<strong>Capital</strong> <strong>Construction</strong>2 nd Ave. SubwayPhase 1 Scope Connection to existing 63rd St and Broadway Lines Service between 96th St & Brooklyn via Broadway Line Tunnels from 92nd St to 62nd St 3 new ADA accessible stations 63rd St. station rehab Track & systems Project cost: 4.451 BExistingLexington Ave /63 rd St Station Completion: December 201672 nd Street Station86 th Street StationExisting tunnel96 th Street StationDRBF Conference, Charleston, SC October 3, 2010