10.07.2015 Views

LRC 101

LRC 101

LRC 101

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1a. Project Scope36• Tracking requirements include real time location ofmaterials as they are being transported by carriers,including truck to truck transfers• Solution may need to consider integration capabilitieswith hazardous waste haulers and receivers• Solution will need to track the Generator, Carrier andReceiver of the materials (all three parties must beregistered with the Ministry)• System will be used to assess fees based on type andquantity of materials being transported and disposed

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!