10.07.2015 Views

Infrastructure Brochure

Infrastructure Brochure

Infrastructure Brochure

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Delhi Mumbai Industrial Corridor (DMIC) &Eastern Dedicated Freight Corridor (EDFC)Delhi Mumbai Industrial Corridor (DMIC)n36,068 sq km (15%) of DMIC catchment area across 12 districts of UPnImmense opportunities for development of an Industrial corridor alongthe alignment of dedicated freight lineShortlisted ProjectsnDadri – Noida – Ghaziabad Investment RegionnMeerut – Muzaffarnagar Manufacturing Zone in Ph-IInMultimodal Logistic Hub at DadrinBoraki Integrated Transport HubnHigh tech Industrial TownshipnHigh speed connectivity between Investment Region and New DelhiEastern Dedicated Freight Corridor (EDFC)n1839 Km railway corridor between Ludhiana and Dankuni, Kolkatan55% or over 1049 km of EDFC falls in U.P.nExpected to facilitate uninterrupted transportation of goods to seaportsnGoUP envisages Industrial Estates & Logistic Hubs along EDFCBenefits to investors:nReduced congestion at terminals & junction stationsnHigher fuel efficiency due to seamless and unhindered movement &reduced emmission of GHGsnWith double stack containers, number of trains could be reduced tonearly half for same throughputnLine capacity on the existing corridors will be leading to more numberof and faster movement of passenger trains


Industrial infrastructure on offer to investorsIndustrial ParkProduct Location FacilitiesTextile Park Apparel Ghaziabad Training Centre, Fashion Design Centre, Tool RoomTextile & Hosiery Kanpur Centre, Quality Control Lab, CETP, etcAgro Park Agro & food processing Barabanki Multi Chamber and Controlled Atmospheric Cold& VaranasiStorages with Sorting, Grading and Cleaning facility andQuality Control LabsLeather Park Leather Banthar Unnao Training and Design Centre, Technological Support(near Kanpur)Service, Quality Control for Saddlery and ExportManagement has been set up by NLDP supportedInternational Institute for Saddlery and ExportManagementExport Promotion Greater Noida & Agra Provides the infrastructure facilities to the units toIndustrial Parksboost-up the export of various commodities and services(EPIP)Growth Centres Promote industrialisation Bijoli, Jhansi, Shajahanpur, Basic infrastructure facilities such as power, water,of backward areas Dibiyapur and Jaunpur telecommunications and bankingLeather Mega Leather Kanpur , Agra, Hardoi Concept report under finalisationClusterPlastic City Plastics Auraiya Land earmarked and concept plan under finalisationIT Park IT/ITeS Lucknow RFP floated for developer by Lucknow IndustrialDevelopment Authority (LIDA)Integrated Dairy Lucknow Concept report under finalisationDairy PlanMega Food Park Food Processing Jagdishpur Concept report under finalisationNational Investment Multi-sector Dadri-Noida-Ghaziabad, Proposal for Auraiya and Jhansi submitted to& Manufacturing Auraiya, Jhansi Govt of IndiaZone (NIMZ)


Uttar Pradesh State Highways Authority (UPSHA)U.P. State Highways Authority is constituted for the development, maintenance and management of state highways . It alsodevelops models for bringing in private & institutional (including international ) funding to the road sector and to raiseinstitutional resources for undertaking the maintenance & upgradation of these highways.Major State Highway upgradation projects in progress by UPSHAS.No. Name of Road SH No. Length Project Cost Concessionaire Expected Date(km) (INR crore) of Completion1. Delhi-Saharanpur- 57 206.09 1718.35 M/s SEW-PRASAD 16-09-2014Yamunotri RoadConsortium, Hyderabad2. Bareilly- Almora 37 54.00 354.07 M/s PNC Infratech 18-08-2015Road(up toLimited, Agrauttarakhand border)3. Varanasi- Shaktinagar 5A 115 1211.96 M/s Apco-Chetak-Patel 18-09-2015Road (up to HathinalaConsortium, Lucknowjunction)4. Meerut-Karnal road 82 87.16 583.23 M/s Abhijeet Roads 01-04-2015Ltd., NagpurTotal 462.25 3867.61Road projects by UPSHA currently in pipelineS.No. Name of Road SH No. Length Project Cost Stage(km) (INR crore)1. Shahjahanpur-Hardoi-Lucknow Road 25 162.4 1288.6 RFQ2. Basti-Mehndawal-Kaptanganj- 64 166.12 328.49 RFQ3. Akbarpur-Jaunpur-Mirzapur-Dudhi Road 5 207.47 1865 RFQ4. Gorakhpur-Maharajganj road 81 53.16 586.91 RFQ5. Balrampur-Gonda-Jarwal Road 1A 88 765 RFQ6. Aligarh-Mathura Road 80 38.96 424.39 RFQ7. Etah-Tundla Road 31 57.16 186.61 RFQ8. Etah-Sikohabad Road 85 51.42 358.21 RFQ9. Varanasi-Bhadohi-Gopiganj Road 87 60.12 362.70 RFQ10. Tarighat-Bara Road 99 39.2 188.93 RFQ11. Muzaffarnagar-Saharanpur via Deoband Road 59 52.7 773.8 RFQ12. Bahraich-Gonda- Faizabad Road (may be extended 30 190 2100 Feasibilityup to Ambedkarnagar)13. Bareilly-Badaun-Kasganj-Hathras Road (may be extended 33 232 2552 Feasibilityup to Rajasthan Border Via Mathura)14. Bharwari-Manjhanpur-Chitrakoot Road 94 &MDR-26B 78 858 Feasibility15. Sitapur-Lakhimpur Kheri road (may 21 45 495 Feasibilitybe extended upto Palia and Dudhwa)16. Pilibhit-Farukhabad-Bewar Road 29 214 2354 Feasibility17. Windhamganj-Kon-Kota-Chopan Road ODR 59.3 416 FeasibilityTotal 1795.01 15,903.64


Uttar Pradesh State Industrial DevelopmentCorporation (UPSIDC)UPSIDC is the premier industrial promotion and infrastructure development undertaking of the state government. Ithas so far developed over 150 industrial areas . More than 11300 units have been set up with an estimated investmentof over INR 20375 crore in UPSIDC estates.Major UPSIDC Industrial <strong>Infrastructure</strong> ProjectsProjectMoradabad Special Economic ZoneTronica City , GhaziabadEPIP at Greater Noida and AgraApparel Parks Tronica and RoomaGrowth CentresUpcoming UPSIDC ProjectsProjectDescriptionMandhna-Bhaunti Integrated l960 acre Integrated industrial township in Kanpur on NH 24TownshipLeather Park , AgraGreater Mathura Knowledge CityPlastic City , Dibiyapur(Auraiya)Trans Ganga Hi-tech City , KanpurDescriptionl467 acres of land, 160 km from New Delhil<strong>Infrastructure</strong> facilities in accordance with GoI SEZ normslIndustrial township over 1975 acres, 2.5 km from Delhi borderlPresently 750 medium size industries are operational in the areal200 acres at Gautam Buddh Nagar and 100 acre at AgralDeveloped to promote exportslHigh quality infrastructure facilities like concrete road, earth station etc.lLocated at Tronica city and Rooma , KanpurlTextile training centre set up by ATDC operational at both parksl385 acres at Jhansi , 300 acres at Jainpur and 330 acres at ShahjahnpurlSelf sustainable integrated townships for industrial developmentLeather Technology Park l232 acres of land at Banthar Unnao on NH 25lCETP in operation on PPPlInstitute for Saddlery and Footwear Training operational in the areal283 acre located 17 km from AgralDedicated STP proposed in the schemel453 acre located at Agra-Delhi National Highway near KosilEngineering & medical colleges , IT education centre plannedl100 acre at Auraiya districtlFirst Plastic City project of UP , to be developed in PPP modellMoU signed with GAIL for smooth supply of raw materiall200 MW power plant being built adjacent to the sitel1151 acre located on bank of river Ganga on other side of Kanpur citylIT, electronics and software industries will be priority sectorslAutomobile hub planned with modern Auto expo mart


Uttar Pradesh Expressways IndustrialDevelopment Authority (UPEIDA)UPEIDA has been set up by the state government under UP Industrial AreaDevelopment Act 1976.It is engaged in the development of Green Field ExpresswayProjects on PPP mode.Agra to Lucknow Access ControlledExpressway ProjectlUPEIDA has been nominated as the nodal agency for development of this projectlThe expressway will start from proposed Agra Ring Road and end at proposedLucknow Ring RoadlConcept report has been prepared and RFQ/RFP will be floated by middle of 2013lIt will reduce the distance between Lucknow and Agra to 270 km from the current335 kmlThe expressway is proposed to be linked through Link expressways from existingand potential commercial/agricultural hubs such as Firozabad, Shikohabad,Etawah, Kannauj & MalihabadSalient FeaturesTotal Length269.68 KmProject CostINR 13087 CroreDesign Speed120 kmphWidth110 metresCarriageway6 laneGrowth Centres 4


Greater Noida Industrial Development Authority (GNIDA)GNIDA is responsible for developing international-standard infrastructure in Greater Noida. Greater Noida is strategically located closeto four important industrial hubs: Noida ,Ghaziabad , Faridabad (35 kms away) and Meerut (75 kms). This region boasts of the singlelargest direct investment by transnational companies.<strong>Infrastructure</strong>lGreater Noida city is located at the intersection of the Western and Eastern Dedicated Freight Corridors. It is also the gateway totheDelhi-Mumbai Industrial Corridor (DMIC).lImportant expressways originate from this city, namely the Yamuna Expressway from Greater Noida to AgralAn eight-lane, 25 km-long expressway connects Greater Noida directly to DelhilGreater Noida is the only city in North India with privatized power distribution, which ensures efficient power supply.lEastern Peripheral Expressway, under development, will take off at Kundli and will join NH2 at Faridabad via Ghaziabad and GreaterNoida. The Howrah-Delhi main railway line passes through the area.Industry HublWith a large number of automobile and automobile component manufacturers located here, Greater Noida is increasingly beingreferred to as he Detroit of IndialIndustrial majors such as Asian Paints, Bharat Petroleum, Delphi Automotive Systems, Yamaha Motors, Honda Siel, LG Electronics,New Holland Tractors, Pepsi, Hindustan Times and Moser Baer India have all chosen Greater Noida as their preferred industrial anoperational base.Medical UniversitylA Medical University is proposed to be developed with state-of-the-art facilities near Gautam Budh University in a total area of 50acreslEstimated cost of construction of this multi-pecialityhospital is INR 939 crorelMedical University is proposed to offer facilities for courses in MBBS, BDS, MD and MDSHeliportlA heliport is proposed to be developed in Greater Noida which will provide a vertical gateway to New Delhi, Agra and JaipurNight SafarilCovering an area of about 222.36 hectare, Greater Noida's proposed Night Safari is the fourth such project of its kind in the world,after Thailand, China and Singapore.Boraki Railway StationlThe state-of-the-art Boraki railway station is to serve the Noida-Greater Noida-Sikandrabad-Bulandshahar hinterlandlIt is projected to cost INR 132.49 crore of which INR 26.12 crore is to be borne by Indian Railways on railway infrastructure, and thebalance INR 106.37 crore by the Greater Noida Industrial Development Authority, including land cost of INR 24.60 crore atprevailing rates


New Okhla Industrial Development Authority (NOIDA)Created by the UP Industrial Area Development Act 1976 on 17th April 1976, NOIDA has succeeded in creating a 21st centurylandmark in urban development . It is a planned, integrated industrial city well connected to Delhi. All this is supported by a reliablepower supply , abundant ground water with Gangajal,outstanding residential, educational and medical facilities and presence ofhighly skilled and semi-skilled manpower.Industry HublIndustrial giants such as BHEL , Panasonic, Samsung, BPL-Sanyo, Eveready, Honda, GAIL, IOC, NTPC, Pawan Hans, FDDI, IBP,KRIBHCO, HUDCO,FCI,ICMR, Mothersons,Minda, Flex and Phoenix have established a major base hereIT/ITeS DestinationlTheNasscom region is home to many prestigious companies such as IBM, TCS, Adobe International, HCL,, Birlasoft, Wipro, Polaris,Cadence, Convergys, ST Microelectronics, Moser Baer,Xansa etc.lBesides there are dozens of special economic zones and software technology parks spread over an area of more than 1000 acreslThe annual exports have exceeded INR 20000 crore and growing steadilyFilm ProductionlHost to a large number of studios and news channels including ZEE TV, Aajtak, Times Now, E-24, IBN 7 , CNN IBN, India TV , EagleFilms, Marwah Studios and T-seriesMedicinelDistrict hospital being developed and upgraded in Sector 39lAn integrated pediatric institute is coming up with 24 departments dedicated to different childhood diseaseslMultispeciality hospitals like Fortis, Max, Apollo, Kailash, Metro Heart Institute, Noida Medicare Centre also presentMetro RaillExcellent connectivity with DelhilNew metro line from botanical garden will provide excellent connectivity with Indira Gandhi International Airportl6 km metro line will connect Greater Noida west with Delhi via NoidaProgress of PPP projects under Housingand Urban Planning DepartmentProject NameDevelopment of InternationalStandard CricketDevelopment of NorthernPeripheral Road in GhaziabadDevelopment of InnerDescriptionlLucknow Development Authority is the nodal agency for implementing this projectlEstimated project cost is Rs 400 crorelM/s Innovest Advisory services has been selected as the new consultant for remodelling and bid processmanagementlTargeted completion date is June 2015lStadium cum Sports Complex in LucknowlGhaziabad Development Authority is the nodal agency to develop this projectlFeedback infrastructure and Services Pvt. Ltd. has been selected as consultant for this projectlThe expected project cost is INR 450 Crore and approximate length is 20 kmlTargeted completion date is June 2015lAgra Development Authority is the nodal agency for implementation of this projectRing Road in Agra lEstimated project cost is INR 1100 crore and length is approximately 24.5 km .lCasta Engineers has been appointed as the consultant for remodelling developer selectionlTargeted completion date is Dec 2015


Success StoriesAboutUdyog Bandhu'Udyog Bandhu' is an IS/ISO 9001:2008 certified agency of Government of Uttar Pradesh to facilitate industrial and infrastructure investment inthe State.It works as a bridge between the entrepreneurs and government by providing advisory services to entrepreneurs desirous of investing in UttarPradesh. 'Udyog Bandhu' is a proactive contributor in policy formulation for creating congenial business environment leading to industrialgrowth. It helps different industry related departments to simplify and deregulate their processes of clearance.To ensure effective and timely resolution of issues of entrepreneurs, 'Udyog Bandhu' organises Tripartite Meetings involving entrepreneurs andgovernment departments concerned. It works at three tiers of district, division and State to redress the grievances of industries.State level Udyog Bandhu is headed by Hon'ble Chief Minister and an Empowered Committee has been constituted under the Chairmanship ofChief Secretary to decide on policy matters and coordination of interdepartmental issues for facilitating the investment in the State.'Udyog Bandhu' has implemented 'Nivesh Mitra' - a web-based seamless interface to facilitate investment in Uttar Pradesh. 'Nivesh Mitra' is anonline single window clearance facility available 24x7 to investors willing to apply for setting up industry or enterprise in the State.Application through 'Nivesh Mitra' is mandatory for establishing all kinds of enterprises except for micro enterprises. Facility of online paymentof relevant fee is also available through this web portal. 'Nivesh Mitra' is currently providing services of 12 departments concerned withindustries, it works as a single point mechanism for timely issuance of approvals and clearances required for setting up enterprise anywhere inthe State.


Knowledge PartnerUdyog BandhuAn ISO 9001-2008Certified OrganisationContactsUdyog BandhuExecutive Director, Udyog Bandhu,12 C Mall Avenue, Lucknow-226001Government of Uttar PradeshPhone :91-522-2238283 Fax:91-522-2238255Email: invest.up@udyogbandhu.comWebsite: www.udyogbandhu.comChief Executive OfficerUP State Highway Authority4th Floor, Mandi BhawanVibhuti Khand, Gomti Nagar, Lucknow (U.P.) IndiaTel: 0522-4150377Fax: 0522-4150377E-mail: info@upsha.in

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!