which under the law relat<strong>in</strong>g to sureties would but for this provision, have effect of so relieved us.<br />

We____________(Name of Bank) _______________________________ _______________lastly undertake not to revoke this guarantee dur<strong>in</strong>g its<br />

currency except with the previous consent of the Government <strong>in</strong> Writ<strong>in</strong>g.<br />

Dated____________<br />

WITNESS:-<br />

1. SIGNATURE: 2. SIGNATURE:<br />

NAME:<br />

NAME:<br />

DATE:<br />

DATE:<br />

ADDRESS:<br />

ADDRESS:<br />

Signed__________________<br />

Seal of the Bank With designation.<br />

Note: -Where necessary Bond should be signed by Two Bank Officers.<br />

FORM No. 6<br />

(On requisite stamp value)<br />

Para-36.1<br />

Chapter-II, Volume-II<br />

BANK GUARANTEE FOR ADVANCE<br />

The President of India,<br />

Through the Dy F<strong>in</strong>ancial Advisor& Chief Accounts Officer,<br />

Railway Electrification<br />

Secunderabad-500071.<br />

Contractor’s signature with stamp Page 57


In consideration of the President of India (here-<strong>in</strong>-after called “The Government”) hav<strong>in</strong>g agreed to pay to Masers ____________________<br />

_________________________________ <strong>in</strong> terms of letter of Acceptance/<br />

(here –<strong>in</strong>-after referred as “The contractor “ )<br />

Contract No.___________________________________ between the Government and the contractor (here-<strong>in</strong>-after referred to as the said<br />

contractor) <strong>in</strong> connection with the proper fulfillment of the terms and conditions regard<strong>in</strong>g _______________________________________by the<br />

Contractor under an Order No._________________________ issued by the Government to the Contractor, the sum of Rs._________________<br />

(Rupees_____________) aga<strong>in</strong>st this Bank Guarantee for Rs._________ (Rupees______________________) represent<strong>in</strong>g lump sump advance <strong>in</strong><br />

terms of Para ______ of the said Letter of Acceptance/Contract.<br />

1. We the ___________________________________________Bank<br />

(Here-<strong>in</strong>-after referred as the Bank)<br />

at ________________________________________________ do hereby undertake to <strong>in</strong>demnify and keep <strong>in</strong>demnified and to pay to the<br />

Government to the extent of Rs._________________________ (Rupees ____________________only) aga<strong>in</strong>st any loss or, damages caused to or<br />

suffered or would be caused to or suffered by the Government by reason of any breach of or failure of the contract or to perform his contractual<br />

obligation under the said clause of the contract.<br />

2. We______________________________________________ Bank at_________________________________ do hereby undertake to<br />

pay the amount due and payable under this guarantee without any demur merely on a demand from the Government stat<strong>in</strong>g that the amount claimed<br />

is due by way of loss or damage caused to or would be caused to or suffered by the Government by reason of any breach of the Contractor of any of<br />

the terms and conditions conta<strong>in</strong>ed <strong>in</strong> the said letter of acceptance/contract or by reason of the Contractor‟s failure to perform his contractual<br />

obligation under the said contract. Any such demand on the Bank shall be conclusive as regards the amount due and payable by the Bank under this<br />

guarantee.<br />

3. This Guarantee will become affective forthwith on the contractor or his nom<strong>in</strong>ee actually receiv<strong>in</strong>g the aforesaid amount from the<br />

Government.<br />

4. This Guarantee will be gradually and automatically reduced proportionately to such extent as the amount of f<strong>in</strong>al payment is adjusted<br />

aga<strong>in</strong>st the progress payment bill of the contractor <strong>in</strong> terms of Para _____<br />

of the said Letter of Acceptance / Contract.<br />

5. We __________________________________________________ Bank further agree that the Guarantee here<strong>in</strong> conta<strong>in</strong>ed shall rema<strong>in</strong> <strong>in</strong><br />

full force and effect up to______________________________________________ from the date the Contractor or his nom<strong>in</strong>ee actually received the<br />

amount from the Government.<br />

6. We ___________________________________________________Bank further unconditionally undertake to consider without any<br />

reference to the contractor to renew this guarantee or to extend the period of guarantee from year to year, with<strong>in</strong> two months before expiry of the<br />

period of the guarantee, or the extended period of the guarantee, with<strong>in</strong> 2 months after the expiry of the period of the guarantee or the extended<br />

period of the guarantee as the case may be, on be<strong>in</strong>g called upon to do so by the<br />

Government. If the guarantee is not duly renewed or the period duly extended on the demand by the Government then we shall pay the Government<br />

the full amount of the guarantee forthwith thereafter.<br />

7. We ___________________________________________________Bank agree that the decision of the Government whether any default<br />

has occurred or has been committed by the contractor shall be conclusive and b<strong>in</strong>d<strong>in</strong>g on us.<br />

8. The Government shall be at liberty from time to time without our consent and without effect<strong>in</strong>g <strong>in</strong> any manner our obligations hereunder to<br />

grant or allow extension of time or give <strong>in</strong>dulgence to the Contractor or to modify the terms and conditions of the said contract with the contractor<br />

without effect<strong>in</strong>g or impair<strong>in</strong>g this Guarantee or our liability hereunder.<br />

9 We ________________________________________________ Bank lastly undertake not to revoke this guarantee dur<strong>in</strong>g its currency or<br />

dur<strong>in</strong>g the extended period of its currency except with previous consent of the Government <strong>in</strong> writ<strong>in</strong>g.<br />

10 Not withstand<strong>in</strong>g any th<strong>in</strong>g conta<strong>in</strong>ed here<strong>in</strong> above our liability under this Guarantee is restricted to Rs.<br />

_________________________________ (Rupees _______________________________________________only).<br />

Our Guarantee shall rema<strong>in</strong> <strong>in</strong> force till ____________________________ unless a demand or claim under this Guarantee is made on us <strong>in</strong> writ<strong>in</strong>g<br />

on or before __________________________We shall be discharged from all liability under this guarantee thereafter.<br />

For _________________Bank<br />

WITNESS:-<br />

1. SIGNATURE:<br />

NAME:<br />

DATE:<br />

ADDRESS:<br />

2. SIGNATURE:<br />

NAME:<br />

DATE:<br />

ADDRESS:<br />

NOTE: - Where necessary the bond will be signed by Two Bank Officers.<br />

FORM No. 7<br />

Para-8.1<br />

Chapter-II, Volume-II<br />

STATION:<br />

ACKNOWLEDGEMENT FOR RECEIVING MATERIALS/ CABLE FROM RAILWAY<br />

To,<br />

The Executive Signal & Telecommunication Eng<strong>in</strong>eer,<br />

Railway Electrification,<br />

Secunderabad.<br />

Sir,<br />

Sub: Receipt of materials/ Cable from Railway.<br />

DATE:<br />

Contractor’s signature with stamp Page 58


It is hereby acknowledged that the follow<strong>in</strong>g materials/ cable as detailed below have been received <strong>in</strong> full and good condition by me at<br />

____________________<br />

for the work com<strong>in</strong>g under the Agreement No.___________________________<br />

dated __________________<br />

DESCRIPTION OF MATERIAL AND<br />

CABLE<br />

QUANTITY<br />

METER/ NOS.<br />

REMARKS, IF ANY<br />

Witnessed by: -<br />

(Signature of Eng<strong>in</strong>eer‟s<br />

Representative)<br />

(Signature of Contractor, or<br />

Contractor‟s Representative)<br />

FORM No. 8<br />

Para-18.5<br />

Chapter-II, Volume-II<br />

CERTIFICATE FOR JOINT INSPECTION OF CABLE TRENCH/ CHASE INCLUDING DUCTS, PIPES ETC.<br />

To,<br />

_________________________________<br />

__________________________________<br />

_________________________________<br />

The cable trench / chase <strong>in</strong>clud<strong>in</strong>g ducts, pipes, etc. arrangement enroute have been jo<strong>in</strong>tly <strong>in</strong>spected by us at the follow<strong>in</strong>g stations / and the same at this<br />

station / these stations have been done accord<strong>in</strong>g to the specification.<br />

SR.<br />

No.<br />

STATION<br />

From Location No.<br />

(At Kilometer)<br />

From Location No.<br />

(At Kilometer)<br />

Remarks<br />

Signature of Contractor‟s<br />

Representative<br />

Signature of Eng<strong>in</strong>eer‟s<br />

Representative with<br />

Designation<br />

FORM No. 9<br />

para-7.10.3<br />

Chapter-II, Volume-II<br />

EXTENSION OF PERIOD OF COMPLETION OF WORK ON CONTRACTOR‟S ACCOUNT<br />

No.<br />

Date:<br />

To,<br />

_______________________<br />

________________________<br />

Sub: -<br />

(i) Name of work _____________________________________________<br />

(ii) Acceptance Letter No._______________________________________<br />

(iii) Undertak<strong>in</strong>g/ Agreement No.__________________________________<br />

Ref: - ________________________ (Quote Specific application of the ContractorFor extension to the date, if received)<br />

Dear Sir,<br />

The stipulated date for completion of the work mentioned above is ___________<br />

_____________. From the progress made so far and the present rate of progress, it is unlikely that the work will be completed by the above date (or however, the work was not<br />

completed on this date).<br />

Contractor’s signature with stamp Page 59


Expect<strong>in</strong>g that you may be able to complete the work if some time is given, the _______(Insert here the contract<strong>in</strong>g party on behalf of the President of India)<br />

although not bound to do so, hereby extends the time for completion from ___________ to ____________.<br />

Please note that, as per para 7.10 of Special Conditions of Contract (SCC, Chapter-II, Volume-II) a sum equivalent to one half of one percent (1/2 of 1%) of the<br />

contract value of the works for each week or part thereof of the week, as a recovery for delay <strong>in</strong> completion of work after the expiry of _________________<br />

(Give here the stipulated date for completion without any penalty fixed earlier) will be recovered from you as mentioned <strong>in</strong> Para 7.10 of the Conditions of<br />

Contract for the extended period not withstand<strong>in</strong>g the grant of this extension. You may proceed with the work accord<strong>in</strong>gly.<br />

The above extension of the completion date will also be subject to the further condition that no <strong>in</strong>crease <strong>in</strong> rates on any account will be payable to you.<br />

Please <strong>in</strong>timate with<strong>in</strong> a week of the receipt of this letter, if you do not accept the extension of the conditions stated above.<br />

Please note that <strong>in</strong> the event of your decl<strong>in</strong><strong>in</strong>g to accept the extension on the above said conditions or <strong>in</strong> the event of your failure after accept<strong>in</strong>g or act<strong>in</strong>g up to<br />

this extension to complete the work by _________ (here mention the extended date), further action will be taken <strong>in</strong> terms of Para 7.8 of Special Conditions of<br />

Contract.<br />

Yours faithfully,<br />

( )<br />

For & on behalf of the President of India.<br />

FORM No. 10<br />

Para-7.11<br />

Chapter-II, Volume-II<br />

egd. With A/D<br />

EXTENSION OF PERIOD OF COMPLETION OF WORK<br />

No.<br />

To,<br />

____________________________<br />

______________________________<br />

Dear Sirs,<br />

Sub (i) ________________________________ (Name of work)<br />

(ii) Acceptance Letter No.___________________________<br />

(iii) Undertak<strong>in</strong>g / Agreement No.______________________<br />

Date:<br />

Ref: - _________________________________ (Quote specific application of<br />

The Contractor for extension to the date, if received)<br />

The stipulated date for completion of the work mentioned above under the above Contract was _______________________In consideration of the<br />

Contractor‟s Letter No. ____________________________________________of ________________ the General Manager on behalf of the President of<br />

India, is pleased to grant extension of the time for completion of works under Para 7.11 of the Contract as mentioned below: -<br />

It may be noted that unless repugnant to the context, all the terms and conditions of the contract will rema<strong>in</strong> unaltered dur<strong>in</strong>g the extended period from<br />

______________to ______________also, and further, no <strong>in</strong>creased additional rates and claims of recoveries which have not been already envisaged <strong>in</strong> terms<br />

of the conditions of the contract will be livable either by you or by the Purchaser <strong>in</strong> respect of this extended period.<br />

Yours faithfully<br />

( )<br />

For and on behalf of the President of India<br />

FORM No. 11<br />

Para-28.5.2<br />

Chapter-II, Volume-II<br />

STANDING INDEMNITY BOND FOR “ON ACCOUNT” PAYMENTS TOWARDS SUPPLY OF<br />

MATERIALS<br />

(On Paper of requisite Stamp value)<br />

We, M/s. ___________________________________________hereby undertake that we hold at our stores Depot/ s at<br />

_________________________________<br />

for and on behalf of the President of India act<strong>in</strong>g <strong>in</strong> the premises through the General Manager or his successor ____________________________Railway all<br />

(Here- <strong>in</strong> – after referred to as “The Purchaser “)<br />

materials for which `ON ACCOUNT‟ payments have been made to us aga<strong>in</strong>st the contract on the section /s ___________________of<br />

________________Railway awarded vide letter of Acceptance No.___________________ dated _____ and materials handed over to us by the Purchaser for<br />

the purpose of execution of the said Contract, until such time for the materials are duly erected or otherwise handed over to him.<br />

We shall be entirely responsible for the safe custody and protection of the said materials aga<strong>in</strong>st all risk till they are duly delivered as erected equipment to the<br />

Purchaser or as he may direct otherwise and shall <strong>in</strong>demnify the Purchaser aga<strong>in</strong>st any loss damage on deterioration whatsoever <strong>in</strong> respect of the said<br />

materials while <strong>in</strong> our possession and aga<strong>in</strong>st disposal of surplus materials. The said materials shall at all times be open to <strong>in</strong>spection by any officer authorized<br />

by the General Manager <strong>in</strong> charge of Railway Electrification (whose address will be <strong>in</strong>timated <strong>in</strong> the due course).<br />

Should any loss, damage of deterioration of materials occur or surplus materials disposed off and refund becomes due, the purchaser shall be entitled to<br />

recover from us the full cost as per prices <strong>in</strong>cluded <strong>in</strong> the Contract (as applicable) and also compensation for such loss or damage if any along with the amount<br />

to be refunded without prejudice to any other remedies available to him by deduction from any sum due or any sum which at any time hereafter becomes due<br />

to us under the said or any other contract.<br />

Dated this_________________________ day of ______________2006<br />

For and on behalf of M/s.________________________________ (Contractor)<br />

Signature of witness :<br />

Name of witness <strong>in</strong> Block letters :<br />

Address :<br />

Contractor’s signature with stamp Page 60