28.05.2015 Views

Planning Documents for NC

This Planning Document is written to get knowledge about the Dräger portfolio and also to find advices to build up an intensive care area. This document contains an overview about the products of Dräger and its technical data. At the last pages of this document you will find several Dräger solutions as an example. According to this you will find detailed drawing of the single workplaces.

This Planning Document is written to get knowledge about the Dräger portfolio
and also to find advices to build up an intensive care area. This document
contains an overview about the products of Dräger and its technical data.
At the last pages of this document you will find several Dräger solutions as
an example. According to this you will find detailed drawing of the single
workplaces.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

22 |<br />

PLANNING DOCUMENTS FOR <strong>NC</strong> |<br />

DRÄGER PORTFOLIO<br />

Ceiling fixtures <strong>for</strong> lights/display arms<br />

PRODUCT DESCRIPTION<br />

The Dräger ceiling fixation supports the<br />

installation of the lights and display holder (at<br />

central axis). The OR light/display arm can be<br />

fixed directly under the concrete ceiling<br />

(direct mounting). The distance tube allows<br />

<strong>for</strong> mounting at different heights of up to 1200<br />

mm under concrete ceiling, in order to bridge<br />

the space above false ceiling. The installation<br />

manuals are part of the delivery.<br />

MOUNTING VARIANTS<br />

Direct mount<br />

This system is recommended as a direct<br />

mount or <strong>for</strong> use with a false ceiling up to a<br />

distance of 600 mm between concrete and<br />

false ceiling or in combination with a laminar<br />

flow system. The suspension tube is available<br />

in five standard lengths (220/460/630/<br />

800/1000 mm). For service purposes, it is to<br />

be considered that the electrical components<br />

are installed in a switch box near the <strong>NC</strong><br />

(max. 40 m).<br />

D-90851-2013<br />

With ceiling cover<br />

D-90851-2013<br />

With flat cover<br />

With laminar flow ceiling<br />

With distance tube<br />

This system is recommended <strong>for</strong> use at a<br />

distance > 600 mm between concrete and<br />

false ceiling or in combination with a laminarflow<br />

system. The distance tube is available in<br />

two standard lengths (600/1200 mm). For<br />

service purposes, it is to be considered that<br />

the electrical components are installed in a<br />

switch box near the <strong>NC</strong> (max. 40 m).<br />

D-90851-2013<br />

D-90851-2013<br />

With ceiling cover<br />

With flat cover<br />

With laminar flow ceiling

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!