12.07.2015 Views

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chap. II ]171[ Appendix <strong>2.10</strong> Asuch other aspects and should there<strong>for</strong>e provide <strong>for</strong> any variation by him/his tenderedrate, as later on no claim whatsoever shall be enterta<strong>in</strong>ed except where any quarry ischanged <strong>for</strong> circumstances beyond the control <strong>of</strong> contractor under the written orders<strong>of</strong> Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer-<strong>in</strong>-Charge <strong>of</strong> work.* Cart<strong>in</strong>g <strong>of</strong> materials will be allowed as per actual lead limited to the lead provided<strong>in</strong> the Statement vide Annexure C. The Eng<strong>in</strong>eer-<strong>in</strong>-Charge shall have the power tochange the quarries and allow longer leads provided the extra cost <strong>for</strong> each k<strong>in</strong>d <strong>of</strong>material does not exceed 20% <strong>of</strong> the cost <strong>of</strong> lead vide clause 2.25.3.12. Exam<strong>in</strong>ation and Tests on completions.- On the completion <strong>of</strong> the work and notlater than three months thereafter, the Eng<strong>in</strong>eer-<strong>in</strong>-Charge shall make suchexam<strong>in</strong>ation and tests <strong>of</strong> the work as may then seem to him be possible, necessary ordesirable, and the contractor shall furnish free <strong>of</strong> cost any materials and labour whichmay be necessary there<strong>for</strong>, and shall facilitate <strong>in</strong> every way all operations required bythe Eng<strong>in</strong>eer-<strong>in</strong>-Charge, <strong>in</strong> mak<strong>in</strong>g exam<strong>in</strong>ation and tests.3.13. Climatic Conditions.- The Executive Eng<strong>in</strong>eer, may order the contractor to suspendany work that may be subject to the damage by climatic conditions and no claim <strong>of</strong>the contractor will be enterta<strong>in</strong>ed by the department on this account.*The para. “ Cart<strong>in</strong>g <strong>of</strong> materials ……………. clause 2.25” is applicable to percentage ratetenders only.3.14. Safety Regulations.- While carry<strong>in</strong>g out this work, the contractor will ensurecompliance <strong>of</strong> all safety regulations as provided <strong>in</strong> the Safety Code (Annexure ‘H’).3.15. Haulroads.- A fair weather road <strong>of</strong> the standard <strong>of</strong> a village cart truck is ord<strong>in</strong>arilyma<strong>in</strong>ta<strong>in</strong>ed by the department along the Canal alignment which is motor able fromNovember to end <strong>of</strong> May, but contractor shall not have any claim on this account ifone is not provided or ma<strong>in</strong>ta<strong>in</strong>ed. Necessary haulroads to work spot, borrow areasand water sources shall be satisfactorily constructed and ma<strong>in</strong>ta<strong>in</strong>ed by the contractorat his own cost. The contractor has to construct and ma<strong>in</strong>ta<strong>in</strong> his own approach roadsfrom the ma<strong>in</strong> haul roads provided by the department. Any new haul roads will havealso to be constructed and ma<strong>in</strong>ta<strong>in</strong>ed by the contractor at his cost.3.16. The contractor will make his own arrangement <strong>for</strong> supply <strong>of</strong> water, light and power<strong>for</strong> his works and labour camps etc. The department will only supply bulk electricityif needed by the contractor <strong>for</strong> light<strong>in</strong>g and power requirements <strong>of</strong> the contractor atthe trans<strong>for</strong>mer po<strong>in</strong>t as may be provided by the department at rates fixed by thedepartment, vide Annexure F. The contractor will have to make his own arrangement<strong>for</strong> further extension and connection <strong>of</strong> supply po<strong>in</strong>t to the work site and labour campsetc. and all other places at his own cost. The department will not enterta<strong>in</strong> any claimwhatsoever <strong>for</strong> any failure or break down etc. <strong>in</strong> supply <strong>of</strong> electricity to the contractor.The contractor will supply and fix his own tested meter <strong>of</strong> the approved make but themeter will be kept <strong>in</strong> the custody <strong>of</strong> the department.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!