12.07.2015 Views

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chap. II ]169[ Appendix <strong>2.10</strong> Anot be deemed as an acceptance <strong>of</strong> any work not completed <strong>in</strong> accordance with thecontract.3.9. Damage to works.- The works whether fully completed or <strong>in</strong>complete, all thematerials, mach<strong>in</strong>ery, plants, tools, temporary build<strong>in</strong>g and other th<strong>in</strong>gs connectedthere with shall rema<strong>in</strong> at the risk and <strong>in</strong> the sole charge <strong>of</strong> the contractor until thecompleted work has been delivered to the Eng<strong>in</strong>eer-<strong>in</strong>-Charge and till completioncertificate has been obta<strong>in</strong>ed <strong>for</strong>m the Eng<strong>in</strong>eer-<strong>in</strong>-Charge . Until such delivery <strong>of</strong> thecompleted work the contractor shall at his own cost take all precautions reasonably tokeep all the a<strong>for</strong>esaid works, materials, mach<strong>in</strong>ery, plants, temporary build<strong>in</strong>gs andother th<strong>in</strong>gs connected there with free from any loss damages and <strong>in</strong> the event <strong>of</strong> thesame or any part there<strong>of</strong> be<strong>in</strong>g lost or damaged, he shall <strong>for</strong>thwith re<strong>in</strong>state and makegood such loss or damage at his own cost.3.10. Departmental Supply <strong>of</strong> Material.- Departmental supply <strong>of</strong> materials will beord<strong>in</strong>arily conf<strong>in</strong>ed only to those, specifically mentioned <strong>in</strong> the tender notice attachedand the cost <strong>of</strong> such material issued will be recovered <strong>for</strong>m the contractor’s bill at therates specified <strong>in</strong> said schedule.The materials will be issued <strong>for</strong>m the departmental stores and the contractorwill have to make his arrangements <strong>for</strong> the transport <strong>of</strong> the materials from the sitestores or wagons to the works at his own cost. Materials to be supplied by thedepartment will be supplied <strong>in</strong> standard lengths and quantities or as available, unlessspecifically mentioned otherwise and cost recovered <strong>for</strong>m the contractor <strong>for</strong> thequantities issued.The contractor shall further at all times satisfy the Eng<strong>in</strong>eer-<strong>in</strong>-Charge ondemand, if any, by the production <strong>of</strong> records or books or submission <strong>of</strong> return and<strong>for</strong>mats as directed that the materials supplied are be<strong>in</strong>g used <strong>for</strong> the purpose <strong>for</strong>which they are supplied and the contractor shall at all times keep the records up todate to enable the Eng<strong>in</strong>eer-<strong>in</strong>-Charge to apply such checks he may desire to impose.The contractor shall not without the written permission <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-Chargeutilise or dispose <strong>of</strong> the materials <strong>for</strong> any purpose other than that <strong>in</strong>tended <strong>in</strong> thecontract.Cement will be supplied to the contractor at the rates specified <strong>in</strong> the tendernotice at the departmental stores. The contractor shall make his own arrangements <strong>for</strong>the storage <strong>of</strong> cement at the work site. Handl<strong>in</strong>g and storage facilities shall be soarranged that no cement will be kept <strong>in</strong> storage <strong>for</strong> more than 120 days. If any cementis kept as long as 120 days it will be tested be<strong>for</strong>e use and if found defective <strong>in</strong> anyway it shall be condemned <strong>for</strong>m use. Steel as required <strong>in</strong> the construction, shall besupplied by the department and shall be transported to the site at contractor’s owncost. The contractor shall make his own arrangements <strong>for</strong> keep<strong>in</strong>g steel at the site. Thecost <strong>of</strong> the materials supplied to the contractor shall be treated as an advance paymentto the contractor and shall be recoverable <strong>for</strong>m him.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!