Loch Fitty coal mining development: forming a fish mitigation
Loch Fitty coal mining development: forming a fish mitigation
Loch Fitty coal mining development: forming a fish mitigation
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Phase 3- dewatering <strong>Loch</strong> <strong>Fitty</strong> and fate of <strong>fish</strong><br />
De-watering by pumping<br />
over 3 month period to<br />
Thortonwood <strong>Loch</strong><br />
Fish pumping and removal<br />
project.<br />
Small number of specimen<br />
<strong>fish</strong> rescued<br />
Concerted effort for eel<br />
capture in 3 month period<br />
prior to de-watering