10.07.2015 Views

TC O-112: Railway Locomotive Inspection and Safety Rules (pdf ...

TC O-112: Railway Locomotive Inspection and Safety Rules (pdf ...

TC O-112: Railway Locomotive Inspection and Safety Rules (pdf ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

18. FAIL SAFE CIRCUITS AND SYSTEMS18.1 Any component of electrical or mechanical systems, vital to the safety of locomotiveoccupants or the general public, shall in the case of failure retain the locomotive in a safeoperating condition.19. FUEL TANKS19.1 Fuel tanks, on new locomotives purchased subsequent to the approval of this rule, are tobe of high impact resistant design which meet or exceed current Association of AmericanRailroads Manual of St<strong>and</strong>ards <strong>and</strong> Recommended Practices (S-5506).19.2 Fuel tanks shall be provided with suitable liquid level gauges, so located that the fuellevel in the tanks can be determined when the tanks are being filled. Gauges must be protectedagainst accidental breakage where loss of fuel would be incurred.20. WHEELS AND AXLES20.1 Traction motors support bearing, on new locomotives purchased subsequent to theapproval of this rule, are to be of the roller bearing type.18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!