02.07.2015 Views

Working drawings checklist - Mekel

Working drawings checklist - Mekel

Working drawings checklist - Mekel

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Working</strong> <strong>drawings</strong> <strong>checklist</strong><br />

Floor plan<br />

Plan element<br />

Remarks<br />

Room titles<br />

emphasised.<br />

Dimensions – ALL are required<br />

Door and window types sizes and<br />

specials, show swings<br />

Floor finishes<br />

Change in levels<br />

overall, rooms, walls, piers, openings etc.<br />

may need a schedule or use opening<br />

numbers.<br />

those in the contract, show lines at<br />

doorways, etc.<br />

steps, stairs.<br />

Roof lines and RWPs<br />

by dotted indication.<br />

Beams and sizes<br />

by dotted indication.<br />

Columns and sizes<br />

note materials.<br />

Truss positions and spacings, CL to CL<br />

Services<br />

Label all materials<br />

Label all fixtures, fittings, recesses,<br />

cupboards, robes, built-in items, etc<br />

ensure supports are indicated.<br />

especially plumbing eg hot water systems,<br />

gas appliances, meter boxes, wastes, etc.<br />

use a legend if necessary.<br />

especially note special items eg fireplaces.<br />

Scale usually 1:100.<br />

North point<br />

if different from site plan.<br />

© WestOne Services 2011 BC1731 Page 1 of 6


Elevations<br />

Plan element<br />

Draw all four<br />

FL to CL heights<br />

Remarks<br />

and parts thereof if necessary –<br />

eg internal courts.<br />

continuous through the elevations.<br />

GL original and finished<br />

indicate cut and fill.<br />

Footings – show dotted<br />

particularly if stepped.<br />

Door and windows<br />

as for floor plan.<br />

Course heights of openings<br />

starting with 0 c , FL, head heights etc.<br />

Columns, beams, steps<br />

materials and sizes.<br />

Roof material and pitch<br />

include RWPs.<br />

Overhangs dimensioned<br />

eg eaves, gables.<br />

Meter boxes<br />

electricity and gas.<br />

All materials noted<br />

eg gable ends.<br />

Chimneys, major flues<br />

from fire places.<br />

Title elevations to suit NP<br />

Scale Usually 1:100.<br />

© WestOne Services 2011 BC1731<br />

Page 2 of 6


Section<br />

Plan element<br />

Draw at least one through the most<br />

informative construction<br />

FL to CL heights<br />

FL floor level<br />

CL ceiling level<br />

GL original and finished<br />

Footings<br />

Remarks<br />

If a large scale section is drawn also show<br />

a simple 1:100.<br />

line section up with an elevation.<br />

full details required.<br />

Door and windows in walls<br />

refer to BC chart and/or reference.<br />

Label rooms in section<br />

Wall finishes<br />

internally and externally.<br />

Roof construction<br />

Note beams, trusses, pitch materials,<br />

overhangs, etc.<br />

full details required.<br />

all sizes, spacings etc.<br />

Scale usually 1:100.<br />

© WestOne Services 2011 BC1731<br />

Page 3 of 6


Site plan<br />

Plan element<br />

Remarks<br />

Site size<br />

in metres, note angles if known.<br />

Datum and site levels<br />

Label all buildings on the site – emphasis<br />

on the contract building<br />

Setbacks<br />

Driveways, paths, walls, banks, pergolas<br />

etc in the contract<br />

Clothes line<br />

assume one if necessary.<br />

existing and new.<br />

ie blackline it and hatch it.<br />

to residential design codes.<br />

usually have less emphasis.<br />

if in contract.<br />

Fencing – new and existing<br />

Trees, plants, etc to be saved<br />

Trees, rocks, etc to be removed<br />

indicate material and height.<br />

note how they are actually marked on the<br />

site.<br />

note what is to be done with the holes.<br />

Scale usually 1:200.<br />

North point<br />

© WestOne Services 2011 BC1731<br />

Page 4 of 6


Footing plan<br />

Sometimes required where it is not obvious from the floor plan as to the footing layout, dimensions<br />

overall widths, setbacks etc.<br />

Plan element<br />

Remarks<br />

Piers, pads, stumps, etc<br />

ie isolated footings.<br />

Location of steps in footings<br />

Floor construction<br />

relate to elevations.<br />

note materials, refer to sections and/or<br />

details.<br />

Scale usually 1:100.<br />

Footing details<br />

Plan element<br />

A frequent requirement of councils – may<br />

need the back up of S Eng. <strong>drawings</strong><br />

Show all sizes, materials<br />

reinforcement.<br />

Remarks<br />

if special requirements necessary, refer to<br />

SE <strong>drawings</strong>.<br />

must be to Building Code of Australia.<br />

Indicate relationship to FGL and FL<br />

Indicate DPC and 0 c<br />

if related to coursing.<br />

Scale usually 1:10.<br />

© WestOne Services 2011 BC1731<br />

Page 5 of 6


General<br />

Plan element<br />

Remarks<br />

As this is a working drawing it must<br />

contain all the necessary construction<br />

information or at least refer to where it is<br />

eg specification<br />

• Label all parts.<br />

• Note all scales.<br />

• Legends if used.<br />

• Drawing title.<br />

Clients’ name and address<br />

ie of project.<br />

Draftsman’s name and date drawn.<br />

Remember, be specific and detailed with working drawing information.<br />

© WestOne Services 2011 BC1731<br />

Page 6 of 6

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!