- Page 1 and 2: ENCINAWASTEWATERAUTHORITYFY 2014ENC
- Page 4 and 5: This page intentionally left blank
- Page 6 and 7: Encina Water Pollution Control Faci
- Page 8 and 9: Encina Water Pollution Control Faci
- Page 10 and 11: Encina Water Pollution Control Faci
- Page 12 and 13: Encina Water Pollution Control Faci
- Page 14 and 15: Encina Water Pollution Control Faci
- Page 16 and 17: This page intentionally left blank.
- Page 18 and 19: The complete list of capital improv
- Page 20 and 21: Table 1‐2: E‐CAMP Condition Ass
- Page 22 and 23: ProjectRank (2) Project No. Project
- Page 24 and 25: Implementation Year 201812 P‐1.3.
- Page 28 and 29: The following is a summary of the g
- Page 30 and 31: CA - 8.1.003FY 2014 Assessments Tri
- Page 32 and 33: P‐3062‐000 Final Effluent Pump
- Page 34 and 35: This page intentionally left blank.
- Page 36 and 37: S - 1.2.006PSB Struct and Mech Reha
- Page 38 and 39: K. PSBs 1‐6 PE Channel Urethane c
- Page 40 and 41: EWA currently has two dewatering pu
- Page 42 and 43: S ‐ 5.1.005Primary Odor Control E
- Page 44 and 45: ES ‐ 8.3.001E‐CAMP UpdateEach y
- Page 46 and 47: DescriptionBar Screen and Grit Proc
- Page 48 and 49: P‐1.1.006GRS Isolation Improvemen
- Page 50 and 51: P‐1.1.008GRS RehabBackgroundGrit
- Page 52 and 53: P‐1.1.010Influent Pipeline Rehab
- Page 54 and 55: P ‐ 1.2.003PE Second PipelineBack
- Page 56 and 57: P‐1.2.006PSB Struct and Mech Reha
- Page 58 and 59: P‐1.2.009PE Pipeline RehabBackgro
- Page 60 and 61: 5.1.3 Secondary TreatmentP‐1.3.00
- Page 62 and 63: P‐1.3.006Secondary Polymer System
- Page 64 and 65: P‐1.3.008SC 7 - Conversion from E
- Page 66 and 67: P‐1.3.012AB DO Probe ReplacementB
- Page 68 and 69: P‐1.3.014SCs 1 ‐ 4 Inf and Eff
- Page 70 and 71: 5.1.4 EffluentP‐1.4.001EPS RehabB
- Page 72 and 73: 5.2 Outfall5.2.1 OutfallP‐2.1.001
- Page 74 and 75: P‐2.1.004Sea Outfall Ballast Rest
- Page 76 and 77:
P‐3.1.002DAF System ReplacementBa
- Page 78 and 79:
P‐3.1.004DAFT Polymer System Repl
- Page 80 and 81:
P‐3.2.003Digesters Nos. 5 and 6 P
- Page 82 and 83:
P‐3.2.006Cell Lysis FacilitiesBac
- Page 84 and 85:
P‐3.2.009Digester No. 4 - Interio
- Page 86 and 87:
5.3.3 Biosolids Dewatering and Dryi
- Page 88 and 89:
Recommendations may include equipme
- Page 90 and 91:
P‐3.3.004Pellet Bagging Facilitie
- Page 92 and 93:
P‐3.3.008Dryer Major MaintBackgro
- Page 94 and 95:
P‐3.3.010Drying Building Coded Lo
- Page 96 and 97:
P‐3.3.016Cake Conveyance Equipmen
- Page 98 and 99:
5.4 Energy Management5.4.1 Energy M
- Page 100 and 101:
P‐4.1.004Natural Gas Dilution Equ
- Page 102 and 103:
Total Operating Hours Per Year:On
- Page 104 and 105:
Total Operating Hours Per Year:On
- Page 106 and 107:
Total Operating Hours Per Year:On
- Page 108 and 109:
P‐4.1.012Heat Loop Bypass Install
- Page 110 and 111:
P‐4.1.014VFDs on Misc EquipmentBa
- Page 112 and 113:
P‐4.1.018Lighting and Controls Im
- Page 114 and 115:
P‐5.1.002ORF I Carbon Replacement
- Page 116 and 117:
P‐5.1.005HW/GRT/PSB Odor Control
- Page 118 and 119:
5.7.2 Plant‐Wide SystemsP‐5.2.0
- Page 120 and 121:
P‐5.2.0043WLC Strainer Replacemen
- Page 122 and 123:
P‐5.2.0063WLC Intertie to 3WHP Sy
- Page 124 and 125:
P‐5.2.009Structure Settlement Sta
- Page 126 and 127:
P‐5.2.012Site Security Facilities
- Page 128 and 129:
P‐5.2.0162W System UpgradesBackgr
- Page 130 and 131:
P‐5.2.019 Plant BeautificationLan
- Page 132 and 133:
P‐5.2.027Plant‐Wide Seal Coatin
- Page 134 and 135:
P‐5.3.003Construction Office Upgr
- Page 136 and 137:
5.7.4 MiscellaneousP‐5.4.004Valle
- Page 138 and 139:
This page intentionally left blankE
- Page 140 and 141:
RefProjectNo.ENCINA WASTEWATER AUTH
- Page 142 and 143:
RefProjectNo.ENCINA WASTEWATER AUTH
- Page 144 and 145:
RefProjectNo.ENCINA WASTEWATER AUTH
- Page 146 and 147:
ENCINA WASTEWATER AUTHORITYTABLE 6
- Page 148 and 149:
This page intentionally left blankE
- Page 150 and 151:
2014ConditionAssessmentsTable 7‐1
- Page 152 and 153:
Table 7‐2: FY 2015 EWA Capital Im
- Page 154 and 155:
2016ConditionAssessmentsTable 7‐3
- Page 156 and 157:
Table 7‐5: FY 2017 EWA Capital Im
- Page 158 and 159:
This page intentionally left blank
- Page 160 and 161:
9. Energy Mgmt ‐ Miscellaneous En
- Page 162 and 163:
FISCAL YEAR 2001 PROJECTSProjects s
- Page 164 and 165:
This page intentionally left blankE
- Page 166 and 167:
This page left intentionally blank
- Page 168 and 169:
RefProjectNo.ENCINA WASTEWATER AUTH
- Page 170 and 171:
RefProjectNo.ENCINA WASTEWATER AUTH
- Page 172 and 173:
RefProjectNo.ENCINA WASTEWATER AUTH
- Page 174 and 175:
RefProjectNo.ENCINA WASTEWATER AUTH
- Page 176 and 177:
ENCINA WASTEWATER AUTHORITYFY 2014
- Page 178 and 179:
This page left intentionally blank
- Page 180 and 181:
Typically the condition assessment
- Page 182 and 183:
C.3.2Asset Useful Life ExpectancyAs
- Page 184 and 185:
AssetUsefulLife(years)AssetUsefulLi
- Page 186 and 187:
C.4.5Task Element 5 - Priority Proj
- Page 188 and 189:
C.4.5.6 Energy EfficiencyThe energy
- Page 190 and 191:
This page left intentionally blank
- Page 192 and 193:
Table No.Appendix D - Table of Cont
- Page 194 and 195:
FY 2013 E‐CAMP Dec‐27 Draft Las
- Page 196 and 197:
Project 1.1.006GRS Isolation Improv
- Page 198 and 199:
Project 1.1.009Influent Flow Meteri
- Page 200 and 201:
Project 1.2.006PSB Struct and Mech
- Page 202 and 203:
Project 1.2.010PSB Scum PipelineMai
- Page 204 and 205:
Project 1.3.004AB MechRehab and RAS
- Page 206 and 207:
Project 1.3.010WAS Pipeline Replace
- Page 208 and 209:
Project 1.3.013SC Concrete Cracking
- Page 210 and 211:
Project 1.3.015AB Flow Eq Feed and
- Page 212 and 213:
Project 2.1.001Land Outfall Inspect
- Page 214 and 215:
Project 2.1.004Sea Outfall Ballast
- Page 216 and 217:
Project 3.1.002DAF System Replaceme
- Page 218 and 219:
Project 3.2.001Biofuel Receiving Fa
- Page 220 and 221:
Project 3.2.009Digester No. 4 Cover
- Page 222 and 223:
Project 3.3.002Pellet Storage Facil
- Page 224 and 225:
Project 3.3.005Cake Pump Improvemen
- Page 226 and 227:
Project 3.3.008Dryer Major Maintena
- Page 228 and 229:
Project 3.3.010Drying Building Code
- Page 230 and 231:
Project 3.3.014RTO Flush Drain Relo
- Page 232 and 233:
Project 3.3.020Dryer Drum Rehabilit
- Page 234 and 235:
Project 4.1.003Cogen Engine Catalys
- Page 236 and 237:
Project 4.1.005Cogeneration Engine
- Page 238 and 239:
Project 4.1.007Co‐gen Engine Full
- Page 240 and 241:
Project 4.1.013Cogen Building Floor
- Page 242 and 243:
Project 4.1.015Gas Conditioning Fac
- Page 244 and 245:
Project 5.1.002ORF I Carbon Replace
- Page 246 and 247:
Project 5.1.005PSB Odor Control Imp
- Page 248 and 249:
Project 5.2.001Natural Gas Pipeline
- Page 250 and 251:
Project 5.2.0043WLC Strainer Replac
- Page 252 and 253:
Project 5.2.0063WLC Intertie to 3WH
- Page 254 and 255:
Project 5.2.0111W System RehabMain
- Page 256 and 257:
Project 5.2.017Service Air and Inst
- Page 258 and 259:
Project 5.2.024Exterior Asset Corro
- Page 260 and 261:
Project 5.2.026Plant Waste Stream R
- Page 262 and 263:
Project 5.3.001Operations Building
- Page 264 and 265:
Project 5.3.004Operations Building
- Page 266 and 267:
Project 5.3.008Roof Access Safety F
- Page 268 and 269:
Project 5.4.001Treatment Plant Mode
- Page 270 and 271:
This page intentionally left blank
- Page 272 and 273:
Table E‐1: Encina Water Pollution
- Page 274 and 275:
Table E‐1: Encina Water Pollution
- Page 276 and 277:
Table E‐1: Encina Water Pollution
- Page 278:
Table E‐1: Encina Water Pollution