Claims and Disputes under FIDIC Contracts in Bulgaria Eng ...

Claims and Disputes under FIDIC Contracts in Bulgaria Eng ...

Claims and Disputes under FIDIC Contracts in Bulgaria Eng ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong><strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong><strong>Eng</strong>. Adriana SpassovaAdriana Spassova, Partner & Manag<strong>in</strong>g Director EQE Control OOD, Company of ABS GroupHead of Commission for International Cooperation <strong>in</strong> BACEA, member of <strong>FIDIC</strong> <strong>and</strong> EFCA1


Introduction• Dur<strong>in</strong>g socialism the Designer, Contractor<strong>and</strong> Employer were the parties <strong>in</strong> the<strong>in</strong>vestment process, all state ownedcompanies.• In 1989 socialism collapsed <strong>and</strong>privatisation started. State ownedcompanies could not survive <strong>in</strong> the newmarket• Private property required new rules <strong>in</strong> the<strong>in</strong>vestment process, but <strong>in</strong> the first 15 yearsmore was ru<strong>in</strong>ed, less improved• <strong>Bulgaria</strong> is EU Member from 2007<strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 2


First <strong>FIDIC</strong> contracts <strong>in</strong> <strong>Bulgaria</strong>Start<strong>in</strong>g with “Old Red Book” - EC f<strong>in</strong>anc<strong>in</strong>g• 1994 <strong>in</strong> the road sector• 1997 <strong>in</strong> the Nuclear Safety ProgrammeSeismic Upgrad<strong>in</strong>gof Wet Spent Fuel Storage,KNPP, PHARE BG 9608Seismic Upgrad<strong>in</strong>g of Units 3&4, KNPP,PHARE BG 9809Low Level Radwaste Treatment Facility,KNPP, PHARE BG 9512Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong>5


Ma<strong>in</strong> Problems Apply<strong>in</strong>g <strong>FIDIC</strong>• Particular Conditions not solv<strong>in</strong>g discrepanciesbetween <strong>FIDIC</strong>, EC regulations <strong>and</strong> <strong>Bulgaria</strong>n law• Bureaucratic procedures for approval ofAddendum for change of any unit rate or contractprice (“Contract Price shall not be changed” –condition <strong>in</strong> the Contract Agreement imposed byEC Delegation, prohibited new unit rates)• EC f<strong>in</strong>anc<strong>in</strong>g approved before Employer executedobligatory procedures (e.g. EIA, property, changeof l<strong>and</strong> use, DZP, Construction Permit)• World Bank rarely used <strong>FIDIC</strong> before MBDHarmonised Edition was published• EC Delegation officers were afraid to use theYellow Book, not to speak about the Silver BookAdriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong>6


<strong>Claims</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong>• In the small EC funded Works <strong>Contracts</strong>the Contractors were <strong>Bulgaria</strong>n companiesused to agree with the <strong>Bulgaria</strong>n Employerthe additional costs <strong>and</strong> Time Extensionfollow<strong>in</strong>g the pr<strong>in</strong>ciple: “If you claim, I shallnever order you any work <strong>in</strong> future”• When the bigger <strong>in</strong>frastructure projectsstarted, the M<strong>in</strong>istries were not preparedfor claims management <strong>and</strong> they did notknow how to mitigate the risks, besidesbe<strong>in</strong>g frustrated with <strong>FIDIC</strong>. Even at thebeg<strong>in</strong>n<strong>in</strong>g they considered <strong>FIDIC</strong> as lawgovern<strong>in</strong>g national legislation…Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 7


Usual Reasons for <strong>Claims</strong>• Late Access to Site – usually somenational procedures are not fulfilled <strong>in</strong>time• Unforeseeable Physical Conditions –geology <strong>and</strong> hydrogeology conditions <strong>in</strong>most cases differ from those <strong>in</strong> TS• Delay <strong>in</strong> the design <strong>and</strong> /or designerrors• Additional f<strong>in</strong>anc<strong>in</strong>g for variationsimplicat<strong>in</strong>g cost <strong>in</strong>crease cannot beprovidedAdriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 8


DAB <strong>in</strong> <strong>Bulgaria</strong>• DAB is new <strong>in</strong> <strong>Bulgaria</strong> but has futures<strong>in</strong>ce already there are a lot of <strong>FIDIC</strong>projects <strong>in</strong> arbitration <strong>and</strong> the Parties startto <strong>under</strong>st<strong>and</strong> DAB merits• World Bank projects have adjudicators• In 2010 BACEA registered a NationalDispute Adjudicator List• Examples of 1 person DAB decisionssatisfy<strong>in</strong>g the parties:• EUROPEAID 113434/D/W/BG: Sozopol Solid WasteL<strong>and</strong>fill – 2006• Private project : Hermes Park Sofia – 2009Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 9


Vid<strong>in</strong> – Calafat Danube Bridgehttp://www.danubebridge2.com/• Important TEN-T Project• 20 years meet<strong>in</strong>gs <strong>and</strong> feasibility studies• 29.04.2002, BBC News: Bridge ready by 2006!• Prelim<strong>in</strong>ary studies 2001-2003• EIA approved 2004• Design Built Contractor selected <strong>in</strong> 2007• Deadl<strong>in</strong>e postponed from 2010 to 2012• 3 member st<strong>and</strong><strong>in</strong>g DAB appo<strong>in</strong>ted 2010Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 10


Vid<strong>in</strong> – Calafat Danube Bridge<strong>Bulgaria</strong>n Side:Contract 1 (C1): Design <strong>and</strong> construction of acomb<strong>in</strong>ed (road <strong>and</strong> railway) bridge with four roadlanes, one s<strong>in</strong>gle railway track, bicycle lane <strong>and</strong> twopavements for pedestrians <strong>and</strong> services.Contract 2 (C2): Construction of the adjo<strong>in</strong><strong>in</strong>g road<strong>and</strong> railway <strong>in</strong>frastructure which covers: new railwayfreight station <strong>and</strong> 7 km of new railway l<strong>in</strong>e,reconstruction of the exist<strong>in</strong>g passenger station <strong>and</strong>construction of 7 new two-level road junctions.Romanian side:Contract 3 (C3): 5 km of new railway l<strong>in</strong>e, 5 km firstclass road <strong>and</strong> a term<strong>in</strong>al station for jo<strong>in</strong>t bordercontrol <strong>and</strong> automobile transport toll charg<strong>in</strong>g.Adriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 11


Vid<strong>in</strong> – Calafat Danube BridgeBudget: 274 mln EURLength: 1971 m226 mln EUR <strong>Bulgaria</strong>n side, 48 mln EUR Rumanian sideF<strong>in</strong>anc<strong>in</strong>g: ISPA grants, EIB loan, AFD grant, KfW grant <strong>and</strong> loan,state budgetsContractor C1&C3: Spanish company FCC<strong>Eng</strong><strong>in</strong>eer C1: French-British consortium Ingerop/High-Po<strong>in</strong>t RendelEQE Control OOD, Licensed <strong>Bulgaria</strong>n ICS Company of ABS Group, Member of <strong>FIDIC</strong> & EFCA 12


Vid<strong>in</strong> – Calafat Danube BridgeProblems orig<strong>in</strong>at<strong>in</strong>g delay <strong>and</strong> cost<strong>in</strong>crease:• Different lenders with different complicatedrequirements• Complex geotech conditions onshore <strong>and</strong> offshore• Delay <strong>in</strong> expropriation <strong>and</strong> unexpected high costs• C1: Concession required for 1 mln cub m earthfill<strong>in</strong>g material• C2: Site Access C2 delayed due to 6 illegalbuild<strong>in</strong>gs <strong>in</strong> the railway easement• C3: Site Access delayed with 1 year• Dispute on the payment of Romanian River TrafficAdm<strong>in</strong>istration expensesEQE Control OOD, Licensed <strong>Bulgaria</strong>n ICS Company of ABS Group, Member of <strong>FIDIC</strong> & EFCA 13


Other Present <strong>FIDIC</strong> Projects• Red Book: EC f<strong>in</strong>anced Roads, WaterSupply <strong>and</strong> Sewerage, etc.; Privateprojects for hotels, office build<strong>in</strong>gs• Yellow Book: EC f<strong>in</strong>anced Waste WaterTreatment Plants, Sofia Metro, WasteTreatment Plants, Private projects for<strong>in</strong>dustrial <strong>in</strong>stallations• Silver Book: Fraport Varna & BurgasAirport Term<strong>in</strong>als, Solar, Thermal PowerPlants with EBRD <strong>and</strong> other f<strong>in</strong>anc<strong>in</strong>gAdriana Spassova: <strong>Claims</strong> <strong>and</strong> <strong>Disputes</strong> <strong>under</strong> <strong>FIDIC</strong> <strong>Contracts</strong> <strong>in</strong> <strong>Bulgaria</strong> 14