<strong>Dispute</strong> <strong>Resolution</strong> <strong>Board</strong><br />

<strong>Foundation</strong><br />

14th Annual Meeting & Region-1 1 Conference<br />

October 1-2-3, 1<br />

2010<br />

Charleston, SC<br />

<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

Levent Irmak (BsCE, MsCM)


<strong>Marmaray</strong> = Marmara + Ray<br />

Marmara = <strong>The</strong> Marmara Sea<br />

Ray (TR) = Rail (EN)


<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

<strong>The</strong> Employer:<br />

Republic of Turkey<br />

Ministry of Transportation<br />

General Directorate of Railways,<br />

Harbours and Airports Construction (DLH)


HISTORY<br />

HISTORY ORIGINAL TUBE TUNNEL PROJECT 1860<br />

OTTOMAN PERIOD BOSPHORUS TUBE TUNNEL PROJECT DETAIL DRAWING<br />

SARAYBURNU - ÜSK<br />

SKÜDAR


<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

<br />

<br />

<strong>The</strong> largest infrastructure project in Turkey contracted<br />

under FIDIC EPC/Turnkey contracts.<br />

<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong> is a combination of integrated<br />

projects administered under 3 seperate contracts:<br />

BC1 “<strong>The</strong><br />

Bosphorus<br />

Crossing Contract”<br />

CR1 “<strong>The</strong><br />

Commuter<br />

Rail Infrastructure and<br />

Systems Contract”<br />

CR2 “Rolling Stock Contract”


<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

CONTRACT<br />

ENG Contract<br />

(AVRASYA JV)<br />

BC1 Contract<br />

(TGN JV)<br />

CR1 Contract<br />

(AMD JV)<br />

CR2 Contract<br />

CONTRACTOR<br />

Oriental Consultants (Japan)<br />

Yuksel Proje (Turkey)<br />

Japan Railway Tech Service<br />

Taisei (Japan)<br />

Gama (Turkey)<br />

Nurol(Turkey)<br />

Hyundai/Rotem (S.Korea)<br />

Contract Value<br />

(Approximately)<br />

JPY 5.5 Bln<br />

JPY 87 Bln<br />

(excluding Provisional Sum)<br />

€ 815 million<br />

(excluding Provisional Sum)<br />

€ 543 million<br />

(excluding Provisional Sum)


<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

<strong>The</strong> Objectives in Contract Formation:<br />

reduction of interface problems among different contracts;<br />

reasonable (and manageable) size contracts (to make them<br />

attractive for international competitive bidding);<br />

avoidance of "gaps“ and “overlaps” in the contract coverage;<br />

clear allocation of responsibility<br />

<strong>The</strong>se Objectives can be best achieved by:<br />

Seeking the largest practical size contracts commensurate<br />

with the nature of the work and the source of funding and its<br />

timing,<br />

Adapting a “Design and Build” approach where the contractor<br />

is responsible for both the design and the construction.


<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

<strong>The</strong> Objectives of the <strong>Project</strong><br />

Provide a direct railway connection between Europe and Asia with bi-<br />

directional and uninterrupted transportation for passengers and freight,<br />

Increase capacity, reliability, accessibility and safety on the commuter<br />

rail services,<br />

Reduce travel time and increase comfort for passengers,<br />

Reduce air pollution and improve the air quality of Istanbul,<br />

Reduce air-borne traffic noise in the city.<br />

While achieving these objectives,<br />

Stay on or below the budget and Stay on or above the income<br />

estimates,<br />

Open for commercial operation as prescribed in the contract<br />

documents,<br />

Complete the <strong>Project</strong> to the required quality,<br />

Meet all fitness for purpose, performance and minimum criteria as a<br />

described in the contract documents for all Contracts.


<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

<strong>The</strong> Challenges of the <strong>Project</strong><br />

<strong>The</strong> Deepest Immersed Tunnel in the World (~58 m)<br />

An expected seismic event of up to magnitude 7.5 (particular emphasis<br />

on IMT connections)<br />

Stations and Tunnels to be constructed in an area where the<br />

civilization can be traced more than 8,000 years.<br />

High Capacity Commuter Rail System with 75,000 pessengers per hour<br />

per direction (particular emphasis on safety of people in the tunnels<br />

and deep stations)<br />

One of the Highest Marine Traffic Areas s in the World (Marine Works to<br />

be carried out in deep waters of the Bosphorus Strait through which<br />

approx. 50.000 ships pass every year and across which a vast number<br />

of ferries and passenger boats)<br />

Marine Works to be performed in the stratified currents of the Strait S<br />

(upper current velocity can reach up to 5 knots)<br />

Densely Populated Urban Environment<br />

A Great Number of Stakeholders


<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

<br />

BC1 Contract<br />

Engineering/design, procurement and construction of<br />

a 13.6 km railway and related structures, which<br />

comprise of :<br />

approximately 1.4 km immersed tunnel,<br />

9.4 km twin-bore tunnel<br />

NATM Tunnel (Sirkeci(<br />

Deep Station with 250 mt<br />

platform and Uskudar Crossover Tunnel)<br />

Cut-and<br />

and-Cover Tunnels (Yenikapi(<br />

(760 mt) ) and<br />

Uskudar (310 mt) ) Deep Stations)


BC1 CONTRACT<br />

<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong>


CR1 Contract<br />

<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

Engineering/design, procurement and construction of an approx. 63 km<br />

railway and related structures, which comprise of :<br />

A fully operational re-aligned track work and 36 new above-ground stations<br />

and dismantling/removal of existing tracks and structures on the Asian and<br />

the European sides, , excluding the trackwork to be constructed under the BC1<br />

Contract,<br />

Expand East-West Railway ROW from 2 to 3 tracks on the surface<br />

Fully operational Traction Power Supply System, Overhead Catenary y System,<br />

Signalling System, Telecommunication System, SCADA System, Railway<br />

ay<br />

Station Buildings and Platforms, seperate Operation Control and Administrative<br />

Centers, Depots and Stabling Yards for the Commuter Rail and Intercity Rail,<br />

Electrical Distribution Systems and all associated mechanical and d electrical<br />

systems.<br />

<strong>The</strong> integration testing, commissioning and putting the <strong>Marmaray</strong> <strong>Project</strong>, P<br />

including the rolling stock, into service.<br />

Provision of spare parts and a complete maintenance service for defined<br />

periods.


<strong>The</strong> CR1 Line<br />

Km 0+000<br />

HALKALI<br />

Km 1+686<br />

MUSTAFAKEMAL<br />

Km 3+948<br />

Km 6+379<br />

KÜÇÜKÇEKMECE<br />

FLORYA<br />

YEŞĐLKÖY<br />

YEŞĐLYURT<br />

ATAKÖY<br />

BAKIRKÖY<br />

YENĐMAHALLE<br />

ZEYTĐNBURNU<br />

KAZLIÇEŞME<br />

YENĐKAPI<br />

SĐRKECĐ<br />

Km 24+902<br />

ÜSKÜDAR<br />

Km 28+270<br />

Km 34+099<br />

SÖĞÜTLÜÇEŞME<br />

FENERYOLU<br />

Km 9+887<br />

Km 11+048<br />

Km 13+554<br />

Km 14+939<br />

Km 15+690<br />

Km 17+861<br />

Km 18+970<br />

Km 22+132<br />

Km 35+844 GÖZTEPE<br />

Km 37+017 ERENKÖY<br />

Km 38+631 SUADĐYE<br />

Km 40+179 BOSTANCI<br />

<strong>Marmaray</strong><br />

<strong>Project</strong><br />

Legend Km 41+411 KÜÇÜKYALI<br />

Stations Km 42+824 ĐDEALTEPE<br />

Transfer Stations<br />

Km 44+124<br />

Km 45+603<br />

SÜREYYAPLAJI<br />

MALTEPE<br />

Underground Stations Km 46+732 CEVĐZLĐ<br />

Tunnel 2 Tracks<br />

At Grade 3 tracks<br />

Km 48+931 ATALAR<br />

Km 50+731 BAŞAK<br />

Km 52+182 KARTAL<br />

Km 53+630<br />

Km 55+355<br />

YUNUS<br />

PENDĐK<br />

Km 57+265<br />

Km 59+644<br />

KAYNARCA<br />

TERSANE<br />

Km 60+703<br />

Km 62+590<br />

GÜZELYALI<br />

AYDINTEPE<br />

Km 63+590<br />

Km 64+544<br />

ĐÇMELER<br />

TUZLA<br />

Km 67+136<br />

Km 70+824<br />

ÇAYIROVA<br />

FATĐH<br />

Km 71+759<br />

Km 73+405<br />

OSMANGAZĐ<br />

GEBZE<br />

Km 76+530<br />

November 2009


AYAZAĞA-TAKSĐM-YENĐKAPImetro<br />

line<br />

ÜSKÜDAR<br />

ÜSKÜDAR-ÜMRANĐYE metro line<br />

Đbrahimağa Station integration<br />

to <strong>Marmaray</strong><br />

SĐRKECĐ<br />

YENĐKAPI<br />

KADIKÖY-KARTAL metro line<br />

End of BC1<br />

KAZLIÇEŞME<br />

BC1 Line<br />

CR Line<br />

CR Line<br />

MARMARAY LINE and Integration of other metro lines


CR2 Contract<br />

<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

Engineering/design,<br />

manufacture and delivery<br />

of 440 rail cars,<br />

Testing and<br />

commissioning of the new<br />

rolling stock,<br />

Training of the Employer’s<br />

staff in train operation,<br />

Provision of spare parts<br />

and maintenance of<br />

railcars for defined<br />

periods.<br />

Above is a representative picture.


BC1 CONTRACT<br />

IMMERSED TUBE TUNNEL CONSTRUCTION


TBM<br />

Immerse Tube Tunnel 1,387m<br />

TBM<br />

E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11<br />

Temporary Jetty<br />

European side<br />

Access Shaft<br />

Asian side<br />

Elev.(m)<br />

-10<br />

-20<br />

-40<br />

TBM<br />

Sea bed<br />

E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11<br />

TBM<br />

-60 Maximum length 135m / element<br />

Immerse tube tunnel 1,387m<br />

Typical Dimensions 135m x 15.5m x 8.6m, Weight = 19,000-20,000 ton


Dredging Works<br />

Contaminated soil: 120.000 m3<br />

Stone backfill: 130.000 m3<br />

Clean soil: 1.000.000 m3<br />

Soil backfill: 800.000 m3


27m3<br />

bucket<br />

Dredging<br />

Area<br />

Improved<br />

Ground<br />

Immersed Tube Tunnel


ÜSKÜDAR TEMPORARY JETTY<br />

Access Shaft


Access Shaft<br />

IMT axis<br />

Üsküdar Temporary Jetty<br />

To Üsküdar st.


HYDROLIC CONNECTION


IMT & TBM CONNECTION SLEEVE


Navigation Channel for IMT Elements


INNER VIEWS OF IMMERSED TUNNEL ELEMENT


Tuzla Offshore Element Fabrication Site


BC1 CONTRACT<br />

BORED TUNNEL CONSTRUCTION<br />

NATM TUNNEL CONSTRUCTION<br />

CUT & COVER TUNNEL CONSTRUCTION


BC1 Profile


AYRILIKÇEŞME PORTAL –TBM 4-5


Station entrances<br />

ÜSKÜDAR STATION SITE OVERVIEW


BC1 Profile


SĐRKECĐ STATION


ENTRANCE<br />

GROUND LEVEL<br />

ENTRANCE<br />

THIS PART WILL BE<br />

BUILT AS NATM<br />

MAIN CORRIDOR<br />

CROSS PASSAGE<br />

SHAFT<br />

CORRĐDOR FOR PASSENGERS<br />

PLATFORM<br />

SIRKECI STATION STRUCTURE


SĐRKECĐ STATION NORTH ENTRANCE


EAST VENTILATION SHAFT


WEST VENTILATON SHAFT


SĐRKECĐ STATION PILOT TUNNEL NATM WORKS IN THE SHAFT


SĐRKECĐ STATION PILOT TUNNEL NATM WORKS IN THE SHAFT


Sirkeci Station<br />

Enlargement of Pilot Tunnels


SĐRKECĐ STATION PILOT TUNNEL NATM WORKS IN THE SHAFT


STATION AREA<br />

EAST AREA EXCAVATION


YENĐKAPI VENTILATION BUILDING CONSTRUCTION


Yedikule TBM Portal


BC1 CONTRACT<br />

ARCHAEOLOGICAL WORKS


DISCOVERY OF ARTIFACTS<br />

(1) Sirkeci West Shaft Archaeological Works<br />

(2) Shipwreck in Yenikapı (11th Century A.C.) (3) Religious Bldg in Uskudar (12th Century A.C.)<br />

* Pictures taken from the paper “<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong>: Managing a Large Scale <strong>Project</strong> with Various Stake Holders” by Authors H. Belkaya, Dr.<br />

I. H. Ozmen, Dr. I. Karamut, WCE 2008, London, U.K.


Church Remainings and<br />

Graves<br />

ARCHAEOLOGICAL EXCAVATION FINDINGS<br />

Level +1.00 m.


Piles<br />

of jetty<br />

Tomb and marble<br />

Piles of<br />

jetty<br />

wall<br />

well<br />

wall<br />

Piles of jetty of<br />

Harbour<br />

level+0.00 m. findings


ARCHAEOLOGICAL EXCAVATION FINDINGS<br />

Level -1.00<br />

m. Findings<br />

Sewerage pit<br />

Sunk boat remainings


Reconstructed Illustratıon of a sunked ship found in Yenikapı by Prof. Dr. Cemal Pulak


II. THEODOSĐUS<br />

Gold Coins


SOME SAMPLES OF ARCHAEOLOGĐCAL CAL EXCAVATION FINDINGS


Thank You for Your Attention.<br />

Levent Irmak<br />

Civil Engineer, Contracts & Claims Consultant<br />