12.07.2015 Views

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

APPENDIX 2.10-A Format of Tender Notice for ... - Cg.nic.in

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chap. II ]170[ Appendix <strong>2.10</strong> AThe contractor will be responsible <strong>for</strong> the safe custody <strong>of</strong> all departmentalmaterials issued to the satisfaction <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-charges and will be required torender proper account to the allocation and disposal <strong>of</strong> these materials show<strong>in</strong>g wherethey were issued on works. The contractor shall return <strong>in</strong> sound condition all suchmaterials which are not used on the works. In case he is unable to account <strong>for</strong> fullamount <strong>of</strong> the materials issued to him recoveries will be affected <strong>for</strong>m him at “IssueRates” or “Market Value” which ever is higher plus 16 per cent to cover thedepartmental supervision charges.The department will not be responsible <strong>for</strong> any delays <strong>in</strong> supply <strong>of</strong> controlledmaterials such as steel sections, M.S. Re<strong>in</strong><strong>for</strong>cement bars and cement. While it willendeavour to see that no delay occurs <strong>in</strong> this account the delay due to late supply willhowever be given due consideration <strong>in</strong> grant<strong>in</strong>g extension <strong>of</strong> time <strong>for</strong> the completion<strong>of</strong> the work if found necessary. No compensation <strong>of</strong> claim <strong>for</strong> damages on idle timewill be enterta<strong>in</strong> able on this score.If the contractor requests the Eng<strong>in</strong>eer-<strong>in</strong>-charge <strong>for</strong> issue <strong>of</strong> such materials asis available <strong>in</strong> the stores <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-Charge the materials may be supplied tothe contractor from the stores <strong>for</strong> execution <strong>of</strong> this work. If the Eng<strong>in</strong>eer-<strong>in</strong>-Chargeconsiders it expedient, the contractor shall pay <strong>for</strong> such material and store issued tohim at the rates fixed by Eng<strong>in</strong>eer-<strong>in</strong>-Charge. Other materials which may be available<strong>in</strong> the stores may be issued on loan if the Eng<strong>in</strong>eer-<strong>in</strong>-Charge considers it necessary <strong>in</strong>the <strong>in</strong>terest <strong>of</strong> work, but <strong>for</strong> such material hire charges should be recovered monthlyas per rules and the contractor shall be responsible to return the material <strong>in</strong> orig<strong>in</strong>alcondition <strong>in</strong> which they were issued.All the materials required <strong>for</strong> the work, other than those that are specificallymentioned <strong>in</strong> the said tender notice, shall be supplied by the contractor.Recommendations to authorities, where required, may be made by the department butthe responsibility <strong>for</strong> the supply <strong>of</strong> the materials shall be that <strong>of</strong> the contractor and noexcuse on this account <strong>for</strong> delay <strong>in</strong> the work shall be accepted.All unused materials, either supplied directly by the Department or obta<strong>in</strong>edby the recommendations <strong>of</strong> the department, which <strong>in</strong> the op<strong>in</strong>ion <strong>of</strong> the Eng<strong>in</strong>eer-<strong>in</strong>-Charge are likely to be useful to the department shall be returned <strong>in</strong> good condition atthe orig<strong>in</strong>al cost paid <strong>for</strong> if so decided by the department.3.11. * The quoted rates <strong>of</strong> the contractor shall be <strong>in</strong>clusive <strong>of</strong> the leads and lifts and <strong>in</strong> nocase separate payment <strong>for</strong> leads or lifts <strong>of</strong> any materials <strong>in</strong>clud<strong>in</strong>g water shall bepayable. Similarly no leads or lifts <strong>for</strong> the materials issued by the department asprescribed <strong>in</strong> the tender documents shall be payable. The contractor shall br<strong>in</strong>gapproved quality <strong>of</strong> materials. Different quarries are shown <strong>in</strong> Annexure C. Thedetails shown <strong>in</strong> the Annexure C are only as a guide to the contractor but thecontractor be<strong>for</strong>e tender<strong>in</strong>g should satisfy himself regard<strong>in</strong>g the quality and quantityavailable and all other details <strong>of</strong> Annexure C and provide <strong>for</strong> any variation <strong>in</strong> respect<strong>of</strong> leads, lifts, place and methods <strong>of</strong> quarry<strong>in</strong>g, type <strong>of</strong> rocks to be quarried and all

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!