10.07.2015 Views

2011/2012 Annual Report - Open Campus - Uwi.edu

2011/2012 Annual Report - Open Campus - Uwi.edu

2011/2012 Annual Report - Open Campus - Uwi.edu

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

UWI OPEN CAMPUS ANNUAL REPORT <strong>2011</strong>/<strong>2012</strong>Overall, the many the many Site improvementshave benefited significantly the <strong>Open</strong> campusstaff and its stakeholders. Such improvementsinclude but are not limited to the following.• expanded and significantly improved teleconferencefacilities with videoconferencingcapability.• A fully functional and up-to-date it laballowing for classes in it subjects.• Space and technical facilities available forstudents and the public to utilize onlineresearch.• Major upgrade of technical facilities for staff.• increased staff to better manage students’needs, and• improved interaction with lecturers andstaff.Trinidad, St. Augustine SiteHeads and Site coordinators attempted todevelop the sites incrementally. Facilitiesimprovement at OccStt is illustrative of thetypes of projects undertaken at the OccS whichincluded:1. tiling of the examination Office at theSt Augustine site;2. repainting of the wall at St Augustine site;3. Painting of the offices at the St Augustinesite;4. Paving of the St Augustine car Park;5. Altering the paved walkway in front of theAlpha east in order to alleviate flooding;6. implementing a drop ceiling in theFacilities and registration departmentat the St. Augustine Site.16A C A M P U S F O R T H E T I M E S . . . A C A M P U S F O R T H E F U T U R E

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!