Ferro-nickel / NPI Production from Laterite Nickel Ore in China
Ferro-nickel / NPI Production from Laterite Nickel Ore in China
Ferro-nickel / NPI Production from Laterite Nickel Ore in China
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Cost Structure – New Project EFPreconditions:1) Ni % <strong>in</strong> ore = 1.8%; moisture = 30%, Ni % <strong>in</strong> <strong>NPI</strong> = 10%;2) <strong>Nickel</strong> ore price ( Ni % = 1.5%) = 550 RMB/WT3) Electricity price = 0.50 RMB/KWH53%<strong>Laterite</strong> <strong>Ore</strong>ElectricityFuel coalReductant coal19%Refractory14%2%6%6%Labor, tax and othersCost structure of <strong>NPI</strong> New Projects <strong>in</strong> Ch<strong>in</strong>aCompared to blast furnaces and exist<strong>in</strong>g electric furnaces, electric furnaces of newly establishedprojects are cost sav<strong>in</strong>g and environmental-friendly, with• rotary kiln – lower electricity consumption;•dedicatedly designed and big capacity - higher production & <strong>nickel</strong> recovery, lowerma<strong>in</strong>tenance;•close to sea ports – no <strong>in</strong>land transportation cost;Except sea freight as additional cost, newly built electric furnaces <strong>in</strong> Ch<strong>in</strong>a have no disadvantagescompar<strong>in</strong>g with other Fe-Ni production furnaces <strong>in</strong> other countries.