10.07.2015 Views

HYDROLOGICAL MODEL – HEC - HMS (Hydrologic ... - Uwi.edu

HYDROLOGICAL MODEL – HEC - HMS (Hydrologic ... - Uwi.edu

HYDROLOGICAL MODEL – HEC - HMS (Hydrologic ... - Uwi.edu

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Flow (cms)60504029 TH SEPT ,7:35AM,52CUMECSJunction "J416" Results for Run "NICOLE"30 TH SEPT ,2:10AM,42CUMECS3020100-1000:00 12:00 00:00 12:00 00:00 12:0028Sep2010 29Sep2010 30Sep2010Run:NICOLE Element:J416 Result:OutflowRun:NICOLE Element:R1920 Result:OutflowRun:NICOLE Element:W1430 Result:OutflowSimulated discharge at the junctionnode near the mouth of the river atharbour view.Simulated vs observed hydrograph forthe hope discharge station at grovewhich is marked as outlet 62 in the hechms model. This is the outlet of flowfrom the sub-basins of the upper partof the watershed.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!