11.07.2015 Views

Untitled - Boskalis

Untitled - Boskalis

Untitled - Boskalis

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Repair of the main breakwater and northern jetty ofTunesia.port of Bizerte. In total 13,200 m3 of concrete, 325 tonsthereinforcement steel and 18,000 tons of armor stones wereofused to restore and reinforce both structures. The works wereexecuted in a period of 28 months and partly financed by theDutch government.Dredging of the Lac du BŽ in LomŽTogo.CSD Donau. withFor the construction of a Gas-To-LiquidsNigeria.for Chevron, 3,000,000 m3 of sand wasfactoryin the middle of the bush in Nigeria. <strong>Boskalis</strong>reclaimedInternational also drained the site using vertical andhorizontal drains and pumps. Bank protection was builtalongside the Escravos River.Maintenance dredging of the access channelGuinea.the harbor basin of the port of Conakry byandJohanna Jacoba. 2,000,000 m3 of sandy silt wasTHSDProjectsdredged in a period of 3 months.We move the earth to a better place

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!