12.07.2015 Views

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chap. II ]168[ Appendix <strong>2.10</strong> Afails to submit such programme, then the construction programme appended with thetender shall be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on the contractor. This programme my be reviewedand revised every year at the beg<strong>in</strong>n<strong>in</strong>g <strong>of</strong> the work<strong>in</strong>g season.3.5. Action when the Progress <strong>of</strong> any crucial Item <strong>of</strong> work is unsatisfactory.- If theprogress <strong>of</strong> a crucial item <strong>of</strong> work, which is important <strong>for</strong> timely completion <strong>of</strong> work,is unsatisfactory, the Eng<strong>in</strong>eer <strong>in</strong> charge shall, notwithstand<strong>in</strong>g that the generalprogress <strong>of</strong> work is satisfactory, <strong>in</strong> accordance with clause 4.3.2 be entitled to takeaction under clause 4.3.3 after giv<strong>in</strong>g the contractor 10 days notice <strong>in</strong> writ<strong>in</strong>g and thecontractor will have no claim <strong>for</strong> compensation <strong>for</strong> any loss susta<strong>in</strong>ed by him ow<strong>in</strong>gto such action3.6. Inspection and Tests. - Except as otherwise provided <strong>in</strong> here<strong>of</strong> material andworkmanship, if not otherwise designated by the specification, shall be subject to<strong>in</strong>spection, exam<strong>in</strong>ation and test by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge at any and all timesdur<strong>in</strong>g manufacture or constructions are carried on. The Eng<strong>in</strong>eer-<strong>in</strong>-charge shall havethe right to reject the defective material and workmanship or require its correction.Rejected workmanship shall be satisfactorily replaced with proper material withoutcharge there<strong>of</strong> and the contractor shall properly segregate and remove rejectedmaterial from the premises. If the contractor fails to proceed at once with thereplacement <strong>of</strong> the rejected material and/ or the construction <strong>of</strong> defectiveworkmanship the Eng<strong>in</strong>eer-<strong>in</strong>-Charge may replace such material and/ or correct suchworkmanship and charge the cost there<strong>of</strong> to the contractor.The contractor shall be liable <strong>for</strong> replacement <strong>of</strong> defective work up to the time<strong>in</strong> accordance with clause 4.3.16 <strong>of</strong> the conditions <strong>of</strong> contract <strong>of</strong> all work to be doneunder the contract.The contractor shall furnish promptly without additional charge all facilities,labour and material necessary <strong>for</strong> the safe and convenient <strong>in</strong>spection and tests thatmay be required by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge. All <strong>in</strong>spections and tests by thedepartment shall be per<strong>for</strong>med <strong>in</strong> such a manner as not to unnecessarily delay thework. Special full size and per<strong>for</strong>mance test shall be charged with any additional cost<strong>of</strong> <strong>in</strong>spection when materials and workmanship are not ready by the contractor at thetime <strong>of</strong> <strong>in</strong>spection .3.7. Removal <strong>of</strong> temporary work, plant and Surplus material.- Prior to f<strong>in</strong>alacceptance <strong>of</strong> the completed work but except<strong>in</strong>g as otherwise expressly directed orpermitted <strong>in</strong> writ<strong>in</strong>g, the contractor shall, at his own expenses remove from the siteand dispose <strong>of</strong> all the temporary structures <strong>in</strong>clud<strong>in</strong>g build<strong>in</strong>gs, pile work, crib work,all plant and surplus material, and all rubbish and debris <strong>for</strong> which he is responsibleto the satisfaction <strong>of</strong> Eng<strong>in</strong>eer-<strong>in</strong>-Charge.3.8. Possession Prior to Completion. – The Eng<strong>in</strong>eer-<strong>in</strong> Charge shall have the right totake possession <strong>of</strong> or use any completed part <strong>of</strong> the work. Such possession or use shall

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!