The Marmaray Project - Dispute Resolution Board Foundation
The Marmaray Project - Dispute Resolution Board Foundation
The Marmaray Project - Dispute Resolution Board Foundation
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>The</strong> <strong>Marmaray</strong> <strong>Project</strong><br />
CONTRACT<br />
ENG Contract<br />
(AVRASYA JV)<br />
BC1 Contract<br />
(TGN JV)<br />
CR1 Contract<br />
(AMD JV)<br />
CR2 Contract<br />
CONTRACTOR<br />
Oriental Consultants (Japan)<br />
Yuksel Proje (Turkey)<br />
Japan Railway Tech Service<br />
Taisei (Japan)<br />
Gama (Turkey)<br />
Nurol(Turkey)<br />
Hyundai/Rotem (S.Korea)<br />
Contract Value<br />
(Approximately)<br />
JPY 5.5 Bln<br />
JPY 87 Bln<br />
(excluding Provisional Sum)<br />
€ 815 million<br />
(excluding Provisional Sum)<br />
€ 543 million<br />
(excluding Provisional Sum)