Chap. II ]167[ Appendix <strong>2.10</strong> Adraw<strong>in</strong>gs as may be necessary or desired as the work proceeds. Such additionalgeneral and detailed draw<strong>in</strong>gs will show dimensions and details necessary <strong>for</strong>construction purposes more completely than are shown on the attached draw<strong>in</strong>gs, <strong>for</strong>all features <strong>of</strong> the work. The contractor shall be required to per<strong>for</strong>m the work on thesefeatures and <strong>in</strong> accordance with additional general and detailed draw<strong>in</strong>gs mentionedabove at the applicable unit prices tendered <strong>in</strong> the schedule <strong>for</strong> work or work <strong>of</strong>similar nature as determ<strong>in</strong>ed by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge. The contractor shall check alldraw<strong>in</strong>gs carefully and advise the Eng<strong>in</strong>eer-<strong>in</strong>-Charge <strong>of</strong> any errors or omissionsdiscovered. The contractor shall not take advantage <strong>of</strong> errors or omissions as full<strong>in</strong>structions will be furnished to the contractor, should any errors or omissions bediscovered.The draw<strong>in</strong>gs and specifications are to be considered as complementary toeach other and should any th<strong>in</strong>g appear <strong>in</strong> one that is not described <strong>in</strong> the other noadvantage shall be taken <strong>of</strong> such omission. In case <strong>of</strong> disagreement betweenspecifications and draw<strong>in</strong>gs the conditions <strong>of</strong> the specifications shall govern thecontract. Should any discrepancies, however appear or should any misunderstand<strong>in</strong>garise as to the mean<strong>in</strong>g and <strong>in</strong>terpretations <strong>of</strong> the said specifications or draw<strong>in</strong>gs or asto the dimension or the quality <strong>of</strong> the materials <strong>for</strong> the proper execution <strong>of</strong> the work oras to the measurements or quality and valuation <strong>of</strong> work executed under this contractor extra thereupon, the same shall be expla<strong>in</strong>ed by the Eng<strong>in</strong>eer-<strong>in</strong>-Charge.Figures <strong>in</strong> dimensioned draw<strong>in</strong>gs shall supersede measurements by scale anddraw<strong>in</strong>gs to a large scale shall take precedence over those on a small scale. Specialdirections <strong>in</strong>corporated on the draw<strong>in</strong>gs shall be complied with strictly.Once copy <strong>of</strong> the draw<strong>in</strong>gs and contract documents shall be kept at all times atthe site <strong>of</strong> the works by the contractor.3.3. Data to be furnished by the contractor.- The contractor shall submit the follow<strong>in</strong>g<strong>in</strong><strong>for</strong>mation to the Eng<strong>in</strong>eer-<strong>in</strong>-Charge;(a) Proposed construction programme and time schedule show<strong>in</strong>g sequence <strong>of</strong>operations with<strong>in</strong> two weeks <strong>of</strong> receipts <strong>of</strong> notice to proceed with the work <strong>in</strong>pursuance <strong>of</strong> the conditions <strong>of</strong> contract. Along with the above he will also submitprogramme <strong>of</strong> br<strong>in</strong>g<strong>in</strong>g requisite tools and plant, mach<strong>in</strong>ery to be engaged by himto the site <strong>of</strong> work.(b) Approximate monthly requirement <strong>of</strong> cement and M.S. re<strong>in</strong><strong>for</strong>cement bars <strong>for</strong> theentire construction period with<strong>in</strong> 4 weeks <strong>of</strong> date <strong>of</strong> the receipt <strong>of</strong> notice toproceed with the work <strong>in</strong> pursuance <strong>of</strong> condition <strong>of</strong> contract.3.4. Programme <strong>for</strong> construction:- The department will <strong>in</strong>itially prepare a constructionprogramme <strong>in</strong>lcud<strong>in</strong>g requirements <strong>of</strong> materials and <strong>in</strong>clude it is as a part <strong>of</strong> the tenderdocuments. After receipt <strong>of</strong> the work order, the contractor if desires to submit hisrevised construction programme shall do so with<strong>in</strong> a period <strong>of</strong> 30 days from the date<strong>of</strong> the issue <strong>of</strong> work order and will got it approved <strong>for</strong>m the department. In case he

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!