Note:<br />
These notes are for advice only and shall NOT form part of the bidding documents.<br />
The bidding documents prevail over any statement given here and the responsibility<br />
for interpretation rests with the reader.<br />
Bidders must read and understand these notes prior to preparing bids<br />
1 This tender will use the Ministry of Public Works Semi E-Procurement system.<br />
Site Visit will be held at 13.00 WITA on August 10 th , 2011 (meeting point-at<br />
Kota Sinjai Km.219 Kabupaten Sinjai, before departing to site).<br />
Pre-Bid meeting will be held at 10.00 WITA on August 12 th , 2011 at Jalan<br />
Mesjid Raya No.72, 2 nd Floor, Makassar.<br />
The Bidder is also advised to visit and examine the Site of Works and its<br />
surroundings and obtain for itself on its own responsibility all information that<br />
may be necessary for preparing the bid and entering into a contract for<br />
construction of the Works. The costs of visiting the Site shall be at the Bidder’s<br />
own expense. (ITB 7.2)<br />
2 There is no pre-qualification of bidders, and bidding is open to all eligible<br />
bidders.<br />
Information for post qualification of bidders will be obtained from the documents<br />
submitted with the bids or during clarification. No document/information can be<br />
added after bid opening except if asked by the Pokja / ULP during the<br />
clarification and, in case any, will not change the prices or substance of the bid.<br />
The Employer will assume that all information in bidding documents is correct<br />
and complete. If there is any omission, including misrepresentation, that<br />
knowingly or recklessly misleads, or attempts to mislead in the document, the<br />
provisions of Clause 3 ITB (Fraud and Corruption) will apply, the bid will be<br />
disqualified and the Bidder will be blacklisted for two years.<br />
Post-Qualification Important Note:<br />
Bidders must read and understand the importance of the Evaluation and Post-<br />
Qualification Criteria included in the bidding documents and must check that<br />
their submitted information will allow them to pass ALL the requirements.<br />
The post-qualification uses pass/fail on every item and failure to pass any one<br />
item will disqualify the bid.
Reminder to Bidders - Page 2 of 5<br />
The requirements are found in Part 1 Section III 1. Evaluation<br />
In addition to the criteria listed in ITB 34.2 (a) – (e) the following criteria shall<br />
apply:<br />
1.1 Assessment of adequacy of Technical Proposal with Requirements<br />
Evaluation of the Bidder's Technical Proposal will include an assessment of<br />
the Bidder's technical capacity to mobilize key equipment and personnel for<br />
the contract consistent with its proposal regarding work methods,<br />
scheduling, and material sourcing in sufficient detail and fully in accordance<br />
with the requirements stipulated in Section VI (Work’s Requirements).<br />
1.2 A Bidder can be awarded only one contract package, although it may submit<br />
bids for several packages, and may be the lowest evaluated substantially<br />
responsive bid on more than one bid. The Employer will evaluate and<br />
compare Bids on the basis of a total of contracts in order to arrive at the least<br />
cost combination for the Employer by taking into account discounts offered<br />
by Bidders. The determination on which contract(s) to be awarded to the<br />
lowest evaluated bidder will be based on the lowest combination of prices<br />
that will result from the different possible options of consideration for award<br />
to the second lowest bidder(s) for the contract(s) in question. The bidder<br />
shall not be involved in this determination.<br />
If your company cannot pass all of the requirements for post-qualification then do<br />
not bid but consider joining another larger company as a partner or as a subcontractor.<br />
Failure of one party in a joint operation to post-qualify will disqualify all parties<br />
and the bid will be disallowed.<br />
The requirements are found in Part 1 Section III 2. Qualification. Take<br />
particular notice of the conditions under 2.1 - Eligibility, 2.2 - Non-performance,<br />
2.3 - Financial Situation, 2.4 - Experience specially Key Activities about<br />
production Rate; and 2.5 - Personnel and 2.6 Equipment. Your company or joint<br />
venture/operation must satisfy all requirements in order to post-qualify<br />
All financial requirements in post qualification shall be presented in USD. The<br />
exchange rate to be used for determining the equivalent US$ value shall be the<br />
Transaction Selling Rate published by the Bank of Indonesia as noted in each<br />
relevant form. The exchange rate shall be obtained from the BI website at the<br />
following address:<br />
http://www.bi.go.id/web/en/Moneter/Kurs+Bank+Indonesia/Kurs+Transaksi/<br />
Note that methods of converting financial rupiah accounts to USD are found in<br />
the Bidding documents under each form. If your accounts are in a third currency<br />
then convert the rate by converting first to rupiah (using the rate from the BI<br />
website) and then from rupiah to USD.
Reminder to Bidders - Page 3 of 5<br />
3 Part 2 Section VI-1 Scope of Works<br />
This Work Package is divided into two separate Sections. Each section shall be<br />
provided with a separate team with minimum key personnel and key equipment as<br />
stipulated in the Section III. Sub-factor 2.5 and 2.6.<br />
4 All Bidders found to have a conflict of interest shall be disqualified (ITB 4.3).<br />
A bidder may be considered to have conflict of interest with one or more parties<br />
in the bidding process, if:<br />
(a) they have at least one controlling partner in common; or<br />
(b) they received or have received any direct or indirect subsidy from any of<br />
them; or<br />
(c) they have same legal representative for purposes of this bid; or<br />
(d) they have a relationship with each other, directly or through common third<br />
parties, that puts them in a position to have access to information about or<br />
influence on the bid of another Bidder, or influence to the decision of the<br />
Employer regarding this bidding process; or<br />
(e)<br />
(f)<br />
a Bidder participates in more than one bid in this bidding process; or<br />
a Bidder participated as consultant in the preparation of the design or<br />
technical specifications of the works that are subject of the bid; or<br />
(g) a Bidder or any of its affiliates has been hired (or is proposed to be hired) by<br />
the Employer as Engineer for the Contract Implementation.<br />
5 If necessary, the Pokja will check the reliability of the information and the<br />
condition of the proposed equipment, material quarry and reported on-going or<br />
past construction contracts to the site. If found that the information is incorrect,<br />
the provisions of Clause 3 ITB will apply and the bid may be disqualified.<br />
6 The original bid security must be enclosed with the bid, not held by the Bidder<br />
or submitted in a separate envelope. Photocopy of the bid security is not accepted.<br />
7 In the bidding document for which duty stamp (meterai) is required, failure to<br />
attach the stamp or to date the stamp will not cause the bid to be disqualified, but<br />
those requirements can be added following the Law No. 13/1985. The absence of<br />
Company seal does not cause the bid to be rejected.<br />
8 This is a unit price contract and selected pay items (unit prices) are subject to the<br />
price adjustment provisions of the Conditions of Contract, if the original time<br />
for completion exceeds three hundred sixty five (365) days.<br />
The Bidders shall provide unit price analysis of each selected pay item. In the<br />
event the unit price of the pay item stated in the priced Bill of Quantities is
Reminder to Bidders - Page 4 of 5<br />
different from unit price in the unit price analysis, the unit price in the priced Bill<br />
of Quantities shall prevail.<br />
9 This contract is unit price contract type. No condition limits that the unit rates for<br />
any item offered in the bid are only applicable up to the original quantities as<br />
stipulated in the BOQ provided in the bidding documents.<br />
Revised unit rates may be applicable referring to GC 12.3 Evaluation.<br />
10 Bidders are reminded to use the forms provided in the Section IV of Bidding<br />
Procedure for Letter of Bid and Unconditional Bid Security. If the bidder uses<br />
other forms substantially different to the forms mentioned above, the bid may be<br />
rejected.<br />
11 Bidders are reminded to submit the bid to the relevant Pokja at the address, date,<br />
time and for the validity as specified in the bid document. Failure to fulfill this<br />
provision will result in the bid being rejected.<br />
12 Bidders are reminded to submit Bid Security in the form of Unconditional Bank<br />
Guarantee in the amount and validity as specified in the bid document. Failure to<br />
fulfill this provision will result in the bid being rejected.<br />
13 Bidders are reminded to check that they attach all required supporting<br />
documentation to their bids and complete all forms that are supplied as part of<br />
the bidding documents. Failure to do so may result in the Bids being declared<br />
substantially not responsive and if so, the bids will be rejected.<br />
14 Bidders are reminded that the bid must be properly signed as specified in the<br />
Instruction to Bidders. Bidders must also initial any hand written changes in their<br />
Bid Documents, especially in their Bid or priced Bill of Quantities. Failure to do<br />
so, will result in their bids being rejected<br />
15 Bidders are reminded to check whether they have signed the blank Integrity<br />
Pact Form distributed with the bid document and included it in their Bid. Lack<br />
of a signed Integrity Pact will cause the Bid to be rejected<br />
16 Bidders are reminded that winning Contractors are auditable by an independent<br />
auditor.<br />
17 Bidders are recommended to check carefully the provisions of environment<br />
clauses in Section 1.17 of the Technical Specifications, the cost of<br />
implementation of which should be included in other Pay Items.<br />
18 Bidders are reminded that some Clauses in the General Conditions have been<br />
replaced, and the new clause is shown in the Special Conditions. The General<br />
Conditions have not been amended.
Reminder to Bidders - Page 5 of 5<br />
19 Information relating to the evaluation of bids and recommendation of contract<br />
award shall not be disclosed to Bidders or any other persons not officially<br />
concerned with such process until information on Contract award is<br />
communicated to all Bidders.<br />
Any attempt by a Bidder to influence the Employer in the evaluation of the bids<br />
or Contract award decisions may result in the rejection of its bid<br />
20 Communication between Bidders and Employer during bidding process and<br />
evaluation shall be in writing, in the forms of letter, fax or email. Bidders shall<br />
confirm to Pokja by fax or email immediately after receiving the information,<br />
whether it will be replied or not. Face to face contact between Bidders and Pokja<br />
is strongly prohibited.<br />
21 If there is any item which is not clear you may ask for clarification from the Pokja<br />
/ ULP in writing only. There shall be no oral or face to face contact between any<br />
bidder and any member of the Pokja.