EAPAN CV Stephanie van Zyl - Enviro Dynamics Namibia
EAPAN CV Stephanie van Zyl - Enviro Dynamics Namibia
EAPAN CV Stephanie van Zyl - Enviro Dynamics Namibia
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CURRICULUM VITAE:<br />
STEPHANIE VAN ZYL<br />
Position:<br />
<strong>Enviro</strong>nmental Consultant<br />
Name of firm:<br />
<strong>Enviro</strong> <strong>Dynamics</strong> cc<br />
Profession:<br />
<strong>Enviro</strong>nmental Assessment Practitioner<br />
Date of birth: 20 December 1970<br />
Years with firm: since 1999<br />
Nationality:<br />
<strong>Namibia</strong>n<br />
Rele<strong>van</strong>t Experience:<br />
<strong>Stephanie</strong> has nineteen years experience in <strong>Enviro</strong>nmental Management and Public<br />
Participation and Facilitation (<strong>Enviro</strong>nmental and Social Assessment, <strong>Enviro</strong>nmental<br />
Management Plans, <strong>Enviro</strong>nmental Education, <strong>Enviro</strong>nmental Management Systems,<br />
<strong>Enviro</strong>nmental Monitoring and Evaluation), Urban and Regional Development<br />
Planning, Socio-Economic Research, Land Use Planning, and Project Co-ordination.<br />
She has been involved in or acted as the principle consultant for a number of largescale<br />
environmental and social assessments in the following sectors:<br />
• infrastructure including roads, railway lines, power lines, and water supply<br />
networks;<br />
• tourism including tourism development plans and lodges;<br />
• mining;<br />
• processing and manufacturing projects;<br />
• agriculture;<br />
• power generation projects; and<br />
Tertiary Education:<br />
Bachelaureus (Town and Regional Planning) University of Pretoria 1992<br />
Masters (<strong>Enviro</strong>nmental Management) University of the Orange Free State 1999<br />
Continuous Professional Development:<br />
Attend IAIAsa Conferences at least bi-annually – includes a short course in a rele<strong>van</strong>t<br />
field, including public participation, socio-economic assessment, integrating<br />
biodiversity with EIA.<br />
Various short courses, including GIS, EIA Project Management (1-week course),<br />
Project Management Course (1-week course), and Business and HR Management.<br />
Membership in Professional Societies:<br />
South African Institute of Ecologists and <strong>Enviro</strong>nmental Scientists<br />
International Association of Impact Assessment (IAIASA)<br />
<strong>Namibia</strong>n Institute of Town and Regional Planners<br />
1
Employment Record:<br />
1999 to date: Managing Director: <strong>Enviro</strong> <strong>Dynamics</strong>, Windhoek<br />
Manage the office, lead or take part in environmental management<br />
and planning related projects and activities, reviewing of EIAs and<br />
other project management related work produced by specialists,<br />
and other staff.<br />
1994 – 1999: Town Planner, Windhoek City Council<br />
Assistant Project Director of the City’s Township Development<br />
Programme since 1997, project manager of various township<br />
development projects, environmental assessment of various<br />
development projects, environmental and planning policy on<br />
various developmental issues, land use planning of new residential,<br />
industrial, and business areas.<br />
1994: Town Planning Assistant, Baard & Van Niekerk Land Surveyors<br />
Land use planning and applications to rele<strong>van</strong>t authorities.<br />
1993: Contract positions as assistant town and regional planner with<br />
Stubenrauch Planning Consultants, Windhoek and Frank De Villiers &<br />
Associates, Pietersburg, South Africa<br />
Socio-economic research, and use planning, structure planning.<br />
Project Experience:<br />
<strong>Enviro</strong>nmental Planning and Management<br />
2012 until present: Biophysical assessment for the Walvis Bay Integrated Spatial<br />
Urban Development Framework (IUSDF)<br />
2011 until present: Team Leader: EIA for the Oshakati Flood Mitigation Measures<br />
project.<br />
2011 until present: EIA for the proposed Sandpiper/Meob Marine Phosphate<br />
Mining Project – <strong>Namibia</strong>n Marine Phosphate (Pty) Ltd. Team<br />
Leader of Terrestrial Component and Public Consultation<br />
Manager for Marine Component.<br />
2010/2011: Team Leaders: EIAs for the proposed 320kV transmission lines<br />
from Katima Mulilo to Ngoma and 220 kV transmission lines<br />
from Onuno to Ondjiiva.<br />
2010/2011: Team Leader: Navachab Biodiversity Inventory.<br />
2010: Team Leader: EIA – proposed development of the Mountain<br />
View Nature Estate.<br />
2
2010 until present: EIA, EMP, Public Health and Safety Plan and HIV/AIDS plans,<br />
including construction monitoring for three Regional Study<br />
Resource Centres – north-central regions for MCA <strong>Namibia</strong>.<br />
2010: EIA for Elizabeth Bay Optimisation Study. Namdeb. Socioeconomic<br />
specialist study and public participation.<br />
2010: Orange River Life of Mines Extension Project for Namdeb<br />
Diamond Corporation. Local team leader of Ecological,<br />
Socio-economic, archaeological, vegetation components.<br />
Public Participation Manager.<br />
2009: Team Leader, socio-economic study and public participation<br />
– proposed expansion of Walvis Bay Harbour Container<br />
Terminal.<br />
2009: Local Team Leader of biophysical component: EIA for<br />
proposed Baynes hydro-electric scheme in the Cunene River,<br />
NamPower.<br />
2009: Local team leader, public participation component and<br />
socio-economic study: EIA of proposed desalination plant,<br />
Mile 6, Swakopmund for NamWater<br />
2009: Team Leader: Biodiversity Inventory for the City of Windhoek.<br />
2008: <strong>Enviro</strong>nmental input and stakeholder engagement for the<br />
Physical Development Plan of the Dukhan Physical<br />
Development, Dukhan, Qatar.<br />
2008: Biophysical team leader – State of the <strong>Enviro</strong>nment Report,<br />
Windhoek, <strong>Namibia</strong>.<br />
2008: EIA of Proposed 220kV transmission Powerline from Omburu<br />
transmission station to Kuiseb transmission station, <strong>Namibia</strong>.<br />
Project Manager.<br />
2008: EIA and EMPs of the proposed Inner Shelf and Inshore Marine<br />
Diamond Mining Projects along the south-western coast of<br />
<strong>Namibia</strong> for Namdeb. Project Manager of <strong>Namibia</strong>n Team.<br />
2008: Team Leader: EIA and EMP of Proposed Karibib Cement<br />
Project - Cement manufacturing Plant, Limestone and Shale<br />
Mines.<br />
2008: EIA of Proposed Bulk Fuel Storage Facility, Walvis Bay: Namcor<br />
– Public Participation and Socio-economic consultant.<br />
2008: EIA and EMP for feasibility phase of the Marine Dredging<br />
Project, Update of EMPRs for Atlantic 1, and EMPR for ML 128<br />
A, B and C. Project Manager of <strong>Namibia</strong>n Team. Socioeconomic<br />
study and public participation.<br />
3
2008: Project Manager: Preliminary <strong>Enviro</strong>nmental Assessment: and<br />
<strong>Enviro</strong>nmental Management Plan: EPL 3600 Exploration.<br />
<strong>Namibia</strong>n China Mineral Resources Investment and<br />
Development.<br />
2008: Team Leader: Preliminary <strong>Enviro</strong>nmental Assessment: Hoaseb<br />
Uranium Project (Exploration - EPL 3664 in Namib Naukluft<br />
Park): Green Mineral Resources.<br />
2007-2008: Project review of various development proposals to the<br />
European Union under the Rural Poverty Reduction<br />
Programme.<br />
2007: <strong>Enviro</strong>nmental Scoping Study: Proposed 10 000 Ha Agricultural<br />
Project at Shesheke, Zambia.<br />
2007: Preliminary <strong>Enviro</strong>nmental Assessment: Marenica Uranium<br />
Project (Exploration – EPL 3287): West Australian Metals.<br />
Project Manager.<br />
2007: Team Leader: <strong>Enviro</strong>nmental Scoping Study: Valencia Uranium<br />
Project.<br />
2007: EIA of proposed Seismic Survey covering the Four North-<br />
Central Regions for Circle Oil <strong>Namibia</strong>. Project Manager.<br />
2006: Technical Team Leader Preliminary <strong>Enviro</strong>nmental and Social<br />
Impact Assessment of the proposed railway line from Katima<br />
Mulilo to Cape Fria, <strong>Namibia</strong>.<br />
2006: Technical Team Leader Bio-physical Assessment for the EIA of<br />
the proposed Trekkopje Uranium Mine on the Farm Trekkopje<br />
and Klein Trekkopje, <strong>Namibia</strong>.<br />
2006: EIA of proposed 132 kV power line from Windhoek to<br />
Rehoboth, <strong>Namibia</strong>. Technical Team Leader, Public<br />
Participation Facilitator.<br />
2006: EIA of proposed 220kV power line from Auas Substation to<br />
Windhoek, <strong>Namibia</strong>. Technical Team Leader, Public<br />
Participation Facilitator.<br />
2005-2007: <strong>Enviro</strong>nmental Management Consultant to Barloworld<br />
<strong>Namibia</strong>, co-ordination of all environmental activities of the<br />
Company.<br />
2006: Public participation facilitator and technical team leader of<br />
EIA of the proposed railway link from Katima Mulilo to Cape<br />
Fria, <strong>Namibia</strong>.<br />
4
2005: <strong>Enviro</strong>nmental input and stakeholder engagement for the<br />
Physical Development Plan of the NGL Complex, Mesaieed<br />
Industrial City, Dukhan, Qatar.<br />
2005: Team Leader and Public Participation Facilitator: EIA of<br />
Proposed 400kV and 220kV power lines from the Kudu Gas<br />
CCGT Power Plant Oranjemund, <strong>Namibia</strong> (EIA’s conducted of<br />
power lines from two separate sites).<br />
2005: Public Participation Facilitator and leader of local specialist<br />
team, EIA of proposed Kudu Gas CCGT Power Plant,<br />
Oranjemund (two separate processes for two alternative<br />
sites).<br />
2004: Public Participation Facilitator, and team leader: EIA and EMP<br />
for a new 132 kV power line from Lüderitz to Keetmanshoop.<br />
2003, 2004: Public Participation, EIA, and EMP’s for 13 new MTC base<br />
transmitter stations, Windhoek.<br />
2004: Community and Public Participation, and team leader, ESA<br />
and EMP for Phase 2 of the Northern Railway Extension,<br />
<strong>Namibia</strong>.<br />
2003: <strong>Enviro</strong>nmental Input and stakeholder engagement for the<br />
Ondangwa Structure Plan.<br />
2003: Public Participation, SEA for the Development of Ha<strong>van</strong>a<br />
North, a 10 000 hectare portion of land earmarked for ultra<br />
low income development.<br />
2003: Public Participation, EA, and EMP of a proposed 66kv<br />
powerline from the CBD to the Windhoek Load Centre<br />
Windhoek.<br />
2003: Community Participation, EIA, and EMP of the upgrading of<br />
the MR 120 and MR 123 main roads (partly a new alignment)<br />
in the northern regions of <strong>Namibia</strong>.<br />
2002: Community Participation, EA, and EMP for the upgrading of<br />
the MR100 and MR67 main roads in the Kunene region.<br />
2002: SEA of National Land Use Policy, <strong>Namibia</strong>.<br />
2002: SEA of an Integrated Land Use Plan for the four North-Central<br />
Regions, <strong>Namibia</strong>.<br />
2002: EIA of a proposed tourism lodge and recreation centre on<br />
Commonage Farm 4, Windhoek.<br />
2002: EIA and EMP for the commercial farming unit of the Mashare<br />
Agricultural Development Institute, Ka<strong>van</strong>go Region.<br />
5
2002: Preliminary EIA, EMP and monitoring of construction of civil<br />
services at the Aredareigas Nature Estate, on the farm<br />
Regenstein near Windhoek.<br />
2001-2002: Public Participation, EIA, EMP, and monitoring: new water<br />
main in the Northern Industrial Area and Pionierspark,<br />
Windhoek.<br />
2002: <strong>Enviro</strong>nmental Scoping: proposed new water supply to a<br />
section of road MR 36(c14) – roads authority.<br />
2001: <strong>Enviro</strong>nmental Scoping Study for the feasibility study for river<br />
transport along the Zambezi River.<br />
2001: <strong>Enviro</strong>nmental Impact Assessment and management plan:<br />
canalisation of the Arebbusch River, Windhoek.<br />
2001: Monitoring and induction workshops of environmental and<br />
social issues during implementation of various township<br />
development projects, including Ha<strong>van</strong>a Sections 1 and 2,<br />
Ongulumbashe, and Otjomuise Extentions, Windhoek.<br />
2001 -2002: <strong>Enviro</strong>nmental Impact Assessment: various bitumen plants, fuel<br />
depots and stations.<br />
2001: Public and Community Participation Facilitator, and team<br />
leader of EIA and EMP: Northern Railway Extension <strong>Namibia</strong>.<br />
Principal consultant for environmental and social assessment.<br />
2001: Principle Consultant: Feasibility Study, Including Public<br />
Participation, ESA, and EMP for the establishment of an SME<br />
Incubator Centre in Windhoek.<br />
2000: <strong>Enviro</strong>nmental Impact Assessment: Otjomuise 1 & 2. Public<br />
Participation Facilitator and Team Leader: <strong>Enviro</strong>nmental and<br />
Social Impact Assessment and, <strong>Enviro</strong>nmental Management<br />
Plan as part of a feasibility study for the new townships<br />
Otjomuise Extensions 1 & 2, Windhoek.<br />
2000: Team Leader and Public Participation Facilitator:<br />
<strong>Enviro</strong>nmental and Social Impact Assessment: Otjomuise<br />
Development Project (about 10 000 new residential erven).<br />
2000: Feasibility Study for upgrading of Ha<strong>van</strong>a Sections 1 & 2 and<br />
Ongulumbashe 1 & 2, EIA, EMP and Community Participation<br />
as part of a Feasibility Study for the upgrading of the informal<br />
settlements Ha<strong>van</strong>a Sections 1 & 2 and Ongulumbashe 1 & 2,<br />
Windhoek.<br />
2000: Preliminary EIA of new 66 kV powerline, Windhoek.<br />
6
2000: Review of three rural water supply projects (environmental<br />
and sanitation aspects) in the North-Central Region, <strong>Namibia</strong>.<br />
2002: Public Participation, EIA, and EMP: new water mains: northern<br />
areas, Windhoek.<br />
2000: <strong>Enviro</strong>nmental Impact Assessment: Heroes Acre, Windhoek<br />
(New cemetery and monument, Windhoek).<br />
1999: EMP’s for various prospecting licences, <strong>Namibia</strong>.<br />
2000: <strong>Enviro</strong>nmental Education Programme for staff of <strong>Namibia</strong><br />
National Parks. <strong>Enviro</strong>nmental education, including waste<br />
management workshop for staff members and wardens of<br />
<strong>Namibia</strong>’s National Parks.<br />
1999: Guidelines for Feasibility Studies. Preparation of environmental<br />
guidelines for feasibility studies for major development projects<br />
in Windhoek.<br />
1999: <strong>Enviro</strong>nmental guidelines for Auasblick. A set of guidelines for<br />
homeowners in Auasblick, Windhoek on preserving and<br />
enhancing the environment.<br />
1999: <strong>Enviro</strong>nmental Education Programme. Co-ordination of an<br />
educational programme on all aspects of the environment,<br />
including waste management practices for Windhoek’s poor<br />
households.<br />
1999: Alternative Sanitation for Windhoek. Thesis for Masters Degree<br />
in environmental management – assessment of social,<br />
economic, and environmental impact of alternative<br />
sanitation options for Windhoek. Recommendations presently<br />
implemented by the Windhoek City Council.<br />
1998-1999: <strong>Enviro</strong>nmental Management Legislation. Part of committee to<br />
consider environmental management and pollution control<br />
and waste management legislation for <strong>Namibia</strong>.<br />
1998: <strong>Enviro</strong>nmental Management & planning: commonage farms,<br />
Windhoek. <strong>Enviro</strong>nmental management and land use<br />
planning proposals for commonage farms surrounding<br />
Windhoek.<br />
1996 – 2002: Avis Dam <strong>Enviro</strong>nmental Management and Planning.<br />
Ongoing co-ordination of environmental planning and<br />
management in the area. Involved Public Participation<br />
Programme.<br />
1998 – 1999: EIA and EMP: Sand extraction in the Klein Windhoek River.<br />
Municipal co-ordinator for environmental impact assessment<br />
7
and environmental management and rehabilitation plans for<br />
sand extraction in the Klein Windhoek River, Windhoek.<br />
1998: Feasibility Study: Implementation of ISO 14000 (<strong>Enviro</strong>nmental<br />
Management System For Windhoek Municipality).<br />
Investigation And Recommendations To The Management Of<br />
The Windhoek Municipality on the Feasibility Of Implementing<br />
The ISO 14 000 <strong>Enviro</strong>nmental Management System.<br />
1998: EIA: Sam Nujoma Extension Preliminary <strong>Enviro</strong>nmental Impact<br />
Assessment For Proposed Extension of Sam Nujoma Road,<br />
Windhoek.<br />
1994-1998: Facilitated Community Participation programmes for various<br />
project proposals, mostly Urban Layout and Development<br />
Plans at the City of Windhoek.<br />
Tertiary Education:<br />
B (Town and Regional Planning) University of Pretoria 1992<br />
M (<strong>Enviro</strong>nmental Management) University of The Orange Free State 1999<br />
Employment Record:<br />
1999 to date: Managing Director: <strong>Enviro</strong> <strong>Dynamics</strong>, Windhoek<br />
Manage the office, lead or take part in environmental management<br />
and planning related projects and activities, reviewing of EIAs and<br />
other project management related work produced by specialists,<br />
and other staff.<br />
1994 – 1999: Town Planner, Windhoek City Council<br />
Assistant Project Director of the City’s Township Development<br />
Programme since 1997, project manager of various township<br />
development projects, environmental assessment of various<br />
development projects, environmental and planning policy on<br />
various developmental issues, land use planning of new residential,<br />
industrial, and business areas.<br />
1994: Town Planning Assistant, Baard & Van Niekerk Land Surveyors<br />
Land use planning and applications to rele<strong>van</strong>t authorities.<br />
1993: Contract positions as assistant town and regional planner with<br />
Stubenrauch Planning Consultants, Windhoek and Frank De Villiers &<br />
Associates, Pietersburg, South Africa<br />
Socio-economic research, and use planning, structure planning.<br />
8