12.07.2015 Views

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chap. II ]158[ Appendix <strong>2.10</strong> Aor Draft or any other mode shall be deducted at the source from his runn<strong>in</strong>g, f<strong>in</strong>al orany type <strong>of</strong> payment <strong>for</strong> this contract as per section 194 <strong>of</strong> Income – tax Act, 1961.2.17.4. It is open to the contractor or the Sub-Contractor as the case may be to make anapplication to the Income Tax Officer concerned and obta<strong>in</strong> from him a Certificateauthoriz<strong>in</strong>g the payer to deduct tax at such lower rate or deduct no tax as may beappropriate to his case. Such certificate will be valid <strong>for</strong> the period specified there<strong>in</strong>unless it is cancelled by the Income Tax Officer earlier.Model Rules <strong>for</strong> Water Supply, Sanitation <strong>in</strong> Labour Camps2.18. The contractor will be bound to follow the Madhya Pradesh Model Rules relat<strong>in</strong>g tolay out <strong>of</strong> water supply and sanitation <strong>in</strong> labour camps ( vide Annexure A).Fair Wages to Labourers2.19 The contractor shall pay not less than fair wages to labourers engaged by him on thework ( copy <strong>of</strong> rules enclosed vide Annexure B.)Right to Take up Work Departmentally or to Award on Contract2.20. The Eng<strong>in</strong>eer-<strong>in</strong>-charge reserves the right to take up departmental work or to awardworks on contract <strong>in</strong> the vic<strong>in</strong>ity without prejudice to the terms <strong>of</strong> contract.Issue <strong>of</strong> Materials by the Department2.21.1. The follow<strong>in</strong>g materials will be supplied by the Department.S.No. Name <strong>of</strong> Articles Unit Rate Place <strong>of</strong> Delivery1.2.3.2.21.2. Deleted2.21.3. Deleted2.21.4. Deleted.Departmental Supply <strong>of</strong> Iron and Steel2.22.1. Iron and Steel will be supplied by the department and their cost debited to the work.Only labourer rate as tendered by the contractor <strong>for</strong> cutt<strong>in</strong>g and b<strong>in</strong>d<strong>in</strong>g, and fix<strong>in</strong>g <strong>in</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!