Reminder to Bidders - Page 1 of 5<br />

<strong>REMINDER</strong> <strong>TO</strong> <strong>BIDDERS</strong> <strong>FOR</strong> <strong>CIVIL</strong> <strong>WORKS</strong><br />

Note:<br />

These notes are for advice only and shall NOT form part of the bidding documents.<br />

The bidding documents prevail over any statement given here and the responsibility<br />

for interpretation rests with the reader.<br />

Bidders must read and understand these notes prior to preparing bids<br />

1 This tender will use the Ministry of Public Works Semi E-Procurement system.<br />

Site Visit will be held at 13.00 WITA on August 10 th , 2011 (meeting point-at<br />

Kota Sinjai Km.219 Kabupaten Sinjai, before departing to site).<br />

Pre-Bid meeting will be held at 10.00 WITA on August 12 th , 2011 at Jalan<br />

Mesjid Raya No.72, 2 nd Floor, Makassar.<br />

The Bidder is also advised to visit and examine the Site of Works and its<br />

surroundings and obtain for itself on its own responsibility all information that<br />

may be necessary for preparing the bid and entering into a contract for<br />

construction of the Works. The costs of visiting the Site shall be at the Bidder’s<br />

own expense. (ITB 7.2)<br />

2 There is no pre-qualification of bidders, and bidding is open to all eligible<br />

bidders.<br />

Information for post qualification of bidders will be obtained from the documents<br />

submitted with the bids or during clarification. No document/information can be<br />

added after bid opening except if asked by the Pokja / ULP during the<br />

clarification and, in case any, will not change the prices or substance of the bid.<br />

The Employer will assume that all information in bidding documents is correct<br />

and complete. If there is any omission, including misrepresentation, that<br />

knowingly or recklessly misleads, or attempts to mislead in the document, the<br />

provisions of Clause 3 ITB (Fraud and Corruption) will apply, the bid will be<br />

disqualified and the Bidder will be blacklisted for two years.<br />

Post-Qualification Important Note:<br />

Bidders must read and understand the importance of the Evaluation and Post-<br />

Qualification Criteria included in the bidding documents and must check that<br />

their submitted information will allow them to pass ALL the requirements.<br />

The post-qualification uses pass/fail on every item and failure to pass any one<br />

item will disqualify the bid.


Reminder to Bidders - Page 2 of 5<br />

The requirements are found in Part 1 Section III 1. Evaluation<br />

In addition to the criteria listed in ITB 34.2 (a) – (e) the following criteria shall<br />

apply:<br />

1.1 Assessment of adequacy of Technical Proposal with Requirements<br />

Evaluation of the Bidder's Technical Proposal will include an assessment of<br />

the Bidder's technical capacity to mobilize key equipment and personnel for<br />

the contract consistent with its proposal regarding work methods,<br />

scheduling, and material sourcing in sufficient detail and fully in accordance<br />

with the requirements stipulated in Section VI (Work’s Requirements).<br />

1.2 A Bidder can be awarded only one contract package, although it may submit<br />

bids for several packages, and may be the lowest evaluated substantially<br />

responsive bid on more than one bid. The Employer will evaluate and<br />

compare Bids on the basis of a total of contracts in order to arrive at the least<br />

cost combination for the Employer by taking into account discounts offered<br />

by Bidders. The determination on which contract(s) to be awarded to the<br />

lowest evaluated bidder will be based on the lowest combination of prices<br />

that will result from the different possible options of consideration for award<br />

to the second lowest bidder(s) for the contract(s) in question. The bidder<br />

shall not be involved in this determination.<br />

If your company cannot pass all of the requirements for post-qualification then do<br />

not bid but consider joining another larger company as a partner or as a subcontractor.<br />

Failure of one party in a joint operation to post-qualify will disqualify all parties<br />

and the bid will be disallowed.<br />

The requirements are found in Part 1 Section III 2. Qualification. Take<br />

particular notice of the conditions under 2.1 - Eligibility, 2.2 - Non-performance,<br />

2.3 - Financial Situation, 2.4 - Experience specially Key Activities about<br />

production Rate; and 2.5 - Personnel and 2.6 Equipment. Your company or joint<br />

venture/operation must satisfy all requirements in order to post-qualify<br />

All financial requirements in post qualification shall be presented in USD. The<br />

exchange rate to be used for determining the equivalent US$ value shall be the<br />

Transaction Selling Rate published by the Bank of Indonesia as noted in each<br />

relevant form. The exchange rate shall be obtained from the BI website at the<br />

following address:<br />

http://www.bi.go.id/web/en/Moneter/Kurs+Bank+Indonesia/Kurs+Transaksi/<br />

Note that methods of converting financial rupiah accounts to USD are found in<br />

the Bidding documents under each form. If your accounts are in a third currency<br />

then convert the rate by converting first to rupiah (using the rate from the BI<br />

website) and then from rupiah to USD.


Reminder to Bidders - Page 3 of 5<br />

3 Part 2 Section VI-1 Scope of Works<br />

This Work Package is divided into two separate Sections. Each section shall be<br />

provided with a separate team with minimum key personnel and key equipment as<br />

stipulated in the Section III. Sub-factor 2.5 and 2.6.<br />

4 All Bidders found to have a conflict of interest shall be disqualified (ITB 4.3).<br />

A bidder may be considered to have conflict of interest with one or more parties<br />

in the bidding process, if:<br />

(a) they have at least one controlling partner in common; or<br />

(b) they received or have received any direct or indirect subsidy from any of<br />

them; or<br />

(c) they have same legal representative for purposes of this bid; or<br />

(d) they have a relationship with each other, directly or through common third<br />

parties, that puts them in a position to have access to information about or<br />

influence on the bid of another Bidder, or influence to the decision of the<br />

Employer regarding this bidding process; or<br />

(e)<br />

(f)<br />

a Bidder participates in more than one bid in this bidding process; or<br />

a Bidder participated as consultant in the preparation of the design or<br />

technical specifications of the works that are subject of the bid; or<br />

(g) a Bidder or any of its affiliates has been hired (or is proposed to be hired) by<br />

the Employer as Engineer for the Contract Implementation.<br />

5 If necessary, the Pokja will check the reliability of the information and the<br />

condition of the proposed equipment, material quarry and reported on-going or<br />

past construction contracts to the site. If found that the information is incorrect,<br />

the provisions of Clause 3 ITB will apply and the bid may be disqualified.<br />

6 The original bid security must be enclosed with the bid, not held by the Bidder<br />

or submitted in a separate envelope. Photocopy of the bid security is not accepted.<br />

7 In the bidding document for which duty stamp (meterai) is required, failure to<br />

attach the stamp or to date the stamp will not cause the bid to be disqualified, but<br />

those requirements can be added following the Law No. 13/1985. The absence of<br />

Company seal does not cause the bid to be rejected.<br />

8 This is a unit price contract and selected pay items (unit prices) are subject to the<br />

price adjustment provisions of the Conditions of Contract, if the original time<br />

for completion exceeds three hundred sixty five (365) days.<br />

The Bidders shall provide unit price analysis of each selected pay item. In the<br />

event the unit price of the pay item stated in the priced Bill of Quantities is


Reminder to Bidders - Page 4 of 5<br />

different from unit price in the unit price analysis, the unit price in the priced Bill<br />

of Quantities shall prevail.<br />

9 This contract is unit price contract type. No condition limits that the unit rates for<br />

any item offered in the bid are only applicable up to the original quantities as<br />

stipulated in the BOQ provided in the bidding documents.<br />

Revised unit rates may be applicable referring to GC 12.3 Evaluation.<br />

10 Bidders are reminded to use the forms provided in the Section IV of Bidding<br />

Procedure for Letter of Bid and Unconditional Bid Security. If the bidder uses<br />

other forms substantially different to the forms mentioned above, the bid may be<br />

rejected.<br />

11 Bidders are reminded to submit the bid to the relevant Pokja at the address, date,<br />

time and for the validity as specified in the bid document. Failure to fulfill this<br />

provision will result in the bid being rejected.<br />

12 Bidders are reminded to submit Bid Security in the form of Unconditional Bank<br />

Guarantee in the amount and validity as specified in the bid document. Failure to<br />

fulfill this provision will result in the bid being rejected.<br />

13 Bidders are reminded to check that they attach all required supporting<br />

documentation to their bids and complete all forms that are supplied as part of<br />

the bidding documents. Failure to do so may result in the Bids being declared<br />

substantially not responsive and if so, the bids will be rejected.<br />

14 Bidders are reminded that the bid must be properly signed as specified in the<br />

Instruction to Bidders. Bidders must also initial any hand written changes in their<br />

Bid Documents, especially in their Bid or priced Bill of Quantities. Failure to do<br />

so, will result in their bids being rejected<br />

15 Bidders are reminded to check whether they have signed the blank Integrity<br />

Pact Form distributed with the bid document and included it in their Bid. Lack<br />

of a signed Integrity Pact will cause the Bid to be rejected<br />

16 Bidders are reminded that winning Contractors are auditable by an independent<br />

auditor.<br />

17 Bidders are recommended to check carefully the provisions of environment<br />

clauses in Section 1.17 of the Technical Specifications, the cost of<br />

implementation of which should be included in other Pay Items.<br />

18 Bidders are reminded that some Clauses in the General Conditions have been<br />

replaced, and the new clause is shown in the Special Conditions. The General<br />

Conditions have not been amended.


Reminder to Bidders - Page 5 of 5<br />

19 Information relating to the evaluation of bids and recommendation of contract<br />

award shall not be disclosed to Bidders or any other persons not officially<br />

concerned with such process until information on Contract award is<br />

communicated to all Bidders.<br />

Any attempt by a Bidder to influence the Employer in the evaluation of the bids<br />

or Contract award decisions may result in the rejection of its bid<br />

20 Communication between Bidders and Employer during bidding process and<br />

evaluation shall be in writing, in the forms of letter, fax or email. Bidders shall<br />

confirm to Pokja by fax or email immediately after receiving the information,<br />

whether it will be replied or not. Face to face contact between Bidders and Pokja<br />

is strongly prohibited.<br />

21 If there is any item which is not clear you may ask for clarification from the Pokja<br />

/ ULP in writing only. There shall be no oral or face to face contact between any<br />

bidder and any member of the Pokja.