MUNICIPALITY OF THAMES CENTRE<br />

TRANSPORTATION SERVICES<br />

OPERATIONS<br />

REPORT NO<br />

<strong>TS</strong><strong>005</strong><strong>13</strong><br />

TO<br />

Mayor and Members <strong>of</strong> Council<br />

FROM GJ Greg Borduas CAO<br />

DATE February 20 20<strong>13</strong><br />

SUBJECT New Operations Centre Septic System and Tile Bed Construction<br />

Award<br />

RECOMMENDATION<br />

It recommended<br />

1 That Council receives <strong>the</strong> following report <strong>for</strong> in<strong>for</strong>mation and<br />

2 That <strong>the</strong> CAO be authorized to award <strong>the</strong> Septic System and Tile Bed<br />

Construction award to Hogg Construction Ltd in <strong>the</strong> amount <strong>of</strong>32 400 plus<br />

HST<br />

PURPOSE<br />

To request Council authority <strong>for</strong> <strong>the</strong> <strong>construction</strong> award <strong>for</strong> <strong>the</strong> septic system and tile<br />

bed <strong>for</strong> <strong>the</strong> new centralized operations centre<br />

BACKGROUND<br />

During <strong>the</strong> budget process Council authorized <strong>the</strong> <strong>construction</strong> <strong>of</strong> a new centralized<br />

operations centre to house roads and water department staff as well as fleet<br />

The Municipality issued a Request For Proposals RFP <strong>for</strong> <strong>the</strong> <strong>construction</strong> <strong>of</strong> a septic<br />

system and tile bed <strong>for</strong> <strong>the</strong> new operations centre The specifications had been<br />

prepared <strong>for</strong> Spriet Engineering by Bos Engineering and Environmental Services as a<br />

part <strong>of</strong> <strong>the</strong> site and servicing engineering agreement with <strong>the</strong> Municipality<br />

Six 6 bids were received <strong>for</strong> <strong>the</strong> Septic System and Tile Bed Construction <strong>for</strong> <strong>the</strong><br />

Central Operations Centre The bids ranged from <strong>the</strong>32 400 to69 438 plus HST<br />

COMMEN<strong>TS</strong><br />

The Contractor Selection Committee <strong>review</strong>ed <strong>the</strong> contract specifications <strong>for</strong> <strong>the</strong> septic<br />

system and tile bed <strong>construction</strong><br />

The bidders and pricing are listed at <strong>the</strong> end <strong>of</strong> this report


<strong>Report</strong> <strong>No</strong> <strong>TS</strong> <strong>005</strong><strong>13</strong><br />

February 20 20<strong>13</strong><br />

Page 2<br />

CONSULTATION<br />

Contractor Selection Committee Manager <strong>of</strong> Roads Chief Building Officer Spriet<br />

Engineering by Bos Engineering and Environmental Services were consulted in <strong>the</strong><br />

preparation <strong>of</strong> this report<br />

FINANCIAL IMPLICATIONS<br />

Funds <strong>for</strong> a new centralized operations centre were identified through <strong>the</strong> 2012 capital<br />

budget process<br />

REFERENCESATTACHMEN<strong>TS</strong><br />

Final Rankings summary sheet<br />

Reviewed by<br />

Prepared by<br />

Matt Je n<br />

Ga reg Borduas<br />

Manager o oads Chief Administrative Officer<br />

i


<strong>Report</strong> <strong>No</strong> <strong>TS</strong><strong>005</strong><strong>13</strong><br />

February 20 20<strong>13</strong><br />

Page 3<br />

Operations Centre<br />

Septic System and Tile Bed RFP<br />

List <strong>of</strong> Bidders and Pricing<br />

<strong>No</strong> Company Bid HST Total<br />

1 Hogg Construction 32 400 4212 36 612<br />

2 Baigent Excavating 32 500 4225 36 725<br />

3 All Season Excavating 39 823 01 5176 99 45 000<br />

4 Denby Environmental 51 895 6746 35 58 641 35<br />

5 R Russell Construction 63 500 8255 71 755<br />

6 BrentReg 69 438 9026 94 78 464 94