12.07.2015 Views

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chap. II ]191[ Appendix <strong>2.10</strong> A(ii) Able face masks should be supplied <strong>for</strong> use by the workers when pa<strong>in</strong>tapplied <strong>in</strong> the <strong>for</strong>m <strong>of</strong> spray or a surface hav<strong>in</strong>g lead pa<strong>in</strong>t dry and rubbleand scrapped.(iii)Overhauls shall be supplied by the contractor to the workmen andadequate facilities shall be provided to enable the work<strong>in</strong>g pa<strong>in</strong>ters towash dur<strong>in</strong>g the cessations <strong>of</strong> work.5. Drown<strong>in</strong>g-When the work is done near any place where there is risk <strong>of</strong> drown<strong>in</strong>g allnecessary equipments should be provided and kept ready <strong>for</strong> use and all necessary stepstaken <strong>for</strong> prompt rescue <strong>of</strong> any person <strong>in</strong> danger and adequate provision should bemade <strong>for</strong> prompt first aid treatment <strong>for</strong> all <strong>in</strong>juries likely to be susta<strong>in</strong>ed dur<strong>in</strong>g thecourse <strong>of</strong> the work.6. Mach<strong>in</strong>es- Use <strong>of</strong> hoist<strong>in</strong>g mach<strong>in</strong>es and tackle <strong>in</strong>clud<strong>in</strong>g their attachments anchorageand support shall con<strong>for</strong>m to use the follow<strong>in</strong>g standard or condition.(a)(b)(c)(d)(e)These shall be <strong>of</strong> good mecha<strong>nic</strong>al construction, sound material and adequatestrength and free from patent defect and shall be kept <strong>in</strong> good repair and <strong>in</strong> goodwork<strong>in</strong>g order.Every rope used <strong>in</strong> hoist<strong>in</strong>g or lower<strong>in</strong>g materials or as a means <strong>of</strong>suspension shall be <strong>of</strong> durable quality and adequate strength and free from patentdefects.Every crane driver or hoist<strong>in</strong>g appliances operator shall be properly qualified andno persons under an age <strong>of</strong> 21 years should <strong>in</strong>charge <strong>of</strong> any hoist<strong>in</strong>g mach<strong>in</strong>e<strong>in</strong>clud<strong>in</strong>g any scaffold which or give signals to operator.In case <strong>of</strong> every hoist<strong>in</strong>g mach<strong>in</strong>e and every cha<strong>in</strong> r<strong>in</strong>g lower<strong>in</strong>g or as means <strong>of</strong>suspensions, the safe work<strong>in</strong>g load shall be ascerta<strong>in</strong>ed by adequate means. Everyhoist<strong>in</strong>g mach<strong>in</strong>e and gear referred to above shall be pla<strong>in</strong>ly marked with the safework<strong>in</strong>g load. In case <strong>of</strong> a hoist<strong>in</strong>g mach<strong>in</strong>e hav<strong>in</strong>g a variable safe work<strong>in</strong>g loadeach safe work<strong>in</strong>g load <strong>of</strong> the conditions under which it is applicable shall beclearly <strong>in</strong>dicated. No part <strong>of</strong> any mach<strong>in</strong>e or <strong>of</strong> any gear referred to above <strong>in</strong> thisparagraph shall be loaded beyond the safe work<strong>in</strong>g load except <strong>for</strong> load purpose<strong>of</strong> test<strong>in</strong>g.In case <strong>of</strong> departmental mach<strong>in</strong>e the safe work<strong>in</strong>g and load shall be notified by theelectrical eng<strong>in</strong>eer–<strong>in</strong>– charge. As regards contractor mach<strong>in</strong>e the contractor shallnotify the safe work<strong>in</strong>g load <strong>of</strong> the mach<strong>in</strong>e to the Eng<strong>in</strong>eer-<strong>in</strong>-Charge, wheneverhe br<strong>in</strong>gs any mach<strong>in</strong>ery to site <strong>of</strong> work and get verified by the electrical eng<strong>in</strong>eerconcerned.Motors gear<strong>in</strong>g transmission, electric wir<strong>in</strong>g and other dangerous parts <strong>of</strong> thehoist<strong>in</strong>g appliance should be provided with efficient safe guards and with meansas will reduced the m<strong>in</strong>imum <strong>of</strong> the risk <strong>of</strong> the accidental descent <strong>of</strong> the loadadequate precautions should be taken to reduce to the m<strong>in</strong>imum the risk <strong>of</strong> anypart <strong>of</strong> a suspended load be com<strong>in</strong>g accidentally displaced. When workersemployed electrical <strong>in</strong>stallations which are already unregistered, <strong>in</strong>sulat<strong>in</strong>g mats,wear<strong>in</strong>g apparel such as gloves sleeves and boots as may necessary should be

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!