10.07.2015 Views

E-CAMP - Encina Wastewater Authority

E-CAMP - Encina Wastewater Authority

E-CAMP - Encina Wastewater Authority

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

P‐1.1.007Vactor Receiving StationBackgroundThere is a demand for vactor/septage receiving in theEWA service area. Currently the EWPCF receives limiteddeliveries from combination (vactor) trucks at a locationadjacent to the Influent Junction Structure (IJS) as shownin Figure P‐1.1.007. The current deposition area isdesigned to be replaced in the 2012 Major Plant RehabProject which will improve the operation. It is noted thatat one time, EWA considered receiving septage at theEWPCF. Receiving septage is no longer underconsideration.Figure P‐1.1.007Vactor Receiving LocationThis project proposes to implement a receiving station tofacilitate discharge of combination truck tanks into the EWPCF. Project considerations includelocation, odor control, separation of rocks from discharge, security, sampling, control of substancesflowing to IJS, rock/debris handling. Project could be constructed in conjunction with P‐3.2.001(Waste to Energy Facilities) to achieve economies of scale in conjunction with the grease receivingstation associated with the grease to gas project.E FY2014 E‐<strong>CAMP</strong> Report 2012‐12Dec.docx 33 December 26, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!