<strong>DOORS</strong>j. Signs as accepted by the VRE and conforming to APTA SS-PS-002-098 Rev 3, shall be placedon the inside <strong>of</strong> each side door identifying the location <strong>of</strong> the manual release handle and givesimplified instruction. [CDRL 8-09]1) The exterior release device shall be an air valve with appropriate signage.k. Identification <strong>of</strong> the exterior emergency handle shall be marked on the side <strong>of</strong> the car forlocation and with operating instructions.l. The exterior emergency handles shall be located so that they can be operated while standing onthe ground.8.8.4 Key Control Switchesa. Whenever a switch is operated by a coach key, the tumbler shall be set back at least 0.5-in. (12.7mm) from the face to prevent operation by a screwdriver or similar device.b. All key control switches shall be arranged so that the key can only be removed in a centered,non-actuated switch position.8.9 Door Signals and Alarms8.9.1 LampsDoor control system signal lights shall use incandescent lamps with green or red lenses, speciallydesigned for transit applications, one (1) inch in diameter, with proven revenue service and asapproved by the VRE. [CDRL 8-<strong>10</strong>]8.9.2 Conductor's Door Signal Lighta. Conductor’s Door Signal Light is not required.8.9.3 AlarmsAll door operators shall have audio and visual alarms that comply with all applicable sections <strong>of</strong>49 CFR 38 Subpart "E" for Commuter Rail Cars, latest version, for ADA compliance.a. These alarms shall be installed in each door station and shall operate for at least ten (<strong>10</strong>) secondswhenever the door close trainline has been energized.b. Door operation shall not be initiated until two (2) seconds after trainline is energized.c. Visual alarm shall coordinate with audio alarm and be located at each door station.d. Selection <strong>of</strong> the waterpro<strong>of</strong> chime audio and visual devices shall be submitted to the VRE forreview and acceptance. [CDRL 8-11]8.<strong>10</strong> Verification and Testinga. All door control equipment shall be completely functionally tested before shipment from thefactory.b. The entire door control system shall be subject to qualification testing. This testing shall includelife cycle testing <strong>of</strong> the door operators with the door panel, verification <strong>of</strong> operation across thevoltage range <strong>of</strong> the supply voltages, life cycle testing <strong>of</strong> the obstruction detection system, andverification <strong>of</strong> all diagnostic and monitoring functions. All life cycle testing shall be performedRFP No. 012-001 – New Passenger Rail Cars III<strong>Page</strong> 8 <strong>of</strong> <strong>10</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!