Chap. II ]2.1.1 to 2.1.6 - Deleted.154[ Appendix <strong>2.10</strong> A2.2.1 Applicable <strong>for</strong> percentage rate tender–Form A only:-The percentage <strong>of</strong> tender above or below to the Schedule <strong>of</strong> Rates <strong>for</strong> WaterResources Department <strong>in</strong> Chhattisgarh <strong>in</strong> <strong>for</strong>ce from 01.12.............. <strong>in</strong>clusive <strong>of</strong> allcorrection slips up to the date <strong>of</strong> issue <strong>of</strong> the tender notice.The percentage above or below as the case may be as tendered <strong>in</strong> clause 4.2.1<strong>of</strong> agreement <strong>for</strong>m A shall be calculated <strong>in</strong> the amount <strong>of</strong> the bill <strong>for</strong> the work doneafter deduct<strong>in</strong>g the cost <strong>of</strong> materials supplied by the department at rates specified <strong>in</strong>the agreement.2.2.2. All overwrit<strong>in</strong>g should be neatly scored out and rewritten and correction should beduly attested prior to the submission <strong>of</strong> the tender.<strong>Tender</strong> not specified percentage above or below the current S.O.R. as tendered<strong>in</strong> clause 4.2.1 <strong>of</strong> agreement <strong>for</strong>m A will be treated as <strong>in</strong>valid.If there is any difference between the amount <strong>in</strong> words and figures written <strong>in</strong>the tender <strong>for</strong>ms by the contractor, the lesser amount will be treated as valid. If thecontractor is not ready to accept the amount so fixed <strong>in</strong> the above manner anddecl<strong>in</strong>es to do the work, earnest money deposited by the contractor shall be <strong>for</strong>feited.2.3.1 Blank <strong>for</strong>ms <strong>of</strong> tender can be obta<strong>in</strong>ed from the <strong>of</strong>fice <strong>of</strong> the…………………………… on payment <strong>of</strong> Rs………… <strong>for</strong> each <strong>for</strong>m and the plansand specifications <strong>of</strong> the work may be seen and all other particulars ascerta<strong>in</strong>eddur<strong>in</strong>g <strong>of</strong>fice hours on any work<strong>in</strong>g day after the date on which the notice is affixedon the notice board <strong>in</strong> the <strong>of</strong>fice <strong>of</strong> the Executive Eng<strong>in</strong>eer ………………… andbe<strong>for</strong>e the last date on which the tenders are to be received.ORFor E-procurement the tender document can be downloaded free <strong>of</strong> cost.2.3.2. The estimated figures <strong>of</strong> quantities and cost shown <strong>in</strong> the tender document are notguaranteed <strong>for</strong> contract but merely given as rough guidance.2.3.3. Each tenderer should carefully exam<strong>in</strong>e the draw<strong>in</strong>gs, specifications. Specialconditions and other particulars etc. and visit the site <strong>of</strong> works and fully satisfy andacqua<strong>in</strong>t himself about the nature, location <strong>of</strong> the work, the surface condition, qualityand quantity <strong>of</strong> materials required, the character <strong>of</strong> equipment and ancillaries neededprelim<strong>in</strong>ary to and dur<strong>in</strong>g the execution <strong>of</strong> the work and general and local conditionswhich may affect the work or its cost.2.4.1. No tender will be received without a deposit <strong>of</strong> earnest money <strong>of</strong> Rs. …………..( <strong>in</strong>words.Rs……..……….) <strong>in</strong> a separate sealed cover duly superscribed. The earnestmoney will be returned to the unsuccessful tenderers on the rejection <strong>of</strong> their tendersor earlier as may be decided by the competent authority and will be reta<strong>in</strong>ed from thesuccessful tenderer as part <strong>of</strong> security deposit.


Chap. II ]155[ Appendix <strong>2.10</strong> A2.4.2. The rate <strong>of</strong> earnest money to be submitted by the <strong>in</strong>tend<strong>in</strong>g contractors will be asunder :-(i) For tenders upto Rs. 1 Lakh .(ii) For tenders more than Rs. 1 Lakh andupto Rs. 5 Lakhs(iii) For tenders more than Rs. 5 Lakhs andupto Rs. 2 crores(iv) (a) For tenders above Rs. 2 crores andupto Rs. 10 crores(b) For tenders above Rs. 10 crores.(v) For unemployment eng<strong>in</strong>eer (tender uptoRs. 10.00 Lacs)3 Percent1.5 percent subject to am<strong>in</strong>imum <strong>of</strong> Rs. 30001 percent subject to a m<strong>in</strong>imum<strong>of</strong> Rs. 75000.75 percent subject to am<strong>in</strong>imum <strong>of</strong> Rs. 2 Lakhs.0.50% Subject to a m<strong>in</strong>imum <strong>of</strong>Rs. 7.50 LacsNil.2.5.1 Where the amount <strong>of</strong> the earnest money to be deposited is more than Rs. 500 amountshould be deposited <strong>in</strong> the treasury / State Bank <strong>of</strong> India and the chalan should beenclosed with tender. If however <strong>in</strong>stead <strong>of</strong> deposit<strong>in</strong>g the earnest money <strong>in</strong> cash <strong>in</strong>treasury, a contractor wishes to deposit the same <strong>in</strong> any <strong>of</strong> the follow<strong>in</strong>g firms. heshould be permitted to do so :(i) Treasury receipts(ii) National Sav<strong>in</strong>gs Certificates(iii) Treasury Bonds(iv) Approved <strong>in</strong>terest bear<strong>in</strong>g Securities(v) Government Promissory Notes <strong>in</strong> National Plan Loans.(vi) Post Office Cash Certificates(vii) 10 years Treasury Sav<strong>in</strong>g / Deposit Certificates(viii) 12 years National Sav<strong>in</strong>g Certificates.(ix) 10 years Defence Deposit Certificates(x) National Sav<strong>in</strong>g Certificate duly hypothecated <strong>in</strong> the name <strong>of</strong> Government <strong>of</strong>C.G.(xi) Demand draft SBI or Scheduled Banks.(xii) Bank drafts issued by big Urban Banks whose work<strong>in</strong>g capital exceed Rs. 5Crores and by “A”. “B” and “C” class Central / Co- operative Banks / Non-Scheduled State Co- operative Banks subject to the condition that the drafts areencashed by the accept<strong>in</strong>g authority as soon as they are received. The contractsallotted only the encashment <strong>of</strong> drafts as per M.P.F.D. No. F/2/18/77/R/5 (iv)13-2-1978.2.5.2 The earnest money <strong>in</strong> one <strong>of</strong> the prescribed <strong>for</strong>ms should be produced/ sentseparately and not kept <strong>in</strong> the covers conta<strong>in</strong><strong>in</strong>g the tenders and if the earnestmoney is not <strong>in</strong> accordance with the prescribed mode the tenders would be returnedunopened to the tenderer.


Chap. II ]156[ Appendix <strong>2.10</strong> A2.6. The <strong>in</strong>tend<strong>in</strong>g tenderers from other States may remit the Earnest Money to theExecutive Eng<strong>in</strong>eer <strong>in</strong> the <strong>for</strong>m <strong>of</strong> Bank Draft <strong>of</strong> the State Bank <strong>of</strong> India or any otherScheduled Bank <strong>of</strong> the district where the <strong>of</strong>fice <strong>of</strong> the Executive Eng<strong>in</strong>eer is situated.2.7 Earnest money which has been deposited <strong>for</strong> a particular work will not ord<strong>in</strong>arily beadjusted towards the earnest money <strong>for</strong> another work, but if tender <strong>of</strong> a contractor<strong>for</strong> a work <strong>in</strong> the same division has been rejected and the earnest money has notbeen refunded to him due to some reason it may be so adjusted by ExecutiveEng<strong>in</strong>eer.2.7.1 Applicable to percentage rate <strong>Tender</strong>s – Forms A only.- The percentage tenderedby the contractor will only apply to those rates which f<strong>in</strong>d place <strong>in</strong> the UnifiedSchedule <strong>of</strong> Rates <strong>of</strong> Water Resources Department <strong>in</strong> <strong>for</strong>ce from 01-12-............... orhave been derived from the said schedule <strong>of</strong> rates and not to other items <strong>of</strong> work.2.8 – The security deposit shall be 5% <strong>of</strong> the amount <strong>of</strong> contract.2.8.1. –Security <strong>for</strong> Per<strong>for</strong>mance :- Security <strong>for</strong> Per<strong>for</strong>mance deposit @ 15% <strong>of</strong> theamount payable to the contractor, <strong>for</strong> work <strong>of</strong> the contract. from its runn<strong>in</strong>g bills,shall be deducted till 70% <strong>of</strong> the agreemented amount <strong>of</strong> the work is completed bythe contractor. The 70% <strong>of</strong> contract amount shall not <strong>in</strong>clude any additionalitem/quantity. This security <strong>for</strong> per<strong>for</strong>mance shall be refunded to the contractorimmediately after satisfactory completion <strong>of</strong> the work.2.8.2 - Unbalanced <strong>Tender</strong> :-In item rate tender if the tender rate <strong>of</strong> some items are very much higherthan the estimated rates and <strong>for</strong> some other items <strong>of</strong> work to be executed <strong>in</strong> laterstage or otherwise, the rates quoted by contractor is much lower than the estimatedrates, then this type <strong>of</strong> tender is known as an “ Unbalanced <strong>Tender</strong>”.Payment <strong>of</strong> runn<strong>in</strong>g bills <strong>of</strong> all items <strong>in</strong> unbalanced item rate tenders.( In whichquoted rates are very much higher than the overall tender percentage) should be madeat the estimated rates <strong>of</strong> those items and payment <strong>of</strong> difference amount should not bepaid to the contractor, and should be kept as “additional security deposit”.This additional security deposit shall be paid to the contractor <strong>in</strong> proportion <strong>of</strong> theitems <strong>of</strong> lower rates be<strong>in</strong>g completed by the contractor. The procedure <strong>of</strong> payment<strong>of</strong> this additional security deposit shall be fixed by the <strong>of</strong>ficer accept<strong>in</strong>g / sanction<strong>in</strong>gthe tender. The authority sanction<strong>in</strong>g the unbalance tender shall mention the aboveprocedure <strong>in</strong> writ<strong>in</strong>g at the time <strong>of</strong> sanction<strong>in</strong>g such tender so that this maybecome a part <strong>of</strong> the agreement.2.9 The authority competent to accept a tender reserves the right <strong>of</strong> accept<strong>in</strong>g the tender<strong>for</strong> the whole work or <strong>for</strong> a dist<strong>in</strong>ct part <strong>of</strong> it, or <strong>of</strong> distribut<strong>in</strong>g the work between oneor more tenders.


Chap. II ]157[ Appendix <strong>2.10</strong> A<strong>2.10</strong> The tenderer whose tender has been accepted (here<strong>in</strong>after referred to as thecontractor) shall produce an appropriate solvency certificate, if so required by theExecutive Eng<strong>in</strong>eer and will execute the agreement <strong>in</strong> the prescribed <strong>for</strong>m with <strong>in</strong> a<strong>for</strong>tnight <strong>of</strong> the date <strong>of</strong> commu<strong>nic</strong>ation <strong>of</strong> acceptance <strong>of</strong> his tender by the competentauthority. Failure to do so will result <strong>in</strong> the earnest money be<strong>in</strong>g <strong>for</strong>feited toGovernment and tender be<strong>in</strong>g cancelled.2.11 The submission <strong>of</strong> a tender by a contractor implies that he has read the notice andconditions <strong>of</strong> tender and contract and has made himself aware <strong>of</strong> the scope andspecifications <strong>of</strong> the work to be done and has seen the quarries with their approaches,sites <strong>of</strong> works etc. and satisfied himself regard<strong>in</strong>g the suitability <strong>of</strong> the materials at thequarries. The responsibility <strong>of</strong> open<strong>in</strong>g <strong>of</strong> new quarries and construction andma<strong>in</strong>tenance <strong>of</strong> approaches thereto shall lie wholly with the contractor2.12. The contractor shall not, without the prior approval <strong>of</strong> the competent authority <strong>in</strong>writ<strong>in</strong>g, sublet or assign to any other party or parties the whole or any portion <strong>of</strong> thework under the contract. Even where such approval is granted the contractor shall notbe relieved <strong>of</strong> any obligation, duty or responsibility which he under takes under thecontract.2.13. All the conditions <strong>of</strong> the tender notice will be b<strong>in</strong>d<strong>in</strong>g on the contractor and will<strong>for</strong>m a part <strong>of</strong> the agreement to be executed by the contractor <strong>in</strong> addition to theconditions <strong>of</strong> contract <strong>in</strong> the prescribed <strong>for</strong>ms and special conditions <strong>of</strong> contract.2.14. Conditional tenders are liable to the rejected.2.15. The tender will be opened at the time and place stated <strong>in</strong> para. 2.1 by the………………………… <strong>in</strong> the presence <strong>of</strong> the tenderers or their duly authorizedagents who may choose to attend. The ………………………….. (as <strong>in</strong> para. 2.1)under unavoidable circumstances may depute another <strong>of</strong>ficer <strong>in</strong> his absence toreceive and open tenders on his behalf.2.16. The ………………………… does not b<strong>in</strong>d himself to accept or to recommend <strong>for</strong>the acceptance <strong>of</strong> the tender to higher authority the lowest or any tender.2.17.1 All dues regard<strong>in</strong>g taxes <strong>in</strong>clud<strong>in</strong>g the commercial tax, Octroi duties, etc. levied onthe contractor’s work by Government and Local bodies or private <strong>in</strong>dividuals willbe payable by the contractor. The Works Department will grant a certificate <strong>for</strong> thequantities actually used on the work but will not enterta<strong>in</strong> any claim on this account.2.17.2. The royalty charges <strong>for</strong> extract<strong>in</strong>g m<strong>in</strong>or m<strong>in</strong>erals <strong>for</strong> Government work will be paidby the contractor to the Collector or local body as per rules.2.17.3. Income Tax at the rate <strong>of</strong> …… from any sum payable to the contractor shall at thetime <strong>of</strong> credit <strong>of</strong> such sum or at the time <strong>of</strong> payment to the contractor by cash, cheque


Chap. II ]158[ Appendix <strong>2.10</strong> Aor Draft or any other mode shall be deducted at the source from his runn<strong>in</strong>g, f<strong>in</strong>al orany type <strong>of</strong> payment <strong>for</strong> this contract as per section 194 <strong>of</strong> Income – tax Act, 1961.2.17.4. It is open to the contractor or the Sub-Contractor as the case may be to make anapplication to the Income Tax Officer concerned and obta<strong>in</strong> from him a Certificateauthoriz<strong>in</strong>g the payer to deduct tax at such lower rate or deduct no tax as may beappropriate to his case. Such certificate will be valid <strong>for</strong> the period specified there<strong>in</strong>unless it is cancelled by the Income Tax Officer earlier.Model Rules <strong>for</strong> Water Supply, Sanitation <strong>in</strong> Labour Camps2.18. The contractor will be bound to follow the Madhya Pradesh Model Rules relat<strong>in</strong>g tolay out <strong>of</strong> water supply and sanitation <strong>in</strong> labour camps ( vide Annexure A).Fair Wages to Labourers2.19 The contractor shall pay not less than fair wages to labourers engaged by him on thework ( copy <strong>of</strong> rules enclosed vide Annexure B.)Right to Take up Work Departmentally or to Award on Contract2.20. The Eng<strong>in</strong>eer-<strong>in</strong>-charge reserves the right to take up departmental work or to awardworks on contract <strong>in</strong> the vic<strong>in</strong>ity without prejudice to the terms <strong>of</strong> contract.Issue <strong>of</strong> Materials by the Department2.21.1. The follow<strong>in</strong>g materials will be supplied by the Department.S.No. Name <strong>of</strong> Articles Unit Rate Place <strong>of</strong> Delivery1.2.3.2.21.2. Deleted2.21.3. Deleted2.21.4. Deleted.Departmental Supply <strong>of</strong> Iron and Steel2.22.1. Iron and Steel will be supplied by the department and their cost debited to the work.Only labourer rate as tendered by the contractor <strong>for</strong> cutt<strong>in</strong>g and b<strong>in</strong>d<strong>in</strong>g, and fix<strong>in</strong>g <strong>in</strong>


Chap. II ]159[ Appendix <strong>2.10</strong> Aposition etc. <strong>of</strong> the steel <strong>for</strong> re<strong>in</strong><strong>for</strong>cement will be paid <strong>in</strong> respect <strong>of</strong> quantity <strong>of</strong> iron/steel supplied by the department.2.22.2. In case <strong>of</strong> departmental supply <strong>of</strong> steel, all waste pieces will be returned by thecontractor to the department. If the waste pieces exceed 3 percent that excess will becharged to the contractor at departmental issue rate plus usual departmental charges.The waste pieces <strong>of</strong> only reasonable size and quality will be accepted. Decision <strong>of</strong> theEng<strong>in</strong>eer-<strong>in</strong>-Charge about the reasonableness will be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on thecontractor.Delay <strong>in</strong> Supply <strong>of</strong> Departmental Materials2.22.3. If the materials are not supplied <strong>in</strong> time, the contractor will not be allowed any claim<strong>for</strong> any loss which may be caused to him, but only extension <strong>of</strong> time will be given atthe discretion <strong>of</strong> the competent authority if applied <strong>for</strong> by the contractor be<strong>for</strong>e theexpiry <strong>of</strong> the contract.Lead and Lift <strong>for</strong> Water2.23 No lead and lift <strong>for</strong> cart<strong>in</strong>g <strong>of</strong> water will be paid.2.24. Application <strong>for</strong> percentage <strong>Tender</strong>s Form–A only.- Cart<strong>in</strong>g <strong>of</strong> materials will beallowed as per actual lead limited to the lead provided <strong>in</strong> the enclosed statement videAnnexure C. The Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer shall have power to change the quarriesand allow longer leads provided the extra cost <strong>for</strong> each k<strong>in</strong>d <strong>of</strong> materials does notexceed 20 per cent <strong>of</strong> the cost <strong>of</strong> lead.2.25. Applicable <strong>for</strong> item rate tenders – Form B only.- Materials to be used on workspecified <strong>in</strong> the contract will be only from the quarries specified <strong>in</strong> Annexure C. If thechanges <strong>of</strong> quarries, from those mentioned <strong>in</strong> Annexure C, are necessitated due to anyreason dur<strong>in</strong>g the execution <strong>of</strong> work, such changes will be made only with theapproval <strong>of</strong> the Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer given <strong>in</strong> writ<strong>in</strong>g. Any alterations <strong>of</strong> itemsaffected by change <strong>of</strong> such quarries will be governed by the clauses 4.3.13.1, 4.3.13.2& 4.3.13.3 <strong>of</strong> the Agreement <strong>in</strong> <strong>for</strong>m B.2.26. If <strong>in</strong> a quarry, material <strong>of</strong> more than one quality is found the material <strong>of</strong> the bestquality as approved by the Executive Eng<strong>in</strong>eer shall be used by the contractor.2.27. Deleted.2.28. The contractor shall execute the work as per detailed specifications part …………….<strong>in</strong>corporated <strong>in</strong> the tender document and <strong>in</strong> accordance with the approved draw<strong>in</strong>gand special conditions <strong>in</strong>corporated <strong>in</strong> the tender documents.Schedule <strong>of</strong> Ma<strong>in</strong> Items <strong>of</strong> Works to be executed2.29 A schedule <strong>of</strong> ma<strong>in</strong> items <strong>of</strong> work to be executed is enclosed vide Annexure I.


Chap. II ]160[ Appendix <strong>2.10</strong> AList <strong>of</strong> Works <strong>in</strong> Hand2.30. <strong>Tender</strong>s must be accompanied by a list <strong>of</strong> contracts already held by the tenderer at thetime <strong>of</strong> submitt<strong>in</strong>g the tenders <strong>in</strong> Chhattisgarh Water Resources Department andelsewhere as per Annexure – K.Removal <strong>of</strong> Unsuitable or Undesirable Employees <strong>of</strong> Contractor2.31. The contractor shall on receipt <strong>of</strong> the requisition from the Executive Eng<strong>in</strong>eer at onceremove any person employed by him on the work who <strong>in</strong> the op<strong>in</strong>ion <strong>of</strong> ExecutiveEng<strong>in</strong>eer is unsuitable or undesirable.Recovery <strong>of</strong> Amount due to Government from Contractor2.32. Any amount due to Government from the contractor on any account concern<strong>in</strong>g workmay be recovered from him as arrear <strong>of</strong> land revenue.Transport <strong>of</strong> Materials is Contractor’s Responsibility2.33. The contractor shall make his own arrangement <strong>for</strong> transport <strong>of</strong> all materials. TheGovernment is not bound to arrange <strong>for</strong> priorities <strong>for</strong> gett<strong>in</strong>g wagon or any othermaterials though all possible assistance by way <strong>of</strong> recommendation will be given, if itis found necessary <strong>in</strong> the op<strong>in</strong>ion <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-Charge. If it proves <strong>in</strong>effective,the contractor shall have no claim <strong>for</strong> any compensation on this account.Arrangements <strong>of</strong> Tools and Plants2.34.1. The contractor shall arrange at his own cost tools and plant required <strong>for</strong> properexecution <strong>of</strong> work. It should be carefully noted that the plant and mach<strong>in</strong>ery as listed(Annexure-E) may be supplied by the Government under the orders <strong>of</strong> Super<strong>in</strong>tend<strong>in</strong>gEng<strong>in</strong>eer/Eng<strong>in</strong>eer-<strong>in</strong>-Charge <strong>of</strong> the work, if available and considered necessary <strong>in</strong> the<strong>in</strong>terest <strong>of</strong> work on the conditions, terms and rates as specified <strong>in</strong> the annexure-E. Thecontractor will have to execute the agreement <strong>for</strong> hir<strong>in</strong>g the mach<strong>in</strong>e, if required to doso by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge <strong>in</strong> the prescribed <strong>for</strong>m, Appended here<strong>in</strong>, videAnnexure F.2.34.2. Items, if any, other than those referred <strong>in</strong> Annexure E will also be supplied by theGovernment if available on conditions and payments as may be fixed by thedepartment at the time <strong>of</strong> loan<strong>in</strong>g the plant.Increase or Decrease <strong>of</strong> Items <strong>of</strong> Work2.35. The competent authority reserves the right to <strong>in</strong>crease or decrease any item <strong>of</strong> thework dur<strong>in</strong>g the currency <strong>of</strong> the contract and contractor will be bound to comply with


Chap. II ]161[ Appendix <strong>2.10</strong> Athe order <strong>of</strong> the competent authority <strong>in</strong> the manner described <strong>in</strong> clause 4.3.13.1,4.3.13.2, and 4.3.13.3 <strong>of</strong> agreement without any claim <strong>for</strong> compensation.Execution <strong>of</strong> Work accord<strong>in</strong>g to Time Schedule2.36 The work shall be done by the contractor accord<strong>in</strong>g to the time schedule fixed bycompetent authority.Canvass<strong>in</strong>g or Support <strong>for</strong> Acceptance <strong>of</strong> tender2.37. Canvass<strong>in</strong>g or support <strong>in</strong> any <strong>for</strong>m <strong>for</strong> the acceptance <strong>of</strong> any tender is strictlyprohibited. Any tenderer do<strong>in</strong>g so will render himself liable to penalties which may<strong>in</strong>clude removal <strong>of</strong> his name from the register <strong>of</strong> approved contractors.Responsibilities <strong>for</strong> Leak<strong>in</strong>g <strong>of</strong> Build<strong>in</strong>g dur<strong>in</strong>g Ra<strong>in</strong>y Season2.38. It will be the responsibility <strong>of</strong> the contractor to see that the build<strong>in</strong>g does not leakdur<strong>in</strong>g the period <strong>of</strong> first ra<strong>in</strong>y season <strong>of</strong> tiled and sheet ro<strong>of</strong> and two consecutivera<strong>in</strong>y seasons <strong>in</strong> respect <strong>of</strong> terraced ro<strong>of</strong> after its completion and he will make goodand replace all the defective work on this account.List <strong>of</strong> Persons Employed by Contractor2.39. The contractor shall not be permitted to tender <strong>for</strong> works <strong>in</strong> the……………………………. Division/Circle (responsible <strong>for</strong> award and execution <strong>of</strong>contracts) <strong>in</strong> which his near relative is posted as Divisional Accountant or as an<strong>of</strong>ficer <strong>in</strong> any capacity between the grades <strong>of</strong> Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer and AssistantEng<strong>in</strong>eer (both <strong>in</strong>clusive). A list show<strong>in</strong>g the names <strong>of</strong> the persons who are work<strong>in</strong>gwith the contractor and are near relatives to any gazetted <strong>of</strong>ficer <strong>in</strong> the………………….. Department <strong>in</strong>clud<strong>in</strong>g Secretariat should also be appended to thetender. He should also <strong>in</strong>timate to the E.E. the names <strong>of</strong> subsequently employedpersons who are near relatives to any gazetted <strong>of</strong>ficer <strong>in</strong> …………………..Department or Divisional Accountant <strong>in</strong> …………………. Division. Any breach <strong>of</strong>this condition by the contractor would render him liable to be removed from theapproved list <strong>of</strong> contractors <strong>of</strong> this Department.Note.- By the term near relative is meant son, grand-son, father, mother, spouse, brother,sister, brother-<strong>in</strong>-law, father-<strong>in</strong>-law, and mother-<strong>in</strong>-law.


Chap. II ]162Price Adjustment[ Appendix <strong>2.10</strong> A2.40.1. No claim <strong>for</strong> price adjustment on account <strong>of</strong> any reason whatsoever shall beenterta<strong>in</strong>ed if construction period as per <strong>Notice</strong> Invit<strong>in</strong>g <strong>Tender</strong>s is not more than 12months. If construction period is more than 12 months the amount paid to thecontractor <strong>for</strong> work shall be adjusted quarterly <strong>for</strong> <strong>in</strong>crease or decrease <strong>in</strong> the rate <strong>of</strong>labour, material and P.O.L. except<strong>in</strong>g those materials supplied by the Government (asper Annexure -L). For this purpose quarters would be January to March, April, toJune, July to September and October to December and the month/ date <strong>of</strong> open<strong>in</strong>gtenders means the month / date prescribed <strong>in</strong> N.I.T. <strong>for</strong> open<strong>in</strong>g the tender.(A) Labour:Increase or decrease <strong>in</strong> the cost due to labour shall be calculated quarterly <strong>in</strong>accordance with the follow<strong>in</strong>g <strong>for</strong>mula:-P L (L-L O )V L = 0.75 X X R X100 L OWhere, V L = <strong>in</strong>crease or decrease <strong>in</strong> the cost <strong>of</strong> work due to labour dur<strong>in</strong>g the quarter.R = the value <strong>of</strong> work done <strong>in</strong> Rupees dur<strong>in</strong>g the quarter.L O = the average consumer price <strong>in</strong>dex <strong>for</strong> <strong>in</strong>dustrial workers (wholesale prices) asapplicable at ……….. (nearest place <strong>for</strong> which the <strong>in</strong>dices are published) <strong>for</strong> themonth <strong>in</strong> which the tender were opened.L = The average consumer price <strong>in</strong>dex <strong>for</strong> <strong>in</strong>dustrial workers (wholesale price <strong>for</strong> the quarter)as applicable at ………..nearest place <strong>for</strong> which the <strong>in</strong>dices are published ) <strong>for</strong> thequarter under consideration.PL = Percentage <strong>of</strong> labour component shall be ………………………………………………….Note.- The <strong>in</strong>dex numbers <strong>of</strong> wholesale prices <strong>in</strong> India (all commodities) shall be aspublished by the Government <strong>of</strong> India, M<strong>in</strong>istry <strong>of</strong> Labour, Labour Bureau, Shimlashall be the basis <strong>for</strong> calculations(B) Materials (other than P.O.L )The <strong>in</strong>crease or decrease <strong>in</strong> cost <strong>of</strong> materials other then those supplied by Governmentat fixed rate shall be calculated quarterly <strong>in</strong> accordance with the follow<strong>in</strong>g <strong>for</strong>mula;-(M-M O )V m = 0.75 X X R X 100M oWhere, V m = The <strong>in</strong>crease or decrease <strong>in</strong> the cost <strong>of</strong> works due to such materials dur<strong>in</strong>g thequarter.P mR= value <strong>of</strong> work done <strong>in</strong> Rupees dur<strong>in</strong>g quarter.


Chap. II ]163[ Appendix <strong>2.10</strong> AMo = The <strong>in</strong>dex number <strong>of</strong> wholesale prices <strong>in</strong> India (all commodities) <strong>for</strong> the month <strong>in</strong>which tenders were opened.M= The average <strong>in</strong>dex number <strong>of</strong> wholesale prices <strong>in</strong> India (all commodities) <strong>for</strong> thequarter under consideration.Pm = Percentage <strong>of</strong> such materials component which be……………………Note:- The <strong>in</strong>dex numbers <strong>of</strong> wholesale prices <strong>in</strong> India (all commodities ) shall be aspublished by the Government <strong>of</strong> India, M<strong>in</strong>istry <strong>of</strong> Industry ,Office <strong>of</strong> the EconomicsAdviser.(C) P.O.LThe <strong>in</strong>crease or decrease <strong>in</strong> the cost <strong>of</strong> the P.O.L. shall be calculated quarterly <strong>in</strong> accordancewith the follow<strong>in</strong>g <strong>for</strong>mula:-P P (P-P O )V P = 0.75 X X R X100 P OWhere, Vp = <strong>in</strong>crease or decrease <strong>in</strong> the cost <strong>of</strong> worksdue to P. O. L. dur<strong>in</strong>g the quarterunder consideration.R = value <strong>of</strong> work done <strong>in</strong> Rupees dur<strong>in</strong>gthe quarter.Po = the price <strong>of</strong> H.S.D. Oil at…………on the date on which tenders were opened.p= the average price <strong>of</strong> H.S.D. Oil at ……dur<strong>in</strong>g the quarter under consideration.Pp = percentage <strong>of</strong> P.O.L. component shallbe.......................................2.40.2 The price adjustment clause shall be applicable only <strong>for</strong> the work that is carried outwith<strong>in</strong> the stipulated time or extension there <strong>of</strong> due to reasons as are not attributable tothe contractor.2.40.3 For the purpose <strong>of</strong> price adjustment amount <strong>of</strong> work done (“R” <strong>in</strong> the above<strong>for</strong>mulae) dur<strong>in</strong>g each quarter would mean value <strong>of</strong> work <strong>of</strong> completed items doneplus value <strong>of</strong> the materials on which secured advance has been granted dur<strong>in</strong>g thequarter, less the value <strong>of</strong> the materials <strong>in</strong> respect <strong>of</strong> such secured advance that hasbeen recovered dur<strong>in</strong>g the quarter.2.40.4 No claims <strong>for</strong> price adjustment other than these provided here<strong>in</strong> shall be enterta<strong>in</strong>ed.


Chap. II ]164[ Appendix <strong>2.10</strong> AValidity <strong>of</strong> <strong>of</strong>fer2.41. The period <strong>of</strong> validity <strong>of</strong> <strong>of</strong>fer <strong>of</strong> tenders will be as follows:-(i) <strong>Tender</strong>s with<strong>in</strong> the competence <strong>of</strong> sanction <strong>of</strong> Executive Eng<strong>in</strong>eer 2 Monthsi.e. up to Rs. 30 Lakhs.(ii) <strong>Tender</strong>s with<strong>in</strong> the competence <strong>of</strong> sanction <strong>of</strong> Super<strong>in</strong>tend<strong>in</strong>g 3 monthsEng<strong>in</strong>eer i.e. up to Rs. 80 Lakhs(iii) <strong>Tender</strong>s with<strong>in</strong> the competence <strong>of</strong> sanction <strong>of</strong> Chief Eng<strong>in</strong>eer i.e. 4 monthsup to Rs.2 Crores(iv) <strong>Tender</strong>s with <strong>in</strong> the competence <strong>of</strong> Eng<strong>in</strong>eer-<strong>in</strong>-Chief i.e. upto 5 5 MonthsCrore(v) <strong>Tender</strong>s with<strong>in</strong> the competence <strong>of</strong> sanction <strong>of</strong> Government. 6 monthsBank Commission Charges2.42 Bank commission charges <strong>in</strong> all payments by demand drafts outside the state will notbe borne by the State Government but by the supplier/firm/ contractor himself.Force Majeure2.43 Should failure <strong>in</strong> per<strong>for</strong>mance <strong>of</strong> any part <strong>of</strong> this contract arise from war, <strong>in</strong>surrection,restra<strong>in</strong>t imposed by Government, act <strong>of</strong> Legislature or other authority, stoppage orh<strong>in</strong>drance <strong>in</strong> the supply <strong>of</strong> raw materials, or fuel, explosion, accident, strike, riot, lockout,or other disorganization <strong>of</strong> labour or transport, break down <strong>of</strong> mach<strong>in</strong>e, flood,fire, act <strong>of</strong> God, or any <strong>in</strong>evitable or un<strong>for</strong>eseen event beyond human control directlyor <strong>in</strong>directly <strong>in</strong>terfer<strong>in</strong>g with the supply <strong>of</strong> stores or from any cause which may be areasonable ground <strong>for</strong> an extension <strong>of</strong> time, the competent authority will allow suchadditional time as he considers to be justified <strong>in</strong> the circumstances <strong>of</strong> the case. Nocompensation will be payable to the contractor <strong>for</strong> any loss <strong>in</strong>curred by him due tothese reasons.2.44. Each tenderer shall supply the name, residence and place <strong>of</strong> bus<strong>in</strong>ess <strong>of</strong> the person orpersons giv<strong>in</strong>g the tender and shall be signed by the tenderer with his usual signature.When tender is given by partnerships the full names <strong>of</strong> all partners shall be furnished.An attested copy <strong>of</strong> the constitution <strong>of</strong> the firm and the registered number <strong>of</strong> the firm,shall be furnished. In such a case the tender must be signed separately by each partnerthere<strong>of</strong> or <strong>in</strong> the event <strong>of</strong> the absence <strong>of</strong> any partner it must be signed on his behalf bya person hold<strong>in</strong>g a power <strong>of</strong> attorney authoris<strong>in</strong>g him to do so. <strong>Tender</strong>s by acorporation shall be signed with legal name <strong>of</strong> the corporation followed by the name<strong>of</strong> the state <strong>of</strong> <strong>in</strong>--corporation and by signature and by designation <strong>of</strong> the president,secretary or other persons authorised to b<strong>in</strong>d it <strong>in</strong> the matter.


Chap. II ]165[ Appendix <strong>2.10</strong> A2.45.1. The tender shall be submitted with the declaration that the contractor has successfullycarried out large works <strong>of</strong> this nature and has adequate organisation, mach<strong>in</strong>ery andexperienced personnel to handle jobs <strong>of</strong> this type and magnitude.2.45.2. A brief description <strong>of</strong> large works previously executed by tenderer.- After thetender has been opened, any tenderer may be required to submit detailed particulars<strong>of</strong> such works along with the manner <strong>of</strong> their execution and other <strong>in</strong><strong>for</strong>mation thatwill satisfy the <strong>of</strong>ficer receiv<strong>in</strong>g the tender that the contractor has adequateorganisation, <strong>in</strong>clud<strong>in</strong>g experienced personnel to execute vigorously the work to becarried out as per these specification.2.45.3. (a) The contractor shall employ the follow<strong>in</strong>g tech<strong>nic</strong>al staff dur<strong>in</strong>g the execution <strong>of</strong>works:-1. One Graduate Eng<strong>in</strong>eer, when cost <strong>of</strong> the work to be executed is more than Rs. 1crore.2. One Diploma-holder Sub-Eng<strong>in</strong>eer, when the cost <strong>of</strong> the work to be executed isRs. 10 Lakh and more but not more than Rs. 1.00 Crore.(b) The tech<strong>nic</strong>al staff should be available at site whenever required by theEng<strong>in</strong>eer-<strong>in</strong>-Charge to take <strong>in</strong>structions.(c)(d)(e)In case the contractor fails to employ the tech<strong>nic</strong>al staff as a<strong>for</strong>esaid,Government shall have the right to take suitable remedial measures.The contractor should give names and other details <strong>of</strong> the Graduate Eng<strong>in</strong>eer,diploma holder Sub-Eng<strong>in</strong>eer whom he <strong>in</strong>tends to employ or if underemployment, on the work at the time he commences the work.The contractor should give a certificate to the effect that Eng<strong>in</strong>eer, DiplomaholderSub-Eng<strong>in</strong>eer is exclusively <strong>in</strong> his employment:Provided that,-(1) An eng<strong>in</strong>eer or sub-Eng<strong>in</strong>eer may look after more than one work <strong>in</strong> the samelocality but the total value <strong>of</strong> works under him should not exceed Rs. Rs.5.00 crore<strong>in</strong> case <strong>of</strong> an eng<strong>in</strong>eer and 1.00 crore <strong>in</strong> the case <strong>of</strong> a Sub-Eng<strong>in</strong>eer.(2) It is not necessary <strong>for</strong> a contractor (or partner) <strong>in</strong> case <strong>of</strong> firm/ company who ishimself an Eng<strong>in</strong>eer/Sub-Eng<strong>in</strong>eer to employ another Eng<strong>in</strong>eer/Sub-Eng<strong>in</strong>eer <strong>for</strong> thesupervision <strong>of</strong> the work so long as the contractor /partner does work similar to whatcould have been done by an employed Eng<strong>in</strong>eer/Sub-Eng<strong>in</strong>eer.(3) A retired Eng<strong>in</strong>eer/ Assistant Eng<strong>in</strong>eer who is hold<strong>in</strong>g diploma may be treated at parwith the graduate eng<strong>in</strong>eer <strong>for</strong> the operation <strong>of</strong> the above clause.


Chap. II ]166[ Appendix <strong>2.10</strong> AIn case the contractor fails to employ the tech<strong>nic</strong>al staff as a<strong>for</strong>esaid, he shallbe liable to pay to the Government a sum <strong>of</strong> Rs. 5,000 (Five thousand only) <strong>for</strong> eachmonth <strong>of</strong> default <strong>in</strong> the case <strong>of</strong> graduate eng<strong>in</strong>eer and Rs.2,500 (Two thousand fivehundred only) <strong>for</strong> each month <strong>of</strong> default <strong>in</strong> the case <strong>of</strong> Diploma-holder Sub-Eng<strong>in</strong>eer.2.46. The contractor should also give the follow<strong>in</strong>g <strong>in</strong><strong>for</strong>mation <strong>in</strong>variably on coverconta<strong>in</strong><strong>in</strong>g the tender:-(a) Name and address <strong>of</strong> the contractor.(b) Class <strong>in</strong> which he is registered.(c) Amount <strong>of</strong> earnest money deposited and No. and date <strong>of</strong> money receipt etc.2.47 <strong>Tender</strong> documents have to be completed and submitted with all the documentrequired <strong>in</strong> the tender notice. Follow<strong>in</strong>g is the summary <strong>of</strong> the documents required tobe submitted with the completed tender <strong>for</strong>m.(i) The name, residence and place <strong>of</strong> bus<strong>in</strong>ess etc. <strong>of</strong> the tenderer vide clause 2.43above.(ii) Details <strong>of</strong> contracts already held by the tenderer vide clause 2.29 above.(iii) Receipt <strong>of</strong> earnest money deposited vide clause 2.5.1. above or surety bond<strong>for</strong>m bank.(iv) Income –tax clearance Certificate vide clause 2.27 above.(v) A list <strong>of</strong> near relatives <strong>of</strong> the tenderer work<strong>in</strong>g <strong>in</strong>Chhattisgarh……….department vide clause 2.38 above see annexure J(vi) Attested copy <strong>of</strong> the constitution <strong>of</strong> firm (if required) and power <strong>of</strong> attorney, asrequired vide clause 2.43.(vii) A declaration that there has been no conviction / imprisonment <strong>for</strong> an <strong>of</strong>fence<strong>in</strong>volv<strong>in</strong>g moral turpitude.(viii) Declaration and description as required vide clause 2.44.1 and 2.44.22.48. The contractor shall obta<strong>in</strong> a valid license under the contract (regulation andAbolition). Act <strong>in</strong> <strong>for</strong>ce and rules made there under by competent authority <strong>for</strong>m timeto time be<strong>for</strong>e commencement <strong>of</strong> work and cont<strong>in</strong>ue to have a valid license until thecompletion <strong>of</strong> the work.PART IIISPECIAL CONDITIONS3.1. General.- The special conditions are supplementary <strong>in</strong>structions to the tenders andwould from part <strong>of</strong> the contract.3.2. Draw<strong>in</strong>gs given, listed and <strong>in</strong>dexed <strong>in</strong> part ……….. will <strong>for</strong>m part <strong>of</strong> the contract.The above draw<strong>in</strong>gs show the work to be done as def<strong>in</strong>itely and <strong>in</strong> such details as ispossible, at the present stage <strong>of</strong> development <strong>of</strong> <strong>in</strong>vestigation and the design. Theattached draw<strong>in</strong>gs will be supplemented or superseded by such additional and detailed


Chap. II ]167[ Appendix <strong>2.10</strong> Adraw<strong>in</strong>gs as may be necessary or desired as the work proceeds. Such additionalgeneral and detailed draw<strong>in</strong>gs will show dimensions and details necessary <strong>for</strong>construction purposes more completely than are shown on the attached draw<strong>in</strong>gs, <strong>for</strong>all features <strong>of</strong> the work. The contractor shall be required to per<strong>for</strong>m the work on thesefeatures and <strong>in</strong> accordance with additional general and detailed draw<strong>in</strong>gs mentionedabove at the applicable unit prices tendered <strong>in</strong> the schedule <strong>for</strong> work or work <strong>of</strong>similar nature as determ<strong>in</strong>ed by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge. The contractor shall check alldraw<strong>in</strong>gs carefully and advise the Eng<strong>in</strong>eer-<strong>in</strong>-Charge <strong>of</strong> any errors or omissionsdiscovered. The contractor shall not take advantage <strong>of</strong> errors or omissions as full<strong>in</strong>structions will be furnished to the contractor, should any errors or omissions bediscovered.The draw<strong>in</strong>gs and specifications are to be considered as complementary toeach other and should any th<strong>in</strong>g appear <strong>in</strong> one that is not described <strong>in</strong> the other noadvantage shall be taken <strong>of</strong> such omission. In case <strong>of</strong> disagreement betweenspecifications and draw<strong>in</strong>gs the conditions <strong>of</strong> the specifications shall govern thecontract. Should any discrepancies, however appear or should any misunderstand<strong>in</strong>garise as to the mean<strong>in</strong>g and <strong>in</strong>terpretations <strong>of</strong> the said specifications or draw<strong>in</strong>gs or asto the dimension or the quality <strong>of</strong> the materials <strong>for</strong> the proper execution <strong>of</strong> the work oras to the measurements or quality and valuation <strong>of</strong> work executed under this contractor extra thereupon, the same shall be expla<strong>in</strong>ed by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge.Figures <strong>in</strong> dimensioned draw<strong>in</strong>gs shall supersede measurements by scale anddraw<strong>in</strong>gs to a large scale shall take precedence over those on a small scale. Specialdirections <strong>in</strong>corporated on the draw<strong>in</strong>gs shall be complied with strictly.Once copy <strong>of</strong> the draw<strong>in</strong>gs and contract documents shall be kept at all times atthe site <strong>of</strong> the works by the contractor.3.3. Data to be furnished by the contractor.- The contractor shall submit the follow<strong>in</strong>g<strong>in</strong><strong>for</strong>mation to the Eng<strong>in</strong>eer-<strong>in</strong>-Charge;(a) Proposed construction programme and time schedule show<strong>in</strong>g sequence <strong>of</strong>operations with<strong>in</strong> two weeks <strong>of</strong> receipts <strong>of</strong> notice to proceed with the work <strong>in</strong>pursuance <strong>of</strong> the conditions <strong>of</strong> contract. Along with the above he will also submitprogramme <strong>of</strong> br<strong>in</strong>g<strong>in</strong>g requisite tools and plant, mach<strong>in</strong>ery to be engaged by himto the site <strong>of</strong> work.(b) Approximate monthly requirement <strong>of</strong> cement and M.S. re<strong>in</strong><strong>for</strong>cement bars <strong>for</strong> theentire construction period with<strong>in</strong> 4 weeks <strong>of</strong> date <strong>of</strong> the receipt <strong>of</strong> notice toproceed with the work <strong>in</strong> pursuance <strong>of</strong> condition <strong>of</strong> contract.3.4. Programme <strong>for</strong> construction:- The department will <strong>in</strong>itially prepare a constructionprogramme <strong>in</strong>lcud<strong>in</strong>g requirements <strong>of</strong> materials and <strong>in</strong>clude it is as a part <strong>of</strong> the tenderdocuments. After receipt <strong>of</strong> the work order, the contractor if desires to submit hisrevised construction programme shall do so with<strong>in</strong> a period <strong>of</strong> 30 days from the date<strong>of</strong> the issue <strong>of</strong> work order and will got it approved <strong>for</strong>m the department. In case he


Chap. II ]168[ Appendix <strong>2.10</strong> Afails to submit such programme, then the construction programme appended with thetender shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the contractor. This programme my be reviewedand revised every year at the beg<strong>in</strong>n<strong>in</strong>g <strong>of</strong> the work<strong>in</strong>g season.3.5. Action when the Progress <strong>of</strong> any crucial Item <strong>of</strong> work is unsatisfactory.- If theprogress <strong>of</strong> a crucial item <strong>of</strong> work, which is important <strong>for</strong> timely completion <strong>of</strong> work,is unsatisfactory, the Eng<strong>in</strong>eer <strong>in</strong> charge shall, notwithstand<strong>in</strong>g that the generalprogress <strong>of</strong> work is satisfactory, <strong>in</strong> accordance with clause 4.3.2 be entitled to takeaction under clause 4.3.3 after giv<strong>in</strong>g the contractor 10 days notice <strong>in</strong> writ<strong>in</strong>g and thecontractor will have no claim <strong>for</strong> compensation <strong>for</strong> any loss susta<strong>in</strong>ed by him ow<strong>in</strong>gto such action3.6. Inspection and Tests. - Except as otherwise provided <strong>in</strong> here<strong>of</strong> material andworkmanship, if not otherwise designated by the specification, shall be subject to<strong>in</strong>spection, exam<strong>in</strong>ation and test by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge at any and all timesdur<strong>in</strong>g manufacture or constructions are carried on. The Eng<strong>in</strong>eer-<strong>in</strong>-charge shall havethe right to reject the defective material and workmanship or require its correction.Rejected workmanship shall be satisfactorily replaced with proper material withoutcharge there<strong>of</strong> and the contractor shall properly segregate and remove rejectedmaterial from the premises. If the contractor fails to proceed at once with thereplacement <strong>of</strong> the rejected material and/ or the construction <strong>of</strong> defectiveworkmanship the Eng<strong>in</strong>eer-<strong>in</strong>-Charge may replace such material and/ or correct suchworkmanship and charge the cost there<strong>of</strong> to the contractor.The contractor shall be liable <strong>for</strong> replacement <strong>of</strong> defective work up to the time<strong>in</strong> accordance with clause 4.3.16 <strong>of</strong> the conditions <strong>of</strong> contract <strong>of</strong> all work to be doneunder the contract.The contractor shall furnish promptly without additional charge all facilities,labour and material necessary <strong>for</strong> the safe and convenient <strong>in</strong>spection and tests thatmay be required by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge. All <strong>in</strong>spections and tests by thedepartment shall be per<strong>for</strong>med <strong>in</strong> such a manner as not to unnecessarily delay thework. Special full size and per<strong>for</strong>mance test shall be charged with any additional cost<strong>of</strong> <strong>in</strong>spection when materials and workmanship are not ready by the contractor at thetime <strong>of</strong> <strong>in</strong>spection .3.7. Removal <strong>of</strong> temporary work, plant and Surplus material.- Prior to f<strong>in</strong>alacceptance <strong>of</strong> the completed work but except<strong>in</strong>g as otherwise expressly directed orpermitted <strong>in</strong> writ<strong>in</strong>g, the contractor shall, at his own expenses remove from the siteand dispose <strong>of</strong> all the temporary structures <strong>in</strong>clud<strong>in</strong>g build<strong>in</strong>gs, pile work, crib work,all plant and surplus material, and all rubbish and debris <strong>for</strong> which he is responsibleto the satisfaction <strong>of</strong> Eng<strong>in</strong>eer-<strong>in</strong>-Charge.3.8. Possession Prior to Completion. – The Eng<strong>in</strong>eer-<strong>in</strong> Charge shall have the right totake possession <strong>of</strong> or use any completed part <strong>of</strong> the work. Such possession or use shall


Chap. II ]169[ Appendix <strong>2.10</strong> Anot be deemed as an acceptance <strong>of</strong> any work not completed <strong>in</strong> accordance with thecontract.3.9. Damage to works.- The works whether fully completed or <strong>in</strong>complete, all thematerials, mach<strong>in</strong>ery, plants, tools, temporary build<strong>in</strong>g and other th<strong>in</strong>gs connectedthere with shall rema<strong>in</strong> at the risk and <strong>in</strong> the sole charge <strong>of</strong> the contractor until thecompleted work has been delivered to the Eng<strong>in</strong>eer-<strong>in</strong>-Charge and till completioncertificate has been obta<strong>in</strong>ed <strong>for</strong>m the Eng<strong>in</strong>eer-<strong>in</strong>-Charge . Until such delivery <strong>of</strong> thecompleted work the contractor shall at his own cost take all precautions reasonably tokeep all the a<strong>for</strong>esaid works, materials, mach<strong>in</strong>ery, plants, temporary build<strong>in</strong>gs andother th<strong>in</strong>gs connected there with free from any loss damages and <strong>in</strong> the event <strong>of</strong> thesame or any part there<strong>of</strong> be<strong>in</strong>g lost or damaged, he shall <strong>for</strong>thwith re<strong>in</strong>state and makegood such loss or damage at his own cost.3.10. Departmental Supply <strong>of</strong> Material.- Departmental supply <strong>of</strong> materials will beord<strong>in</strong>arily conf<strong>in</strong>ed only to those, specifically mentioned <strong>in</strong> the tender notice attachedand the cost <strong>of</strong> such material issued will be recovered <strong>for</strong>m the contractor’s bill at therates specified <strong>in</strong> said schedule.The materials will be issued <strong>for</strong>m the departmental stores and the contractorwill have to make his arrangements <strong>for</strong> the transport <strong>of</strong> the materials from the sitestores or wagons to the works at his own cost. Materials to be supplied by thedepartment will be supplied <strong>in</strong> standard lengths and quantities or as available, unlessspecifically mentioned otherwise and cost recovered <strong>for</strong>m the contractor <strong>for</strong> thequantities issued.The contractor shall further at all times satisfy the Eng<strong>in</strong>eer-<strong>in</strong>-Charge ondemand, if any, by the production <strong>of</strong> records or books or submission <strong>of</strong> return and<strong>for</strong>mats as directed that the materials supplied are be<strong>in</strong>g used <strong>for</strong> the purpose <strong>for</strong>which they are supplied and the contractor shall at all times keep the records up todate to enable the Eng<strong>in</strong>eer-<strong>in</strong>-Charge to apply such checks he may desire to impose.The contractor shall not without the written permission <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-Chargeutilise or dispose <strong>of</strong> the materials <strong>for</strong> any purpose other than that <strong>in</strong>tended <strong>in</strong> thecontract.Cement will be supplied to the contractor at the rates specified <strong>in</strong> the tendernotice at the departmental stores. The contractor shall make his own arrangements <strong>for</strong>the storage <strong>of</strong> cement at the work site. Handl<strong>in</strong>g and storage facilities shall be soarranged that no cement will be kept <strong>in</strong> storage <strong>for</strong> more than 120 days. If any cementis kept as long as 120 days it will be tested be<strong>for</strong>e use and if found defective <strong>in</strong> anyway it shall be condemned <strong>for</strong>m use. Steel as required <strong>in</strong> the construction, shall besupplied by the department and shall be transported to the site at contractor’s owncost. The contractor shall make his own arrangements <strong>for</strong> keep<strong>in</strong>g steel at the site. Thecost <strong>of</strong> the materials supplied to the contractor shall be treated as an advance paymentto the contractor and shall be recoverable <strong>for</strong>m him.


Chap. II ]170[ Appendix <strong>2.10</strong> AThe contractor will be responsible <strong>for</strong> the safe custody <strong>of</strong> all departmentalmaterials issued to the satisfaction <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-charges and will be required torender proper account to the allocation and disposal <strong>of</strong> these materials show<strong>in</strong>g wherethey were issued on works. The contractor shall return <strong>in</strong> sound condition all suchmaterials which are not used on the works. In case he is unable to account <strong>for</strong> fullamount <strong>of</strong> the materials issued to him recoveries will be affected <strong>for</strong>m him at “IssueRates” or “Market Value” which ever is higher plus 16 per cent to cover thedepartmental supervision charges.The department will not be responsible <strong>for</strong> any delays <strong>in</strong> supply <strong>of</strong> controlledmaterials such as steel sections, M.S. Re<strong>in</strong><strong>for</strong>cement bars and cement. While it willendeavour to see that no delay occurs <strong>in</strong> this account the delay due to late supply willhowever be given due consideration <strong>in</strong> grant<strong>in</strong>g extension <strong>of</strong> time <strong>for</strong> the completion<strong>of</strong> the work if found necessary. No compensation <strong>of</strong> claim <strong>for</strong> damages on idle timewill be enterta<strong>in</strong> able on this score.If the contractor requests the Eng<strong>in</strong>eer-<strong>in</strong>-charge <strong>for</strong> issue <strong>of</strong> such materials asis available <strong>in</strong> the stores <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-Charge the materials may be supplied tothe contractor from the stores <strong>for</strong> execution <strong>of</strong> this work. If the Eng<strong>in</strong>eer-<strong>in</strong>-Chargeconsiders it expedient, the contractor shall pay <strong>for</strong> such material and store issued tohim at the rates fixed by Eng<strong>in</strong>eer-<strong>in</strong>-Charge. Other materials which may be available<strong>in</strong> the stores may be issued on loan if the Eng<strong>in</strong>eer-<strong>in</strong>-Charge considers it necessary <strong>in</strong>the <strong>in</strong>terest <strong>of</strong> work, but <strong>for</strong> such material hire charges should be recovered monthlyas per rules and the contractor shall be responsible to return the material <strong>in</strong> orig<strong>in</strong>alcondition <strong>in</strong> which they were issued.All the materials required <strong>for</strong> the work, other than those that are specificallymentioned <strong>in</strong> the said tender notice, shall be supplied by the contractor.Recommendations to authorities, where required, may be made by the department butthe responsibility <strong>for</strong> the supply <strong>of</strong> the materials shall be that <strong>of</strong> the contractor and noexcuse on this account <strong>for</strong> delay <strong>in</strong> the work shall be accepted.All unused materials, either supplied directly by the Department or obta<strong>in</strong>edby the recommendations <strong>of</strong> the department, which <strong>in</strong> the op<strong>in</strong>ion <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-Charge are likely to be useful to the department shall be returned <strong>in</strong> good condition atthe orig<strong>in</strong>al cost paid <strong>for</strong> if so decided by the department.3.11. * The quoted rates <strong>of</strong> the contractor shall be <strong>in</strong>clusive <strong>of</strong> the leads and lifts and <strong>in</strong> nocase separate payment <strong>for</strong> leads or lifts <strong>of</strong> any materials <strong>in</strong>clud<strong>in</strong>g water shall bepayable. Similarly no leads or lifts <strong>for</strong> the materials issued by the department asprescribed <strong>in</strong> the tender documents shall be payable. The contractor shall br<strong>in</strong>gapproved quality <strong>of</strong> materials. Different quarries are shown <strong>in</strong> Annexure C. Thedetails shown <strong>in</strong> the Annexure C are only as a guide to the contractor but thecontractor be<strong>for</strong>e tender<strong>in</strong>g should satisfy himself regard<strong>in</strong>g the quality and quantityavailable and all other details <strong>of</strong> Annexure C and provide <strong>for</strong> any variation <strong>in</strong> respect<strong>of</strong> leads, lifts, place and methods <strong>of</strong> quarry<strong>in</strong>g, type <strong>of</strong> rocks to be quarried and all


Chap. II ]171[ Appendix <strong>2.10</strong> Asuch other aspects and should there<strong>for</strong>e provide <strong>for</strong> any variation by him/his tenderedrate, as later on no claim whatsoever shall be enterta<strong>in</strong>ed except where any quarry ischanged <strong>for</strong> circumstances beyond the control <strong>of</strong> contractor under the written orders<strong>of</strong> Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer-<strong>in</strong>-Charge <strong>of</strong> work.* Cart<strong>in</strong>g <strong>of</strong> materials will be allowed as per actual lead limited to the lead provided<strong>in</strong> the Statement vide Annexure C. The Eng<strong>in</strong>eer-<strong>in</strong>-Charge shall have the power tochange the quarries and allow longer leads provided the extra cost <strong>for</strong> each k<strong>in</strong>d <strong>of</strong>material does not exceed 20% <strong>of</strong> the cost <strong>of</strong> lead vide clause 2.25.3.12. Exam<strong>in</strong>ation and Tests on completions.- On the completion <strong>of</strong> the work and notlater than three months thereafter, the Eng<strong>in</strong>eer-<strong>in</strong>-Charge shall make suchexam<strong>in</strong>ation and tests <strong>of</strong> the work as may then seem to him be possible, necessary ordesirable, and the contractor shall furnish free <strong>of</strong> cost any materials and labour whichmay be necessary there<strong>for</strong>, and shall facilitate <strong>in</strong> every way all operations required bythe Eng<strong>in</strong>eer-<strong>in</strong>-Charge, <strong>in</strong> mak<strong>in</strong>g exam<strong>in</strong>ation and tests.3.13. Climatic Conditions.- The Executive Eng<strong>in</strong>eer, may order the contractor to suspendany work that may be subject to the damage by climatic conditions and no claim <strong>of</strong>the contractor will be enterta<strong>in</strong>ed by the department on this account.*The para. “ Cart<strong>in</strong>g <strong>of</strong> materials ……………. clause 2.25” is applicable to percentage ratetenders only.3.14. Safety Regulations.- While carry<strong>in</strong>g out this work, the contractor will ensurecompliance <strong>of</strong> all safety regulations as provided <strong>in</strong> the Safety Code (Annexure ‘H’).3.15. Haulroads.- A fair weather road <strong>of</strong> the standard <strong>of</strong> a village cart truck is ord<strong>in</strong>arilyma<strong>in</strong>ta<strong>in</strong>ed by the department along the Canal alignment which is motor able fromNovember to end <strong>of</strong> May, but contractor shall not have any claim on this account ifone is not provided or ma<strong>in</strong>ta<strong>in</strong>ed. Necessary haulroads to work spot, borrow areasand water sources shall be satisfactorily constructed and ma<strong>in</strong>ta<strong>in</strong>ed by the contractorat his own cost. The contractor has to construct and ma<strong>in</strong>ta<strong>in</strong> his own approach roadsfrom the ma<strong>in</strong> haul roads provided by the department. Any new haul roads will havealso to be constructed and ma<strong>in</strong>ta<strong>in</strong>ed by the contractor at his cost.3.16. The contractor will make his own arrangement <strong>for</strong> supply <strong>of</strong> water, light and power<strong>for</strong> his works and labour camps etc. The department will only supply bulk electricityif needed by the contractor <strong>for</strong> light<strong>in</strong>g and power requirements <strong>of</strong> the contractor atthe trans<strong>for</strong>mer po<strong>in</strong>t as may be provided by the department at rates fixed by thedepartment, vide Annexure F. The contractor will have to make his own arrangement<strong>for</strong> further extension and connection <strong>of</strong> supply po<strong>in</strong>t to the work site and labour campsetc. and all other places at his own cost. The department will not enterta<strong>in</strong> any claimwhatsoever <strong>for</strong> any failure or break down etc. <strong>in</strong> supply <strong>of</strong> electricity to the contractor.The contractor will supply and fix his own tested meter <strong>of</strong> the approved make but themeter will be kept <strong>in</strong> the custody <strong>of</strong> the department.


Chap. II ]172[ Appendix <strong>2.10</strong> A3.17. The contractor must not <strong>in</strong>terfere with other contactors who may be employedsimultaneously or otherwise to/by the department. He will at no time engagedepartmental labour or that <strong>of</strong> other contractors without the written permission <strong>of</strong> theEng<strong>in</strong>eer-<strong>in</strong>-Charge.3.18. Regulations and Bye-laws.- The contractor shall con<strong>for</strong>m to the regulations, byelawsany other statutory rules made by any local authorities or by the Government andshall protect and <strong>in</strong>demnify Government aga<strong>in</strong>st any claim or liability aris<strong>in</strong>g from orbased on the violation <strong>of</strong> any such laws, ord<strong>in</strong>ance, regulation orders, decrees etc.3.19. Order Book.- An order book shall be kept <strong>in</strong> the departmental <strong>of</strong>fice on the site <strong>of</strong> thework. As far as possible all orders regard<strong>in</strong>g the works are to be entered <strong>in</strong> this book.All entries there<strong>in</strong> shall be signed by the departmental <strong>of</strong>ficers <strong>in</strong> direct charge <strong>of</strong> thework and the contractor or his representative <strong>in</strong> the important cases the ExecutiveEng<strong>in</strong>eer or the Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer will countersign the entries which have beenmade. The order book shall not be removed from the work site except with the writtenpermission <strong>of</strong> the Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer/Chief Eng<strong>in</strong>eer where S.E. is not postedand the contractor or his representative shall be bound to take note <strong>of</strong> all <strong>in</strong>structionsmeant <strong>for</strong> the contractor as entered <strong>in</strong> the order book without hav<strong>in</strong>g to be called orseparately to note them. The Eng<strong>in</strong>eer-<strong>in</strong>-Charge shall submit periodically copies <strong>of</strong>the remarks <strong>of</strong> the Order Book to the Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer and Chief Eng<strong>in</strong>eer <strong>for</strong>record and to the contractor <strong>for</strong> compliance and report.3.20. Conversion <strong>of</strong> units.- Whenever <strong>in</strong> the contract agreement dimensions and units have beenexpressed <strong>in</strong> F.P.S. system, the same will be converted <strong>in</strong>to metric system units by apply<strong>in</strong>gthe standard conversion table <strong>of</strong> Indian Standard Institution so as to derive the correspond<strong>in</strong>gfigure arithmetically and the contractor will have to accept the figures so derived without anyclaim or compensation whatsoever.3.21 Right <strong>of</strong> other contractor and persons:- If, dur<strong>in</strong>g progress <strong>of</strong> the work covered by thiscontract, it is necessary <strong>for</strong> other contractor or persons to do work <strong>in</strong> or about the work, thecontractor shall af<strong>for</strong>d such facilities, as the Eng<strong>in</strong>eer-<strong>in</strong>-Charge may require.3.22 Employment <strong>of</strong> Tech<strong>nic</strong>al Persons.-(a) The contractor shall employ the follow<strong>in</strong>g Tech<strong>nic</strong>al Staff dur<strong>in</strong>g the Execution <strong>of</strong> Work:-(i) One Graduate Eng<strong>in</strong>eer when the work to be executed is more than Rs. 1.00 Crore.(ii) One Diploma Holder, Eng<strong>in</strong>eer when the cost <strong>of</strong> work to be executed is <strong>for</strong>m Rs. 10Lakhs or more but not more than Rs. 1.00 Crore.(b) The Tech<strong>nic</strong>al Staff should be available at site whenever required by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge to take <strong>in</strong>structions.(c) In case the contractor fails to employ the tech<strong>nic</strong>al staff as a<strong>for</strong>esaid, the E.E. shall havethe right to take suitable remedial measures.(d)The contractor should give the names and other details <strong>of</strong> the Graduate Eng<strong>in</strong>eer/DiplomaHolder, Eng<strong>in</strong>eer whom he <strong>in</strong>tends to employ or who is under employment on the work atthe time he commences work.(e) The contractor should give a certificate to the effect that the Eng<strong>in</strong>eer/Diploma Holder,Eng<strong>in</strong>eer is exclusively <strong>in</strong> his employment.


Chap. II ]173[ Appendix <strong>2.10</strong> AProvided that:-(I) An Eng<strong>in</strong>eer or Sub-Eng<strong>in</strong>eer may look after more than one work <strong>in</strong> the same locality but thetotal value <strong>of</strong> such work under him should not exceed Rs. 5.00 Crore <strong>in</strong> the case <strong>of</strong> anEng<strong>in</strong>eer and Rs. 1.00 Crore <strong>in</strong> the case <strong>of</strong> a Sub-Eng<strong>in</strong>eer.It is not necessary <strong>for</strong> the contractor’s partner <strong>in</strong> case <strong>of</strong> firm /company, who ishimself an Eng<strong>in</strong>eer. Sub Eng<strong>in</strong>eer to employ another Eng<strong>in</strong>eer, Sub-Eng<strong>in</strong>eer <strong>for</strong> thesupervision <strong>of</strong> work.The Retired Assistant Eng<strong>in</strong>eer who is hold<strong>in</strong>g a diploma may be treated at par with aGraduate <strong>for</strong> operation <strong>of</strong> the above clause.In case the contractor fails to employ the tech<strong>nic</strong>al staff as <strong>for</strong>esaid he shall be liableto pay Executive Eng<strong>in</strong>eer a sum <strong>of</strong> Rs. 5,000 (Five Thousand) only <strong>for</strong> each month <strong>of</strong> default<strong>in</strong> the case <strong>of</strong> Graduate Eng<strong>in</strong>eer and Rs. 2500 (Two Thousand Five Hundred) only <strong>for</strong> eachmonth <strong>of</strong> default <strong>in</strong> the case <strong>of</strong> Diploma Holder.3.23 Deleted.3.24 Deleted.3.25 Deleted.3.26 Use <strong>of</strong> Fly Ash / Fly Products :- Construction materials <strong>in</strong> structure viz. Build<strong>in</strong>gs,Roads, Road embankments, the fly ash / fly ash products like fly ash bricks, fly ashcement concrete, fly ash mortar, fly ash clay bricks & tiles etc. shall be usedcompulsorily by the contractor <strong>in</strong> accordance with the notification dated 05.11.2002issued by the Govt. <strong>of</strong> India, unless and otherwise it is specifically mentioned <strong>in</strong> theNIT <strong>in</strong> Canal structures like falls, VRB's also use <strong>of</strong> the fly ash cement mortar and flyash concrete shall be ensured after approval from Eng<strong>in</strong>eer-<strong>in</strong>-Charge.


Chap. II ]174[ Appendix <strong>2.10</strong> AANNEXURE-AMODEL RULES RELETING TO LABOUR, WATER SUPPLY AND SANITATIONIN LABOUR CAMPSNOTE- These modal rules are <strong>in</strong>tended primarily <strong>for</strong> labour camps which are not <strong>of</strong> apermanent nature. They lay down the m<strong>in</strong>imum desirable standard which should beadhered to, standard <strong>in</strong> permanent or semi- permanent labour camps should notobviously be lower then these <strong>for</strong> temporary camps.(1) Location- The camps should be located <strong>in</strong> elevated and well dra<strong>in</strong>ed <strong>in</strong> the locality(2) Layout – Labour huts to be constructed <strong>for</strong> one family 5 persons each. The layout tobe shown <strong>in</strong> the prescribed sketch.(3) Hutt<strong>in</strong>g- The huts to be built <strong>of</strong> local materials. Each hut should provide atleast 20 sq.meter <strong>of</strong> liv<strong>in</strong>g space.(4) Sanitary Facilities-There shall be provided latr<strong>in</strong>e and ur<strong>in</strong>als at least 16 meter awayfrom the nearest quarter separately <strong>for</strong> men and women specially so marked on thefollow<strong>in</strong>g scale.(5) Latr<strong>in</strong>es- Pit privies at the rates <strong>of</strong> 10 users or two families per seat. Separate ur<strong>in</strong>alsare not required as the privy can also be used <strong>for</strong> this purpose.(6) Dr<strong>in</strong>k<strong>in</strong>g Water- Adequate arrangements shall be made <strong>for</strong> the supply <strong>of</strong> dr<strong>in</strong>k<strong>in</strong>gwater. If practicable, filtered and chlor<strong>in</strong>ated supply shall be arranged where supply isfrom <strong>in</strong>termittent sources, a covered storage tank shall be provided with capacity <strong>for</strong>five liters per person per day.Where the supply is to be made from a well it shallconfirm to the sanitary standard laid down <strong>in</strong> the report <strong>of</strong> the Rural SanitationCommittee. The well should be at lest 30metres away from any latr<strong>in</strong>e or othersources <strong>of</strong> pollution. If possible a hand pump should be <strong>in</strong>stalled <strong>for</strong> draw<strong>in</strong>g thewater from well. The well should be effectively dis<strong>in</strong>fected once every month andquality <strong>of</strong> water should be got tested at Public Health Institution between each work<strong>of</strong> dis<strong>in</strong>fection.Wash<strong>in</strong>g and bath<strong>in</strong>g should be strictly prohibited at place where water supplyis from a river. The daily supply must be dis<strong>in</strong>fected <strong>in</strong> the storage reservoir and givenat least 3 m<strong>in</strong>utes contact with the dis<strong>in</strong>fectant be<strong>for</strong>e it is drawn <strong>for</strong> use(7) Bath<strong>in</strong>g and wash<strong>in</strong>g- Separate bath<strong>in</strong>g and wash<strong>in</strong>g place shall be provided <strong>for</strong> menand women <strong>for</strong> every 25 persons <strong>in</strong> the camp. There shall be a gap and space <strong>of</strong> 2 sq.meters <strong>for</strong> the water should be provided.


Chap. II ]175[ Appendix <strong>2.10</strong> A(8) Waste Disposal– Dust-b<strong>in</strong>s shall be provided at suitable place <strong>in</strong> camp and theresidents shall be directed throw all rubbish <strong>in</strong>to these dust-b<strong>in</strong>s. The dust-b<strong>in</strong>s shallbe provided with covers. The contents shall be removed every day and disposed <strong>of</strong>f bytrench<strong>in</strong>g.(9) Medical facilities- (a) Every camp where 1000 or more persons reside be providedwith whole time doctor and dispensary. If there are women <strong>in</strong> the camp a whole timenurse shall be employed.(b)(c)Every camp where less than 1000 but more then 250 persons reside shall be providedwith a dispensary and a part time nurse/midwife, shall also be employed.If there are less then 250 persons <strong>in</strong> any camp a standard first aid out kit shall bema<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> charge <strong>of</strong> the whole time persons, tra<strong>in</strong>ed <strong>in</strong> first aid.All the medical facilities mentioned above shall be <strong>for</strong> all residents <strong>in</strong> the camp, <strong>in</strong>clud<strong>in</strong>g thedependents <strong>of</strong> the workers, if any, free <strong>of</strong> cost.For each labour camp there should be qualified sanitary <strong>in</strong>spector and sweepers, should beprovided <strong>in</strong> the follow<strong>in</strong>g scale:-(1) For camps with strengthover 200 but notexceed<strong>in</strong>g 500 persons(2) For camps withstrength over500 personsOne sweeper <strong>for</strong> every 75 persons above thefirst 200 <strong>for</strong> which three sweepers should beprovidedOne sweeper <strong>for</strong> every 100 persons abovethe first 500 <strong>for</strong> which six sweepers shouldbe provided.


Chap. II ]176ANNEXURE-B[ Appendix <strong>2.10</strong> AThe contractor shall pay not less then Fair Wage to labour engaged by him on the work.Explanation-(a)(b)(c)(d)(e)(f)“Fair wage” means wage whether <strong>for</strong> time or piece work as notified at the time <strong>of</strong><strong>in</strong>vit<strong>in</strong>g tenders <strong>for</strong> the work and where such wages have not been so notified thewages prescribed by the ……………………. Department <strong>for</strong> the division <strong>in</strong> whichthe work is done.The contractor shall, notwithstand<strong>in</strong>g the provisions <strong>of</strong> any contract to the contrary,cause to be paid a fair wage to labourers <strong>in</strong>directly engaged on the work <strong>in</strong>clud<strong>in</strong>g anylabour engaged by his subcontractors had been immediately employed by him.In respect <strong>of</strong> all labour directly or <strong>in</strong>directly employed on the work <strong>for</strong> theper<strong>for</strong>mance <strong>of</strong> the contractor’s part <strong>of</strong> this agreement , the contractor shall complywith or cause to be complied with the Labour Act <strong>in</strong> <strong>for</strong>ce.The Executive Eng<strong>in</strong>eer/ Sub-Divisional Officer shall have the right to deduct fromthe moneys due to the contractor, any sum required <strong>for</strong> mak<strong>in</strong>g good the loss sufferedby a worker or workers by reason <strong>of</strong> non- fulfillment <strong>of</strong> the condition <strong>of</strong> the contractor<strong>for</strong> the benefit <strong>of</strong> the workers, non-payment <strong>of</strong> wages, or <strong>of</strong> deductions made from histheir wages, which are not justified by the terms <strong>of</strong> the contractor or non-observance<strong>of</strong> the regulations.The contractor shall be primarily liable <strong>for</strong> all payments to be made under and <strong>for</strong> theobservance <strong>of</strong> the regulations a<strong>for</strong>esaid without prejudice to his right to claim<strong>in</strong>demnity from his sub- contractors.The regulations a<strong>for</strong>esaid shall be deemed to be a part <strong>of</strong> his contractor.


Chap. II ]177ANNEXURE-C[ Appendix <strong>2.10</strong> A[Applicable <strong>for</strong> Percentage Rate <strong>Tender</strong> Form (A)]LEAD STATEMENTStatement show<strong>in</strong>g the maximum permissible leadsS.No.Lead-distance with name <strong>of</strong>quarry if anyDescription <strong>of</strong> materials(1) (2) (3)Executive Eng<strong>in</strong>eer……….. ..Division


Chap. II ]178ANNEXURE-C[ Appendix <strong>2.10</strong> A[Applicable to Item Rate <strong>Tender</strong> <strong>in</strong> Form (B)]STATEMENT OF QUARRIESS.No Description <strong>of</strong> materials Name and location<strong>of</strong> Quarry(1) (2) (3)Note- This statement is only <strong>for</strong> the guidance <strong>of</strong> the contractor. The tenderer should satisfyhimself regard<strong>in</strong>g availability <strong>of</strong> the required quality and quantity <strong>of</strong> matarials.


Chap. II ]179[ Appendix <strong>2.10</strong> AANNEXURE-DIncome Tax Clearance Certificate. – A tenderer purchas<strong>in</strong>g tender document <strong>for</strong> worksexceed<strong>in</strong>g Rs. 10.00 Lakh shall submit balance sheet <strong>of</strong> his firm <strong>for</strong> the latestassessment year duly approved by Chartered Accountant. No tender documents can beissued /sold to him unless such certificate is submitted.(i)(ii)(iii)Names and style (<strong>of</strong> company/firm H.U.F. or <strong>in</strong>dividual) <strong>in</strong> which the applicant isassessed to <strong>in</strong>come tax and address <strong>for</strong> purpose <strong>of</strong> assessment.The Income Tax circle/ward/ district <strong>in</strong> which the applicant is assessed to <strong>in</strong>come tax.The follow<strong>in</strong>g portion concern<strong>in</strong>g the last Income-Tax Assessment made:-(a) Reference No.(or G.I.R No.) <strong>of</strong> the assessment .(b) Assessment year and account<strong>in</strong>g year.(c) Amount <strong>of</strong> total <strong>in</strong>come assessed.(d) Amount <strong>of</strong> tax assessed I.T.,S.T., E.P.T(e) Amount <strong>of</strong> tax paid I.T., S.T., E.P.T., B.P.T.(f) Balance be<strong>in</strong>g tax not yet paid and reasons <strong>for</strong> such arrears.(g) Whether any attachment <strong>of</strong> certificate or proceed<strong>in</strong>g pend<strong>in</strong>g <strong>in</strong> respect <strong>of</strong> the arrears.(h) Whether the company or firm or H.U.F on which the assessment was made has beenor is be<strong>in</strong>g liquidated, wound up, dissolved partitioned or be<strong>in</strong>g declared <strong>in</strong>solvent asthe case may be.(iv)(v)(vi)The position about latter assessments namely, whether returns submitted under section22(1) or (2) <strong>of</strong> the Income Tax Act and whether tax paid under section18 (A) <strong>of</strong> theAct and the amount <strong>of</strong> tax so paid <strong>in</strong> arrears.In the case there has been no <strong>in</strong>come tax assessment at all <strong>in</strong> the past whether returnssubmitted under section 148 (1) or (2) and 140 (3) and if so the amount <strong>of</strong> <strong>in</strong>cometax returned or tax paid and the <strong>in</strong>come tax circle /ward/ district concerned.The name and address <strong>of</strong> branch (es).Verified the particulars set out above and found correct to the follow<strong>in</strong>g remarks :-Date:-Seal:-Signature <strong>of</strong> I.T.O.(Circle/Ward/District)


Chap. II ]180[ Appendix <strong>2.10</strong> AANNEXURE-ES.No.Details <strong>of</strong> Government plant and mach<strong>in</strong>es to be supplied on hireDescription<strong>of</strong> plantand mach<strong>in</strong>esNo.Basic hourly rate <strong>for</strong> purpose <strong>of</strong>determ<strong>in</strong><strong>in</strong>g ultimate hire charges to berecovered from contractor.(1) (2) (3) (4)Note :-(1) Add extra to Rate <strong>in</strong> For department chargescolumn No. 4(2) Add extra to Rate <strong>in</strong> For <strong>in</strong>terest charges tocolumn No. 4capital …………%(3) So far as recovery <strong>of</strong> above charges from contractor are concerned, the decision <strong>of</strong>S.E.(E/M) Circle …………..shall be f<strong>in</strong>al, conclusive, b<strong>in</strong>d<strong>in</strong>g on both parties.


Chap. II ]181[ Appendix <strong>2.10</strong> AANNEXURE-FAGREEMENT FOR USING GOVERNMENT PLANT AND MACHINERY BYCONTRACTORAn agreement made this………….….day <strong>of</strong>……20……. between the Governor <strong>of</strong>Chhattisgarh act<strong>in</strong>g through the Executive Eng<strong>in</strong>eer………………….(here<strong>in</strong>aftercalled Governor which expression shall, where the context so admits, <strong>in</strong>clude hissuccessor <strong>in</strong> <strong>of</strong>fice) <strong>of</strong> the one part.M/s………………………………. a company <strong>in</strong>corporatedand…………….Shri…………….S/o……………….under the…………………... Act19……….. and ………resident <strong>of</strong>……… <strong>in</strong> the …………hav<strong>in</strong>g its registered <strong>of</strong>ficeat …………………… Tehsil <strong>of</strong> the ………District………..through…………….……………(here<strong>in</strong>after call the contractor, which expressionshall, where the context so admits, <strong>in</strong>clude his successor <strong>in</strong> <strong>of</strong>fice) <strong>of</strong> the other part.2. Whereas the contractor has applied to the State Government <strong>for</strong> the hire <strong>of</strong> the………………….. described <strong>in</strong> Annexure “E” appended herewith <strong>for</strong> a period<strong>of</strong>………… months from…………..<strong>in</strong> the first <strong>in</strong>stance subject to it be<strong>in</strong>g extendedon the same terms and conditions up to the end <strong>of</strong> work<strong>in</strong>g seasons<strong>of</strong>…………………………. .3. Now it is agreed between the parties hereto that-(i)The Executive Eng<strong>in</strong>eer (Civil) shall provide and operate and let to the hirer that the………………. mach<strong>in</strong>ery <strong>for</strong> a period <strong>of</strong> …………………………………. at theproject site……………………The mach<strong>in</strong>ery shall be deemed to rema<strong>in</strong> always under the overall and directcontrol <strong>of</strong> the S.D.O (E/M) ………………………Department…………………..<strong>for</strong>the purpose <strong>of</strong> arrangement and supply <strong>of</strong> POL, all field operation and ma<strong>in</strong>tenanceetc. The contractor shall not be allowed at any time to operate, ma<strong>in</strong>ta<strong>in</strong>, run or workthe mach<strong>in</strong>e with his materials/men <strong>of</strong> his staff directly.(ii)(iii)The contractor shall deposit <strong>in</strong> advance a sum <strong>of</strong> Rs……… with the ExecutiveEng<strong>in</strong>eer ……………. . The contractor shall pay all hire charges <strong>of</strong> the said unit <strong>of</strong>mach<strong>in</strong>ery as specified <strong>in</strong> clause. (iii) below, by the 15 th <strong>of</strong> the month succeed<strong>in</strong>g that<strong>for</strong> which it become payable. Any sums not paid shall be recoverable from any otherpayment which may be due to the hirer or fail<strong>in</strong>g which as an arrear <strong>of</strong> land revenue.The monthly use charges <strong>in</strong>clusive <strong>of</strong> Department charges and other charges <strong>for</strong> thesaid unit <strong>of</strong> mach<strong>in</strong>ery recoverable from the hirer as worked on the basic rates shown<strong>in</strong> Annexure “E” shall be f<strong>in</strong>al and payable by contractor to the department. Noremission <strong>of</strong> hire charges shall be permissible except under the orders <strong>of</strong> thecompetent authority <strong>of</strong> department.


Chap. II ]182[ Appendix <strong>2.10</strong> A(iv)(v)(vi)The contractor shall dur<strong>in</strong>g the mach<strong>in</strong>es are employed by department and work<strong>in</strong>g onhis works be responsible to make good to the department any loss or damage causedto said unit <strong>of</strong> mach<strong>in</strong>ery and men work<strong>in</strong>g on the mach<strong>in</strong>e due to circumstancecaused on account <strong>of</strong> any contractor lapses, like prevent<strong>in</strong>g the <strong>of</strong>ficers to attend toregular ma<strong>in</strong>tenance and timely repairs, and his failure <strong>in</strong> respect <strong>of</strong> non-ma<strong>in</strong>tenance<strong>of</strong> haul roads, both <strong>in</strong> respect <strong>of</strong> grade and proper water<strong>in</strong>g or any other cause etc. asmay, be provided <strong>in</strong> the contract.The Eng<strong>in</strong>eer-<strong>in</strong>-Charge shall be the f<strong>in</strong>al authority to determ<strong>in</strong>e the extent <strong>of</strong>damages and amount recoverable under such conditions.A sum due from the contractor under this agreement shall be recoverable as arrears <strong>of</strong>land revenue.(a) Basic hourly rate <strong>for</strong> purpose <strong>of</strong> determ<strong>in</strong><strong>in</strong>g ultimate charges to be recovered fromthe contractor <strong>for</strong> the issue <strong>of</strong> the said unit <strong>of</strong> mach<strong>in</strong>e <strong>for</strong> the work……. shall be asgiven <strong>in</strong> Annexure “E” <strong>of</strong> this contract. On the amount so worked out <strong>for</strong> any perioddepartmental charge at the rate <strong>of</strong>…………….% will be added <strong>in</strong> addition. Thecontractor shall also pay <strong>in</strong>terest charges on capital on the follow<strong>in</strong>g basis <strong>for</strong> eachday <strong>of</strong> this contract period and <strong>for</strong> the extra period <strong>of</strong> the duration <strong>of</strong> the contract ifextended on the basis as under:-1. Per day 2. Per day 3. Per day.(b) No rebate on account <strong>of</strong> idle hours <strong>of</strong> mach<strong>in</strong>es will be given except<strong>in</strong>g when themach<strong>in</strong>es are not required on the items <strong>of</strong> work <strong>in</strong> progress <strong>of</strong> mach<strong>in</strong>es break downand cannot actually do any work. Even under such circumstances specific orders <strong>in</strong>writ<strong>in</strong>g by the Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer (Civil), Irrigation Circle <strong>for</strong> the rebate due ifany shall have to be obta<strong>in</strong>ed.(vii)(b)(viii)(a) The total hours that will be reckoned <strong>for</strong> purposes <strong>of</strong> charg<strong>in</strong>g the contractor onhourly basis clause (iii) & (iv) above shall be accord<strong>in</strong>g to clock hours and these shallbe reckoned from the actual time said unit <strong>of</strong> the mach<strong>in</strong>ery is brought to the worksite and used on contractors work or <strong>in</strong>clud<strong>in</strong>g the time required <strong>for</strong> adjustments <strong>in</strong>the mach<strong>in</strong>ery out exclud<strong>in</strong>g periods <strong>in</strong>volved <strong>in</strong> the mach<strong>in</strong>ery on break downs andstoppage <strong>of</strong> work due to any reason under orders <strong>of</strong> Eng<strong>in</strong>eer-<strong>in</strong>-Charge.The said unit <strong>of</strong> mach<strong>in</strong>ery shall work daily <strong>in</strong> …..……. ……………. shifts asprescribed by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge and Sub-divisional <strong>of</strong>ficer E/M accord<strong>in</strong>g tosuitability from time to time and <strong>in</strong>timated to contractor <strong>in</strong> advance by him or hisauthorsied representative. The actual time <strong>of</strong> operation <strong>of</strong> mach<strong>in</strong>ery by Departmenton contractors work on each day shall be entered on the log books <strong>of</strong> respectivemach<strong>in</strong>ery by the S.D.O. (E/M) or his sectional <strong>of</strong>ficer on each occasions <strong>of</strong> the dayand these entries <strong>in</strong> the log books shall be <strong>in</strong>itiated both by the S.D.O. (E/M) or hisSectional <strong>of</strong>ficer and the hirer or his authorised representative.The contractor shall report to the Eng<strong>in</strong>eer-<strong>in</strong>-charge or Sub-Divisional Officer (E/M)any defect <strong>in</strong> the work<strong>in</strong>g <strong>of</strong> the said unit <strong>of</strong> mach<strong>in</strong>ery dur<strong>in</strong>g work<strong>in</strong>g hours and


Chap. II ]183[ Appendix <strong>2.10</strong> AEng<strong>in</strong>eer-<strong>in</strong>-Charge or S.D.O. (E/M) shall get the defect remedied on the field itself orat the departmental work shop.(ix)(x)(xi)(xii)The Executive Eng<strong>in</strong>eer may at any time by giv<strong>in</strong>g seven days notice <strong>in</strong> writ<strong>in</strong>g to thecontractor term<strong>in</strong>ate this agreement. The contractor shall not claim any compensation<strong>for</strong> such action.In case <strong>of</strong> non observance and or non-per<strong>for</strong>mance by the contractor <strong>of</strong> the provisionhere<strong>in</strong>be<strong>for</strong>e conta<strong>in</strong>ed the E.E. shall be at the liberty <strong>for</strong>thwith to term<strong>in</strong>ate thisagreement without prejudice to the right <strong>of</strong> the Government to recover damage fromhirer <strong>for</strong> the breach <strong>of</strong> any clause <strong>of</strong> this agreement to the extent <strong>of</strong> the full securitydeposit or part there<strong>of</strong>.In the event <strong>of</strong> any dispute between the parties hereto as regards <strong>in</strong>terpretation or anyother clause due to any <strong>of</strong> the conditions <strong>of</strong> this agreement, the decision <strong>of</strong> theSuper<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer (Civil)………………….. Circle shall be f<strong>in</strong>al conclusiveand b<strong>in</strong>d<strong>in</strong>g on both.It is hereby agreed the expression the Governor and the contractor, here<strong>in</strong>be<strong>for</strong>e usedshall respectively <strong>in</strong>clude the <strong>for</strong>mer’s successor <strong>in</strong> <strong>of</strong>fice and the latter’s heirs,executers, adm<strong>in</strong>istrators and representatives.…………………………………….Signature <strong>of</strong> the contractorSignature <strong>of</strong> theExecutive Eng<strong>in</strong>eer


Chap. II ]184ANNEXURE G–IGUARANTEE BOND[ Appendix <strong>2.10</strong> A(to be used by approved scheduled banks )1. In consideration <strong>of</strong> the Governor <strong>of</strong> Chhattisgarh (here<strong>in</strong>after called the Government)hav<strong>in</strong>g agreed to exempt .............................................(here<strong>in</strong>after called ''the saidContractor (s)'' from the demand under the terms and conditions <strong>of</strong> an agreement)dated ........................ made between………............... and…….........................<strong>for</strong>……………. (here<strong>in</strong>after called '' the said agreement'') <strong>of</strong> ………….deposits <strong>for</strong>the due fulfillment by the said contractor(s) <strong>of</strong> the terms and conditions conta<strong>in</strong>ed <strong>in</strong>the said agreement on production <strong>of</strong> a bank Guarantee <strong>for</strong> Rs..........................(Rupees.............................only).We..................... bank Limited, (here<strong>in</strong>after referred to as ''the Bank'') do hereby undertake to pay the Government anamount not exceed<strong>in</strong>g Rs. ........................................... aga<strong>in</strong>st any loss or damagecaused to or suffered or would be caused to or suffered by the Government byreason <strong>of</strong> any breach by the said contractor (s) <strong>of</strong> any terms or conditions conta<strong>in</strong>ed <strong>in</strong>the said agreement .2. We.....................................Bank Limited ...................... do hereby undertake to paythe amounts due and payable under this guarantee without any demand any merelyon demand from the Government stat<strong>in</strong>g that the amount claimed is due by way <strong>of</strong>loss or damage caused to or would be caused to or suffered by the Government byreason <strong>of</strong> any breach by the said contractor (s) <strong>of</strong> any <strong>of</strong> the terms or conditionsconta<strong>in</strong>ed <strong>in</strong> the said agreement or by reason <strong>of</strong> the contractor (s) failure to per<strong>for</strong>mthe said agreement . Any such demand made on the Bank shall be conclusive asregards the amount due and payable by the Bank under this guarantee. However, ourliability under this guarantee shall be restricted to an amount not exceed<strong>in</strong>g Rs........................................3. We ....................................... Bank Limited further agree that the guarantee here<strong>in</strong>conta<strong>in</strong>ed shall rema<strong>in</strong> <strong>in</strong> full <strong>for</strong>ce and effect dur<strong>in</strong>g the period that would be taken<strong>for</strong> the per<strong>for</strong>mance <strong>of</strong> the said agreement and that it shall cont<strong>in</strong>ue to be en<strong>for</strong>ceabletill all dues <strong>of</strong> Government under or by virtue <strong>of</strong> the said agreement have been fullypaid and its claims satisfied or till……………….................................................department <strong>of</strong> .............................certificates that the term and conditions <strong>of</strong> the said agreement have been fully andproperly carried out by the said contractor (s) and accord<strong>in</strong>gly discharge theguarantee. Unless a demand or claim under this guarantee is made on us <strong>in</strong> writ<strong>in</strong>g onor be<strong>for</strong>e the ....................................... we shall be discharged from all liability underthis guarantee thereafter.4. We.................................. Bank limited further agree with the Government that theGovernment shall have fullest liberty without out consent and without affect<strong>in</strong>g <strong>in</strong> anymanner our obligations here under or vary any <strong>of</strong> the terms and conditions <strong>of</strong> the saidagreement or to extended time <strong>of</strong> per<strong>for</strong>mance by the said contractor (s) from time to


Chap. II ]185[ Appendix <strong>2.10</strong> Atime are to postpone <strong>for</strong> any time or from time to time any <strong>of</strong> the power exercisableby the Government aga<strong>in</strong>st the said contractor (s) and to <strong>for</strong>ebear or en<strong>for</strong>ce any <strong>of</strong>the terms and conditions relat<strong>in</strong>g to the said Agreement and we shall not be relievedfrom our liability by reasons <strong>of</strong> any such variation <strong>of</strong> extension be<strong>in</strong>g granted to thesaid contractor (s) or <strong>for</strong> any <strong>for</strong>bearance act or omission on the part <strong>of</strong> theGovernment or any <strong>in</strong>dulgence by the Government to the said contractor (s) or by anysuch matter or th<strong>in</strong>g whatsoever which under the law relat<strong>in</strong>g to sureties would but<strong>for</strong> this provision have effect <strong>of</strong> so reliev<strong>in</strong>g us.5. We........................................................Bank limited lastly undertake not be revoke thisguarantee dur<strong>in</strong>g its currency except with the previous consent <strong>of</strong> the Government <strong>in</strong>writ<strong>in</strong>g.Dated the..............................day <strong>of</strong>...……….........20 …………........... <strong>for</strong>....................................................................... Bank Limited.


Chap. II ]186[ Appendix <strong>2.10</strong> AGUARANTEE BOND(to be used by un –approved schedule blank)1. In consideration <strong>of</strong> the Government <strong>of</strong> Chhattisgarh hav<strong>in</strong>g at our request agreed toaccept this ............................... Bank Ltd. ..............................guarantee <strong>in</strong> lieu <strong>of</strong> cashdeposit required from Messrs.............................. <strong>for</strong> the due fulfillment by them <strong>of</strong> theterms and conditions <strong>of</strong> the agreement dated ..........................made between....................<strong>for</strong> ........................................(here<strong>in</strong>after called ''the said Agreement'')...................................dur<strong>in</strong>g the period commenc<strong>in</strong>g from ...............................andend<strong>in</strong>g on .............................. or the extended period if any we ..................................Bank Ltd., do here by undertake to pay the Governor <strong>of</strong> Chhattisgarh (here<strong>in</strong>after called''the Government'') an amount not exceed<strong>in</strong>g...........................Rupees................................... only aga<strong>in</strong>st and loss or damage causedto or suffered <strong>of</strong> would be caused to or suffered by the Government by reason <strong>of</strong> anywrench by the said ........................ <strong>of</strong> any terms or conditions <strong>of</strong> agreement.2. We ............................................. Bank Ltd., do hereby undertake to pay the amounts dueand payable under this guarantee without any demor on a demand <strong>for</strong>m the Governmentstat<strong>in</strong>g that the amount claimed is due by way or loss or damage caused to or sufferedwould be caused to or suffered by the Government by reason <strong>of</strong> any breach by the said........................ <strong>of</strong> any <strong>of</strong> the terms and conditions conta<strong>in</strong>ed <strong>in</strong> the said agreement or byreason <strong>of</strong> the said ..................... failure to per<strong>for</strong>m the said Agreement any such demandmade on the bank shall be conclusive as regards the amounts due and payable by underthe guarantee . However our liability under this guarantee shall be restricted to anamount not exceed<strong>in</strong>g Rs.................................(Rupees .............................) we........................... Bank Ltd., authorised the Government to recover the same directlyfrom the reserve Bank <strong>of</strong> India from our deposits <strong>of</strong> each and/on securities with the saidBank . The said Reserve Bank <strong>of</strong> India have at the request <strong>of</strong> the.................................................... Bank Ltd., agree to pay to the Government or demandand from out <strong>of</strong> the said deposits any sum which may become payable to Governmentunder this guarantee <strong>for</strong> payment.3. We .......................................................... Bank Ltd., further agree that the guaranteehere<strong>in</strong> conta<strong>in</strong>ed rema<strong>in</strong> <strong>in</strong> full <strong>for</strong>ce and effect up to and <strong>in</strong>clusive <strong>of</strong> the........................................ date referred to above, or the expiry <strong>of</strong> the extended period ifany that it shall cont<strong>in</strong>ue to be en<strong>for</strong>ceable till all the case <strong>of</strong> Government under or byvirtue <strong>of</strong> the said agreement have been full and properly carried out by the said...................................................... and accord<strong>in</strong>gly discharges the guarantee, unless ademand or claim under this guarantee is made on us <strong>in</strong> writ<strong>in</strong>g or on be<strong>for</strong>e the........................................... we shall be discharged from all liability under this guaranteethereafter .


Chap. II ]187[ Appendix <strong>2.10</strong> A4. We ......................................... Bank Ltd., further agree with the Government that theGovernment shall have the fullest liberty without our consent and without affect<strong>in</strong>g <strong>in</strong>any manner our obligations here under or vary any <strong>of</strong> the terms and condition <strong>of</strong> thesaid agreement or to extend time <strong>of</strong> per<strong>for</strong>mance by the said ....................... from timeto time or to postpone <strong>for</strong> any time or from time to time and any <strong>of</strong> the powersexercisable by the Government aga<strong>in</strong>st the said ............................. and to <strong>for</strong>ebear oren<strong>for</strong>ce any <strong>of</strong> the terms and conditions relat<strong>in</strong>g to the said Agreement and we shall notbe relieved from our liability by reasons <strong>of</strong> any such variation or extension be<strong>in</strong>ggranted to be said .................................... or <strong>for</strong> any <strong>for</strong>bearance act, or omission on thepart <strong>of</strong> the Government ........................... or any <strong>in</strong>dulgence by the Government to thesaid…………. or by any such matter or th<strong>in</strong>g whatsoever which under the law relat<strong>in</strong>gto sureties would but <strong>for</strong> this provisions have effect <strong>of</strong> so reliev<strong>in</strong>g us.5. We ................................................... Bank Ltd., lastly undertake not be revoke thisguarantee dur<strong>in</strong>g its currency except with previous consent <strong>of</strong> the Government <strong>in</strong>writ<strong>in</strong>g .Dated ........................ day........................20 .................... <strong>for</strong>............................................. Bank Limited.


Chap. II ]188[ Appendix <strong>2.10</strong> AANNEXURES G-IIDear Sir,To,.............................................................................................................................................................................................................................................We enclosed our Fixed Deposit Receipt/Cash Certificate/other similar <strong>in</strong>strument No.............................. <strong>for</strong> Rs..................................<strong>in</strong> favour <strong>of</strong> ……….................................................................Designation <strong>of</strong> the Officer concerned <strong>in</strong> lieu <strong>of</strong> depositsrequired from ............ .. <strong>for</strong> the due fulfillment by him/them <strong>of</strong> the terms <strong>of</strong> contractor dated.............................. <strong>for</strong> dur<strong>in</strong>g the period .............. commenc<strong>in</strong>g from ...........................andend<strong>in</strong>g on .............................. or the extension there<strong>of</strong> if any.Yours faithfully,For and on behalfPlease specify the nature <strong>of</strong> the <strong>in</strong>strument whom <strong>in</strong>strument similar to fixed depositreceipts are tendered and delete item not applicable.


Chap. II ]189[ Appendix <strong>2.10</strong> AANNEXURE-HSAFETY CODE1. Scaffold<strong>in</strong>g –(i) Suitable scaffolds should be provided <strong>for</strong> workman <strong>for</strong> allworks that cannot safely be done from the grounds or from solid constructionexcept such short period work as can be done safely from ladders. When aladder is used an extra mazdoor shall be engaged <strong>for</strong> hold<strong>in</strong>g the ladder <strong>for</strong>carry<strong>in</strong>g materials as well as suitable foot holds and hand holds shall beprovided on the ladder and the ladder shall be given an <strong>in</strong>cl<strong>in</strong>ation not steeperthan 1/4:1 (1/4 Horizontal and 1 Vertical).(ii)Scaffold<strong>in</strong>g or stag<strong>in</strong>g more than 3.50m, above the ground floor, swung orsuspended from an overhead support or erected with stationery support shallhave a guard rail properly attached, bolted, braced or otherwise secured atleast 1 metre high above the floor plat<strong>for</strong>ms <strong>of</strong> such scaffold<strong>in</strong>g or stag<strong>in</strong>g andextend<strong>in</strong>g along the entire length <strong>of</strong> the outside the ends there<strong>of</strong> with onlysuch open<strong>in</strong>g as may be necessary <strong>for</strong> the delivery <strong>of</strong> the materials. Suchscaffold<strong>in</strong>g or stag<strong>in</strong>g shall be fastened as to prevent it from sway<strong>in</strong>g from thebuild<strong>in</strong>g <strong>of</strong> structure.(iii)Work<strong>in</strong>g plat<strong>for</strong>m gangways and stairways should be so constructed that theyshould not sway unduly or unequally and if the height <strong>of</strong> the plat<strong>for</strong>m <strong>of</strong> thegangway or the stairway is more than 3.54 metre above ground level and orfloor level they should be closely boarded ,should have adequate width andshould be suitably fenced as described (ii) above.(iv)Every open<strong>in</strong>g <strong>in</strong> the floor <strong>of</strong> a build<strong>in</strong>g or <strong>in</strong> a work<strong>in</strong>g plat<strong>for</strong>m be providedwith suitable means to prevent the fall<strong>in</strong>g <strong>of</strong> persons or materials by provid<strong>in</strong>gsuitable fenc<strong>in</strong>g or rail<strong>in</strong>g whose m<strong>in</strong>imum height shall be 1 metre.(v)Safe means <strong>of</strong> access shall be provided to all work<strong>in</strong>g plat<strong>for</strong>ms and otherwork<strong>in</strong>g places. Every ladder shall be securely fixed . No portable ladder shallbe over 9 metre <strong>in</strong> length while the width between side rails <strong>in</strong> r<strong>in</strong>g laddershall be <strong>in</strong> no case be less than 0.3 metre <strong>for</strong> ladder up to and <strong>in</strong>clud<strong>in</strong>g 3meters length. For longer ladders this width should be <strong>in</strong>creased at least 2 cm.<strong>for</strong> each additional metre <strong>of</strong> length. Uni<strong>for</strong>m step spac<strong>in</strong>g shall not exceed0.3mt. Adequate precaution shall be taken to prevent danger from electricalequipment. No material on any <strong>of</strong> the work site shall be so stacked or placedas to cause danger or <strong>in</strong>convenience to any person or the public. Thecontractor shall also provide all necessary fenc<strong>in</strong>g and lights to protect thepublic from accident and shall be bound to bear the expenses <strong>of</strong> defense <strong>of</strong>every suit action or other precautions <strong>of</strong> law that may be brought by anyperson <strong>for</strong> <strong>in</strong>jury susta<strong>in</strong>ed ow<strong>in</strong>g to neglect <strong>of</strong> the above and to pay any


Chap. II ]190[ Appendix <strong>2.10</strong> Adamages and cost which may be awarded <strong>in</strong> any such suit action orproceed<strong>in</strong>g to any such person or which may with consent <strong>of</strong> the contractor bepaid to compromise any claims by any such person.2. Excavation and Trench<strong>in</strong>g.– All trenches 1.2 metre or more <strong>in</strong> depth, shall at all timebe supplied with at least one ladder <strong>for</strong> each 30 meter <strong>in</strong> length <strong>of</strong> fraction there<strong>of</strong>ladder shall be extended from bottom <strong>of</strong> the trench to at least 1 metre above the surface<strong>of</strong> the ground. The side <strong>of</strong> the trenches which are 1.5 metre or more <strong>in</strong> depth shall bestopped back to give suitable slopes or securely held by timber brac<strong>in</strong>g so as to avoidthe danger <strong>of</strong> sides to collapse. The excavated materials shall not be placed with<strong>in</strong> 1.5metre <strong>of</strong> the edge <strong>of</strong> the trench or half <strong>of</strong> the depth <strong>of</strong> the trench whichever is morecutt<strong>in</strong>g shall be done from top to bottom. Under no circumstances under m<strong>in</strong><strong>in</strong>g orundercutt<strong>in</strong>g shall be done.3. Demolition- Be<strong>for</strong>e any demolition work is commenced and also dur<strong>in</strong>g the process<strong>of</strong> the works: :-(a)(b)(c)All roads and open areas adjacent to the work site shall either be closed orsuitably protected.No electric cable or apparatus which is liable to be a source <strong>of</strong> danger over acable or apparatus used by the operator shall rema<strong>in</strong> electrically charged.All precautionary steps shall be taken to prevent danger to persons employedfrom risk <strong>of</strong> fire or explosion <strong>of</strong> floor<strong>in</strong>g. No floor ro<strong>of</strong> or other part <strong>of</strong> thebuild<strong>in</strong>g shall be so overloaded with debris or materials as to render it unsafe .4. Pa<strong>in</strong>t<strong>in</strong>g- All necessary personal safety equipment as considered adequate by theEng<strong>in</strong>eer-<strong>in</strong>-charge should be kept available <strong>for</strong> the use <strong>of</strong> person employed on the siteand ma<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> a condition suitable <strong>for</strong> immediate use, and the contractor shouldtake adequate steps to ensure proper use <strong>of</strong> equipment by those concerned.(a)(b)(c)(d)(e)Workers employed on mix<strong>in</strong>g asphaltic mate- rials, cement ,lime mortars shallbe provided with protective footwear and protective goggles.Stone breakers shall be provided with protective goggles and protectivecloth<strong>in</strong>gs, and seated at sufficiently safe <strong>in</strong>tervals.Those engaged <strong>in</strong> weld<strong>in</strong>g works shall be provided with welder's protect.When workers are employed <strong>in</strong> sewers and manholes which are <strong>in</strong> use, thecontractors shall ensure that the manhole covers are open and are ventilated atleast <strong>for</strong> an hour be<strong>for</strong>e the work shall be coronded <strong>of</strong> with suitable rail<strong>in</strong>g andprovided with warn<strong>in</strong>g signals or boards to prevent accident to the public.The contractor shall not employ man below the age <strong>of</strong> 18 and woman on thework <strong>of</strong> pa<strong>in</strong>t<strong>in</strong>g with products conta<strong>in</strong><strong>in</strong>g lead <strong>in</strong> any <strong>for</strong>m whenever manabove the age <strong>of</strong> 18 are employed on the work <strong>of</strong> lead pa<strong>in</strong>t<strong>in</strong>g the follow<strong>in</strong>gprecautions should be taken :-(i) No pa<strong>in</strong>t conta<strong>in</strong><strong>in</strong>g lead or lead shall be used except <strong>in</strong> the <strong>for</strong>m <strong>of</strong> pasteor ready made pa<strong>in</strong>t.


Chap. II ]191[ Appendix <strong>2.10</strong> A(ii) Able face masks should be supplied <strong>for</strong> use by the workers when pa<strong>in</strong>tapplied <strong>in</strong> the <strong>for</strong>m <strong>of</strong> spray or a surface hav<strong>in</strong>g lead pa<strong>in</strong>t dry and rubbleand scrapped.(iii)Overhauls shall be supplied by the contractor to the workmen andadequate facilities shall be provided to enable the work<strong>in</strong>g pa<strong>in</strong>ters towash dur<strong>in</strong>g the cessations <strong>of</strong> work.5. Drown<strong>in</strong>g-When the work is done near any place where there is risk <strong>of</strong> drown<strong>in</strong>g allnecessary equipments should be provided and kept ready <strong>for</strong> use and all necessary stepstaken <strong>for</strong> prompt rescue <strong>of</strong> any person <strong>in</strong> danger and adequate provision should bemade <strong>for</strong> prompt first aid treatment <strong>for</strong> all <strong>in</strong>juries likely to be susta<strong>in</strong>ed dur<strong>in</strong>g thecourse <strong>of</strong> the work.6. Mach<strong>in</strong>es- Use <strong>of</strong> hoist<strong>in</strong>g mach<strong>in</strong>es and tackle <strong>in</strong>clud<strong>in</strong>g their attachments anchorageand support shall con<strong>for</strong>m to use the follow<strong>in</strong>g standard or condition.(a)(b)(c)(d)(e)These shall be <strong>of</strong> good mecha<strong>nic</strong>al construction, sound material and adequatestrength and free from patent defect and shall be kept <strong>in</strong> good repair and <strong>in</strong> goodwork<strong>in</strong>g order.Every rope used <strong>in</strong> hoist<strong>in</strong>g or lower<strong>in</strong>g materials or as a means <strong>of</strong>suspension shall be <strong>of</strong> durable quality and adequate strength and free from patentdefects.Every crane driver or hoist<strong>in</strong>g appliances operator shall be properly qualified andno persons under an age <strong>of</strong> 21 years should <strong>in</strong>charge <strong>of</strong> any hoist<strong>in</strong>g mach<strong>in</strong>e<strong>in</strong>clud<strong>in</strong>g any scaffold which or give signals to operator.In case <strong>of</strong> every hoist<strong>in</strong>g mach<strong>in</strong>e and every cha<strong>in</strong> r<strong>in</strong>g lower<strong>in</strong>g or as means <strong>of</strong>suspensions, the safe work<strong>in</strong>g load shall be ascerta<strong>in</strong>ed by adequate means. Everyhoist<strong>in</strong>g mach<strong>in</strong>e and gear referred to above shall be pla<strong>in</strong>ly marked with the safework<strong>in</strong>g load. In case <strong>of</strong> a hoist<strong>in</strong>g mach<strong>in</strong>e hav<strong>in</strong>g a variable safe work<strong>in</strong>g loadeach safe work<strong>in</strong>g load <strong>of</strong> the conditions under which it is applicable shall beclearly <strong>in</strong>dicated. No part <strong>of</strong> any mach<strong>in</strong>e or <strong>of</strong> any gear referred to above <strong>in</strong> thisparagraph shall be loaded beyond the safe work<strong>in</strong>g load except <strong>for</strong> load purpose<strong>of</strong> test<strong>in</strong>g.In case <strong>of</strong> departmental mach<strong>in</strong>e the safe work<strong>in</strong>g and load shall be notified by theelectrical eng<strong>in</strong>eer–<strong>in</strong>– charge. As regards contractor mach<strong>in</strong>e the contractor shallnotify the safe work<strong>in</strong>g load <strong>of</strong> the mach<strong>in</strong>e to the Eng<strong>in</strong>eer-<strong>in</strong>-Charge, wheneverhe br<strong>in</strong>gs any mach<strong>in</strong>ery to site <strong>of</strong> work and get verified by the electrical eng<strong>in</strong>eerconcerned.Motors gear<strong>in</strong>g transmission, electric wir<strong>in</strong>g and other dangerous parts <strong>of</strong> thehoist<strong>in</strong>g appliance should be provided with efficient safe guards and with meansas will reduced the m<strong>in</strong>imum <strong>of</strong> the risk <strong>of</strong> the accidental descent <strong>of</strong> the loadadequate precautions should be taken to reduce to the m<strong>in</strong>imum the risk <strong>of</strong> anypart <strong>of</strong> a suspended load be com<strong>in</strong>g accidentally displaced. When workersemployed electrical <strong>in</strong>stallations which are already unregistered, <strong>in</strong>sulat<strong>in</strong>g mats,wear<strong>in</strong>g apparel such as gloves sleeves and boots as may necessary should be


Chap. II ]192[ Appendix <strong>2.10</strong> Aprovided, the workers should not wear r<strong>in</strong>gs, watches and carry keys or othermaterials which are good conductors <strong>of</strong> electricity.7. All scaffolds, ladders and their safety device mentioned or described here<strong>in</strong> shall bema<strong>in</strong>ta<strong>in</strong>ed <strong>in</strong> safe condition and no scaffold ladder or equipment shall be altered orremoved while it is <strong>in</strong> use. Adequate wash<strong>in</strong>g facilities shall be provided at or nearplaces <strong>of</strong> work.8. These safety provisions should be brought to the notice <strong>of</strong> all concerned by display on a<strong>Notice</strong> Board at prom<strong>in</strong>ent places at the work spot. The persons responsible <strong>for</strong>compliance <strong>of</strong> the safety code shall be named there<strong>in</strong> by the contractor.9. To ensure effective en<strong>for</strong>cement <strong>of</strong> the rules and regulations relat<strong>in</strong>g to safetyprecautions the arrangement made by the contractor shall be open to <strong>in</strong>spection by theLabour <strong>of</strong>ficer, Eng<strong>in</strong>eer-<strong>in</strong> -Charge, or the Department or their representatives.10. Notwithstand<strong>in</strong>g the above clause (1) to (9) there is noth<strong>in</strong>g <strong>in</strong> these to exempt thecontractors to exclude the operations <strong>of</strong> any other act or rule <strong>in</strong> <strong>for</strong>ce <strong>in</strong> the Republic <strong>of</strong>India.


Chap. II ]193[ Appendix <strong>2.10</strong> AANNEXURE-ISchedule <strong>of</strong> QuantitiesRateItem Quantity Particulars Unit InInAmountFigure Words1 2 3 4 5 6 7Signature <strong>of</strong> ContractorSignature <strong>of</strong> S.E./E.E.


Chap. II ]194[ Appendix <strong>2.10</strong> AS.NoANNEXURE-JList show<strong>in</strong>g the name <strong>of</strong> near relative work<strong>in</strong>g <strong>in</strong> C.G. Water Resources Deptt. asrequired vide clause 2.39 <strong>of</strong> Part -IIName <strong>of</strong> DivisionalAccountant andGazetted OfficersWork<strong>in</strong>g <strong>in</strong> C.G.Water ResourcesDeptt.Relationship with selfName <strong>of</strong> Personwork<strong>in</strong>g with thecontractor who arenear relative togazetted <strong>of</strong>ficersmentioned <strong>in</strong> Column(2)Relationship1 2 3 4 5Date……………………………………………… Signature <strong>of</strong> the Contractor


Chap. II ]195[ Appendix <strong>2.10</strong> AANNEXURE-KList <strong>of</strong> contracts already held by the Contractor <strong>in</strong> Water ResourcesDeptt./P.W.D. and Other Departments at the time <strong>of</strong> submission <strong>of</strong> this tender asrequired vide clause 2-30 <strong>of</strong> the N.I.T.Name <strong>of</strong>DivisionName <strong>of</strong> workAmount <strong>of</strong>contractExclud<strong>in</strong>gHigher/LowerPercentageif any.Value <strong>of</strong>work doneexclud<strong>in</strong>gpercentage.Value <strong>of</strong>balance workexclud<strong>in</strong>gpercentageAmount <strong>of</strong>solvency <strong>in</strong> the time<strong>of</strong> registration1 2 3 4 5 6Date …………………………………… Signature <strong>of</strong> Contractor


Chap. II ]196[ Appendix <strong>2.10</strong> AANNEXURE-LShow<strong>in</strong>g (approximately) materials to be supplied by the ……… Department <strong>for</strong>work contracted to be executed and rates at which they are to be charged <strong>for</strong> :-Particulars Rate at which the materials will be chargedfrom the contractor1 2UnitRs.Place <strong>of</strong> delivery3Note- The person or firm submitt<strong>in</strong>g the tender should see that the rates <strong>in</strong> the above scheduleare filled up by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge on the issue <strong>of</strong> the <strong>for</strong>m prior to thesubmission to the tender.……………………..Signature <strong>of</strong> Contractor…..……..……………..Signature <strong>of</strong> Divisional Officer


Chap. II ] 197[ Appendix 2.11<strong>APPENDIX</strong> 2.11( See paragraph 2.079 )NOTICE INVITING TENDERS FOR PIECE WORKFORM - "D"(Notes and Directions)1. Where circumstances permit tender <strong>for</strong> piece works should be advertised as publicly asthose <strong>for</strong> work on regular contract.<strong>Notice</strong>s should be posted at the lead<strong>in</strong>g <strong>of</strong>fices <strong>of</strong> head quarters <strong>of</strong> the Sub–Division and the place where the work is situated, and at the head quarters <strong>of</strong> theDivision also.2. Ample time should be allowed <strong>for</strong> contractors to submit tenders.3. As piece–work does not <strong>in</strong>volve a total quantity <strong>of</strong> work The advertisement should notspecify either, except to <strong>in</strong>dicate the total quantity available <strong>for</strong> tender and the date, ifany, on which the contract will term<strong>in</strong>ate. When the estimate is <strong>for</strong> orig<strong>in</strong>al work orspecial repairs, paragraph 5 <strong>of</strong> the notice may be struck out.4. All tenders received by S.D.Os. will be <strong>for</strong>warded by them to the E.E.Note.- Any alterations are permissible to suit circumstances provided rules are not <strong>in</strong>fr<strong>in</strong>ged.NOTICE INVITING TENDERS FOR PIECE WORK1. Sealed tenders will be received from .............................. Class /Classes W. D.Contractor <strong>of</strong> the ........................ Bas<strong>in</strong> /Zone /Project/Circle/Division at the <strong>of</strong>fice <strong>of</strong>the ..................................................... upto ............... on the .......................................20 ................................. <strong>for</strong> the follow<strong>in</strong>g work.Estimate no. ......................................... <strong>of</strong> 20................ Name <strong>of</strong>work.................................................................. Amount <strong>of</strong> EstimateRs.................................................... Amount perta<strong>in</strong><strong>in</strong>g to the contractRs.......................... Time allowed <strong>for</strong> completion ..........................................................2. <strong>Tender</strong>s must be <strong>in</strong> Form -D. Form can be purchased on payment from............................................................ and all <strong>in</strong><strong>for</strong>mation regard<strong>in</strong>g the workascerta<strong>in</strong>ed dur<strong>in</strong>g <strong>of</strong>fice hours on each work<strong>in</strong>g day up to that previous to theexpiration <strong>of</strong> this notice.3. <strong>Tender</strong>s may <strong>in</strong>clude the whole or any portion <strong>of</strong> the above work. They should specifywhether the supply <strong>of</strong> Government tools is required.


Chap. II ] 198[ Appendix 2.114. The authority competent to accept the tender does not b<strong>in</strong>d himself to accept the lowestor any tender .5. The successful tenderer will be bound to accept any Government materials that areavailable <strong>for</strong> the work at book rates. In<strong>for</strong>mation regard<strong>in</strong>g rates may be obta<strong>in</strong>ed fromthe <strong>of</strong>fice <strong>of</strong> the.......................................................6. The contract will term<strong>in</strong>ate on........................................7. This N. I. T. shall <strong>for</strong>m the part <strong>of</strong> the agreement.......................................................Signature and designation<strong>of</strong> the authority<strong>in</strong>vit<strong>in</strong>g tender


Chap. II ] 199[ Appendix 2.12<strong>APPENDIX</strong> 2.12(See paragraph 2.084)Schedule <strong>of</strong> <strong>Tender</strong>sName <strong>of</strong> work .................................................................................................................................................................................................................................................................................................................................................................................................................................................. Amount sanctioned <strong>for</strong>work tendered <strong>for</strong>..................................... Sanctioned<strong>in</strong>..................................................................................S.No.Name <strong>of</strong> contractortender<strong>in</strong>gPercentageabove or belowestimatedratesAmount <strong>of</strong>tenderRemarks(1) (2) (3) (4) (5)No departure from the authorised course has occurred <strong>in</strong> the manner <strong>of</strong> call<strong>in</strong>g <strong>for</strong>, or<strong>in</strong> the receipt <strong>of</strong>, above tenders. <strong>Tender</strong> No ................................................ <strong>of</strong> the aboveschedule is recommended <strong>for</strong> acceptance /No tender is suitable....................................................Signature and designation <strong>of</strong> theauthority prepar<strong>in</strong>g the scheme