CR1 Contract<br />

<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />

Engineering/design, procurement and construction of an approx. 63 km<br />

railway and related structures, which comprise of :<br />

A fully operational re-aligned track work and 36 new above-ground stations<br />

and dismantling/removal of existing tracks and structures on the Asian and<br />

the European sides, , excluding the trackwork to be constructed under the BC1<br />

Contract,<br />

Expand East-West Railway ROW from 2 to 3 tracks on the surface<br />

Fully operational Traction Power Supply System, Overhead Catenary y System,<br />

Signalling System, Telecommunication System, SCADA System, Railway<br />

ay<br />

Station Buildings and Platforms, seperate Operation Control and Administrative<br />

Centers, Depots and Stabling Yards for the Commuter Rail and Intercity Rail,<br />

Electrical Distribution Systems and all associated mechanical and d electrical<br />

systems.<br />

<strong>The</strong> integration testing, commissioning and putting the <strong>Marmaray</strong> <strong>Project</strong>, P<br />

including the rolling stock, into service.<br />

Provision of spare parts and a complete maintenance service for defined<br />

periods.