11.07.2015 Views

AFTERMARKET - OME

AFTERMARKET - OME

AFTERMARKET - OME

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

aveANEWPLANIn fact, Díaz points out, “Chicago’sBurnham Plan – their Miami 21 – was createda hundred years ago when Chicago had a populationof two million people. It shows youthat it can be done in an existing city with alarge population.”PUBLIC INPUT IS KEYGetting input from area neighborhoods maybe the key to Miami 21’s future success.“What we are trying to do,” says activistNina West, “is have an impact on what is goodfor an already-built city with stable neighborhoods,because nobody knows the neighborhoodsbetter than the people who live there.Most of this smart growth has been successfulwhere it has been imposed on a blank slate.”West would like to see much more inputfrom citizens, emphasizing that the final planwill have a long-lasting, dramatic impact onthe city’s future.“Not enough citizens understand this,” shesays.But Alejandro Miyar, a spokesman for the mayor, points out thatMiami 21 has received extensive coverage on Channel 77.“Meetings have been televised and thoroughly covered by thechannel,” Miyar said. “The most recent public meeting on July 15was shown in its entirety on 77. The channel is also currently airinga half-hour show exclusively on Miami 21.”He also notes the popularity of the Miami 21 website.“The website receives about 500 daily hits, with almost 400 questionssubmitted to date, 320-plus comments, and innumerous phonecalls, emails, and walk-ins handled by our outreach staff.”Meanwhile, discussions with various commissioners and city staffare still ongoing as Plater-Zyberk and her team finish up the plan’sdetails.“We’re a little bit frustrated that we haven’t been able to write itup and get it out there, but the extra time we have taken to listenand converse with groups and individuals has served the processwell,” she says. “And we look forward to producing it in the nextmonth or so.”There is no better time than now, Mayor Díaz emphasizes, forMiami 21 to replace an antiquated code with applications and provisionsthat date back 50 to 100 years.“Particularly since the alternative is not to do anything at all,” hesays. “We can create something spectacular that someone 100 yearsfrom now will be thankful for. This is a visionary long-term projectthat will create a beautiful city. In 40-to-50 years a lot of the buildingswe see today will be gone, and new buildings will have to bebuilt with the code we are now creating.“Yes, it will help the current Miami – but it is really for futuregenerations. We are paying the price for the mistakes and inactionof the people 50 years ago.” mExamples of New Urbanism from the RuskinSquare area of Seaside, Florida. As designed byDuany Palter-Zyberg, mixed-use buildings lookout on broad public walkways.PHOTOS BY DUANY PLATER - ZYBERK & COMPANY48 Miami Monthly / OCTOBER 2006


<strong>AFTERMARKET</strong>07<strong>AFTERMARKET</strong>SERVICEKKI has a dedicated, flexible, highlymotivated and well-qualified service team,based at our UK headquarters. We offera full range of service support, fromcommissioning new equipment, routinemaintenance and trim overhauls to fullvalve overhauls and testing.FULLY QUALIFIED ENGINEERSOur engineers are fully qualifiedfor UK and Norwegian sectoroffshore work, as well as otherinternational work, and will travelacross the world to customersites, as required. The team canbe mobilised the same day forUK services or within 24 hoursfor international work, subject toengineer availability and a securitycheck of the destination.We have dedicated vehicles forsite visits, fully equipped withemergency stocks and tooling. Aswell as servicing work, the teamconducts site surveys and offersadvice on routine maintenance andplant optimisation.Close xCOMPLETESERVICE SUPPORTFOR CUST<strong>OME</strong>RSWORLDWIDEWELL-EQUIPPED SERVICE FACILITIESThe dedicated service workshop at our UKfactory is capable of handling large shutdownswith fast turn-around times to suit customerrequirements.Our workshop facilities include:• Shot-blast and aqua cleaningequipment to overhaul components tonear-new condition.• Machine shop for shut-down work.• Welding and overlay equipment.• Full inspection facilities.• Dedicated service test bay with twotest rigs, capable of hydro testing to15,000psi.• Ten workstations for flexibility withinthe workshop.• Access to a 7.5-tonne crane.QUALITY-ASSURED SERVICE -EVERY TIMEThe overhaul procedures we employmirror those used for manufacturing newvalves, ensuring full compliance with PEDrequirements. All completed service workis issued with a final test certificate and acompleted quality plan, identifying any futurerecommendations.Roll over images toexpand


<strong>AFTERMARKET</strong> 09<strong>AFTERMARKET</strong> SALESAND UPGRADESREPLACEMENT VALVE SALESDELIVER OPTIMUM SOLUTIONSAftermarket valve sales provide a fast-track servicefor all replacement KKI valves, as well as advice onupgrades and trim retrofits for valves manufactured byother valve companies.If you need to replace KKI valves after a long service life,we will review your requirements and re-size and re-specifya valve solution to meet your current service conditions.For non-KKI equipment, we can advise you on suitableupgrades to fulfil your service requirements. All aftermarketsales enquiries are reviewed by KKI engineers who haveyears of experience in providing valve solutions for themost demanding and problematic processes.DETAILED REVIEW AND RECOMMENDATIONSOur review of your requirements covers all issuesassociated with premature valve failure or poorperformance, including cavitation, flashing, noise, velocity,pressure drop, erosion and corrosion. Following thisreview we will offer recommendations and advise you onthe optimum solution for your application, based on yourcurrent service conditions.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!