<strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong><strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong><strong>Eng</strong>. Adriana SpassovaAdriana Spassova, Partner & Manag<strong>in</strong>g Director EQE Control OOD, Company of ABS GroupHead of Commission for International Cooperation <strong>in</strong> BACEA, member of <strong>FIDIC</strong> <strong>and</strong> EFCA1
Introduction• Dur<strong>in</strong>g socialism the Designer, Contractor<strong>and</strong> Employer were the parties <strong>in</strong> the<strong>in</strong>vestment process, all state ownedcompanies.• In 1989 socialism collapsed <strong>and</strong>privatisation started. State ownedcompanies could not survive <strong>in</strong> the newmarket• Private property required new rules <strong>in</strong> the<strong>in</strong>vestment process, but <strong>in</strong> the first 15 yearsmore was ru<strong>in</strong>ed, less improved• <strong>Bulgaria</strong> is EU Member from 2007<strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 2
First <strong>FIDIC</strong> contracts <strong>in</strong> <strong>Bulgaria</strong>Start<strong>in</strong>g with “Old Red Book” - EC f<strong>in</strong>anc<strong>in</strong>g• 1994 <strong>in</strong> the road sector• 1997 <strong>in</strong> the Nuclear Safety ProgrammeSeismic Upgrad<strong>in</strong>gof Wet Spent Fuel Storage,KNPP, PHARE BG 9608Seismic Upgrad<strong>in</strong>g of Units 3&4, KNPP,PHARE BG 9809Low Level Radwaste Treatment Facility,KNPP, PHARE BG 9512Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong>5
Ma<strong>in</strong> Problems Apply<strong>in</strong>g <strong>FIDIC</strong>• Particular Conditions not solv<strong>in</strong>g discrepanciesbetween <strong>FIDIC</strong>, EC regulations <strong>and</strong> <strong>Bulgaria</strong>n law• Bureaucratic procedures for approval ofAddendum for change of any unit rate or contractprice (“Contract Price shall not be changed” –condition <strong>in</strong> the Contract Agreement imposed byEC Delegation, prohibited new unit rates)• EC f<strong>in</strong>anc<strong>in</strong>g approved before Employer executedobligatory procedures (e.g. EIA, property, changeof l<strong>and</strong> use, DZP, Construction Permit)• World Bank rarely used <strong>FIDIC</strong> before MBDHarmonised Edition was published• EC Delegation officers were afraid to use theYellow Book, not to speak about the Silver BookAdriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong>6
<strong>Claims</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong>• In the small EC funded Works <strong>Contracts</strong>the Contractors were <strong>Bulgaria</strong>n companiesused to agree with the <strong>Bulgaria</strong>n Employerthe additional costs <strong>and</strong> Time Extensionfollow<strong>in</strong>g the pr<strong>in</strong>ciple: “If you claim, I shallnever order you any work <strong>in</strong> future”• When the bigger <strong>in</strong>frastructure projectsstarted, the M<strong>in</strong>istries were not preparedfor claims management <strong>and</strong> they did notknow how to mitigate the risks, besidesbe<strong>in</strong>g frustrated with <strong>FIDIC</strong>. Even at thebeg<strong>in</strong>n<strong>in</strong>g they considered <strong>FIDIC</strong> as lawgovern<strong>in</strong>g national legislation…Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 7
Usual Reasons for <strong>Claims</strong>• Late Access to Site – usually somenational procedures are not fulfilled <strong>in</strong>time• Unforeseeable Physical Conditions –geology <strong>and</strong> hydrogeology conditions <strong>in</strong>most cases differ from those <strong>in</strong> TS• Delay <strong>in</strong> the design <strong>and</strong> /or designerrors• Additional f<strong>in</strong>anc<strong>in</strong>g for variationsimplicat<strong>in</strong>g cost <strong>in</strong>crease cannot beprovidedAdriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 8
DAB <strong>in</strong> <strong>Bulgaria</strong>• DAB is new <strong>in</strong> <strong>Bulgaria</strong> but has futures<strong>in</strong>ce already there are a lot of <strong>FIDIC</strong>projects <strong>in</strong> arbitration <strong>and</strong> the Parties startto <strong>under</strong>st<strong>and</strong> DAB merits• World Bank projects have adjudicators• In 2010 BACEA registered a NationalDispute Adjudicator List• Examples of 1 person DAB decisionssatisfy<strong>in</strong>g the parties:• EUROPEAID 113434/D/W/BG: Sozopol Solid WasteL<strong>and</strong>fill – 2006• Private project : Hermes Park Sofia – 2009Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 9
Vid<strong>in</strong> – Calafat Danube Bridgehttp://www.danubebridge2.com/• Important TEN-T Project• 20 years meet<strong>in</strong>gs <strong>and</strong> feasibility studies• 29.04.2002, BBC News: Bridge ready by 2006!• Prelim<strong>in</strong>ary studies 2001-2003• EIA approved 2004• Design Built Contractor selected <strong>in</strong> 2007• Deadl<strong>in</strong>e postponed from 2010 to 2012• 3 member st<strong>and</strong><strong>in</strong>g DAB appo<strong>in</strong>ted 2010Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 10
Vid<strong>in</strong> – Calafat Danube Bridge<strong>Bulgaria</strong>n Side:Contract 1 (C1): Design <strong>and</strong> construction of acomb<strong>in</strong>ed (road <strong>and</strong> railway) bridge with four roadlanes, one s<strong>in</strong>gle railway track, bicycle lane <strong>and</strong> twopavements for pedestrians <strong>and</strong> services.Contract 2 (C2): Construction of the adjo<strong>in</strong><strong>in</strong>g road<strong>and</strong> railway <strong>in</strong>frastructure which covers: new railwayfreight station <strong>and</strong> 7 km of new railway l<strong>in</strong>e,reconstruction of the exist<strong>in</strong>g passenger station <strong>and</strong>construction of 7 new two-level road junctions.Romanian side:Contract 3 (C3): 5 km of new railway l<strong>in</strong>e, 5 km firstclass road <strong>and</strong> a term<strong>in</strong>al station for jo<strong>in</strong>t bordercontrol <strong>and</strong> automobile transport toll charg<strong>in</strong>g.Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 11
Vid<strong>in</strong> – Calafat Danube BridgeBudget: 274 mln EURLength: 1971 m226 mln EUR <strong>Bulgaria</strong>n side, 48 mln EUR Rumanian sideF<strong>in</strong>anc<strong>in</strong>g: ISPA grants, EIB loan, AFD grant, KfW grant <strong>and</strong> loan,state budgetsContractor C1&C3: Spanish company FCC<strong>Eng</strong><strong>in</strong>eer C1: French-British consortium Ingerop/High-Po<strong>in</strong>t RendelEQE Control OOD, Licensed <strong>Bulgaria</strong>n ICS Company of ABS Group, Member of <strong>FIDIC</strong> & EFCA 12
Vid<strong>in</strong> – Calafat Danube BridgeProblems orig<strong>in</strong>at<strong>in</strong>g delay <strong>and</strong> cost<strong>in</strong>crease:• Different lenders with different complicatedrequirements• Complex geotech conditions onshore <strong>and</strong> offshore• Delay <strong>in</strong> expropriation <strong>and</strong> unexpected high costs• C1: Concession required for 1 mln cub m earthfill<strong>in</strong>g material• C2: Site Access C2 delayed due to 6 illegalbuild<strong>in</strong>gs <strong>in</strong> the railway easement• C3: Site Access delayed with 1 year• Dispute on the payment of Romanian River TrafficAdm<strong>in</strong>istration expensesEQE Control OOD, Licensed <strong>Bulgaria</strong>n ICS Company of ABS Group, Member of <strong>FIDIC</strong> & EFCA 13
Other Present <strong>FIDIC</strong> Projects• Red Book: EC f<strong>in</strong>anced Roads, WaterSupply <strong>and</strong> Sewerage, etc.; Privateprojects for hotels, office build<strong>in</strong>gs• Yellow Book: EC f<strong>in</strong>anced Waste WaterTreatment Plants, Sofia Metro, WasteTreatment Plants, Private projects for<strong>in</strong>dustrial <strong>in</strong>stallations• Silver Book: Fraport Varna & BurgasAirport Term<strong>in</strong>als, Solar, Thermal PowerPlants with EBRD <strong>and</strong> other f<strong>in</strong>anc<strong>in</strong>gAdriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 14