12.07.2015 Views

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chap. II ]159[ Appendix <strong>2.10</strong> Aposition etc. <strong>of</strong> the steel <strong>for</strong> re<strong>in</strong><strong>for</strong>cement will be paid <strong>in</strong> respect <strong>of</strong> quantity <strong>of</strong> iron/steel supplied by the department.2.22.2. In case <strong>of</strong> departmental supply <strong>of</strong> steel, all waste pieces will be returned by thecontractor to the department. If the waste pieces exceed 3 percent that excess will becharged to the contractor at departmental issue rate plus usual departmental charges.The waste pieces <strong>of</strong> only reasonable size and quality will be accepted. Decision <strong>of</strong> theEng<strong>in</strong>eer-<strong>in</strong>-Charge about the reasonableness will be f<strong>in</strong>al and b<strong>in</strong>d<strong>in</strong>g on thecontractor.Delay <strong>in</strong> Supply <strong>of</strong> Departmental Materials2.22.3. If the materials are not supplied <strong>in</strong> time, the contractor will not be allowed any claim<strong>for</strong> any loss which may be caused to him, but only extension <strong>of</strong> time will be given atthe discretion <strong>of</strong> the competent authority if applied <strong>for</strong> by the contractor be<strong>for</strong>e theexpiry <strong>of</strong> the contract.Lead and Lift <strong>for</strong> Water2.23 No lead and lift <strong>for</strong> cart<strong>in</strong>g <strong>of</strong> water will be paid.2.24. Application <strong>for</strong> percentage <strong>Tender</strong>s Form–A only.- Cart<strong>in</strong>g <strong>of</strong> materials will beallowed as per actual lead limited to the lead provided <strong>in</strong> the enclosed statement videAnnexure C. The Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer shall have power to change the quarriesand allow longer leads provided the extra cost <strong>for</strong> each k<strong>in</strong>d <strong>of</strong> materials does notexceed 20 per cent <strong>of</strong> the cost <strong>of</strong> lead.2.25. Applicable <strong>for</strong> item rate tenders – Form B only.- Materials to be used on workspecified <strong>in</strong> the contract will be only from the quarries specified <strong>in</strong> Annexure C. If thechanges <strong>of</strong> quarries, from those mentioned <strong>in</strong> Annexure C, are necessitated due to anyreason dur<strong>in</strong>g the execution <strong>of</strong> work, such changes will be made only with theapproval <strong>of</strong> the Super<strong>in</strong>tend<strong>in</strong>g Eng<strong>in</strong>eer given <strong>in</strong> writ<strong>in</strong>g. Any alterations <strong>of</strong> itemsaffected by change <strong>of</strong> such quarries will be governed by the clauses 4.3.13.1, 4.3.13.2& 4.3.13.3 <strong>of</strong> the Agreement <strong>in</strong> <strong>for</strong>m B.2.26. If <strong>in</strong> a quarry, material <strong>of</strong> more than one quality is found the material <strong>of</strong> the bestquality as approved by the Executive Eng<strong>in</strong>eer shall be used by the contractor.2.27. Deleted.2.28. The contractor shall execute the work as per detailed specifications part …………….<strong>in</strong>corporated <strong>in</strong> the tender document and <strong>in</strong> accordance with the approved draw<strong>in</strong>gand special conditions <strong>in</strong>corporated <strong>in</strong> the tender documents.Schedule <strong>of</strong> Ma<strong>in</strong> Items <strong>of</strong> Works to be executed2.29 A schedule <strong>of</strong> ma<strong>in</strong> items <strong>of</strong> work to be executed is enclosed vide Annexure I.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!