12.07.2015 Views

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chap. II ]165[ Appendix <strong>2.10</strong> A2.45.1. The tender shall be submitted with the declaration that the contractor has successfullycarried out large works <strong>of</strong> this nature and has adequate organisation, mach<strong>in</strong>ery andexperienced personnel to handle jobs <strong>of</strong> this type and magnitude.2.45.2. A brief description <strong>of</strong> large works previously executed by tenderer.- After thetender has been opened, any tenderer may be required to submit detailed particulars<strong>of</strong> such works along with the manner <strong>of</strong> their execution and other <strong>in</strong><strong>for</strong>mation thatwill satisfy the <strong>of</strong>ficer receiv<strong>in</strong>g the tender that the contractor has adequateorganisation, <strong>in</strong>clud<strong>in</strong>g experienced personnel to execute vigorously the work to becarried out as per these specification.2.45.3. (a) The contractor shall employ the follow<strong>in</strong>g tech<strong>nic</strong>al staff dur<strong>in</strong>g the execution <strong>of</strong>works:-1. One Graduate Eng<strong>in</strong>eer, when cost <strong>of</strong> the work to be executed is more than Rs. 1crore.2. One Diploma-holder Sub-Eng<strong>in</strong>eer, when the cost <strong>of</strong> the work to be executed isRs. 10 Lakh and more but not more than Rs. 1.00 Crore.(b) The tech<strong>nic</strong>al staff should be available at site whenever required by theEng<strong>in</strong>eer-<strong>in</strong>-Charge to take <strong>in</strong>structions.(c)(d)(e)In case the contractor fails to employ the tech<strong>nic</strong>al staff as a<strong>for</strong>esaid,Government shall have the right to take suitable remedial measures.The contractor should give names and other details <strong>of</strong> the Graduate Eng<strong>in</strong>eer,diploma holder Sub-Eng<strong>in</strong>eer whom he <strong>in</strong>tends to employ or if underemployment, on the work at the time he commences the work.The contractor should give a certificate to the effect that Eng<strong>in</strong>eer, DiplomaholderSub-Eng<strong>in</strong>eer is exclusively <strong>in</strong> his employment:Provided that,-(1) An eng<strong>in</strong>eer or sub-Eng<strong>in</strong>eer may look after more than one work <strong>in</strong> the samelocality but the total value <strong>of</strong> works under him should not exceed Rs. Rs.5.00 crore<strong>in</strong> case <strong>of</strong> an eng<strong>in</strong>eer and 1.00 crore <strong>in</strong> the case <strong>of</strong> a Sub-Eng<strong>in</strong>eer.(2) It is not necessary <strong>for</strong> a contractor (or partner) <strong>in</strong> case <strong>of</strong> firm/ company who ishimself an Eng<strong>in</strong>eer/Sub-Eng<strong>in</strong>eer to employ another Eng<strong>in</strong>eer/Sub-Eng<strong>in</strong>eer <strong>for</strong> thesupervision <strong>of</strong> the work so long as the contractor /partner does work similar to whatcould have been done by an employed Eng<strong>in</strong>eer/Sub-Eng<strong>in</strong>eer.(3) A retired Eng<strong>in</strong>eer/ Assistant Eng<strong>in</strong>eer who is hold<strong>in</strong>g diploma may be treated at parwith the graduate eng<strong>in</strong>eer <strong>for</strong> the operation <strong>of</strong> the above clause.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!