10.07.2015 Views

Clarifications on the queries provided in the Pre-Bid Conference on ...

Clarifications on the queries provided in the Pre-Bid Conference on ...

Clarifications on the queries provided in the Pre-Bid Conference on ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Clarificati<strong>on</strong>s</str<strong>on</strong>g> <strong>on</strong> <strong>the</strong> <strong>queries</strong> <strong>provided</strong> <strong>in</strong> <strong>the</strong> <strong>Pre</strong>-<strong>Bid</strong> C<strong>on</strong>ference <strong>on</strong> 22-3-20119 of 50Each applicant should c<strong>on</strong>duct its own <strong>in</strong>vestigati<strong>on</strong> and analysis and should check <strong>the</strong> accuracy, reliability and completeness of <strong>the</strong> <strong>in</strong>formati<strong>on</strong> c<strong>on</strong>ta<strong>in</strong>ed <strong>in</strong> RFP & this document. The bidders are requested toobta<strong>in</strong> <strong>in</strong>dependent advice from appropriate sources.S.No.Name of <strong>the</strong>firmQuerypageNo.Clause no/paragraph Clarificati<strong>on</strong>/changes sought DPI’S clarificati<strong>on</strong>95 Educomp9 Eligibility criteria- no.1 Apart from Prime <strong>Bid</strong>der fulfill<strong>in</strong>g <strong>the</strong> eligibility criteria, we The clause is very clear.soluti<strong>on</strong>s Ltd.also suggest <strong>the</strong> o<strong>the</strong>r member form<strong>in</strong>g <strong>the</strong> c<strong>on</strong>sortiumshould also have an expertise <strong>in</strong> execut<strong>in</strong>g CE & CAEprojects of similar mandate and its bel<strong>on</strong>g<strong>in</strong>gness to <strong>the</strong>roots of educati<strong>on</strong> fraternity after look<strong>in</strong>g <strong>in</strong>to <strong>the</strong> vast scope96 Educomp10 Eligibility criteria- EMD of An implement<strong>in</strong>g opti<strong>on</strong> am<strong>on</strong>g Demand CEP <strong>in</strong> 1900 draft and Schools Bank across Guarantee Chattisgarh should be to Not Accepted.soluti<strong>on</strong>s Ltd.<strong>provided</strong> to <strong>the</strong> bidder for submitt<strong>in</strong>g / furnish<strong>in</strong>g <strong>the</strong> EMDs for all<strong>the</strong> three prescribed z<strong>on</strong>es. Bank Guarantee format has to bereleased by <strong>the</strong> DPI <strong>in</strong> <strong>the</strong> same c<strong>on</strong>text97 Educomp 15 Site preparati<strong>on</strong>Accord<strong>in</strong>g to our expertise <strong>the</strong> ideal space required forsoluti<strong>on</strong>s Ltd.accommodat<strong>in</strong>g 20 students & teacher with 10 computers am<strong>in</strong>imum space of 20’x20’=400 Sq Ft area is desired. Werequest <strong>the</strong> department to specify <strong>the</strong> space to be <strong>provided</strong>for sett<strong>in</strong>g up of <strong>the</strong> lab. We understand that <strong>the</strong> separateelectrical c<strong>on</strong>nectivity will have to be taken <strong>in</strong> <strong>the</strong> name ofschool. Obta<strong>in</strong><strong>in</strong>g c<strong>on</strong>necti<strong>on</strong> for each of <strong>the</strong> sites willrequired additi<strong>on</strong>al time as necessary documents needs besubmitted at <strong>the</strong> local electrical sub-divisi<strong>on</strong>, we request <strong>the</strong>department to suitably add <strong>on</strong>e week more <strong>in</strong>stead of <strong>on</strong>lythree weeks. Or department can suggest us a process <strong>in</strong>liais<strong>on</strong> with <strong>the</strong> electrical department to get <strong>the</strong> c<strong>on</strong>necti<strong>on</strong>s98 Educomp16 Test<strong>in</strong>g & commissi<strong>on</strong><strong>in</strong>g- centrally Department <strong>in</strong>stead is requested of apply<strong>in</strong>g to provide separately <strong>the</strong> schedule for each for Acceptanceof <strong>the</strong> Refer to time schedule given <strong>in</strong> RFPsoluti<strong>on</strong>s Ltd.1.5.1&1.5.2Test which will be followed after <strong>the</strong> completi<strong>on</strong> of <strong>the</strong> site99 Educomp 17 Supply of tra<strong>in</strong><strong>in</strong>g pers<strong>on</strong>nelpreparati<strong>on</strong>.Department may k<strong>in</strong>dly clarify <strong>the</strong> durati<strong>on</strong> of PGDCA. Also Not acceptedsoluti<strong>on</strong>s Ltd.1.6.2The average size of <strong>the</strong> room is clarified <strong>in</strong>query no.79.gett<strong>in</strong>g 2 yrs PGDCA candidate might be difficult <strong>in</strong> alllocati<strong>on</strong>s, department may suitably amend <strong>the</strong> clause orc<strong>on</strong>sider candidates with lower qualificati<strong>on</strong>s <strong>on</strong> case to case100 Educomp17 Tra<strong>in</strong><strong>in</strong>g of Govt Teachers…. basis. We apprehend that we need to tra<strong>in</strong> 5 teachers every year for a Clarified as query no.82soluti<strong>on</strong>s Ltd.period of 2 weeks for 6 hrs /day from each 1900 schools but werequest a clarify <strong>on</strong> <strong>the</strong> approximate nos of o<strong>the</strong>r schools to beidentified for tra<strong>in</strong><strong>in</strong>g and also <strong>the</strong> details of <strong>the</strong> venue which willbe use for <strong>the</strong> tra<strong>in</strong><strong>in</strong>g ei<strong>the</strong>r it needs to be arranged by <strong>the</strong>101 Educomp 25 IT <strong>in</strong>frastructure relatedbidder or will be <strong>provided</strong> by <strong>the</strong> department.The technical requirement given <strong>in</strong> <strong>the</strong> tender is for 30 m<strong>in</strong>s Please see <strong>the</strong> clarificati<strong>on</strong> given here<strong>in</strong> abovesoluti<strong>on</strong>s Ltd.service levelsbackup time. To avail 4 hrs backup time <strong>in</strong> case of powerdrop we need to suitably modify <strong>the</strong> technical requirementof <strong>the</strong> UPS. If it is <strong>the</strong> case of electricity and UPS <strong>the</strong>n it alldepends up<strong>on</strong> <strong>the</strong> power situati<strong>on</strong> of <strong>the</strong> locality. Underforce majeure where <strong>the</strong>re is no power it will be difficult toma<strong>in</strong>ta<strong>in</strong> <strong>the</strong> 4 hrs target.Department mayelaborate <strong>the</strong> term “M<strong>in</strong>or Civil Repairs”. Attend<strong>in</strong>g anyrepair works with<strong>in</strong> 72 hrs is not practical as it <strong>in</strong>volves102 Educomp 37 & 38 QCBCA resource In BOOT Model and manpower Projects of similar mobilizati<strong>on</strong> scope of also. work Department usually <strong>in</strong> quality may Not Accepted.soluti<strong>on</strong>s Ltd.QCBS [Quality Cost Based Selecti<strong>on</strong>] 70% weightage is given <strong>on</strong>Technical Capabilities and 30% <strong>on</strong> F<strong>in</strong>ancial <strong>Bid</strong>s. As executi<strong>on</strong> ofprojects of this nature require more technical and groundexpertise we would suggest to c<strong>on</strong>sider 70% weightage forTechnical and 30% weightage for F<strong>in</strong>ancial.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!