10.07.2015 Views

COCKPIT CHECKLISTS: CONCEPTS, DESIGN, AND USE - NASA

COCKPIT CHECKLISTS: CONCEPTS, DESIGN, AND USE - NASA

COCKPIT CHECKLISTS: CONCEPTS, DESIGN, AND USE - NASA

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

pressure, maintenance crews may forget to reset these systems. The ASRS reportsrevealed several incidents in which maintenance crews pulled a circuit breaker and forgotto push it back, left the engine fuel injection levers in the idle (on) position, orunintentionally disabled an automated warning system (ASRS, 1987, 1989).Checklist AmbiguityAmbiguous terms can be found even in such a verbally restricted procedure as thechecklist. Many checklists examined by the authors employ the ambiguous responses“set,” “checked,” “completed,” etc., to indicate that an item is accomplished. One ASRSreport details this ambiguity and also provides the solution:...I strongly feel that we need to back the response portion of our checklist with“what you see” responses [and] not just “checked and set,” etc. For example“Altimeters—30.10” and not “checked”; “airspeed—125.” It takes as much timeto say it like it is as to say “checked and set.” The problem is “checked” and “set”can be said too easily without any sound verification... (ASRS, 1987, Report No.76798)<strong>DESIGN</strong>ING A CHECKLISTThe following discussion will detail the considerations in designing a checklist. Whatfollows is based on the findings from the field study and examination of the applicablehuman factors literature. This discussion is confined to aviation; however, the transfer toother domains should not be difficult.Defining the Task-ChecklistChecklists of older technology airplanes such as the L-1011, DC-9 series, and DC-10usually have a long list of items on the BEFORE ENGINE START. Some aircraft haveas many as 76 items on this task-checklist. Many pilots have complained aboutinadvertently skipping items in long checklists. Swain and Guttman (1983), in their studyof nuclear power plant operations “recognized the fact that as the list of items grows,there may be a higher probability of overlooking any given item” (chap. 15, p. 13). Along checklist, therefore, can be sub-divided to smaller checklists. For example, theground phase can be divided into five task-checklists: PREFLIGHT, BEFORE START,AFTER START, TAXI, BEFORE TAKEOFF. The above does not necessarily imply thatevery task-checklist should be divided into smaller lists. However, having a single taskchecklistwith 76 items may be somewhat extreme.There are several principles that can be employed if the designer is constrained to use along list of items. Wickens (1987) states that “...where printed information is read, storedand used (as in instructions, procedures, etc.), the retention process can be aided by [1]determining the logical chunks that are grouped together in memory, and [2] physicallyseparating these chunks from others” (p. 82). The designer can apply these principles forchecklist design by:• Grouping the items corresponding to a system such as pressurization, hydraulic,electrical, etc., into chunks of checklist items.- 11 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!